ECOsponsible, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 38885 [2020-13916]

Download as PDF Federal Register / Vol. 85, No. 125 / Monday, June 29, 2020 / Notices announces that the Final Rule will become effective on July 1, 2020. Dated: June 23, 2020. Kimberly D. Bose, Secretary. [FR Doc. 2020–13917 Filed 6–26–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 15032–000] jbell on DSKJLSW7X2PROD with NOTICES ECOsponsible, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On May 6, 2020, ECOsponsible, LLC, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of hydropower at the existing Springville Dam located on Cattaraugus Creek in the town of Concord in Erie County, New York. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed Springville Dam Hydro Project would redevelop an abandoned project and would consist of the following: (1) An existing 338-foot-long and 40-foot-high concrete gravity dam with a 182-foot-long spillway; (2) an existing impoundment; (3) an existing powerhouse to be rebuilt and to include two new identical turbine-generator units with an installed capacity of 500 kilowatts each; (4) a new 4.8- to 13.2kilovolt, 500-foot-long transmission line extending from the powerhouse to a grid interconnection point; and (5) appurtenant facilities. The proposed project would have an annual generation of 6.5 gigawatt-hours. Applicant Contact: Dennis Ryan, ECOsponsible, LLC, P.O. Box 114, West Falls, NY 14170; phone: (716) 222–2188. FERC Contact: Monir Chowdhury; phone: (202) 502–6736. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. VerDate Sep<11>2014 20:25 Jun 26, 2020 Jkt 250001 The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of the Commission’s website at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–15032) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: June 23, 2020. Kimberly D. Bose, Secretary. [FR Doc. 2020–13916 Filed 6–26–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER20–1703–000] Capital Energy PA LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced Capital Energy PA LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and PO 00000 Frm 00046 Fmt 4703 Sfmt 4703 38885 assumptions of liability, is July 13, 2020. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically may mail similar pleadings to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. Hand delivered submissions in docketed proceedings should be delivered to Health and Human Services, 12225 Wilkins Avenue, Rockville, Maryland 20852. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Dated: June 23, 2020. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2020–13909 Filed 6–26–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER20–2123–000] Hardin Solar Energy LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Hardin E:\FR\FM\29JNN1.SGM 29JNN1

Agencies

[Federal Register Volume 85, Number 125 (Monday, June 29, 2020)]
[Notices]
[Page 38885]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-13916]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 15032-000]


ECOsponsible, LLC; Notice of Preliminary Permit Application 
Accepted for Filing and Soliciting Comments, Motions To Intervene, and 
Competing Applications

    On May 6, 2020, ECOsponsible, LLC, filed an application for a 
preliminary permit, pursuant to section 4(f) of the Federal Power Act 
(FPA), proposing to study the feasibility of hydropower at the existing 
Springville Dam located on Cattaraugus Creek in the town of Concord in 
Erie County, New York. The sole purpose of a preliminary permit, if 
issued, is to grant the permit holder priority to file a license 
application during the permit term. A preliminary permit does not 
authorize the permit holder to perform any land-disturbing activities 
or otherwise enter upon lands or waters owned by others without the 
owners' express permission.
    The proposed Springville Dam Hydro Project would redevelop an 
abandoned project and would consist of the following: (1) An existing 
338-foot-long and 40-foot-high concrete gravity dam with a 182-foot-
long spillway; (2) an existing impoundment; (3) an existing powerhouse 
to be rebuilt and to include two new identical turbine-generator units 
with an installed capacity of 500 kilowatts each; (4) a new 4.8- to 
13.2-kilovolt, 500-foot-long transmission line extending from the 
powerhouse to a grid interconnection point; and (5) appurtenant 
facilities. The proposed project would have an annual generation of 6.5 
gigawatt-hours.
    Applicant Contact: Dennis Ryan, ECOsponsible, LLC, P.O. Box 114, 
West Falls, NY 14170; phone: (716) 222-2188.
    FERC Contact: Monir Chowdhury; phone: (202) 502-6736.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY).
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of the 
Commission's website at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-15032) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: June 23, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-13916 Filed 6-26-20; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.