Lower Saranac Hydro, LLC; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments, 36574-36575 [2020-13033]
Download as PDF
36574
Federal Register / Vol. 85, No. 117 / Wednesday, June 17, 2020 / Notices
Dated: June 11, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–13024 Filed 6–16–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
khammond on DSKJM1Z7X2PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG20–183–000.
Applicants: Aviator Wind, LLC.
Description: Aviator Wind, LLC
Submits EWG Self-Certification.
Filed Date: 6/11/20.
Accession Number: 20200611–5041.
Comments Due: 5 p.m. ET 7/2/20.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER20–1281–001.
Applicants: California Independent
System Operator Corporation.
Description: Compliance filing: 2020–
06–10 Compliance Filing in Docket No.
ER20–1281 to be effective 1/28/2020.
Filed Date: 6/10/20.
Accession Number: 20200610–5139.
Comments Due: 5 p.m. ET 7/1/20.
Docket Numbers: ER20–1656–001.
Applicants: MidAmerican Energy
Company.
Description: Tariff Amendment: Joint
Pricing Zone Revenue Allocation Agt3rd Rev (Amended) to be effective
6/1/2020.
Filed Date: 6/10/20.
Accession Number: 20200610–5187.
Comments Due: 5 p.m. ET 7/1/20.
Docket Numbers: ER20–2028–000.
Applicants: Bitter Ridge Wind Farm,
LLC.
Description: Baseline eTariff Filing:
Application for Market-Based Rate
Authority to be effective 7/1/2020.
Filed Date: 6/11/20.
Accession Number: 20200611–5002.
Comments Due: 5 p.m. ET 7/2/20.
Docket Numbers: ER20–2029–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Section 205(d) Rate
Filing: 2020–06–11_SA 3501 METC–
MEC North GIA (J937) to be effective
5/29/2020.
Filed Date: 6/11/20.
Accession Number: 20200611–5017.
Comments Due: 5 p.m. ET 7/2/20.
Docket Numbers: ER20–2030–000;
TS20–5–000.
Applicants: Altavista Solar, LLC.
VerDate Sep<11>2014
16:44 Jun 16, 2020
Jkt 250001
Description: Petition for Waiver of
Open-Access Requirements of Order
Nos. 888, et al. of Altavista Solar, LLC.
Filed Date: 6/10/20.
Accession Number: 20200610–5209.
Comments Due: 5 p.m. ET 7/1/20.
Docket Numbers: ER20–2031–000.
Applicants: Mission Solar, LLC.
Description: Appeal and Protest of
Mission Solar, LLC.
Filed Date: 6/8/20.
Accession Number: 20200608–5240.
Comments Due: 5 p.m. ET 6/29/20.
Docket Numbers: ER20–2032–000.
Applicants: Hardin Wind, LLC.
Description: Baseline eTariff Filing:
Application for Market-Based Rate
Authorization Pursuant to Section 205
to be effective 8/10/2020.
Filed Date: 6/11/20.
Accession Number: 20200611–5096.
Comments Due: 5 p.m. ET 7/2/20.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: June 11, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–13019 Filed 6–16–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 3511–024]
Lower Saranac Hydro, LLC; Notice of
Application Tendered for Filing With
the Commission and Soliciting
Additional Study Requests and
Establishing Procedural Schedule for
Relicensing and a Deadline for
Submission of Final Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
PO 00000
Frm 00048
Fmt 4703
Sfmt 4703
a. Type of Application: Subsequent
Minor License.
b. Project No.: 3511–024.
c. Date filed: May 29, 2020.
d. Applicant: Lower Saranac Hydro,
LLC.
e. Name of Project: Groveville
Hydroelectric Project.
f. Location: On Fishkill Creek, in the
City of Beacon, Dutchess County, New
York. The project does not occupy any
federal land.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Ms. Elise
Anderson, Senior Environmental
Permitting Specialist, Lower Saranac
Hydro, LLC, Enel Green Power North
America, Inc., 100 Brickstone Square,
Suite 300, Andover, MA 01810; Phone:
(978) 447–4408 or email at
elise.anderson@enel.com.
i. FERC Contact: Jeremy Feinberg at
(202) 502–6893 or jeremy.feinberg@
ferc.gov.
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: July 28, 2020.
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY).
m. The application is not ready for
environmental analysis at this time.
E:\FR\FM\17JNN1.SGM
17JNN1
khammond on DSKJM1Z7X2PROD with NOTICES
Federal Register / Vol. 85, No. 117 / Wednesday, June 17, 2020 / Notices
n. The existing Groveville Mills
Hydroelectric Project consists of: (1) A
167-foot-long, 37-foot-high concrete
gravity dam, with a 140-foot-long
spillway having a crest elevation of
172.4 feet National Geodetic Vertical
Datum of 1929 (NGVD29) and topped
with 3-foot-high wooden flashboards;
(2) an impoundment with a gross
storage capacity of approximately 43
acre-feet and a surface area of 5 acres at
a normal pool elevation of 175.4 feet
NGVD29; (3) an intake structure with
two gates and a 27-foot-high, 34-footwide trashrack; (4) a 9-foot-diameter,
approximately 140-foot-long riveted
steel underground penstock; (5) a
powerhouse containing three fixedoutput turbine-generator units with a
total rated capacity of 927 kilowatts; (6)
a 4-foot-high submerged stilling basin
weir approximately 60 feet downstream
of the dam spillway; (7) a 20-foot-wide,
90-foot-long tailrace; (8) a 20-foot-long
underground generator lead connecting
to a step-up transformer that connects to
a 13.2-kilovolt, 40-foot-long
underground transmission line that then
connects to a 15-foot-long aerial
transmission line before connecting to
the regional grid; and (9) appurtenant
facilities.
The project operates in a modified
run-of-river mode. The project had an
average annual generation of 1,762.7
megawatt-hours between 2012 and
2019.
o. A copy of the application may be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document (P–3511). For assistance,
contact FERC Online Support at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or (202) 502–
8659 (TTY). At this time, the
Commission has suspended access to its
Public Reference Room due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19) issued
by the President on March 13, 2020.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. Procedural schedule and final
amendments: The application will be
processed according to the following
preliminary schedule. Revisions to the
schedule will be made as appropriate.
Issue Deficiency Letter (if necessary)—
August 2020
VerDate Sep<11>2014
16:44 Jun 16, 2020
Jkt 250001
Request Additional Information—
August 2020
Issue Acceptance Letter—November
2020
Issue Scoping Document 1 for
comments—December 2020
Request Additional Information (if
necessary)—February 2021
Issue Scoping Document 2 (if
necessary)—March 2021
Issue Notice of Ready for Environmental
Analysis—March 2021
Commission issues Environmental
Assessment (EA)—September 2021
Comments on EA—October 2021
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
date of the notice of ready for
environmental analysis.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–13033 Filed 6–16–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER20–1988–000]
Northern Colorado Wind Energy
Center II; Supplemental Notice That
Initial Market-Based Rate Filing
Includes Request for Blanket Section
204 Authorization
This is a supplemental notice in the
above-referenced Northern Colorado
Wind Energy Center II’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is July 1, 2020.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
PO 00000
Frm 00049
Fmt 4703
Sfmt 4703
36575
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
may mail similar pleadings to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426. Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Dated: June 11, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–13023 Filed 6–16–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL20–52–000]
Constellation Mystic Power, LLC v. ISO
New England, Inc.; Notice of Complaint
Take notice that on June 10, 2020,
pursuant to sections 206, 306, and 309
of the Federal Power Act, 16 U.S.C.
824e, 825e, and 825h, and Rule 206 of
the Federal Energy Regulatory
Commission’s (Commission) Rules of
Practice and Procedure, 18 CFR
385.206(b), Constellation Mystic Power,
LLC (Complainant) filed a formal
complaint against ISO New England,
Inc., (Respondent), requesting that the
Commission prohibit the Respondent
E:\FR\FM\17JNN1.SGM
17JNN1
Agencies
[Federal Register Volume 85, Number 117 (Wednesday, June 17, 2020)]
[Notices]
[Pages 36574-36575]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-13033]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 3511-024]
Lower Saranac Hydro, LLC; Notice of Application Tendered for
Filing With the Commission and Soliciting Additional Study Requests and
Establishing Procedural Schedule for Relicensing and a Deadline for
Submission of Final Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Subsequent Minor License.
b. Project No.: 3511-024.
c. Date filed: May 29, 2020.
d. Applicant: Lower Saranac Hydro, LLC.
e. Name of Project: Groveville Hydroelectric Project.
f. Location: On Fishkill Creek, in the City of Beacon, Dutchess
County, New York. The project does not occupy any federal land.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Ms. Elise Anderson, Senior Environmental
Permitting Specialist, Lower Saranac Hydro, LLC, Enel Green Power North
America, Inc., 100 Brickstone Square, Suite 300, Andover, MA 01810;
Phone: (978) 447-4408 or email at [email protected].
i. FERC Contact: Jeremy Feinberg at (202) 502-6893 or
[email protected].
j. Cooperating agencies: Federal, state, local, and tribal agencies
with jurisdiction and/or special expertise with respect to
environmental issues that wish to cooperate in the preparation of the
environmental document should follow the instructions for filing such
requests described in item l below. Cooperating agencies should note
the Commission's policy that agencies that cooperate in the preparation
of the environmental document cannot also intervene. See, 94 FERC ]
61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission's
regulations, if any resource agency, Indian Tribe, or person believes
that an additional scientific study should be conducted in order to
form an adequate factual basis for a complete analysis of the
application on its merit, the resource agency, Indian Tribe, or person
must file a request for a study with the Commission not later than 60
days from the date of filing of the application, and serve a copy of
the request on the applicant.
l. Deadline for filing additional study requests and requests for
cooperating agency status: July 28, 2020.
The Commission strongly encourages electronic filing. Please file
additional study requests and requests for cooperating agency status
using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support
at [email protected], (866) 208-3676 (toll free), or (202)
502-8659 (TTY).
m. The application is not ready for environmental analysis at this
time.
[[Page 36575]]
n. The existing Groveville Mills Hydroelectric Project consists of:
(1) A 167-foot-long, 37-foot-high concrete gravity dam, with a 140-
foot-long spillway having a crest elevation of 172.4 feet National
Geodetic Vertical Datum of 1929 (NGVD29) and topped with 3-foot-high
wooden flashboards; (2) an impoundment with a gross storage capacity of
approximately 43 acre-feet and a surface area of 5 acres at a normal
pool elevation of 175.4 feet NGVD29; (3) an intake structure with two
gates and a 27-foot-high, 34-foot-wide trashrack; (4) a 9-foot-
diameter, approximately 140-foot-long riveted steel underground
penstock; (5) a powerhouse containing three fixed-output turbine-
generator units with a total rated capacity of 927 kilowatts; (6) a 4-
foot-high submerged stilling basin weir approximately 60 feet
downstream of the dam spillway; (7) a 20-foot-wide, 90-foot-long
tailrace; (8) a 20-foot-long underground generator lead connecting to a
step-up transformer that connects to a 13.2-kilovolt, 40-foot-long
underground transmission line that then connects to a 15-foot-long
aerial transmission line before connecting to the regional grid; and
(9) appurtenant facilities.
The project operates in a modified run-of-river mode. The project
had an average annual generation of 1,762.7 megawatt-hours between 2012
and 2019.
o. A copy of the application may be viewed on the Commission's
website at https://www.ferc.gov using the ``eLibrary'' link. Enter the
docket number excluding the last three digits in the docket number
field to access the document (P-3511). For assistance, contact FERC
Online Support at [email protected] or call toll-free, (866)
208-3676 or (202) 502-8659 (TTY). At this time, the Commission has
suspended access to its Public Reference Room due to the proclamation
declaring a National Emergency concerning the Novel Coronavirus Disease
(COVID-19) issued by the President on March 13, 2020.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
p. Procedural schedule and final amendments: The application will
be processed according to the following preliminary schedule. Revisions
to the schedule will be made as appropriate.
Issue Deficiency Letter (if necessary)--August 2020
Request Additional Information--August 2020
Issue Acceptance Letter--November 2020
Issue Scoping Document 1 for comments--December 2020
Request Additional Information (if necessary)--February 2021
Issue Scoping Document 2 (if necessary)--March 2021
Issue Notice of Ready for Environmental Analysis--March 2021
Commission issues Environmental Assessment (EA)--September 2021
Comments on EA--October 2021
Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-13033 Filed 6-16-20; 8:45 am]
BILLING CODE 6717-01-P