Combined Notice of Filings, 37091-37092 [2020-13244]
Download as PDF
khammond on DSKJM1Z7X2PROD with NOTICES
Federal Register / Vol. 85, No. 119 / Friday, June 19, 2020 / Notices
Description: Fern Solar LLC Notice of
Self-Certification of Exempt Wholesale
Generator Status.
Filed Date: 6/12/20.
Accession Number: 20200612–5229.
Comments Due: 5 p.m. ET 7/6/20.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER20–1107–002.
Applicants: Midcontinent
Independent System Operator, Inc., ITC
Midwest LLC.
Description: Tariff Amendment:
2020–06–15_SA 2945 ITC–IPL Sub 1st
Rev FSA (J233 J514) Unpopulated
Template to be effective 2/28/2020.
Filed Date: 6/15/20.
Accession Number: 20200615–5142.
Comments Due: 5 p.m. ET 7/6/20.
Docket Numbers: ER20–2050–000.
Applicants: Tri-State Generation and
Transmission Association, Inc.
Description: § 205(d) Rate Filing:
Amendment to Service Agreement No.
207 to be effective 2/25/2020.
Filed Date: 6/12/20.
Accession Number: 20200612–5192.
Comments Due: 5 p.m. ET 7/6/20.
Docket Numbers: ER20–2051–000.
Applicants: Niagara Mohawk Power
Corporation, New York Independent
System Operator, Inc.
Description: Compliance filing:
Niagara Mohawk—Order No. 864
compliance re: transmission service
charge to be effective 1/27/2020.
Filed Date: 6/15/20.
Accession Number: 20200615–5017.
Comments Due: 5 p.m. ET 7/6/20.
Docket Numbers: ER20–2052–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to ICSA, SA No. 5247;
Queue Position Z2–107 to be effective 6/
21/2019.
Filed Date: 6/15/20.
Accession Number: 20200615–5106.
Comments Due: 5 p.m. ET 7/6/20.
Docket Numbers: ER20–2053–000.
Applicants: Republic Transmission,
LLC.
Description: Tariff Cancellation:
Republic Transmission LLC
Cancellation of Formula Rates Tariff to
be effective 6/15/2020.
Filed Date: 6/15/20.
Accession Number: 20200615–5130.
Comments Due: 5 p.m. ET 7/6/20.
Docket Numbers: ER20–2055–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing:
Amended GIA & DSA Kaweah River
Power Authority SA Nos. 1100–1101
Terminus Dam to be effective 8/15/
2020.
VerDate Sep<11>2014
17:17 Jun 18, 2020
Jkt 250001
Filed Date: 6/15/20.
Accession Number: 20200615–5165.
Comments Due: 5 p.m. ET 7/6/20.
Docket Numbers: ER20–2056–000.
Applicants: Northern Indiana Public
Service Company.
Description: § 205(d) Rate Filing:
Filing of a CIAC Agreement to be
effective 6/10/2020.
Filed Date: 6/15/20.
Accession Number: 20200615–5198.
Comments Due: 5 p.m. ET 7/6/20.
Docket Numbers: ER20–2057–000.
Applicants: El Paso Electric Company.
Description: § 205(d) Rate Filing:
Service Agreement No. 335,
Nonconforming EPE and EDFR Solar
LGIA to be effective 5/29/2020.
Filed Date: 6/15/20.
Accession Number: 20200615–5220.
Comments Due: 5 p.m. ET 7/6/20.
Docket Numbers: ER20–2058–000.
Applicants: El Paso Electric Company.
Description: § 205(d) Rate Filing:
Service Agreement No. 336,
Nonconforming EPE and NextEra LGIA
to be effective 5/20/2020.
Filed Date: 6/15/20.
Accession Number: 20200615–5240.
Comments Due: 5 p.m. ET 7/6/20.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES20–43–000.
Applicants: Consolidated Edison
Company of New York, Inc.
Description: Application Under
Section 204 of the Federal Power Act for
Authorization to Issue Securities of
Consolidated Edison Company of New
York, Inc.
Filed Date: 6/12/20.
Accession Number: 20200612–5242.
Comments Due: 5 p.m. ET 7/6/20.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
37091
Dated: June 15, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–13245 Filed 6–18–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Numbers: RP19–581–003.
Applicants: Rager Mountain Storage
Company LLC.
Description: Compliance filing Order
No. 587–Y—Request for Additional
Extension of Time.
Filed Date: 6/12/20.
Accession Number: 20200612–5103.
Comments Due: 5 p.m. ET 6/24/20.
Docket Numbers: RP19–582–003.
Applicants: Equitrans, L.P.
Description: Compliance filing Order
No. 587–Y—Request for Additional
Extension of Time.
Filed Date: 6/12/20.
Accession Number: 20200612–5157.
Comments Due: 5 p.m. ET 6/24/20.
Docket Numbers: RP20–955–000.
Applicants: Gas Transmission
Northwest LLC.
Description: § 4(d) Rate Filing:
Negotiated Rate Agreement—Seven
Generations to be effective 6/1/2020.
Filed Date: 6/12/20.
Accession Number: 20200612–5208.
Comments Due: 5 p.m. ET 6/24/20.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified date(s). Protests
may be considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
E:\FR\FM\19JNN1.SGM
19JNN1
37092
Federal Register / Vol. 85, No. 119 / Friday, June 19, 2020 / Notices
Dated: June 15, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–13244 Filed 6–18–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Effectiveness of Exempt
Wholesale Generator Status
Docket Nos.
Frontier Windpower II, LLC ......
Coyote Wind, LLC ....................
Roundhouse Renewable Energy, LLC.
Oliver Wind II, LLC ...................
Anson Solar Center, LLC .........
Bluestone Farm Solar, LLC ......
Whitehorn Solar LLC ................
Las Majadas Wind Farm, LLC
Milligan 1 Wind LLC .................
King Plains Wind Project, LLC
Johanna Energy Center, LLC ..
Dakota Range III, LLC .............
Triple H Wind Project, LLC ......
Las Lomas Wind Project, LLC
Prairie Hill Wind Project, LLC ..
Mechanicsville Solar, LLC ........
Albemarle Beach Solar, LLC ....
RE Mustang Two Barbaro, LLC
RE Mustang Two Whirlaway,
LLC.
LA3 West Baton Rouge, LLC ...
Yards Creek Energy, LLC ........
Inter-Power/AhlCon Partners,
L.P.
Northern Colorado Wind Energy Center, LLC.
EG20–88–000
EG20–89–000
EG20–90–000
EG20–91–000
EG20–92–000
EG20–93–000
EG20–94–000
EG20–95–000
EG20–96–000
EG20–97–000
EG20–98–000
EG20–99–000
EG20–100–000
EG20–101–000
EG20–102–000
EG20–103–000
EG20–104–000
EG20–105–000
EG20–106–000
EG20–107–000
EG20–108–000
EG20–109–000
EG20–110–000
Take notice that during the month of
May 2020, the status of the abovecaptioned entities as Exempt Wholesale
Generators became effective by
operation of the Commission’s
regulations. 18 CFR 366.7(a) (2019).
Dated: June 15, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–13242 Filed 6–18–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Southeastern Power Administration
Revision to Power Marketing Policy
Kerr-Philpott System of Projects
Southeastern Power
Administration, DOE.
ACTION: Notice of proposed revision to
power marketing policy.
khammond on DSKJM1Z7X2PROD with NOTICES
AGENCY:
Pursuant to its Procedure for
Public Participation in the Formulation
of Marketing Policy, published in the
Federal Register of July 6, 1978,
Southeastern Power Administration
SUMMARY:
VerDate Sep<11>2014
17:17 Jun 18, 2020
Jkt 250001
(Southeastern or SEPA) published on
November 15, 2019, a notice of intent to
revise its power marketing policy to
include provisions regarding renewable
energy certificates (RECs) from its KerrPhilpott System of Projects (KerrPhilpott System). The current power
marketing policy was published on July
29, 1985, for the Kerr-Philpott System
and is reflected in contracts for the sale
of system power, which are maintained
in Southeastern’s headquarters office.
The following is the proposed revision
to the Kerr-Philpott System Power
Marketing Policy to include a procedure
for distribution of RECs to Preference
Customers. Southeastern solicits written
comments in formulating the final
marketing policy revision.
DATES: A public information and
comment forum will be held in
Boydton, Virginia, at 1:00 p.m. on
August 18, 2020. Persons desiring to
attend the forum should notify
Southeastern by August 10, 2020, so
that a list of forum participants can be
prepared. Persons desiring to speak at
the forum should specify this in their
notification to Southeastern; others may
speak if time permits. Written
comments are due September 2, 2020,
fifteen (15) days after the scheduled
comment forum.
ADDRESSES: Five copies of written
comments should be submitted to:
Herbert R. Nadler, Acting
Administrator, Southeastern Power
Administration, Department of Energy,
1166 Athens Tech Road, Elberton,
Georgia 30635–6711, and emailed to
Comments@sepa.doe.gov. The public
information and comment forum for the
revision of the Kerr-Philpott System
power marketing policy to include
provisions for renewable energy
certificates will be at the U.S. Army
Corps of Engineers, J. H. Kerr Reservoir
Visitor Assistance Center, 1930 Mays
Chapel Road, Boydton, Virginia 23917,
Phone: (434) 738–6143. If travel
restrictions occur due to the COVID–19
pandemic on August 18, 2020, the
comment forum will be held as a
webinar on the same date and time.
Please register your intent to attend,
including name, address, phone
number, and email address, with
Southeastern’s Legal Assistant at
judith.worley@sepa.doe.gov, to receive
updates on the meeting status of the
comment forum. Registered attendees
will be contacted on August 11, 2020,
regarding meeting updates and call-in
information, if held by webinar.
FOR FURTHER INFORMATION CONTACT:
Leon Jourolmon IV, General Counsel,
Southeastern Power Administration,
1166 Athens Tech Road, Elberton, GA
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
30635, (706) 213–3800,
leon.jourolmon@sepa.doe.gov.
SUPPLEMENTARY INFORMATION:
Background: Pursuant to its Procedure
for ‘‘Public Participation in Formulation
of Marketing Policy’’ published in the
Federal Register on July 6, 1978, 43 FR
29186, Southeastern published a
‘‘Notice of Issuance of Final Power
Marketing Policy, Kerr-Philpott System
of Projects’’ in the Federal Register on
July 29, 1985, 50 FR 30751. The policy
establishes the marketing area for
system power and addresses the
utilization of area utility systems for
essential purposes. The policy also
addresses wholesale rates, resale rates,
and conservation measures, but does not
address renewable energy certificates.
Under Section 5 of the Flood Control
Act of 1944 (16 U.S.C. 825s),
Southeastern is responsible for the
transmission and disposition of electric
power and energy from reservoir
projects operated by the Department of
the Army. Furthermore, Southeastern
must transmit and dispose of such
power and energy in such manner as to
encourage the most widespread use at
the lowest possible rates to consumers
consistent with sound business
principles. Rate schedules shall be
drawn to recover all costs associated
with producing and transmitting the
power in accordance with repayment
criteria
All documents introduced at the
public information and comment forum,
and all comments, questions and
answers will be available for inspection
and copying in accordance with the
Freedom of Information Act (5 U.S.C.
552).
Public Notice and Comment
On November 15, 2019, Southeastern
published in the Federal Register, 84 FR
62519, a ‘‘Notice of Intention to begin a
public process’’ to revise its marketing
policy by including provisions
regarding renewable energy certificates
from its Kerr-Philpott System. The
notice requested that written comments
and proposals be submitted on or before
January 14, 2020. All comments
received are summarized and answered
in the following section.
Staff Review of Comments
Written comments were received from
one source, Southeastern Federal Power
Customers, Inc. (SeFPC), and are
summarized below. Southeastern’s
response follows each comment.
Comment 1: Precedential Effect
At the outset, the SeFPC recognizes
that SEPA is only revising the marketing
policy for the Kerr-Philpott system of
E:\FR\FM\19JNN1.SGM
19JNN1
Agencies
[Federal Register Volume 85, Number 119 (Friday, June 19, 2020)]
[Notices]
[Pages 37091-37092]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-13244]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings
Take notice that the Commission has received the following Natural
Gas Pipeline Rate and Refund Report filings:
Docket Numbers: RP19-581-003.
Applicants: Rager Mountain Storage Company LLC.
Description: Compliance filing Order No. 587-Y--Request for
Additional Extension of Time.
Filed Date: 6/12/20.
Accession Number: 20200612-5103.
Comments Due: 5 p.m. ET 6/24/20.
Docket Numbers: RP19-582-003.
Applicants: Equitrans, L.P.
Description: Compliance filing Order No. 587-Y--Request for
Additional Extension of Time.
Filed Date: 6/12/20.
Accession Number: 20200612-5157.
Comments Due: 5 p.m. ET 6/24/20.
Docket Numbers: RP20-955-000.
Applicants: Gas Transmission Northwest LLC.
Description: Sec. 4(d) Rate Filing: Negotiated Rate Agreement--
Seven Generations to be effective 6/1/2020.
Filed Date: 6/12/20.
Accession Number: 20200612-5208.
Comments Due: 5 p.m. ET 6/24/20.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified date(s). Protests may be considered,
but intervention is necessary to become a party to the proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
[[Page 37092]]
Dated: June 15, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020-13244 Filed 6-18-20; 8:45 am]
BILLING CODE 6717-01-P