Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information, 40689-40694 [2020-12624]
Download as PDF
Federal Register / Vol. 85, No. 130 / Tuesday, July 7, 2020 / Notices
Monday, August 17, 2020, 10:00
a.m. to 6:00 p.m.; and Tuesday, August
18, 2020, 10:00 a.m. to 6:00 p.m.;
Eastern Time.
ADDRESSES: Virtual meeting via dial-in
teleconference and WebEx only.
FOR FURTHER INFORMATION CONTACT: Ms.
Karshelia Henderson, Science Mission
Directorate, NASA Headquarters,
Washington, DC 20546, (202) 358–2355,
fax (202) 358–2779, or khenderson@
nasa.gov.
DATES:
As noted
above, this meeting will be available
telephonically and by WebEx only. You
must use a touch-tone phone to
participate in this meeting. Any
interested person may call the USA toll
free conference call number 1–800–779–
9966 or toll number 1–517–645–6359,
passcode 5255996, on both days, to
participate in this meeting by telephone.
The WebEx link is https://
nasaenterprise.webex.com/; the meeting
number is 901 917 366 and the
password is PAC@Aug17+18 (case
sensitive) on both days. The agenda for
the meeting includes the following
topics:
—Planetary Science Division Update
—Planetary Science Division Research
and Analysis Program Update
It is imperative that the meeting be
held on these dates to accommodate the
scheduling priorities of the key
participants.
SUPPLEMENTARY INFORMATION:
Patricia Rausch,
Advisory Committee Management Officer,
National Aeronautics and Space
Administration.
[FR Doc. 2020–14465 Filed 7–6–20; 8:45 am]
BILLING CODE 7510–13–P
NATIONAL SECURITY COMMISSION
ON ARTIFICIAL INTELLIGENCE
[Docket No.: 07–2020–01]
National Security Commission on
Artificial Intelligence; Notice of Federal
Advisory Committee Meeting
National Security Commission
on Artificial Intelligence.
ACTION: Notice of Federal Advisory
Committee virtual public meeting.
AGENCY:
The National Security
Commission on Artificial Intelligence
(the ‘‘Commission’’) is publishing this
notice to announce that the following
Federal Advisory Committee virtual
public meeting will take place.
DATES: Monday, July 20, 2020, 1:30 p.m.
to 4:00 p.m. Eastern Standard Time
(EST).
jbell on DSKJLSW7X2PROD with NOTICES
SUMMARY:
VerDate Sep<11>2014
16:59 Jul 06, 2020
Jkt 250001
Ms.
Angela Ponmakha, 703–614–6379
(Voice), nscai-dfo@nscai.gov. Mailing
address: Designated Federal Officer,
National Security Commission on
Artificial Intelligence, 2530 Crystal
Drive, Box 45, Arlington, VA 22202.
website: https://www.nscai.gov. The
most up-to-date information about the
meeting and the Commission can be
found on the website.
SUPPLEMENTARY INFORMATION: This
meeting is being held under the
provisions of the Federal Advisory
Committee Act (FACA) (5 U.S.C.,
Appendix), the Government in the
Sunshine Act (5 U.S.C. 552b), and 41
CFR 102–3.140 and 102–3.150.
Purpose of the Meeting: The John S.
McCain National Defense Authorization
Act for Fiscal Year 2019 (FY19 NDAA),
Sec. 1051, Public Law 115–232, 132
Stat. 1636, 1962–65 (2018), created the
Commission to ‘‘consider the methods
and means necessary to advance the
development of artificial intelligence,
machine learning, and associated
technologies by the United States to
comprehensively address the national
security and defense needs of the
United States.’’ The Commission will
consider potential recommendations to
Congress and the Executive Branch.
Agenda: The meeting will begin on
July 20, 2020 at 1:30 p.m. EST with
opening remarks by the Designated
Federal Officer, Ms. Angela Ponmakha;
the Executive Director, Mr. Yll
Bajraktari; and the Commission Chair,
Dr. Eric Schmidt. Chairs of the working
groups studying each of the
Commission’s lines of effort (LOEs) will
present the recommendations from their
respective LOEs for consideration by the
entire Commission. The Commission’s
LOEs: LOE 1—Invest in AI Research &
Development and Software; LOE 2—
Apply AI to National Security Missions;
LOE 3—Train and Recruit AI Talent;
LOE 4—Protect and Build Upon U.S.
Technological Advantages & Hardware;
LOE 5—Marshal Global AI Cooperation;
and LOE 6—Ethics and Responsible AI.
The Commission will deliberate on
the presented recommendations and
vote on their inclusion in the
Commission’s second quarterly
memorandum to Congress and the
Administration. The meeting will
adjourn at 4:00 p.m. EST.
Meeting Accessibility: Pursuant to
Federal statutes and regulations (the
FACA, the Sunshine Act, and 41 CFR
102–3.140 through 102–3.165) and the
availability of space, the virtual meeting
is open to the public from 1:30 p.m. to
4:00 p.m. EST. Members of the public
wishing to receive a link to the live
FOR FURTHER INFORMATION CONTACT:
PO 00000
Frm 00070
Fmt 4703
Sfmt 4703
40689
stream webcast for viewing and audio
access to the virtual meeting should
register on the Commission’s website,
https://www.nscai.gov. Registration will
be available from July 8, 2020 through
July 15, 2020. Members of the media
should RSVP to the Commission’s press
office at press@nscai.gov.
Special Accommodations: Individuals
requiring special accommodations to
access the public meeting should
contact the DFO, see the FOR FURTHER
INFORMATION CONTACT section for contact
information, no later than July 15, 2020,
so that appropriate arrangements can be
made.
Access to Records of the Meeting:
Pursuant to FACA requirements, the
public may inspect the meeting
materials for the July 20, 2020 virtual
meeting on the Commission’s website at
https://www.nscai.gov three business
days prior to July 20, 2020.
Written Statements: Written
comments may be submitted to the DFO
via email to: nscai-dfo@nscai.gov in
either Adobe Acrobat or Microsoft Word
format. The DFO will compile all
written submissions and provide them
to the Commissioners for consideration.
Please note that all submitted comments
will be treated as public documents and
will be made available for public
inspection, including, but not limited
to, being posted on the Commission’s
website.
Dated: July 1, 2020.
Michael Gable,
Chief of Staff.
[FR Doc. 2020–14587 Filed 7–6–20; 8:45 am]
BILLING CODE 3610–Y8–P
NUCLEAR REGULATORY
COMMISSION
[NRC–2020–0135]
Applications and Amendments to
Facility Operating Licenses and
Combined Licenses Involving
Proposed No Significant Hazards
Considerations and Containing
Sensitive Unclassified Non-Safeguards
Information and Order Imposing
Procedures for Access to Sensitive
Unclassified Non-Safeguards
Information
Nuclear Regulatory
Commission.
ACTION: License amendment request;
notice of opportunity to comment,
request a hearing, and petition for leave
to intervene; order imposing
procedures.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) received and is
SUMMARY:
E:\FR\FM\07JYN1.SGM
07JYN1
40690
Federal Register / Vol. 85, No. 130 / Tuesday, July 7, 2020 / Notices
considering approval of one amendment
request. The amendment request is for
Salem Nuclear Generating Station, Unit
Nos. 1 and 2. For the amendment
request, the NRC proposes to determine
that it involves no significant hazards
consideration. Because the amendment
request contains sensitive unclassified
non-safeguards information (SUNSI), an
order imposes procedures to obtain
access to SUNSI for contention
preparation.
Comments must be filed by
August 6, 2020. A request for a hearing
or petitions for leave to intervene must
be filed by September 8, 2020. Any
potential party as defined in § 2.4 of title
10 of the Code of Federal Regulations
(10 CFR), who believes access to SUNSI
is necessary to respond to this notice
must request document access by July
17, 2020.
ADDRESSES: You may submit comments
by any of the following methods:
• Federal Rulemaking Website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2020–0135. Address
questions about NRC Docket IDs in
Regulations.gov to Jennifer Borges;
telephone: 301–287–9127; email:
Jennifer.Borges@nrc.gov. For technical
questions, contact the individual listed
in the FOR FURTHER INFORMATION
CONTACT section of this document.
• Mail Comments to: Office of
Administration, Mail Stop: TWFN–7–
A60M, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001, ATTN: Program Management,
Announcements and Editing Staff.
For additional direction on obtaining
information and submitting comments,
see ‘‘Obtaining Information and
Submitting Comments’’ in the
SUPPLEMENTARY INFORMATION section of
this document.
FOR FURTHER INFORMATION CONTACT:
Shirley Rohrer, Office of Nuclear
Reactor Regulation, telephone: 301–
415–5411, email: Shirley.Rohrer@
nrc.gov, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001.
DATES:
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and
Submitting Comments
jbell on DSKJLSW7X2PROD with NOTICES
A. Obtaining Information
Please refer to Docket ID NRC–2020–
0135, facility name, unit number(s),
docket number(s), application date, and
subject when contacting the NRC about
the availability of information for this
action. You may obtain publiclyavailable information related to this
action by any of the following methods:
VerDate Sep<11>2014
17:55 Jul 06, 2020
Jkt 250001
• Federal Rulemaking Website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2020–0135.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publiclyavailable documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘Begin Web-based ADAMS Search.’’ For
problems with ADAMS, please contact
the NRC’s Public Document Room (PDR)
reference staff at 1–800–397–4209, 301–
415–4737, or by email to pdr.resource@
nrc.gov. The ADAMS accession number
for each document referenced (if it is
available in ADAMS) is provided the
first time that it is mentioned in this
document.
B. Submitting Comments
Please include Docket ID NRC–2020–
0135, facility name, unit number(s),
docket number(s), application date, and
subject in your comment submission.
The NRC cautions you not to include
identifying or contact information that
you do not want to be publicly
disclosed in your comment submission.
The NRC will post all comment
submissions at https://
www.regulations.gov as well as enter the
comment submissions into ADAMS.
The NRC does not routinely edit
comment submissions to remove
identifying or contact information.
If you are requesting or aggregating
comments from other persons for
submission to the NRC, then you should
inform those persons not to include
identifying or contact information that
they do not want to be publicly
disclosed in their comment submission.
Your request should state that the NRC
does not routinely edit comment
submissions to remove such information
before making the comment
submissions available to the public or
entering the comment into ADAMS.
II. Background
Pursuant to Section 189a.(2) of the
Atomic Energy Act of 1954, as amended
(the Act), the NRC is publishing this
notice. The Act requires the
Commission to publish notice of any
amendments issued, or proposed to be
issued and grants the Commission the
authority to issue and make
immediately effective any amendment
to an operating license or combined
license, as applicable, upon a
determination by the Commission that
such amendment involves no significant
hazards consideration, notwithstanding
the pendency before the Commission of
a request for a hearing from any person.
PO 00000
Frm 00071
Fmt 4703
Sfmt 4703
This notice includes a notice of
amendment containing SUNSI.
III. Notice of Consideration of Issuance
of Amendments to Facility Operating
Licenses and Combined Licenses,
Proposed No Significant Hazards
Consideration Determination, and
Opportunity for a Hearing
The Commission has made a
proposed determination that the
following amendment request involves
no significant hazards consideration.
Under the Commission’s regulations in
10 CFR 50.92, this means that operation
of the facility in accordance with the
proposed amendment would not (1)
involve a significant increase in the
probability or consequences of an
accident previously evaluated, or (2)
create the possibility of a new or
different kind of accident from any
accident previously evaluated, or (3)
involve a significant reduction in a
margin of safety. The basis for this
proposed determination for the
amendment request is shown below.
The Commission is seeking public
comments on this proposed
determination. Any comments received
within 30 days after the date of
publication of this notice will be
considered in making any final
determination.
Normally, the Commission will not
issue the amendment until the
expiration of 60 days after the date of
publication of this notice. The
Commission may issue the license
amendment before expiration of the 60day period provided that its final
determination is that the amendment
involves no significant hazards
consideration. In addition, the
Commission may issue the amendment
prior to the expiration of the 30-day
comment period if circumstances
change during the 30-day comment
period such that failure to act in a
timely way would result, for example,
in derating or shutdown of the facility.
If the Commission takes action prior to
the expiration of either the comment
period or the notice period, it will
publish a notice of issuance in the
Federal Register. If the Commission
makes a final no significant hazards
consideration determination, any
hearing will take place after issuance.
The Commission expects that the need
to take this action will occur very
infrequently.
A. Opportunity To Request a Hearing
and Petition for Leave To Intervene
Within 60 days after the date of
publication of this notice, any persons
(petitioner) whose interest may be
affected by this action may file a request
E:\FR\FM\07JYN1.SGM
07JYN1
jbell on DSKJLSW7X2PROD with NOTICES
Federal Register / Vol. 85, No. 130 / Tuesday, July 7, 2020 / Notices
for a hearing and petition for leave to
intervene (petition) with respect to the
action. Petitions shall be filed in
accordance with the Commission’s
‘‘Agency Rules of Practice and
Procedure’’ in 10 CFR part 2. Interested
persons should consult a current copy
of 10 CFR 2.309. The NRC’s regulations
are accessible electronically from the
NRC Library on the NRC’s website at
https://www.nrc.gov/reading-rm/doccollections/cfr/. If a petition is filed, the
Commission or a presiding officer will
rule on the petition and, if appropriate,
a notice of a hearing will be issued.
As required by 10 CFR 2.309(d) the
petition should specifically explain the
reasons why intervention should be
permitted with particular reference to
the following general requirements for
standing: (1) The name, address, and
telephone number of the petitioner; (2)
the nature of the petitioner’s right under
the Act to be made a party to the
proceeding; (3) the nature and extent of
the petitioner’s property, financial, or
other interest in the proceeding; and (4)
the possible effect of any decision or
order which may be entered in the
proceeding on the petitioner’s interest.
In accordance with 10 CFR 2.309(f),
the petition must also set forth the
specific contentions which the
petitioner seeks to have litigated in the
proceeding. Each contention must
consist of a specific statement of the
issue of law or fact to be raised or
controverted. In addition, the petitioner
must provide a brief explanation of the
bases for the contention and a concise
statement of the alleged facts or expert
opinion which support the contention
and on which the petitioner intends to
rely in proving the contention at the
hearing. The petitioner must also
provide references to the specific
sources and documents on which the
petitioner intends to rely to support its
position on the issue. The petition must
include sufficient information to show
that a genuine dispute exists with the
applicant or licensee on a material issue
of law or fact. Contentions must be
limited to matters within the scope of
the proceeding. The contention must be
one which, if proven, would entitle the
petitioner to relief. A petitioner who
fails to satisfy the requirements at 10
CFR 2.309(f) with respect to at least one
contention will not be permitted to
participate as a party.
Those permitted to intervene become
parties to the proceeding, subject to any
limitations in the order granting leave to
intervene. Parties have the opportunity
to participate fully in the conduct of the
hearing with respect to resolution of
that party’s admitted contentions,
including the opportunity to present
VerDate Sep<11>2014
16:59 Jul 06, 2020
Jkt 250001
evidence, consistent with the NRC’s
regulations, policies, and procedures.
Petitions must be filed no later than
60 days from the date of publication of
this notice. Petitions and motions for
leave to file new or amended
contentions that are filed after the
deadline will not be entertained absent
a determination by the presiding officer
that the filing demonstrates good cause
by satisfying the three factors in 10 CFR
2.309(c)(1)(i) through (iii). The petition
must be filed in accordance with the
filing instructions in the ‘‘Electronic
Submissions (E-Filing)’’ section of this
document.
If a hearing is requested, and the
Commission has not made a final
determination on the issue of no
significant hazards consideration, the
Commission will make a final
determination on the issue of no
significant hazards consideration. The
final determination will serve to
establish when the hearing is held. If the
final determination is that the
amendment request involves no
significant hazards consideration, the
Commission may issue the amendment
and make it immediately effective,
notwithstanding the request for a
hearing. Any hearing would take place
after issuance of the amendment. If the
final determination is that the
amendment request involves a
significant hazards consideration, then
any hearing held would take place
before the issuance of the amendment
unless the Commission finds an
imminent danger to the health or safety
of the public, in which case it will issue
an appropriate order or rule under 10
CFR part 2.
A State, local governmental body,
Federally-recognized Indian Tribe, or
agency thereof, may submit a petition to
the Commission to participate as a party
under 10 CFR 2.309(h)(1). The petition
should state the nature and extent of the
petitioner’s interest in the proceeding.
The petition should be submitted to the
Commission no later than 60 days from
the date of publication of this notice.
The petition must be filed in accordance
with the filing instructions in the
‘‘Electronic Submissions (E-Filing)’’
section of this document, and should
meet the requirements for petitions set
forth in this section, except that under
10 CFR 2.309(h)(2) a State, local
governmental body, or Federallyrecognized Indian Tribe, or agency
thereof does not need to address the
standing requirements in 10 CFR
2.309(d) if the facility is located within
its boundaries. Alternatively, a State,
local governmental body, Federallyrecognized Indian Tribe, or agency
PO 00000
Frm 00072
Fmt 4703
Sfmt 4703
40691
thereof may participate as a non-party
under 10 CFR 2.315(c).
If a hearing is granted, any person
who is not a party to the proceeding and
is not affiliated with or represented by
a party may, at the discretion of the
presiding officer, be permitted to make
a limited appearance pursuant to the
provisions of 10 CFR 2.315(a). A person
making a limited appearance may make
an oral or written statement of his or her
position on the issues but may not
otherwise participate in the proceeding.
A limited appearance may be made at
any session of the hearing or at any
prehearing conference, subject to the
limits and conditions as may be
imposed by the presiding officer. Details
regarding the opportunity to make a
limited appearance will be provided by
the presiding officer if such sessions are
scheduled.
B. Electronic Submissions (E-Filing)
All documents filed in NRC
adjudicatory proceedings, including a
request for hearing and petition for
leave to intervene (petition), any motion
or other document filed in the
proceeding prior to the submission of a
request for hearing or petition to
intervene, and documents filed by
interested governmental entities that
request to participate under 10 CFR
2.315(c), must be filed in accordance
with the NRC’s E-Filing rule (72 FR
49139; August 28, 2007, as amended at
77 FR 46562; August 3, 2012). The EFiling process requires participants to
submit and serve all adjudicatory
documents over the internet, or in some
cases to mail copies on electronic
storage media. Detailed guidance on
making electronic submissions may be
found in the Guidance for Electronic
Submissions to the NRC and on the NRC
website at https://www.nrc.gov/sitehelp/e-submittals.html. Participants
may not submit paper copies of their
filings unless they seek an exemption in
accordance with the procedures
described below.
To comply with the procedural
requirements of E-Filing, at least 10
days prior to the filing deadline, the
participant should contact the Office of
the Secretary by email at
hearing.docket@nrc.gov, or by telephone
at 301–415–1677, to (1) request a digital
identification (ID) certificate, which
allows the participant (or its counsel or
representative) to digitally sign
submissions and access the E-Filing
system for any proceeding in which it
is participating; and (2) advise the
Secretary that the participant will be
submitting a petition or other
adjudicatory document (even in
instances in which the participant, or its
E:\FR\FM\07JYN1.SGM
07JYN1
jbell on DSKJLSW7X2PROD with NOTICES
40692
Federal Register / Vol. 85, No. 130 / Tuesday, July 7, 2020 / Notices
counsel or representative, already holds
an NRC-issued digital ID certificate).
Based upon this information, the
Secretary will establish an electronic
docket for the hearing in this proceeding
if the Secretary has not already
established an electronic docket.
Information about applying for a
digital ID certificate is available on the
NRC’s public website at https://
www.nrc.gov/site-help/e-submittals/
getting-started.html. Once a participant
has obtained a digital ID certificate and
a docket has been created, the
participant can then submit
adjudicatory documents. Submissions
must be in Portable Document Format
(PDF). Additional guidance on PDF
submissions is available on the NRC’s
public website at https://www.nrc.gov/
site-help/electronic-sub-ref-mat.html. A
filing is considered complete at the time
the document is submitted through the
NRC’s E-Filing system. To be timely, an
electronic filing must be submitted to
the E-Filing system no later than 11:59
p.m. Eastern Time on the due date.
Upon receipt of a transmission, the EFiling system time-stamps the document
and sends the submitter an email notice
confirming receipt of the document. The
E-Filing system also distributes an email
notice that provides access to the
document to the NRC’s Office of the
General Counsel and any others who
have advised the Office of the Secretary
that they wish to participate in the
proceeding, so that the filer need not
serve the document on those
participants separately. Therefore,
applicants and other participants (or
their counsel or representative) must
apply for and receive a digital ID
certificate before adjudicatory
documents are filed so that they can
obtain access to the documents via the
E-Filing system.
A person filing electronically using
the NRC’s adjudicatory E-Filing system
may seek assistance by contacting the
NRC’s Electronic Filing Help Desk
through the ‘‘Contact Us’’ link located
on the NRC’s public website at https://
www.nrc.gov/site-help/esubmittals.html, by email to
MSHD.Resource@nrc.gov, or by a tollfree call at 1–866–672–7640. The NRC
Electronic Filing Help Desk is available
between 9 a.m. and 6 p.m., Eastern
Time, Monday through Friday,
excluding government holidays.
Participants who believe that they
have a good cause for not submitting
documents electronically must file an
exemption request, in accordance with
10 CFR 2.302(g), with their initial paper
filing stating why there is good cause for
not filing electronically and requesting
authorization to continue to submit
VerDate Sep<11>2014
16:59 Jul 06, 2020
Jkt 250001
documents in paper format. Such filings
must be submitted by: (1) First class
mail addressed to the Office of the
Secretary of the Commission, U.S.
Nuclear Regulatory Commission,
Washington, DC 20555–0001, Attention:
Rulemaking and Adjudications Staff; or
(2) courier, express mail, or expedited
delivery service to the Office of the
Secretary, 11555 Rockville Pike,
Rockville, Maryland 20852, Attention:
Rulemaking and Adjudications Staff.
Participants filing adjudicatory
documents in this manner are
responsible for serving the document on
all other participants. Filing is
considered complete by first-class mail
as of the time of deposit in the mail, or
by courier, express mail, or expedited
delivery service upon depositing the
document with the provider of the
service. A presiding officer, having
granted an exemption request from
using E-Filing, may require a participant
or party to use E-Filing if the presiding
officer subsequently determines that the
reason for granting the exemption from
use of E-Filing no longer exists.
Documents submitted in adjudicatory
proceedings will appear in the NRC’s
electronic hearing docket which is
available to the public at https://
adams.nrc.gov/ehd, unless excluded
pursuant to an order of the Commission
or the presiding officer. If you do not
have an NRC-issued digital ID certificate
as described above, click ‘‘cancel’’ when
the link requests certificates and you
will be automatically directed to the
NRC’s electronic hearing dockets where
you will be able to access any publicly
available documents in a particular
hearing docket. Participants are
requested not to include personal
privacy information, such as social
security numbers, home addresses, or
personal phone numbers in their filings,
unless an NRC regulation or other law
requires submission of such
information. For example, in some
instances, individuals provide home
addresses in order to demonstrate
proximity to a facility or site. With
respect to copyrighted works, except for
limited excerpts that serve the purpose
of the adjudicatory filings and would
constitute a Fair Use application,
participants are requested not to include
copyrighted materials in their
submission.
PSEG Nuclear LLC, and Exelon
Generation Company, LLC, Docket Nos.
50–272 and 50–311, Salem Nuclear
Generating Station, Unit Nos. 1 and 2,
Salem County, New Jersey
Date of amendment request: April 24,
2020. A publicly-available version is in
PO 00000
Frm 00073
Fmt 4703
Sfmt 4703
ADAMS under Accession No.
ML20115E374.
Description of amendment request:
This amendment request contains
SUNSI. The amendments would use the
leak-before-break methodology to
eliminate the dynamic effects of
postulated pipe ruptures in specific
portions of systems attached to the
reactor coolant system.
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
issue of no significant hazards
consideration, which is presented
below:
1. Does the proposed change involve a
significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
The proposed change requests plantspecific approval of a previously approved
Leak-Before-Break (LBB) evaluation
methodology, in accordance with 10 CFR 50,
Appendix A, General Design Criterion (GDC)
4. The LBB evaluations demonstrate that the
probability of a rupture of the piping in the
scope of the request is extremely low under
design basis conditions, such that the
dynamic effects of postulated pipe ruptures
may be removed from the design basis of
Salem Generating Station (Salem) Units 1
and 2.
The proposed change does not adversely
affect accident initiators or precursors.
Overall protection system performance will
remain within the bounds of the previously
performed accident analyses. The design of
the protection systems will be unaffected.
The Reactor Protection System (RPS) and
Emergency Core Cooling System (ECCS) will
continue to function in a manner consistent
with the plant design basis. All design,
material, and construction standards that
were applicable prior to the request will
remain applicable. There will be no change
to normal plant operating parameters or
accident mitigation performance. The
proposed amendment will not alter any
assumptions or change any mitigation actions
in the radiological consequence evaluations
in the Salem Updated Final Safety Analysis
Report (UFSAR).
Therefore, these proposed changes do not
involve a significant increase in the
probability or consequences of an accident
previously evaluated.
2. Does the proposed change create the
possibility of a new or different kind of
accident from any accident previously
evaluated?
Response: No.
The proposed change requests NRC
approval of LBB methodology to demonstrate
an extremely low probability of pipe rupture.
It does not introduce any new accident
scenarios, failure mechanisms, or single
failures. All systems, structures, and
components previously required for the
mitigation of an event remain capable of
fulfilling their intended design function. The
proposed change has no adverse effects on
E:\FR\FM\07JYN1.SGM
07JYN1
Federal Register / Vol. 85, No. 130 / Tuesday, July 7, 2020 / Notices
any safety related systems or components
and does not challenge the performance or
integrity of any safety related system.
Further, there are no changes in the method
by which any safety-related plant system
performs its safety function. This amendment
will not affect the normal method of power
operation or change any operating
parameters.
Therefore, the proposed change does not
create the possibility of a new or different
kind of accident from any accident
previously evaluated.
3. Do the proposed changes involve a
significant reduction in a margin of safety?
Response: No.
The proposed change does not adversely
affect the ability of the fuel cladding, reactor
coolant pressure boundary, or containment to
perform their design basis functions as
fission product barriers. The proposed
change uses previously accepted analytical
methods to demonstrate that the probability
of a fluid system rupture is extremely low.
It has no effect on the manner in which safety
limits or limiting safety system settings are
determined and it does not adversely affect
any plant systems necessary to assure the
accomplishment of protection functions.
Therefore, the proposed change does not
involve a significant reduction in a margin of
safety.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
Attorney for licensee: Steven
Fleischer, PSEG Services Corporation,
80 Park Plaza, T–5, Newark, NJ 07101.
NRC Branch Chief: James G. Danna.
jbell on DSKJLSW7X2PROD with NOTICES
Order Imposing Procedures for Access
to Sensitive Unclassified NonSafeguards Information for Contention
Preparation
PSEG Nuclear LLC, and Exelon
Generation Company, LLC, Docket Nos.
50–272 and 50–311, Salem Nuclear
Generating Station, Unit Nos. 1 and 2,
Salem County, New Jersey
A. This Order contains instructions
regarding how potential parties to this
proceeding may request access to
documents containing Sensitive
Unclassified Non-Safeguards
Information (SUNSI).
B. Within 10 days after publication of
this notice of hearing and opportunity to
petition for leave to intervene, any
potential party who believes access to
SUNSI is necessary to respond to this
notice may request access to SUNSI. A
‘‘potential party’’ is any person who
intends to participate as a party by
demonstrating standing and filing an
admissible contention under 10 CFR
2.309. Requests for access to SUNSI
VerDate Sep<11>2014
16:59 Jul 06, 2020
Jkt 250001
40693
submitted later than 10 days after
publication of this notice will not be
considered absent a showing of good
cause for the late filing, addressing why
the request could not have been filed
earlier.
C. The requestor shall submit a letter
requesting permission to access SUNSI
to the Office of the Secretary, U.S.
Nuclear Regulatory Commission,
Washington, DC 20555–0001, Attention:
Rulemakings and Adjudications Staff,
and provide a copy to the Deputy
General Counsel for Hearings and
Administration, Office of the General
Counsel, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001. The expedited delivery or courier
mail address for both offices is: U.S.
Nuclear Regulatory Commission, 11555
Rockville Pike, Rockville, Maryland
20852. The email address for the Office
of the Secretary and the Office of the
General Counsel are Hearing.Docket@
nrc.gov and
RidsOgcMailCenter.Resource@nrc.gov,
respectively.1 The request must include
the following information:
(1) A description of the licensing
action with a citation to this Federal
Register notice;
(2) The name and address of the
potential party and a description of the
potential party’s particularized interest
that could be harmed by the action
identified in C.(1); and
(3) The identity of the individual or
entity requesting access to SUNSI and
the requestor’s basis for the need for the
information in order to meaningfully
participate in this adjudicatory
proceeding. In particular, the request
must explain why publicly available
versions of the information requested
would not be sufficient to provide the
basis and specificity for a proffered
contention.
D. Based on an evaluation of the
information submitted under paragraph
C.(3) the NRC staff will determine
within 10 days of receipt of the request
whether:
(1) There is a reasonable basis to
believe the petitioner is likely to
establish standing to participate in this
NRC proceeding; and
(2) The requestor has established a
legitimate need for access to SUNSI.
E. If the NRC staff determines that the
requestor satisfies both D.(1) and D.(2)
above, the NRC staff will notify the
requestor in writing that access to
SUNSI has been granted. The written
notification will contain instructions on
how the requestor may obtain copies of
the requested documents, and any other
conditions that may apply to access to
those documents. These conditions may
include, but are not limited to, the
signing of a Non-Disclosure Agreement
or Affidavit, or Protective Order 2setting
forth terms and conditions to prevent
the unauthorized or inadvertent
disclosure of SUNSI by each individual
who will be granted access to SUNSI.
F. Filing of Contentions. Any
contentions in these proceedings that
are based upon the information received
as a result of the request made for
SUNSI must be filed by the requestor no
later than 25 days after receipt of (or
access to) that information. However, if
more than 25 days remain between the
petitioner’s receipt of (or access to) the
information and the deadline for filing
all other contentions (as established in
the notice of hearing or opportunity for
hearing), the petitioner may file its
SUNSI contentions by that later
deadline.
G. Review of Denials of Access.
(1) If the request for access to SUNSI
is denied by the NRC staff after a
determination on standing and requisite
need, the NRC staff shall immediately
notify the requestor in writing, briefly
stating the reason or reasons for the
denial.
(2) The requestor may challenge the
NRC staff’s adverse determination by
filing a challenge within 5 days of
receipt of that determination with: (a)
The presiding officer designated in this
proceeding; (b) if no presiding officer
has been appointed, the Chief
Administrative Judge, or if he or she is
unavailable, another administrative
judge, or an Administrative Law Judge
with jurisdiction pursuant to 10 CFR
2.318(a); or (c) if another officer has
been designated to rule on information
access issues, with that officer.
(3) Further appeals of decisions under
this paragraph must be made pursuant
to 10 CFR 2.311.
H. Review of Grants of Access. A
party other than the requestor may
challenge an NRC staff determination
granting access to SUNSI whose release
would harm that party’s interest
independent of the proceeding. Such a
challenge must be filed within 5 days of
the notification by the NRC staff of its
grant of access and must be filed with:
(a) The presiding officer designated in
this proceeding; (b) if no presiding
1 While a request for hearing or petition to
intervene in this proceeding must comply with the
filing requirements of the NRC’s ‘‘E-Filing Rule,’’
the initial request to access SUNSI under these
procedures should be submitted as described in this
paragraph.
2 Any motion for Protective Order or draft NonDisclosure Affidavit or Agreement for SUNSI must
be filed with the presiding officer or the Chief
Administrative Judge if the presiding officer has not
yet been designated, within 30 days of the deadline
for the receipt of the written access request.
PO 00000
Frm 00074
Fmt 4703
Sfmt 4703
E:\FR\FM\07JYN1.SGM
07JYN1
40694
Federal Register / Vol. 85, No. 130 / Tuesday, July 7, 2020 / Notices
officer has been appointed, the Chief
Administrative Judge, or if he or she is
unavailable, another administrative
judge, or an Administrative Law Judge
with jurisdiction pursuant to 10 CFR
2.318(a); or (c) if another officer has
been designated to rule on information
access issues, with that officer.
If challenges to the NRC staff
determinations are filed, these
procedures give way to the normal
process for litigating disputes
concerning access to information. The
availability of interlocutory review by
the Commission of orders ruling on
such NRC staff determinations (whether
granting or denying access) is governed
by 10 CFR 2.311.3
I. The Commission expects that the
NRC staff and presiding officers (and
any other reviewing officers) will
consider and resolve requests for access
to SUNSI, and motions for protective
orders, in a timely fashion in order to
minimize any unnecessary delays in
identifying those petitioners who have
standing and who have propounded
contentions meeting the specificity and
basis requirements in 10 CFR part 2.
The attachment to this Order
summarizes the general target schedule
for processing and resolving requests
under these procedures.
It is so ordered.
Dated: June 6, 2020.
For the Nuclear Regulatory Commission.
Annette L. Vietti-Cook,
Secretary of the Commission.
ATTACHMENT 1—GENERAL TARGET SCHEDULE FOR PROCESSING AND RESOLVING REQUESTS FOR ACCESS TO SENSITIVE
UNCLASSIFIED NON-SAFEGUARDS INFORMATION IN THIS PROCEEDING
Day
Event/activity
0 ........................
Publication of Federal Register notice of hearing and opportunity to petition for leave to intervene, including order with instructions for access requests.
Deadline for submitting requests for access to Sensitive Unclassified Non-Safeguards Information (SUNSI) with information:
Supporting the standing of a potential party identified by name and address; describing the need for the information in order
for the potential party to participate meaningfully in an adjudicatory proceeding.
Deadline for submitting petition for intervention containing: (i) Demonstration of standing; and (ii) all contentions whose formulation does not require access to SUNSI (+25 Answers to petition for intervention; +7 petitioner/requestor reply).
U.S. Nuclear Regulatory Commission (NRC) staff informs the requestor of the staff’s determination whether the request for
access provides a reasonable basis to believe standing can be established and shows need for SUNSI. (NRC staff also informs any party to the proceeding whose interest independent of the proceeding would be harmed by the release of the information.) If NRC staff makes the finding of need for SUNSI and likelihood of standing, NRC staff begins document processing (preparation of redactions or review of redacted documents).
If NRC staff finds no ‘‘need’’ or no likelihood of standing, the deadline for petitioner/requestor to file a motion seeking a ruling
to reverse the NRC staff’s denial of access; NRC staff files copy of access determination with the presiding officer (or Chief
Administrative Judge or other designated officer, as appropriate). If NRC staff finds ‘‘need’’ for SUNSI, the deadline for any
party to the proceeding whose interest independent of the proceeding would be harmed by the release of the information to
file a motion seeking a ruling to reverse the NRC staff’s grant of access.
Deadline for NRC staff reply to motions to reverse NRC staff determination(s).
(Receipt +30) If NRC staff finds standing and need for SUNSI, deadline for NRC staff to complete information processing and
file motion for Protective Order and draft Non-Disclosure Affidavit. Deadline for applicant/licensee to file Non-Disclosure
Agreement for SUNSI.
If access granted: Issuance of presiding officer or other designated officer decision on motion for protective order for access
to sensitive information (including schedule for providing access and submission of contentions) or decision reversing a
final adverse determination by the NRC staff.
Deadline for filing executed Non-Disclosure Affidavits. Access provided to SUNSI consistent with decision issuing the protective order.
Deadline for submission of contentions whose development depends upon access to SUNSI. However, if more than 25 days
remain between the petitioner’s receipt of (or access to) the information and the deadline for filing all other contentions (as
established in the notice of opportunity to request a hearing and petition for leave to intervene), the petitioner may file its
SUNSI contentions by that later deadline.
(Contention receipt +25) Answers to contentions whose development depends upon access to SUNSI.
(Answer receipt +7) Petitioner/Intervenor reply to answers.
Decision on contention admission.
10 ......................
60 ......................
20 ......................
25 ......................
30 ......................
40 ......................
A .......................
A + 3 .................
A + 28 ...............
A + 53 ...............
A + 60 ...............
>A + 60 .............
Commissioners’ Conference
Room, 11555 Rockville Pike, Rockville,
Maryland.
PLACE:
[FR Doc. 2020–12624 Filed 7–6–20; 8:45 am]
BILLING CODE 7590–01–P
STATUS:
jbell on DSKJLSW7X2PROD with NOTICES
NUCLEAR REGULATORY
COMMISSION
Public.
There are no meetings scheduled for
the week of July 6, 2020.
Sunshine Act Meetings
Week of July 13, 2020—Tentative
TIME AND DATE:
Weeks of July 6, 13, 20,
27, August 3, 10, 2020.
There are no meetings scheduled for
the week of July 13, 2020.
3 Requestors should note that the filing
requirements of the NRC’s E-Filing Rule (72 FR
49139; August 28, 2007, as amended at 77 FR
46562; August 3, 2012) apply to appeals of NRC
staff determinations (because they must be served
on a presiding officer or the Commission, as
16:59 Jul 06, 2020
Jkt 250001
PO 00000
Frm 00075
Fmt 4703
There are no meetings scheduled for
the week of July 20, 2020.
Week of July 27, 2020—Tentative
Week of July 6, 2020
[NRC–2020–0001]
VerDate Sep<11>2014
Week of July 20, 2020—Tentative
Sfmt 4703
There are no meetings scheduled for
the week of July 27, 2020.
Week of August 3, 2020—Tentative
There are no meetings scheduled for
the week of August 3, 2020.
applicable), but not to the initial SUNSI request
submitted to the NRC staff under these procedures.
E:\FR\FM\07JYN1.SGM
07JYN1
Agencies
[Federal Register Volume 85, Number 130 (Tuesday, July 7, 2020)]
[Notices]
[Pages 40689-40694]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-12624]
=======================================================================
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[NRC-2020-0135]
Applications and Amendments to Facility Operating Licenses and
Combined Licenses Involving Proposed No Significant Hazards
Considerations and Containing Sensitive Unclassified Non-Safeguards
Information and Order Imposing Procedures for Access to Sensitive
Unclassified Non-Safeguards Information
AGENCY: Nuclear Regulatory Commission.
ACTION: License amendment request; notice of opportunity to comment,
request a hearing, and petition for leave to intervene; order imposing
procedures.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) received and is
[[Page 40690]]
considering approval of one amendment request. The amendment request is
for Salem Nuclear Generating Station, Unit Nos. 1 and 2. For the
amendment request, the NRC proposes to determine that it involves no
significant hazards consideration. Because the amendment request
contains sensitive unclassified non-safeguards information (SUNSI), an
order imposes procedures to obtain access to SUNSI for contention
preparation.
DATES: Comments must be filed by August 6, 2020. A request for a
hearing or petitions for leave to intervene must be filed by September
8, 2020. Any potential party as defined in Sec. 2.4 of title 10 of the
Code of Federal Regulations (10 CFR), who believes access to SUNSI is
necessary to respond to this notice must request document access by
July 17, 2020.
ADDRESSES: You may submit comments by any of the following methods:
Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2020-0135. Address
questions about NRC Docket IDs in Regulations.gov to Jennifer Borges;
telephone: 301-287-9127; email: [email protected]. For technical
questions, contact the individual listed in the FOR FURTHER INFORMATION
CONTACT section of this document.
Mail Comments to: Office of Administration, Mail Stop:
TWFN-7-A60M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-
0001, ATTN: Program Management, Announcements and Editing Staff.
For additional direction on obtaining information and submitting
comments, see ``Obtaining Information and Submitting Comments'' in the
SUPPLEMENTARY INFORMATION section of this document.
FOR FURTHER INFORMATION CONTACT: Shirley Rohrer, Office of Nuclear
Reactor Regulation, telephone: 301-415-5411, email:
[email protected], U.S. Nuclear Regulatory Commission, Washington,
DC 20555-0001.
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and Submitting Comments
A. Obtaining Information
Please refer to Docket ID NRC-2020-0135, facility name, unit
number(s), docket number(s), application date, and subject when
contacting the NRC about the availability of information for this
action. You may obtain publicly-available information related to this
action by any of the following methods:
Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2020-0135.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly-available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS
Search.'' For problems with ADAMS, please contact the NRC's Public
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or
by email to [email protected]. The ADAMS accession number for each
document referenced (if it is available in ADAMS) is provided the first
time that it is mentioned in this document.
B. Submitting Comments
Please include Docket ID NRC-2020-0135, facility name, unit
number(s), docket number(s), application date, and subject in your
comment submission.
The NRC cautions you not to include identifying or contact
information that you do not want to be publicly disclosed in your
comment submission. The NRC will post all comment submissions at
https://www.regulations.gov as well as enter the comment submissions
into ADAMS. The NRC does not routinely edit comment submissions to
remove identifying or contact information.
If you are requesting or aggregating comments from other persons
for submission to the NRC, then you should inform those persons not to
include identifying or contact information that they do not want to be
publicly disclosed in their comment submission. Your request should
state that the NRC does not routinely edit comment submissions to
remove such information before making the comment submissions available
to the public or entering the comment into ADAMS.
II. Background
Pursuant to Section 189a.(2) of the Atomic Energy Act of 1954, as
amended (the Act), the NRC is publishing this notice. The Act requires
the Commission to publish notice of any amendments issued, or proposed
to be issued and grants the Commission the authority to issue and make
immediately effective any amendment to an operating license or combined
license, as applicable, upon a determination by the Commission that
such amendment involves no significant hazards consideration,
notwithstanding the pendency before the Commission of a request for a
hearing from any person.
This notice includes a notice of amendment containing SUNSI.
III. Notice of Consideration of Issuance of Amendments to Facility
Operating Licenses and Combined Licenses, Proposed No Significant
Hazards Consideration Determination, and Opportunity for a Hearing
The Commission has made a proposed determination that the following
amendment request involves no significant hazards consideration. Under
the Commission's regulations in 10 CFR 50.92, this means that operation
of the facility in accordance with the proposed amendment would not (1)
involve a significant increase in the probability or consequences of an
accident previously evaluated, or (2) create the possibility of a new
or different kind of accident from any accident previously evaluated,
or (3) involve a significant reduction in a margin of safety. The basis
for this proposed determination for the amendment request is shown
below.
The Commission is seeking public comments on this proposed
determination. Any comments received within 30 days after the date of
publication of this notice will be considered in making any final
determination.
Normally, the Commission will not issue the amendment until the
expiration of 60 days after the date of publication of this notice. The
Commission may issue the license amendment before expiration of the 60-
day period provided that its final determination is that the amendment
involves no significant hazards consideration. In addition, the
Commission may issue the amendment prior to the expiration of the 30-
day comment period if circumstances change during the 30-day comment
period such that failure to act in a timely way would result, for
example, in derating or shutdown of the facility. If the Commission
takes action prior to the expiration of either the comment period or
the notice period, it will publish a notice of issuance in the Federal
Register. If the Commission makes a final no significant hazards
consideration determination, any hearing will take place after
issuance. The Commission expects that the need to take this action will
occur very infrequently.
A. Opportunity To Request a Hearing and Petition for Leave To Intervene
Within 60 days after the date of publication of this notice, any
persons (petitioner) whose interest may be affected by this action may
file a request
[[Page 40691]]
for a hearing and petition for leave to intervene (petition) with
respect to the action. Petitions shall be filed in accordance with the
Commission's ``Agency Rules of Practice and Procedure'' in 10 CFR part
2. Interested persons should consult a current copy of 10 CFR 2.309.
The NRC's regulations are accessible electronically from the NRC
Library on the NRC's website at https://www.nrc.gov/reading-rm/doc-collections/cfr/. If a petition is filed, the Commission or a presiding
officer will rule on the petition and, if appropriate, a notice of a
hearing will be issued.
As required by 10 CFR 2.309(d) the petition should specifically
explain the reasons why intervention should be permitted with
particular reference to the following general requirements for
standing: (1) The name, address, and telephone number of the
petitioner; (2) the nature of the petitioner's right under the Act to
be made a party to the proceeding; (3) the nature and extent of the
petitioner's property, financial, or other interest in the proceeding;
and (4) the possible effect of any decision or order which may be
entered in the proceeding on the petitioner's interest.
In accordance with 10 CFR 2.309(f), the petition must also set
forth the specific contentions which the petitioner seeks to have
litigated in the proceeding. Each contention must consist of a specific
statement of the issue of law or fact to be raised or controverted. In
addition, the petitioner must provide a brief explanation of the bases
for the contention and a concise statement of the alleged facts or
expert opinion which support the contention and on which the petitioner
intends to rely in proving the contention at the hearing. The
petitioner must also provide references to the specific sources and
documents on which the petitioner intends to rely to support its
position on the issue. The petition must include sufficient information
to show that a genuine dispute exists with the applicant or licensee on
a material issue of law or fact. Contentions must be limited to matters
within the scope of the proceeding. The contention must be one which,
if proven, would entitle the petitioner to relief. A petitioner who
fails to satisfy the requirements at 10 CFR 2.309(f) with respect to at
least one contention will not be permitted to participate as a party.
Those permitted to intervene become parties to the proceeding,
subject to any limitations in the order granting leave to intervene.
Parties have the opportunity to participate fully in the conduct of the
hearing with respect to resolution of that party's admitted
contentions, including the opportunity to present evidence, consistent
with the NRC's regulations, policies, and procedures.
Petitions must be filed no later than 60 days from the date of
publication of this notice. Petitions and motions for leave to file new
or amended contentions that are filed after the deadline will not be
entertained absent a determination by the presiding officer that the
filing demonstrates good cause by satisfying the three factors in 10
CFR 2.309(c)(1)(i) through (iii). The petition must be filed in
accordance with the filing instructions in the ``Electronic Submissions
(E-Filing)'' section of this document.
If a hearing is requested, and the Commission has not made a final
determination on the issue of no significant hazards consideration, the
Commission will make a final determination on the issue of no
significant hazards consideration. The final determination will serve
to establish when the hearing is held. If the final determination is
that the amendment request involves no significant hazards
consideration, the Commission may issue the amendment and make it
immediately effective, notwithstanding the request for a hearing. Any
hearing would take place after issuance of the amendment. If the final
determination is that the amendment request involves a significant
hazards consideration, then any hearing held would take place before
the issuance of the amendment unless the Commission finds an imminent
danger to the health or safety of the public, in which case it will
issue an appropriate order or rule under 10 CFR part 2.
A State, local governmental body, Federally-recognized Indian
Tribe, or agency thereof, may submit a petition to the Commission to
participate as a party under 10 CFR 2.309(h)(1). The petition should
state the nature and extent of the petitioner's interest in the
proceeding. The petition should be submitted to the Commission no later
than 60 days from the date of publication of this notice. The petition
must be filed in accordance with the filing instructions in the
``Electronic Submissions (E-Filing)'' section of this document, and
should meet the requirements for petitions set forth in this section,
except that under 10 CFR 2.309(h)(2) a State, local governmental body,
or Federally-recognized Indian Tribe, or agency thereof does not need
to address the standing requirements in 10 CFR 2.309(d) if the facility
is located within its boundaries. Alternatively, a State, local
governmental body, Federally-recognized Indian Tribe, or agency thereof
may participate as a non-party under 10 CFR 2.315(c).
If a hearing is granted, any person who is not a party to the
proceeding and is not affiliated with or represented by a party may, at
the discretion of the presiding officer, be permitted to make a limited
appearance pursuant to the provisions of 10 CFR 2.315(a). A person
making a limited appearance may make an oral or written statement of
his or her position on the issues but may not otherwise participate in
the proceeding. A limited appearance may be made at any session of the
hearing or at any prehearing conference, subject to the limits and
conditions as may be imposed by the presiding officer. Details
regarding the opportunity to make a limited appearance will be provided
by the presiding officer if such sessions are scheduled.
B. Electronic Submissions (E-Filing)
All documents filed in NRC adjudicatory proceedings, including a
request for hearing and petition for leave to intervene (petition), any
motion or other document filed in the proceeding prior to the
submission of a request for hearing or petition to intervene, and
documents filed by interested governmental entities that request to
participate under 10 CFR 2.315(c), must be filed in accordance with the
NRC's E-Filing rule (72 FR 49139; August 28, 2007, as amended at 77 FR
46562; August 3, 2012). The E-Filing process requires participants to
submit and serve all adjudicatory documents over the internet, or in
some cases to mail copies on electronic storage media. Detailed
guidance on making electronic submissions may be found in the Guidance
for Electronic Submissions to the NRC and on the NRC website at https://www.nrc.gov/site-help/e-submittals.html. Participants may not submit
paper copies of their filings unless they seek an exemption in
accordance with the procedures described below.
To comply with the procedural requirements of E-Filing, at least 10
days prior to the filing deadline, the participant should contact the
Office of the Secretary by email at [email protected], or by
telephone at 301-415-1677, to (1) request a digital identification (ID)
certificate, which allows the participant (or its counsel or
representative) to digitally sign submissions and access the E-Filing
system for any proceeding in which it is participating; and (2) advise
the Secretary that the participant will be submitting a petition or
other adjudicatory document (even in instances in which the
participant, or its
[[Page 40692]]
counsel or representative, already holds an NRC-issued digital ID
certificate). Based upon this information, the Secretary will establish
an electronic docket for the hearing in this proceeding if the
Secretary has not already established an electronic docket.
Information about applying for a digital ID certificate is
available on the NRC's public website at https://www.nrc.gov/site-help/e-submittals/getting-started.html. Once a participant has obtained a
digital ID certificate and a docket has been created, the participant
can then submit adjudicatory documents. Submissions must be in Portable
Document Format (PDF). Additional guidance on PDF submissions is
available on the NRC's public website at https://www.nrc.gov/site-help/electronic-sub-ref-mat.html. A filing is considered complete at the
time the document is submitted through the NRC's E-Filing system. To be
timely, an electronic filing must be submitted to the E-Filing system
no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of
a transmission, the E-Filing system time-stamps the document and sends
the submitter an email notice confirming receipt of the document. The
E-Filing system also distributes an email notice that provides access
to the document to the NRC's Office of the General Counsel and any
others who have advised the Office of the Secretary that they wish to
participate in the proceeding, so that the filer need not serve the
document on those participants separately. Therefore, applicants and
other participants (or their counsel or representative) must apply for
and receive a digital ID certificate before adjudicatory documents are
filed so that they can obtain access to the documents via the E-Filing
system.
A person filing electronically using the NRC's adjudicatory E-
Filing system may seek assistance by contacting the NRC's Electronic
Filing Help Desk through the ``Contact Us'' link located on the NRC's
public website at https://www.nrc.gov/site-help/e-submittals.html, by
email to [email protected], or by a toll-free call at 1-866-672-
7640. The NRC Electronic Filing Help Desk is available between 9 a.m.
and 6 p.m., Eastern Time, Monday through Friday, excluding government
holidays.
Participants who believe that they have a good cause for not
submitting documents electronically must file an exemption request, in
accordance with 10 CFR 2.302(g), with their initial paper filing
stating why there is good cause for not filing electronically and
requesting authorization to continue to submit documents in paper
format. Such filings must be submitted by: (1) First class mail
addressed to the Office of the Secretary of the Commission, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemaking and Adjudications Staff; or (2) courier, express mail, or
expedited delivery service to the Office of the Secretary, 11555
Rockville Pike, Rockville, Maryland 20852, Attention: Rulemaking and
Adjudications Staff. Participants filing adjudicatory documents in this
manner are responsible for serving the document on all other
participants. Filing is considered complete by first-class mail as of
the time of deposit in the mail, or by courier, express mail, or
expedited delivery service upon depositing the document with the
provider of the service. A presiding officer, having granted an
exemption request from using E-Filing, may require a participant or
party to use E-Filing if the presiding officer subsequently determines
that the reason for granting the exemption from use of E-Filing no
longer exists.
Documents submitted in adjudicatory proceedings will appear in the
NRC's electronic hearing docket which is available to the public at
https://adams.nrc.gov/ehd, unless excluded pursuant to an order of the
Commission or the presiding officer. If you do not have an NRC-issued
digital ID certificate as described above, click ``cancel'' when the
link requests certificates and you will be automatically directed to
the NRC's electronic hearing dockets where you will be able to access
any publicly available documents in a particular hearing docket.
Participants are requested not to include personal privacy information,
such as social security numbers, home addresses, or personal phone
numbers in their filings, unless an NRC regulation or other law
requires submission of such information. For example, in some
instances, individuals provide home addresses in order to demonstrate
proximity to a facility or site. With respect to copyrighted works,
except for limited excerpts that serve the purpose of the adjudicatory
filings and would constitute a Fair Use application, participants are
requested not to include copyrighted materials in their submission.
PSEG Nuclear LLC, and Exelon Generation Company, LLC, Docket Nos. 50-
272 and 50-311, Salem Nuclear Generating Station, Unit Nos. 1 and 2,
Salem County, New Jersey
Date of amendment request: April 24, 2020. A publicly-available
version is in ADAMS under Accession No. ML20115E374.
Description of amendment request: This amendment request contains
SUNSI. The amendments would use the leak-before-break methodology to
eliminate the dynamic effects of postulated pipe ruptures in specific
portions of systems attached to the reactor coolant system.
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below:
1. Does the proposed change involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The proposed change requests plant-specific approval of a
previously approved Leak-Before-Break (LBB) evaluation methodology,
in accordance with 10 CFR 50, Appendix A, General Design Criterion
(GDC) 4. The LBB evaluations demonstrate that the probability of a
rupture of the piping in the scope of the request is extremely low
under design basis conditions, such that the dynamic effects of
postulated pipe ruptures may be removed from the design basis of
Salem Generating Station (Salem) Units 1 and 2.
The proposed change does not adversely affect accident
initiators or precursors. Overall protection system performance will
remain within the bounds of the previously performed accident
analyses. The design of the protection systems will be unaffected.
The Reactor Protection System (RPS) and Emergency Core Cooling
System (ECCS) will continue to function in a manner consistent with
the plant design basis. All design, material, and construction
standards that were applicable prior to the request will remain
applicable. There will be no change to normal plant operating
parameters or accident mitigation performance. The proposed
amendment will not alter any assumptions or change any mitigation
actions in the radiological consequence evaluations in the Salem
Updated Final Safety Analysis Report (UFSAR).
Therefore, these proposed changes do not involve a significant
increase in the probability or consequences of an accident
previously evaluated.
2. Does the proposed change create the possibility of a new or
different kind of accident from any accident previously evaluated?
Response: No.
The proposed change requests NRC approval of LBB methodology to
demonstrate an extremely low probability of pipe rupture. It does
not introduce any new accident scenarios, failure mechanisms, or
single failures. All systems, structures, and components previously
required for the mitigation of an event remain capable of fulfilling
their intended design function. The proposed change has no adverse
effects on
[[Page 40693]]
any safety related systems or components and does not challenge the
performance or integrity of any safety related system. Further,
there are no changes in the method by which any safety-related plant
system performs its safety function. This amendment will not affect
the normal method of power operation or change any operating
parameters.
Therefore, the proposed change does not create the possibility
of a new or different kind of accident from any accident previously
evaluated.
3. Do the proposed changes involve a significant reduction in a
margin of safety?
Response: No.
The proposed change does not adversely affect the ability of the
fuel cladding, reactor coolant pressure boundary, or containment to
perform their design basis functions as fission product barriers.
The proposed change uses previously accepted analytical methods to
demonstrate that the probability of a fluid system rupture is
extremely low. It has no effect on the manner in which safety limits
or limiting safety system settings are determined and it does not
adversely affect any plant systems necessary to assure the
accomplishment of protection functions.
Therefore, the proposed change does not involve a significant
reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
Attorney for licensee: Steven Fleischer, PSEG Services Corporation,
80 Park Plaza, T-5, Newark, NJ 07101.
NRC Branch Chief: James G. Danna.
Order Imposing Procedures for Access to Sensitive Unclassified Non-
Safeguards Information for Contention Preparation
PSEG Nuclear LLC, and Exelon Generation Company, LLC, Docket Nos. 50-
272 and 50-311, Salem Nuclear Generating Station, Unit Nos. 1 and 2,
Salem County, New Jersey
A. This Order contains instructions regarding how potential parties
to this proceeding may request access to documents containing Sensitive
Unclassified Non-Safeguards Information (SUNSI).
B. Within 10 days after publication of this notice of hearing and
opportunity to petition for leave to intervene, any potential party who
believes access to SUNSI is necessary to respond to this notice may
request access to SUNSI. A ``potential party'' is any person who
intends to participate as a party by demonstrating standing and filing
an admissible contention under 10 CFR 2.309. Requests for access to
SUNSI submitted later than 10 days after publication of this notice
will not be considered absent a showing of good cause for the late
filing, addressing why the request could not have been filed earlier.
C. The requestor shall submit a letter requesting permission to
access SUNSI to the Office of the Secretary, U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, Attention: Rulemakings and
Adjudications Staff, and provide a copy to the Deputy General Counsel
for Hearings and Administration, Office of the General Counsel, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001. The expedited
delivery or courier mail address for both offices is: U.S. Nuclear
Regulatory Commission, 11555 Rockville Pike, Rockville, Maryland 20852.
The email address for the Office of the Secretary and the Office of the
General Counsel are [email protected] and
[email protected], respectively.\1\ The request must
include the following information:
---------------------------------------------------------------------------
\1\ While a request for hearing or petition to intervene in this
proceeding must comply with the filing requirements of the NRC's
``E-Filing Rule,'' the initial request to access SUNSI under these
procedures should be submitted as described in this paragraph.
---------------------------------------------------------------------------
(1) A description of the licensing action with a citation to this
Federal Register notice;
(2) The name and address of the potential party and a description
of the potential party's particularized interest that could be harmed
by the action identified in C.(1); and
(3) The identity of the individual or entity requesting access to
SUNSI and the requestor's basis for the need for the information in
order to meaningfully participate in this adjudicatory proceeding. In
particular, the request must explain why publicly available versions of
the information requested would not be sufficient to provide the basis
and specificity for a proffered contention.
D. Based on an evaluation of the information submitted under
paragraph C.(3) the NRC staff will determine within 10 days of receipt
of the request whether:
(1) There is a reasonable basis to believe the petitioner is likely
to establish standing to participate in this NRC proceeding; and
(2) The requestor has established a legitimate need for access to
SUNSI.
E. If the NRC staff determines that the requestor satisfies both
D.(1) and D.(2) above, the NRC staff will notify the requestor in
writing that access to SUNSI has been granted. The written notification
will contain instructions on how the requestor may obtain copies of the
requested documents, and any other conditions that may apply to access
to those documents. These conditions may include, but are not limited
to, the signing of a Non-Disclosure Agreement or Affidavit, or
Protective Order \2\setting forth terms and conditions to prevent the
unauthorized or inadvertent disclosure of SUNSI by each individual who
will be granted access to SUNSI.
---------------------------------------------------------------------------
\2\ Any motion for Protective Order or draft Non-Disclosure
Affidavit or Agreement for SUNSI must be filed with the presiding
officer or the Chief Administrative Judge if the presiding officer
has not yet been designated, within 30 days of the deadline for the
receipt of the written access request.
---------------------------------------------------------------------------
F. Filing of Contentions. Any contentions in these proceedings that
are based upon the information received as a result of the request made
for SUNSI must be filed by the requestor no later than 25 days after
receipt of (or access to) that information. However, if more than 25
days remain between the petitioner's receipt of (or access to) the
information and the deadline for filing all other contentions (as
established in the notice of hearing or opportunity for hearing), the
petitioner may file its SUNSI contentions by that later deadline.
G. Review of Denials of Access.
(1) If the request for access to SUNSI is denied by the NRC staff
after a determination on standing and requisite need, the NRC staff
shall immediately notify the requestor in writing, briefly stating the
reason or reasons for the denial.
(2) The requestor may challenge the NRC staff's adverse
determination by filing a challenge within 5 days of receipt of that
determination with: (a) The presiding officer designated in this
proceeding; (b) if no presiding officer has been appointed, the Chief
Administrative Judge, or if he or she is unavailable, another
administrative judge, or an Administrative Law Judge with jurisdiction
pursuant to 10 CFR 2.318(a); or (c) if another officer has been
designated to rule on information access issues, with that officer.
(3) Further appeals of decisions under this paragraph must be made
pursuant to 10 CFR 2.311.
H. Review of Grants of Access. A party other than the requestor may
challenge an NRC staff determination granting access to SUNSI whose
release would harm that party's interest independent of the proceeding.
Such a challenge must be filed within 5 days of the notification by the
NRC staff of its grant of access and must be filed with: (a) The
presiding officer designated in this proceeding; (b) if no presiding
[[Page 40694]]
officer has been appointed, the Chief Administrative Judge, or if he or
she is unavailable, another administrative judge, or an Administrative
Law Judge with jurisdiction pursuant to 10 CFR 2.318(a); or (c) if
another officer has been designated to rule on information access
issues, with that officer.
If challenges to the NRC staff determinations are filed, these
procedures give way to the normal process for litigating disputes
concerning access to information. The availability of interlocutory
review by the Commission of orders ruling on such NRC staff
determinations (whether granting or denying access) is governed by 10
CFR 2.311.\3\
---------------------------------------------------------------------------
\3\ Requestors should note that the filing requirements of the
NRC's E-Filing Rule (72 FR 49139; August 28, 2007, as amended at 77
FR 46562; August 3, 2012) apply to appeals of NRC staff
determinations (because they must be served on a presiding officer
or the Commission, as applicable), but not to the initial SUNSI
request submitted to the NRC staff under these procedures.
---------------------------------------------------------------------------
I. The Commission expects that the NRC staff and presiding officers
(and any other reviewing officers) will consider and resolve requests
for access to SUNSI, and motions for protective orders, in a timely
fashion in order to minimize any unnecessary delays in identifying
those petitioners who have standing and who have propounded contentions
meeting the specificity and basis requirements in 10 CFR part 2. The
attachment to this Order summarizes the general target schedule for
processing and resolving requests under these procedures.
It is so ordered.
Dated: June 6, 2020.
For the Nuclear Regulatory Commission.
Annette L. Vietti-Cook,
Secretary of the Commission.
Attachment 1--General Target Schedule for Processing and Resolving
Requests for Access to Sensitive Unclassified Non-Safeguards Information
in This Proceeding
------------------------------------------------------------------------
Day Event/activity
------------------------------------------------------------------------
0........................ Publication of Federal Register notice of
hearing and opportunity to petition for
leave to intervene, including order with
instructions for access requests.
10....................... Deadline for submitting requests for access
to Sensitive Unclassified Non-Safeguards
Information (SUNSI) with information:
Supporting the standing of a potential party
identified by name and address; describing
the need for the information in order for
the potential party to participate
meaningfully in an adjudicatory proceeding.
60....................... Deadline for submitting petition for
intervention containing: (i) Demonstration
of standing; and (ii) all contentions whose
formulation does not require access to SUNSI
(+25 Answers to petition for intervention;
+7 petitioner/requestor reply).
20....................... U.S. Nuclear Regulatory Commission (NRC)
staff informs the requestor of the staff's
determination whether the request for access
provides a reasonable basis to believe
standing can be established and shows need
for SUNSI. (NRC staff also informs any party
to the proceeding whose interest independent
of the proceeding would be harmed by the
release of the information.) If NRC staff
makes the finding of need for SUNSI and
likelihood of standing, NRC staff begins
document processing (preparation of
redactions or review of redacted documents).
25....................... If NRC staff finds no ``need'' or no
likelihood of standing, the deadline for
petitioner/requestor to file a motion
seeking a ruling to reverse the NRC staff's
denial of access; NRC staff files copy of
access determination with the presiding
officer (or Chief Administrative Judge or
other designated officer, as appropriate).
If NRC staff finds ``need'' for SUNSI, the
deadline for any party to the proceeding
whose interest independent of the proceeding
would be harmed by the release of the
information to file a motion seeking a
ruling to reverse the NRC staff's grant of
access.
30....................... Deadline for NRC staff reply to motions to
reverse NRC staff determination(s).
40....................... (Receipt +30) If NRC staff finds standing and
need for SUNSI, deadline for NRC staff to
complete information processing and file
motion for Protective Order and draft Non-
Disclosure Affidavit. Deadline for applicant/
licensee to file Non-Disclosure Agreement
for SUNSI.
A........................ If access granted: Issuance of presiding
officer or other designated officer decision
on motion for protective order for access to
sensitive information (including schedule
for providing access and submission of
contentions) or decision reversing a final
adverse determination by the NRC staff.
A + 3.................... Deadline for filing executed Non-Disclosure
Affidavits. Access provided to SUNSI
consistent with decision issuing the
protective order.
A + 28................... Deadline for submission of contentions whose
development depends upon access to SUNSI.
However, if more than 25 days remain between
the petitioner's receipt of (or access to)
the information and the deadline for filing
all other contentions (as established in the
notice of opportunity to request a hearing
and petition for leave to intervene), the
petitioner may file its SUNSI contentions by
that later deadline.
A + 53................... (Contention receipt +25) Answers to
contentions whose development depends upon
access to SUNSI.
A + 60................... (Answer receipt +7) Petitioner/Intervenor
reply to answers.
>A + 60.................. Decision on contention admission.
------------------------------------------------------------------------
[FR Doc. 2020-12624 Filed 7-6-20; 8:45 am]