Scott's Mill Hydro, LLC; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests, 39553-39554 [2020-14176]
Download as PDF
Federal Register / Vol. 85, No. 127 / Wednesday, July 1, 2020 / Notices
39553
information collection as shown in the
following table:
FERC–600—RULES OF PRACTICE AND PROCEDURE: COMPLAINT PROCEDURES
A
B
C
D
E
F
Number of
respondents
Annual
number of
responses
Total number
of responses
(column A ×
column B)
Average burden hour and
cost per response
Total annual burden
hour and cost
(column C × column D)
Cost per
respondent
(column E ÷
column A)
62
1
62
160 hrs.; $12,800 .........................
9,920 hrs.; $793,600 ....................
Comments: Comments are invited on:
(1) Whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collection
of information, including the validity of
the methodology and assumptions used;
(3) ways to enhance the quality, utility
and clarity of the information collection;
and (4) ways to minimize the burden of
the collection of information on those
who are to respond, including the use
of automated collection techniques or
other forms of information technology.
Dated: June 24, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–14177 Filed 6–30–20; 8:45 am]
BILLING CODE 6717–01–P
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified date(s). Protests
may be considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: June 25, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
DEPARTMENT OF ENERGY
[FR Doc. 2020–14159 Filed 6–30–20; 8:45 am]
Federal Energy Regulatory
Commission
BILLING CODE 6717–01–P
Combined Notice of Filings
DEPARTMENT OF ENERGY
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Number: PR20–58–002.
Applicants: Black Hills/Kansas Gas
Utility Company, LLC.
Description: Tariff filing per
284.123(b),(e)/: BHKG Substitute
Statement of Rates Filing to be effective
4/16/2020 under PR20–58.
Filed Date: 6/24/2020.
Accession Number: 202006245111.
Comments/Protests Due: 5 p.m. ET 7/
8/2020.
Docket Numbers: RP20–965–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: § 4(d) Rate Filing: 062320
Negotiated Rates—Direct Energy
Business Marketing R–7465–08 to be
effective 7/1/2020.
Filed Date: 6/23/20.
Accession Number: 20200623–5046.
Comments Due: 5 p.m. ET 7/6/20.
VerDate Sep<11>2014
01:53 Jul 01, 2020
Jkt 250001
Federal Energy Regulatory
Commission
[Project No. 14867–001]
Scott’s Mill Hydro, LLC; Notice of
Application Tendered for Filing With
the Commission and Soliciting
Additional Study Requests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Exemption
from Licensing.
b. Project No.: 14867–001.
c. Date filed: June 17, 2020.
d. Applicant: Scott’s Mill Hydro, LLC.
e. Name of Project: Scott’s Mill
Hydroelectric Project.
f. Location: On the James River, near
the City of Lynchburg, in Bedford and
Amherst Counties, Virginia. No federal
or tribal land would be occupied by
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
$12,800
project works or located within the
project boundary.
g. Filed Pursuant to: Public Utility
Regulatory Policies Act of 1978, 16
U.S.C. 2705, 2708.
h. Applicant Contact: Mr. Mark
Fendig, P.O. Box 13, Coleman Falls, VA
24536; phone: (540) 320–6762.
i. FERC Contact: Jody Callihan,
phone: (202) 502–8278 or email at
jody.callihan@ferc.gov.
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of the
Commission’s regulations, if any
resource agency, Indian Tribe, or person
believes that an additional scientific
study should be conducted in order to
form an adequate factual basis for a
complete analysis of the application on
its merit, the resource agency, Indian
Tribe, or person must file a request for
a study with the Commission not later
than 60 days from the date of filing of
the application, and serve a copy of the
request on the applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: August 16, 2020.
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY).
m. The application is not ready for
environmental analysis at this time.
n. The Scott’s Mill Hydroelectric
Project would consist of: (1) An existing
E:\FR\FM\01JYN1.SGM
01JYN1
39554
Federal Register / Vol. 85, No. 127 / Wednesday, July 1, 2020 / Notices
masonry dam containing two spillways
separated by a 25-foot-wide stone pier,
with one 735-foot-long, 15-foot-high
overflow spillway and the other a 140foot-long, 16-foot-high arch-section
spillway; (2) an impoundment with a
surface area of 316 acres at the normal
pool elevation of 516 feet North
American Vertical Datum of 1988
(NAVD 88); (3) a new modular
powerhouse containing nine generating
units with a total installed capacity of
4.5 megawatts that would be installed
immediately downstream of the existing
arch-section spillway of the dam; (4) a
new 1,200-foot-long underground
transmission line; and (5) appurtenant
facilities.
To increase flow through the modular
powerhouse, Scott’s Mill proposes to
remove the top 6.8 feet of the existing
arch-section spillway of the dam and
add a 2-foot-high concrete cap to the
existing overflow spillway. Scott’s Mill
proposes to operate the project in a runof-river mode with an estimated annual
energy production of 20,700 megawatthours.
o. In addition to publishing the full
text of this document in the Federal
Register, the Commission provides all
interested individuals an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page
(www.ferc.gov) using the ‘‘eLibrary’’
link. At this time, the Commission has
suspended access to the Commission’s
Public Access Room due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TTY, (202)
502–8659.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. Procedural schedule: The
application will be processed according
to the following preliminary schedule.
Revisions to the schedule will be made
as appropriate.
Milestone
Issue Deficiency/Additional Information Request (if necessary).
Issue Acceptance Letter ...........
Issue Scoping Document 1 for
comments.
Comments on Scoping Document 1.
VerDate Sep<11>2014
Target date
August 2020.
October 2020.
October 2020.
November 2020.
01:53 Jul 01, 2020
Jkt 250001
Milestone
Target date
Issue Scoping Document 2 (if
necessary).
Issue Notice of Ready for Environmental Analysis.
Commission issues EA ............
Comments on EA .....................
December 2020.
December 2020.
June 2021.
July 2021.
Dated: June 24, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–14176 Filed 6–30–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP20–481–000]
Rio Bravo Pipeline Company, LLC;
Notice of Application To Amend
Take notice that on June 16, 2020, Rio
Bravo Pipeline Company, LLC (Rio
Bravo), 5400 Westheimer Court,
Houston, Texas 77056–531, filed an
application pursuant to section 7(c) of
the Natural Gas Act (NGA) and, Part 157
of the Commission’s regulations for
authority to amend its order issued by
the Commission on November 22, 2019,
in Docket No. CP16–455–000.1 Rio
Bravo requests authorization to, among
other things, modify individual units at
Compressor Station 1; eliminate
Compressor Stations 2, 3 and two
interconnect booster stations; eliminate
certain measurement facilities; change
the maximum allowable operating
pressure of the pipelines and header
system, and increase the diameter of the
first pipeline from 42 inches to 48
inches, resulting in an increase in the
mainline design capacity on the first
pipeline from 2.25 Bcf/d to 2.6 Bcf/d.
Rio Bravo is not proposing a change to
the Project’s total certificated design
capacity of 4.5 Bcf/d. Rio Bravo also
proposes to revise its initial Project rates
to reflect an increase in the overall
estimated cost to construct the Project
facilities; to implement a new electric
power charge to reflect the addition of
two electric-driven compressor units
and to revise the initial fuel retainage
percentage for Phase 1 and for the entire
Project following in-service of Phase 2
all as more fully set forth in the
application which is on file with the
Commission and open to public
inspection. The filing is available for
review on the Commission’s website
web at https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
1 Rio Grande LNG, LLC and Rio Bravo Pipeline
Company, LLC, 169 FERC ¶ 61,131 (2019).
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
at FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TYY, (202)
502–8659. At this time, the Commission
has suspended access to the
Commission’s Public Reference Room,
due to the proclamation declaring a
National Emergency concerning the
Novel Coronavirus Disease (COVID–19),
issued by the President on March 13,
2020.
Any questions concerning this
application may be directed to Lisa A.
Connolly Director, Rates & Certificates,
Shelly Olmo Specialist I, Rates &
Certificates Rio Bravo Pipeline
Company, LLC P.O. Box 1642 Houston,
Texas 77251–1642 Phone: (713) 627–
4102 Fax: (713) 627–5947 and James D.
Seegers, Damien R. Lyster, Vinson &
Elkins L.L.P., 1001 Fannin, Suite 2500
Houston, Texas 77002 Phone: (713)
758–2939, Fax: (713) 615–5206 Email:
jseegers@velaw.com, Email: dlyster@
velaw.com.
Pursuant to section 157.9 of the
Commission’s rules (18 CFR 157.9),
within 90 days of this Notice, the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
E:\FR\FM\01JYN1.SGM
01JYN1
Agencies
[Federal Register Volume 85, Number 127 (Wednesday, July 1, 2020)]
[Notices]
[Pages 39553-39554]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-14176]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14867-001]
Scott's Mill Hydro, LLC; Notice of Application Tendered for
Filing With the Commission and Soliciting Additional Study Requests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Exemption from Licensing.
b. Project No.: 14867-001.
c. Date filed: June 17, 2020.
d. Applicant: Scott's Mill Hydro, LLC.
e. Name of Project: Scott's Mill Hydroelectric Project.
f. Location: On the James River, near the City of Lynchburg, in
Bedford and Amherst Counties, Virginia. No federal or tribal land would
be occupied by project works or located within the project boundary.
g. Filed Pursuant to: Public Utility Regulatory Policies Act of
1978, 16 U.S.C. 2705, 2708.
h. Applicant Contact: Mr. Mark Fendig, P.O. Box 13, Coleman Falls,
VA 24536; phone: (540) 320-6762.
i. FERC Contact: Jody Callihan, phone: (202) 502-8278 or email at
[email protected].
j. Cooperating agencies: Federal, state, local, and tribal agencies
with jurisdiction and/or special expertise with respect to
environmental issues that wish to cooperate in the preparation of the
environmental document should follow the instructions for filing such
requests described in item l below. Cooperating agencies should note
the Commission's policy that agencies that cooperate in the preparation
of the environmental document cannot also intervene. See, 94 FERC ]
61,076 (2001).
k. Pursuant to section 4.32(b)(7) of the Commission's regulations,
if any resource agency, Indian Tribe, or person believes that an
additional scientific study should be conducted in order to form an
adequate factual basis for a complete analysis of the application on
its merit, the resource agency, Indian Tribe, or person must file a
request for a study with the Commission not later than 60 days from the
date of filing of the application, and serve a copy of the request on
the applicant.
l. Deadline for filing additional study requests and requests for
cooperating agency status: August 16, 2020.
The Commission strongly encourages electronic filing. Please file
additional study requests and requests for cooperating agency status
using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support
at [email protected], (866) 208-3676 (toll free), or (202)
502-8659 (TTY).
m. The application is not ready for environmental analysis at this
time.
n. The Scott's Mill Hydroelectric Project would consist of: (1) An
existing
[[Page 39554]]
masonry dam containing two spillways separated by a 25-foot-wide stone
pier, with one 735-foot-long, 15-foot-high overflow spillway and the
other a 140-foot-long, 16-foot-high arch-section spillway; (2) an
impoundment with a surface area of 316 acres at the normal pool
elevation of 516 feet North American Vertical Datum of 1988 (NAVD 88);
(3) a new modular powerhouse containing nine generating units with a
total installed capacity of 4.5 megawatts that would be installed
immediately downstream of the existing arch-section spillway of the
dam; (4) a new 1,200-foot-long underground transmission line; and (5)
appurtenant facilities.
To increase flow through the modular powerhouse, Scott's Mill
proposes to remove the top 6.8 feet of the existing arch-section
spillway of the dam and add a 2-foot-high concrete cap to the existing
overflow spillway. Scott's Mill proposes to operate the project in a
run-of-river mode with an estimated annual energy production of 20,700
megawatt-hours.
o. In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested individuals an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (www.ferc.gov) using the
``eLibrary'' link. At this time, the Commission has suspended access to
the Commission's Public Access Room due to the proclamation declaring a
National Emergency concerning the Novel Coronavirus Disease (COVID-19),
issued by the President on March 13, 2020. For assistance, contact FERC
at [email protected] or call toll-free, (886) 208-3676 or TTY,
(202) 502-8659.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
p. Procedural schedule: The application will be processed according
to the following preliminary schedule. Revisions to the schedule will
be made as appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Issue Deficiency/Additional Information August 2020.
Request (if necessary).
Issue Acceptance Letter................ October 2020.
Issue Scoping Document 1 for comments.. October 2020.
Comments on Scoping Document 1......... November 2020.
Issue Scoping Document 2 (if necessary) December 2020.
Issue Notice of Ready for Environmental December 2020.
Analysis.
Commission issues EA................... June 2021.
Comments on EA......................... July 2021.
------------------------------------------------------------------------
Dated: June 24, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-14176 Filed 6-30-20; 8:45 am]
BILLING CODE 6717-01-P