Great Falls Hydroelectric Company, City of Paterson, New Jersey; Notice of Application Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions, 37652-37653 [2020-13442]
Download as PDF
37652
Federal Register / Vol. 85, No. 121 / Tuesday, June 23, 2020 / Notices
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
In addition to publishing the full text
of this document in the Federal
Register, The Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the eLibrary link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Comment Date: 5:00 p.m. Eastern
Time on July 6, 2020.
Dated: June 16, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–13445 Filed 6–22–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER20–2063–000]
jbell on DSKJLSW7X2PROD with NOTICES
Trafigura Trading, LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of
Trafigura Trading, LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
VerDate Sep<11>2014
17:17 Jun 22, 2020
Jkt 250001
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is July 7, 2020.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
may mail similar pleadings to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426. Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the eLibrary link. Enter
the docket number excluding the last
three digits in the docket number field
to access the document. At this time, the
Commission has suspended access to
the Commission’s Public Reference
Room, due to the proclamation
declaring a National Emergency
concerning the Novel Coronavirus
Disease (COVID–19), issued by the
President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Dated: June 17, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–13479 Filed 6–22–20; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2814–025]
Great Falls Hydroelectric Company,
City of Paterson, New Jersey; Notice of
Application Ready for Environmental
Analysis, and Soliciting Comments,
Recommendations, Terms and
Conditions, and Prescriptions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 2814–025.
c. Date Filed: February 28, 2019.
d. Applicant: Great Falls
Hydroelectric Company and the City of
Paterson, New Jersey, as co-licensees.
e. Name of Project: Great Falls
Hydroelectric Project (Great Falls
Project or project).
f. Location: On the Passaic River, near
the City of Paterson, Passaic County,
New Jersey. The project does not occupy
federal land.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mr. Robert
Gates, Senior Vice President of
Operations, Eagle Creek Renewable
Energy, 65 Madison Avenue, Suite 500,
Morristown, NJ 07960; (973) 998–8400;
email—bob.gates@eaglecreekre.com
and/or Ben-David Seligman, 2nd
Assistant Corp. Counsel, City of
Paterson, 155 Market Street, Paterson,
NJ; (973) 321–1366; email—bseligman@
patersonnj.gov.
i. FERC Contact: Christopher Millard
at (202) 502–8256; or email at
christopher.millard@ferc.gov.
j. Deadline for filing comments,
recommendations, terms and
conditions, and prescriptions: 60 days
from the issuance date of this notice;
reply comments are due 105 days from
the issuance date of this notice.
The Commission strongly encourages
electronic filing. Please file comments,
recommendations, terms and
conditions, and prescriptions using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
E:\FR\FM\23JNN1.SGM
23JNN1
jbell on DSKJLSW7X2PROD with NOTICES
Federal Register / Vol. 85, No. 121 / Tuesday, June 23, 2020 / Notices
208–3676 (toll free), or (202) 502–8659
(TTY).
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted
and is ready for environmental analysis
at this time.
l. The existing project works consist
of: (1) The Society for the Establishment
of Useful Manufactures (S.U.M.) dam,
an overflow granite stone gravity
structure about 315 feet long, with a
maximum height of 15 feet and having
a crest elevation of 114.6 feet mean sea
level (msl); (2) a reservoir with a surface
area of 114.69 acres and a storage
capacity of 1,415 acre-feet at elevation
114.6 feet msl; (3) a forebay inlet
structure; (4) a headgate control
structure containing three trashracks
and three steel gates; (5) three
penstocks, each 8.5 feet in diameter and
approximately 55 feet long; (6) a
powerhouse containing three turbinegenerator units with a total rated
capacity of 10.95 megawatts; (7) a 37foot-long, 4.16-kilovolt (kV)
underground transmission line
connecting the powerhouse to a 4.16/
26.4-kV step-up transformer which in
turn is connected to a 26.4-kV
transmission grid via an approximately
30-foot-long, 26.4-kV underground
transmission line; (8) and appurtenant
facilities.
The Great Falls Project is operated in
a run-of-river mode. For the period 2010
through 2018, the average annual
generation at the Great Falls Project was
17,484 megawatt-hours.
m. A copy of the application may be
viewed and/or printed on the
Commission’s website (https://
www.ferc.gov), using the eLibrary link.
Enter the docket number, excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact FERC Online
Support at FERC OnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY).
VerDate Sep<11>2014
17:17 Jun 22, 2020
Jkt 250001
All filings must (1) bear in all capital
letters the title COMMENTS, REPLY
COMMENTS, RECOMMENDATIONS,
TERMS AND CONDITIONS, or
PRESCRIPTIONS; (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person submitting the
filing; and (4) otherwise comply with
the requirements of 18 CFR 385.2001
through 385.2005. All comments,
recommendations, terms and conditions
or prescriptions must set forth their
evidentiary basis and otherwise comply
with the requirements of 18 CFR 4.34(b).
Agencies may obtain copies of the
application directly from the applicant.
Each filing must be accompanied by
proof of service on all persons listed on
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. A license applicant must file no
later than 60 days following the date of
issuance of this notice: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
o. Procedural schedule: The
application will be processed according
to the following schedule. Revisions to
the schedule will be made as
appropriate.
Milestone
Target date
Deadline for filing comments,
recommendations, terms and
conditions, and prescriptions.
Reply comments due ..................
Commission issues EA ...............
Comments on EA due ................
August 2020.
September 2020.
January 2021.
February 2021.
Dated: June 16, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–13442 Filed 6–22–20; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
37653
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AD20–18–000]
Offshore Wind Integration in RTOs/
ISOs; Notice of Technical Conference
Take notice that Federal Energy
Regulatory Commission (Commission)
staff will convene a technical
conference to discuss whether existing
Commission transmission,
interconnection, and merchant
transmission facility frameworks in
RTOs/ISOs can accommodate
anticipated growth in offshore wind
generation in an efficient and effective
manner that safeguards open access
transmission principles and to consider
possible changes or improvements to
the current framework should they be
needed to accommodate such growth.
Commissioners may participate in the
technical conference.
The technical conference will be held
on Tuesday, October 27, 2020, from
approximately 9:00 a.m. to 5:00 p.m.
Eastern Time. The technical conference
will be held either in-person at the
Commission’s headquarters at 888 First
Street NE, Washington, DC 20426 in the
Commission Meeting Room (with a
WebEx option available) or solely
electronically. A supplemental notice
will be issued prior to the technical
conference with further details
regarding the agenda, whether it will be
held in-person or electronically, and if
there are changes to the date or time of
the technical conference.
Individuals interested in participating
as panelists should submit a selfnomination form by 5:00 p.m. on
Friday, August 14, 2020 at: https://
www.ferc.gov/whats-new/registration/
10-27-20-speaker-form.asp. Individuals
who are interested in registering for the
conference can do so here: https://
www.ferc.gov/whats-new/registration/
10-27-20-form.asp.
The conference will be transcribed.
Transcripts will be available for a fee
from Ace Reporting (202–347–3700).
Commission conferences are
accessible under section 508 of the
Rehabilitation Act of 1973. For
accessibility accommodations, please
send an email to accessibility@ferc.gov
or call toll free 1–866–208–3372 (voice)
or 202–208–8659 (TTY), or send a fax to
202–208–2106 with the required
accommodations.
E:\FR\FM\23JNN1.SGM
23JNN1
Agencies
[Federal Register Volume 85, Number 121 (Tuesday, June 23, 2020)]
[Notices]
[Pages 37652-37653]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-13442]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2814-025]
Great Falls Hydroelectric Company, City of Paterson, New Jersey;
Notice of Application Ready for Environmental Analysis, and Soliciting
Comments, Recommendations, Terms and Conditions, and Prescriptions
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 2814-025.
c. Date Filed: February 28, 2019.
d. Applicant: Great Falls Hydroelectric Company and the City of
Paterson, New Jersey, as co-licensees.
e. Name of Project: Great Falls Hydroelectric Project (Great Falls
Project or project).
f. Location: On the Passaic River, near the City of Paterson,
Passaic County, New Jersey. The project does not occupy federal land.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Mr. Robert Gates, Senior Vice President of
Operations, Eagle Creek Renewable Energy, 65 Madison Avenue, Suite 500,
Morristown, NJ 07960; (973) 998-8400; [email protected]
and/or Ben-David Seligman, 2nd Assistant Corp. Counsel, City of
Paterson, 155 Market Street, Paterson, NJ; (973) 321-1366; email_
[email protected]
i. FERC Contact: Christopher Millard at (202) 502-8256; or email at
[email protected].
j. Deadline for filing comments, recommendations, terms and
conditions, and prescriptions: 60 days from the issuance date of this
notice; reply comments are due 105 days from the issuance date of this
notice.
The Commission strongly encourages electronic filing. Please file
comments, recommendations, terms and conditions, and prescriptions
using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000
characters, without prior registration, using the eComment system at
https://www.ferc.gov/docs-filing/ecomment.asp. You must include your
name and contact information at the end of your comments. For
assistance, please contact FERC Online Support at
[email protected]">FERC[email protected], (866)
[[Page 37653]]
208-3676 (toll free), or (202) 502-8659 (TTY).
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
k. This application has been accepted and is ready for
environmental analysis at this time.
l. The existing project works consist of: (1) The Society for the
Establishment of Useful Manufactures (S.U.M.) dam, an overflow granite
stone gravity structure about 315 feet long, with a maximum height of
15 feet and having a crest elevation of 114.6 feet mean sea level
(msl); (2) a reservoir with a surface area of 114.69 acres and a
storage capacity of 1,415 acre-feet at elevation 114.6 feet msl; (3) a
forebay inlet structure; (4) a headgate control structure containing
three trashracks and three steel gates; (5) three penstocks, each 8.5
feet in diameter and approximately 55 feet long; (6) a powerhouse
containing three turbine-generator units with a total rated capacity of
10.95 megawatts; (7) a 37-foot-long, 4.16-kilovolt (kV) underground
transmission line connecting the powerhouse to a 4.16/26.4-kV step-up
transformer which in turn is connected to a 26.4-kV transmission grid
via an approximately 30-foot-long, 26.4-kV underground transmission
line; (8) and appurtenant facilities.
The Great Falls Project is operated in a run-of-river mode. For the
period 2010 through 2018, the average annual generation at the Great
Falls Project was 17,484 megawatt-hours.
m. A copy of the application may be viewed and/or printed on the
Commission's website (https://www.ferc.gov), using the eLibrary link.
Enter the docket number, excluding the last three digits in the docket
number field to access the document. At this time, the Commission has
suspended access to the Commission's Public Reference Room, due to the
proclamation declaring a National Emergency concerning the Novel
Coronavirus Disease (COVID-19), issued by the President on March 13,
2020. For assistance, contact FERC Online Support at [email protected]">FERC[email protected], (866) 208-3676 (toll free), or (202) 502-8659
(TTY).
All filings must (1) bear in all capital letters the title
COMMENTS, REPLY COMMENTS, RECOMMENDATIONS, TERMS AND CONDITIONS, or
PRESCRIPTIONS; (2) set forth in the heading the name of the applicant
and the project number of the application to which the filing responds;
(3) furnish the name, address, and telephone number of the person
submitting the filing; and (4) otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005. All comments, recommendations,
terms and conditions or prescriptions must set forth their evidentiary
basis and otherwise comply with the requirements of 18 CFR 4.34(b).
Agencies may obtain copies of the application directly from the
applicant. Each filing must be accompanied by proof of service on all
persons listed on the service list prepared by the Commission in this
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. A license applicant must file no later than 60 days following
the date of issuance of this notice: (1) A copy of the water quality
certification; (2) a copy of the request for certification, including
proof of the date on which the certifying agency received the request;
or (3) evidence of waiver of water quality certification.
o. Procedural schedule: The application will be processed according
to the following schedule. Revisions to the schedule will be made as
appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Deadline for filing comments, August 2020.
recommendations, terms and conditions,
and prescriptions.
Reply comments due...................... September 2020.
Commission issues EA.................... January 2021.
Comments on EA due...................... February 2021.
------------------------------------------------------------------------
Dated: June 16, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-13442 Filed 6-22-20; 8:45 am]
BILLING CODE 6717-01-P