Application To Export Electric Energy; Rainbow Energy Marketing Corporation, 37089 [2020-13236]
Download as PDF
khammond on DSKJM1Z7X2PROD with NOTICES
Federal Register / Vol. 85, No. 119 / Friday, June 19, 2020 / Notices
current rulemaking. See discussion under
sub-recommendation 3.a. for the basis for
rejection of 4.a.
Sub-Recommendation 4.b. While
conducting the analyses in 3.a. and 4.a.
above, retain the requirement for contractors
to submit a documented safety analysis on
an annual schedule for DOE approval.
DOE rejects this sub-recommendation
because DOE is considering this matter in the
current rulemaking. See discussion under
sub-recommendation 3.a for the basis for
rejection of 4.b.
Sub-Recommendation 4.c. Specify what
safety basis documentation a contractor must
submit when seeking approval for an action
involving a USQ (proposed 10 CFR
830.203(d)).
DOE partially accepts this subrecommendation and will evaluate DOE’s
nuclear safety management framework (i.e.,
DOE directives and technical standards) to
determine whether improvements are
necessary. DOE’s understanding is that the
Board staff is also in the process of reviewing
DOE’s implementation of USQ requirements
for defense nuclear facilities. DOE looks
forward to considering the results of this
review, once complete, to inform DOE’s path
forward in this area. The Implementation
Plan will further describe the steps that will
be taken to address this subrecommendation.
Sub-Recommendation 4.d. Establish
requirements for USQs and TSRs in 10 CFR
830 and/or orders, by elevating key guidance
on USQs and TSRs to clearly identified
requirements.
DOE partially accepts this subrecommendation and will evaluate DOE’s
nuclear safety management framework (i.e.,
DOE directives and technical standards) to
determine whether improvements are
necessary. DOE’s understanding is that the
Board staff is also in the process of reviewing
DOE’s implementation of USQ and technical
safety requirements (TSR) for defense nuclear
facilities. DOE looks forward to considering
the results of these reviews, once complete,
to inform DOE’s path forward in this area.
The Implementation Plan will further
describe the steps that will be taken to
address this sub-recommendation.
Sub-Recommendation 4.e. Establish
requirements for and incorporate the concept
of defense-in-depth and SACs and add a
discussion of defense-in-depth and SACs to
10 CFR 830 under safety structures, systems,
and components.
DOE rejects this sub-recommendation
because this topic is outside of the scope of
the current rulemaking to amend 10 CFR part
830. However, DOE will perform a regulatory
analysis to evaluate whether any changes to
10 CFR part 830 should be proposed through
an additional rulemaking.
[FR Doc. 2020–13238 Filed 6–18–20; 8:45 am]
BILLING CODE 6450–01–P
VerDate Sep<11>2014
17:17 Jun 18, 2020
Jkt 250001
DEPARTMENT OF ENERGY
[OE Docket No. EA–375–B]
Application To Export Electric Energy;
Rainbow Energy Marketing
Corporation
Office of Electricity,
Department of Energy.
ACTION: Notice of application.
AGENCY:
Rainbow Energy Marketing
Corporation (Applicant or Rainbow) has
applied to renew its authorization to
transmit electric energy from the United
States to Mexico pursuant to the Federal
Power Act.
DATES: Comments, protests, or motions
to intervene must be submitted on or
before July 20, 2020.
ADDRESSES: Comments, protests,
motions to intervene, or requests for
more information should be addressed
by electronic mail to
Electricity.Exports@hq.doe.gov, or by
facsimile to (202) 586–8008.
SUPPLEMENTARY INFORMATION: The
Department of Energy (DOE) regulates
exports of electricity from the United
States to a foreign country, pursuant to
sections 301(b) and 402(f) of the
Department of Energy Organization Act
(42 U.S.C. 7151(b) and 42 U.S.C.
7172(f)). Such exports require
authorization under section 202(e) of
the Federal Power Act (FPA) (16 U.S.C.
824a(e)).
On December 3, 2015, DOE issued
Order No. EA–375–A, which authorized
Rainbow to transmit electric energy
from the United States to Mexico as a
power marketer for a five-year term
using existing international
transmission facilities appropriate for
open access. This authorization expires
on December 14, 2020. On June 5, 2020,
Rainbow filed an application
(Application or App.) with DOE for
renewal of the export authorization
contained in Order No. EA–375–A.
Rainbow states that its principal place
of business is in Bismarck, North
Dakota, and that it ‘‘is a privately owned
U.S. corporation, which is partially
owned by United Energy Corporation.’’
App. at 1–2. Rainbow adds that it ‘‘does
not own or control any electric power
generation or transmission facilities and
does not have a franchised electric
power service area.’’ Id. at 2.
Rainbow further states that it ‘‘will
purchase the power to be exported from
electric utilities and federal power
marketing agencies as those terms are
defined in the FPA.’’ App. at 3–4.
Rainbow contends that its proposed
SUMMARY:
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
37089
exports ‘‘would not impede or tend to
impede the coordinated use of
transmission facilities within the
meaning of FPA Section 202(e).’’ Id at
5.
The existing international
transmission facilities to be utilized by
the Applicant have previously been
authorized by Presidential permits
issued pursuant to Executive Order
10485, as amended, and are appropriate
for open access transmission by third
parties.
Procedural Matters: Any person
desiring to be heard in this proceeding
should file a comment or protest to the
Application at the address provided
above. Protests should be filed in
accordance with Rule 211 of the Federal
Energy Regulatory Commission’s (FERC)
Rules of Practice and Procedure (18 CFR
385.211). Any person desiring to
become a party to this proceeding
should file a motion to intervene at the
above address in accordance with FERC
Rule 214 (18 CFR 385.214).
Comments and other filings
concerning Rainbow’s Application
should be clearly marked with OE
Docket No. EA–375–B. Additional
copies are to be provided directly to
Joseph A. Wolfe, Kirkwood Office
Tower, 919 South 7th Street, Suite 405,
Bismarck, ND 58504, j.wolfe@
rainbowenergy.com; and Steven A.
Weiler, 1401 New York Avenue NW,
Suite 900, Washington, DC 20005–2102,
weiler.steve@dorsey.com.
A final decision will be made on this
Application after the environmental
impacts have been evaluated pursuant
to DOE’s National Environmental Policy
Act Implementing Procedures (10 CFR
part 1021) and after DOE determines
that the proposed action will not have
an adverse impact on the sufficiency of
supply or reliability of the U.S. electric
power supply system.
Copies of this Application will be
made available, upon request, by
accessing the program website at https://
energy.gov/node/11845, or by emailing
Matthew Aronoff at matthew.aronoff@
hq.doe.gov.
Signed in Washington, DC, on June 15,
2020.
Christopher Lawrence,
Management and Program Analyst,
Transmission Permitting and Technical
Assistance, Office of Electricity.
[FR Doc. 2020–13236 Filed 6–18–20; 8:45 am]
BILLING CODE 6450–01–P
E:\FR\FM\19JNN1.SGM
19JNN1
Agencies
[Federal Register Volume 85, Number 119 (Friday, June 19, 2020)]
[Notices]
[Page 37089]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-13236]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[OE Docket No. EA-375-B]
Application To Export Electric Energy; Rainbow Energy Marketing
Corporation
AGENCY: Office of Electricity, Department of Energy.
ACTION: Notice of application.
-----------------------------------------------------------------------
SUMMARY: Rainbow Energy Marketing Corporation (Applicant or Rainbow)
has applied to renew its authorization to transmit electric energy from
the United States to Mexico pursuant to the Federal Power Act.
DATES: Comments, protests, or motions to intervene must be submitted on
or before July 20, 2020.
ADDRESSES: Comments, protests, motions to intervene, or requests for
more information should be addressed by electronic mail to
[email protected], or by facsimile to (202) 586-8008.
SUPPLEMENTARY INFORMATION: The Department of Energy (DOE) regulates
exports of electricity from the United States to a foreign country,
pursuant to sections 301(b) and 402(f) of the Department of Energy
Organization Act (42 U.S.C. 7151(b) and 42 U.S.C. 7172(f)). Such
exports require authorization under section 202(e) of the Federal Power
Act (FPA) (16 U.S.C. 824a(e)).
On December 3, 2015, DOE issued Order No. EA-375-A, which
authorized Rainbow to transmit electric energy from the United States
to Mexico as a power marketer for a five-year term using existing
international transmission facilities appropriate for open access. This
authorization expires on December 14, 2020. On June 5, 2020, Rainbow
filed an application (Application or App.) with DOE for renewal of the
export authorization contained in Order No. EA-375-A.
Rainbow states that its principal place of business is in Bismarck,
North Dakota, and that it ``is a privately owned U.S. corporation,
which is partially owned by United Energy Corporation.'' App. at 1-2.
Rainbow adds that it ``does not own or control any electric power
generation or transmission facilities and does not have a franchised
electric power service area.'' Id. at 2.
Rainbow further states that it ``will purchase the power to be
exported from electric utilities and federal power marketing agencies
as those terms are defined in the FPA.'' App. at 3-4. Rainbow contends
that its proposed exports ``would not impede or tend to impede the
coordinated use of transmission facilities within the meaning of FPA
Section 202(e).'' Id at 5.
The existing international transmission facilities to be utilized
by the Applicant have previously been authorized by Presidential
permits issued pursuant to Executive Order 10485, as amended, and are
appropriate for open access transmission by third parties.
Procedural Matters: Any person desiring to be heard in this
proceeding should file a comment or protest to the Application at the
address provided above. Protests should be filed in accordance with
Rule 211 of the Federal Energy Regulatory Commission's (FERC) Rules of
Practice and Procedure (18 CFR 385.211). Any person desiring to become
a party to this proceeding should file a motion to intervene at the
above address in accordance with FERC Rule 214 (18 CFR 385.214).
Comments and other filings concerning Rainbow's Application should
be clearly marked with OE Docket No. EA-375-B. Additional copies are to
be provided directly to Joseph A. Wolfe, Kirkwood Office Tower, 919
South 7th Street, Suite 405, Bismarck, ND 58504,
[email protected]; and Steven A. Weiler, 1401 New York Avenue
NW, Suite 900, Washington, DC 20005-2102, [email protected].
A final decision will be made on this Application after the
environmental impacts have been evaluated pursuant to DOE's National
Environmental Policy Act Implementing Procedures (10 CFR part 1021) and
after DOE determines that the proposed action will not have an adverse
impact on the sufficiency of supply or reliability of the U.S. electric
power supply system.
Copies of this Application will be made available, upon request, by
accessing the program website at https://energy.gov/node/11845, or by
emailing Matthew Aronoff at [email protected].
Signed in Washington, DC, on June 15, 2020.
Christopher Lawrence,
Management and Program Analyst, Transmission Permitting and Technical
Assistance, Office of Electricity.
[FR Doc. 2020-13236 Filed 6-18-20; 8:45 am]
BILLING CODE 6450-01-P