Midcontinent Independent System Operator, Inc.; Notice of Conference Call, 39559-39560 [2020-14186]
Download as PDF
Federal Register / Vol. 85, No. 127 / Wednesday, July 1, 2020 / Notices
Comments Due: 5 p.m. ET 7/16/20.
Docket Numbers: ER20–2158–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Ameren Illinois Company.
Description: § 205(d) Rate Filing:
2020–06–25_SA 3527 Ameren IllinoisHoopeston Wind (H094) FSA to be
effective 8/25/2020.
Filed Date: 6/25/20.
Accession Number: 20200625–5048.
Comments Due: 5 p.m. ET 7/16/20.
Docket Numbers: ER20–2159–000.
Applicants: Brandon Shores LLC.
Description: § 205(d) Rate Filing:
Market-Based Rate Tariff Revisions to be
effective 6/26/2020.
Filed Date: 6/25/20.
Accession Number: 20200625–5087.
Comments Due: 5 p.m. ET 7/16/20.
Docket Numbers: ER20–2160–000.
Applicants: Brunner Island, LLC.
Description: § 205(d) Rate Filing:
Market-Based Rate Tariff Revisions to be
effective 6/26/2020.
Filed Date: 6/25/20.
Accession Number: 20200625–5090.
Comments Due: 5 p.m. ET 7/16/20.
Docket Numbers: ER20–2161–000.
Applicants: Camden Plant Holding,
L.L.C.
Description: § 205(d) Rate Filing:
Market-Based Rate Tariff Revisions to be
effective 6/26/2020.
Filed Date: 6/25/20.
Accession Number: 20200625–5091.
Comments Due: 5 p.m. ET 7/16/20.
Docket Numbers: ER20–2162–000.
Applicants: Dartmouth Power
Associates Limited Partnership.
Description: § 205(d) Rate Filing:
Market-Based Rate Tariff Revisions to be
effective 6/26/2020.
Filed Date: 6/25/20.
Accession Number: 20200625–5092.
Comments Due: 5 p.m. ET 7/16/20.
Docket Numbers: ER20–2163–000.
Applicants: Elmwood Park Power,
LLC.
Description: § 205(d) Rate Filing:
Market-Based Rate Tariff Revisions to be
effective 6/26/2020.
Filed Date: 6/25/20.
Accession Number: 20200625–5107.
Comments Due: 5 p.m. ET 7/16/20.
Docket Numbers: ER20–2164–000.
Applicants: H.A. Wagner LLC.
Description: § 205(d) Rate Filing:
Market-Based Rate Tariff Revisions to be
effective 6/26/2020.
Filed Date: 6/25/20.
Accession Number: 20200625–5108.
Comments Due: 5 p.m. ET 7/16/20.
Docket Numbers: ER20–2165–000.
Applicants: LMBE Project Company
LLC.
Description: § 205(d) Rate Filing:
Market-Based Rate Tariff Revisions to be
effective 6/26/2020.
VerDate Sep<11>2014
01:53 Jul 01, 2020
Jkt 250001
Filed Date: 6/25/20.
Accession Number: 20200625–5095.
Comments Due: 5 p.m. ET 7/16/20.
Docket Numbers: ER20–2166–000.
Applicants: Martins Creek, LLC.
Description: § 205(d) Rate Filing:
Market-Based Rate Tariff Revisions to be
effective 6/26/2020.
Filed Date: 6/25/20.
Accession Number: 20200625–5097.
Comments Due: 5 p.m. ET 7/16/20.
Docket Numbers: ER20–2167–000.
Applicants: MC Project Company
LLC.
Description: § 205(d) Rate Filing:
Market-Based Rate Tariff Revisions to be
effective 6/26/2020.
Filed Date: 6/25/20.
Accession Number: 20200625–5098.
Comments Due: 5 p.m. ET 7/16/20.
Docket Numbers: ER20–2168–000.
Applicants: Millennium Power
Partners, L.P.
Description: § 205(d) Rate Filing:
Market-Based Rate Tariff Revisions to be
effective 6/26/2020.
Filed Date: 6/25/20.
Accession Number: 20200625–5100.
Comments Due: 5 p.m. ET 7/16/20.
Docket Numbers: ER20–2169–000.
Applicants: Montour, LLC.
Description: § 205(d) Rate Filing:
Market-Based Rate Tariff Revisions to be
effective 6/26/2020.
Filed Date: 6/25/20.
Accession Number: 20200625–5101.
Comments Due: 5 p.m. ET 7/16/20.
Docket Numbers: ER20–2170–000.
Applicants: New Athens Generating
Company, LLC.
Description: § 205(d) Rate Filing:
Market-Based Rate Tariff Revisions to be
effective 6/26/2020.
Filed Date: 6/25/20.
Accession Number: 20200625–5102.
Comments Due: 5 p.m. ET 7/16/20.
Docket Numbers: ER20–2171–000.
Applicants: Pedricktown
Cogeneration Company LP.
Description: § 205(d) Rate Filing:
Market-Based Rate Tariff Revisions to be
effective 6/26/2020.
Filed Date: 6/25/20.
Accession Number: 20200625–5103.
Comments Due: 5 p.m. ET 7/16/20.
Docket Numbers: ER20–2172–000.
Applicants: Susquehanna Nuclear,
LLC.
Description: § 205(d) Rate Filing:
Market-Based Rate Tariff Revisions to be
effective 6/26/2020.
Filed Date: 6/25/20.
Accession Number: 20200625–5105.
Comments Due: 5 p.m. ET 7/16/20.
Docket Numbers: ER20–2173–000.
Applicants: York Generation
Company LLC.
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
39559
Description: § 205(d) Rate Filing:
Market-Based Rate Tariff Revisions to be
effective 6/26/2020.
Filed Date: 6/25/20.
Accession Number: 20200625–5110.
Comments Due: 5 p.m. ET 7/16/20.
Docket Numbers: ER20–2174–000.
Applicants: Newark Bay Cogeneration
Partnership, L.P.
Description: § 205(d) Rate Filing:
Market-Based Rate Tariff Revisions to be
effective 6/26/2020.
Filed Date: 6/25/20.
Accession Number: 20200625–5112.
Comments Due: 5 p.m. ET 7/16/20.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: June 25, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–14161 Filed 6–30–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. ER20–1942–000; ER20–1942–
001; Docket No. ER20–2005–000]
Midcontinent Independent System
Operator, Inc.; Notice of Conference
Call
June 25, 2020.
On Friday, July 10, 2020, Commission
staff will hold a conference call with
Midcontinent Independent System
Operator, Inc. (MISO) at 3:00 p.m.
(Eastern Time). The purpose of the
conference call is to address factual
questions related to MISO’s proposed
tariff revisions filed in the two
captioned dockets regarding the
deliverability requirements for
intermittent and non-intermittent
Capacity Resources to convert capacity
E:\FR\FM\01JYN1.SGM
01JYN1
39560
Federal Register / Vol. 85, No. 127 / Wednesday, July 1, 2020 / Notices
to Zonal Resource Credits. Please be
advised that the questions listed in the
Appendix to this notice, as well as
possible follow-up questions, will be
discussed during the conference call.
Additional questions may also be
discussed.
The conference call will not be
webcasted or transcribed. However, for
any person interested in these
proceedings, an audio listen-only line
will be provided. Those wishing to
access the listen-only line must email
Corey Cox at Corey.Cox@ferc.gov by
5:00 p.m. (Eastern Time) on Thursday,
July 2, 2020, with your name, email, and
phone number, in order to receive the
call-in information before the
conference call. Please use the following
text for the subject line, ‘‘ER20–1942–
000 listen-only line registration.’’
Commission conferences are
accessible under section 508 of the
Rehabilitation Act of 1973. For
accessibility accommodations, please
send an email to accessibility@ferc.gov
or call toll free 1 (866) 208–3372 (voice)
or (202) 208–1659 (TTY), or send a FAX
to (202) 208–2106 with the required
accommodations.
For additional information, please
contact Corey Cox by phone at (202)
502–6848 or by email at Corey.Cox@
ferc.gov.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–14186 Filed 6–30–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2413–127]
Georgia Power Company; Notice of
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Non-project use
of project lands and waters.
b. Project No: 2413–127.
c. Date Filed: June 12, 2020.
d. Applicant: Georgia Power
Company.
e. Name of Project: Wallace Dam
Pumped Storage Project.
f. Location: Lake Oconee in Putnam
County, Georgia.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Joseph Charles,
Hydro Compliance Coordinator, Georgia
VerDate Sep<11>2014
01:53 Jul 01, 2020
Jkt 250001
Power, 241 Ralph McGill Blvd. NE, BIN
10151, Atlanta, Georgia 30308, (404)
506–2337, jcharles@southernco.com.
i. FERC Contact: Mark Carter, (678)
245–3083, mark.carter@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests: July
27, 2020.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). The first page of any filing
should include docket number P–2413–
127. Comments emailed to Commission
staff are not considered part of the
Commission record.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Request: Georgia
Power Company is requesting
Commission approval to permit 1054
Lake Oconee Parkway, LLC (applicant)
to construct a commercial marina on the
site of an existing commercial
development (i.e., Jerry’s Bait and
Tackle) that has closed. The applicant
proposes to construct a commercial
marina and dry boat storage facility that
would include a stationary, wooden
dock that could accommodate 18
watercraft, a concrete walkway, and two
concrete ramps (one of which would be
used as the launch serving the dry
storage operation). The dock would not
extend farther than 50 feet into the
water, would include a fuel pump
platform (with two pumps and four
dispensers), and would follow the
licensee’s shoreline management
guidelines. Since filing its marina
application, on June 18, 2020, the
licensee received a new license to
continue operating the Wallace Dam
project.
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
l. Locations of the Application: In
addition to publishing the full text of
this document in the Federal Register,
the Commission provides all interested
persons an opportunity to view and/or
print the contents of this document via
the internet through the Commission’s
Home Page (https://www.ferc.gov) using
the ‘‘elibrary’’ link. Enter the docket
number excluding the last three digits in
the document field to access the
document. At this time, the Commission
has suspended access to the
Commission’s Public Reference Room,
due to the proclamation declaring a
National Emergency concerning the
Novel Coronavirus Disease (COVID–19),
issued by the President on March 13,
2020. For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3673 or TYY, (202)
502–8659. Agencies may obtain copies
of the application directly from the
applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
E:\FR\FM\01JYN1.SGM
01JYN1
Agencies
[Federal Register Volume 85, Number 127 (Wednesday, July 1, 2020)]
[Notices]
[Pages 39559-39560]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-14186]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. ER20-1942-000; ER20-1942-001; Docket No. ER20-2005-000]
Midcontinent Independent System Operator, Inc.; Notice of
Conference Call
June 25, 2020.
On Friday, July 10, 2020, Commission staff will hold a conference
call with Midcontinent Independent System Operator, Inc. (MISO) at 3:00
p.m. (Eastern Time). The purpose of the conference call is to address
factual questions related to MISO's proposed tariff revisions filed in
the two captioned dockets regarding the deliverability requirements for
intermittent and non-intermittent Capacity Resources to convert
capacity
[[Page 39560]]
to Zonal Resource Credits. Please be advised that the questions listed
in the Appendix to this notice, as well as possible follow-up
questions, will be discussed during the conference call. Additional
questions may also be discussed.
The conference call will not be webcasted or transcribed. However,
for any person interested in these proceedings, an audio listen-only
line will be provided. Those wishing to access the listen-only line
must email Corey Cox at [email protected] by 5:00 p.m. (Eastern Time)
on Thursday, July 2, 2020, with your name, email, and phone number, in
order to receive the call-in information before the conference call.
Please use the following text for the subject line, ``ER20-1942-000
listen-only line registration.''
Commission conferences are accessible under section 508 of the
Rehabilitation Act of 1973. For accessibility accommodations, please
send an email to [email protected] or call toll free 1 (866) 208-
3372 (voice) or (202) 208-1659 (TTY), or send a FAX to (202) 208-2106
with the required accommodations.
For additional information, please contact Corey Cox by phone at
(202) 502-6848 or by email at [email protected].
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-14186 Filed 6-30-20; 8:45 am]
BILLING CODE 6717-01-P