Walden Hydro, LLC; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments, 35929-35930 [2020-12719]
Download as PDF
jbell on DSKJLSW7X2PROD with NOTICES
Federal Register / Vol. 85, No. 114 / Friday, June 12, 2020 / Notices
Applicants: Orbit Bloom Energy, LLC.
Description: Baseline eTariff Filing:
Orbit Bloom Energy, LLC Application
for MBR Authority to be effective 6/20/
2020.
Filed Date: 6/8/20.
Accession Number: 20200608–5110.
Comments Due: 5 p.m. ET 6/29/20.
Docket Numbers: ER20–2013–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Cancellation:
Notice of Cancellation of ISA No. 3608,
Queue No. Y2–100 to be effective 6/1/
2020.
Filed Date: 6/8/20.
Accession Number: 20200608–5135.
Comments Due: 5 p.m. ET 6/29/20.
Docket Numbers: ER20–2014–000.
Applicants: Rattlesnake Flat, LLC.
Description: Baseline eTariff Filing:
Application for Market-Based Rate
Authorization under Section 205 of the
FPA to be effective 8/1/2020.
Filed Date: 6/8/20.
Accession Number: 20200608–5160.
Comments Due: 5 p.m. ET 6/29/20.
Take notice that the Commission
received the following public utility
holding company filings:
Docket Numbers: PH20–12–000.
Applicants: Nevada Gold Mines LLC,
Nevada Gold Energy LLC.
Description: Nevada Gold Mines LLC,
et al. submits FERC 65–A Updated
Exemption Notification.
Filed Date: 6/8/20.
Accession Number: 20200608–5163.
Comments Due: 5 p.m. ET 6/29/20.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: June 8, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–12721 Filed 6–11–20; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
17:43 Jun 11, 2020
Jkt 250001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 4428–011]
Walden Hydro, LLC; Notice of
Application Tendered for Filing With
the Commission and Soliciting
Additional Study Requests and
Establishing Procedural Schedule for
Relicensing and a Deadline for
Submission of Final Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 4428–011.
c. Date filed: May 29, 2020.
d. Applicant: Walden Hydro, LLC.
e. Name of Project: Walden
Hydroelectric Project.
f. Location: On the Wallkill River, in
the Village of Walden, Orange County,
New York. The project does not occupy
any federal land.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Ms. Elise
Anderson, Senior Environmental
Permitting Specialist, Walden Hydro,
LLC, Enel Green Power North America,
Inc., 100 Brickstone Square, Suite 300,
Andover, MA 01810; Phone at (978)
447–4408 or email at Elise.Anderson@
enel.com.
i. FERC Contact: Samantha Pollak at
(202) 502–6419, or samantha.pollak@
ferc.gov.
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
35929
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: July 28, 2020.
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY).
m. The application is not ready for
environmental analysis at this time.
n. The Walden Project consists of the
following existing facilities: (1) A 417foot-long, V-shaped concrete dam
topped with 2-foot-high flashboards; (2)
an impoundment with a surface area of
69 acres at the normal pool elevation of
321.3 feet National Geodetic Vertical
Datum of 1929 (NGVD29); (3) an intake
structure consisting of a 252-foot-long,
56-foot-wide, 18-foot-deep canal
forebay; (4) four 40-foot-long steel
penstocks; (5) a 60-foot-long, 45-footwide, 29-foot-high powerhouse
containing three horizontal doublerunner Francis turbine units with
ratings of 980 kilowatts (kW), 630 kW,
and 500 kW, respectively for a total
rated capacity of 2,110 kW; (6) a 30-footlong, 37-foot-wide tailrace; (7) a 230foot-long bypass reach consisting
primarily of bedrock; (8) a transmission
line; (9) a substation with a single-phase
12.5-kilovolt transformer; and (10)
appurtenant facilities.
The project operates in a run-of-river
mode with a minimum flow of 31 cubic
feet per second. The project has an
average annual generation of 3,333
megawatt-hours between 2012 and
2019.
o. A copy of the application may be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document (P–4428). For assistance,
contact FERC Online Support. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19) issued
by the President on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or (202) 502–
8659 (TTY).
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
E:\FR\FM\12JNN1.SGM
12JNN1
35930
Federal Register / Vol. 85, No. 114 / Friday, June 12, 2020 / Notices
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. Procedural schedule and final
amendments: The application will be
processed according to the following
preliminary schedule. Revisions to the
schedule will be made as appropriate.
Issue Deficiency Letter (if necessary)—
July 2020
Request Additional Information—July
2020
Issue Acceptance Letter—October 2020
Issue Scoping Document 1 for
comments—November 2020
Request Additional Information (if
necessary)—January 2021
Issue Scoping Document 2 (if
necessary)—February 2021
Issue Notice of Ready for Environmental
Analysis—February 2021
Commission issues EA—September
2021
Comments on EA—October 2021
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
date of the notice of ready for
environmental analysis.
Dated: June 8, 2020.
Kimberly D. Bose,
Secretary.
EIS No. 20200120, Draft, FRA, DC,
Washington Union Station Expansion
Project, Comment Period Ends: 07/27/
2020, Contact: David Valenstein 202–
493–6368.
EIS No. 20200121, Draft, BIA, CA, Tejon
Trust Acquisition and Casino Project,
Comment Period Ends: 07/27/2020,
Contact: Chad Broussard 916–978–
6165.
EIS No. 20200122, Final, BLM, CO,
Proposed Competitive Mineral
Materials Sale (COC–078119) at
Parkdale, Fremont County, CO.
Review Period Ends: 07/13/2020,
Contact: Stephanie Carter 719–269–
8551.
EIS No. 20200123, Draft Supplement,
BOEM, MA, Vineyard Wind 1
Offshore Wind Energy Project,
Comment Period Ends: 07/27/2020,
Contact: Michelle Morin 703–787–
1722.
Amended Notice
EIS No. 20200118, Draft, BR, UT, Lake
Powell Pipeline Project, Comment
Period Ends: 09/08/2020, Contact:
Rick Baxter 801–379–1078. Revision
to FR Notice Published 6/5/2020;
Extending the Comment Period from
9/3/2020 to 9/8/2020.
Dated: June 9, 2020.
Cindy S. Barger,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 2020–12719 Filed 6–11–20; 8:45 am]
BILLING CODE 6717–01–P
[FR Doc. 2020–12732 Filed 6–11–20; 8:45 am]
ENVIRONMENTAL PROTECTION
AGENCY
BILLING CODE 6560–50–P
[ER–FRL–9051–3]
ENVIRONMENTAL PROTECTION
AGENCY
jbell on DSKJLSW7X2PROD with NOTICES
Environmental Impact Statements;
Notice of Availability
[FRL–10010–54–OW]
Responsible Agency: Office of Federal
Activities, General Information 202–
564–5632 or https://www.epa.gov/nepa.
Weekly receipt of Environmental Impact
Statements (EIS)
Filed June 1, 2020, 10 a.m. EST Through
June 8, 2020, 10 a.m. EST
Pursuant to 40 CFR 1506.9.
Section 309(a) of the Clean Air Act
requires that EPA make public its
comments on EISs issued by other
Federal agencies. EPA’s comment letters
on EISs are available at: https://
cdxnodengn.epa.gov/cdx-enepa-public/
action/eis/search.
EIS No. 20200119, Draft, USFWS, BLM,
UT, Northern Corridor—Highway
Right-of-way, Issuance of an
Incidental Take Permit, Draft EIS and
Draft Resource Management Plan
Amendments, Comment Period Ends:
09/10/2020, Contact: Gloria Tibbetts
435–865–3063.
VerDate Sep<11>2014
17:43 Jun 11, 2020
Jkt 250001
The National Drinking Water Advisory
Council: Request for Nominations
Environmental Protection
Agency (EPA).
ACTION: Request for nominations.
AGENCY:
The Environmental Protection
Agency (EPA) is inviting nominations
from a diverse range of qualified
candidates to be considered to fill
vacancies on the National Drinking
Water Advisory Council (NDWAC or
Council). The 15-member Council was
established by the Safe Drinking Water
Act (SDWA) to provide independent
advice, consultation, and
recommendations to the EPA
Administrator on matters relating to the
activities, functions, policies, and
regulations required by the SDWA. This
announcement solicits nominations to
fill five vacancies with three-year
appointments from December 2020
SUMMARY:
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
through December 2023. The EPA may
also consider nominations received
through this solicitation in 2021 and in
the event of unplanned vacancies on the
Council. To enable the EPA to maintain
the representation required by statute,
the Agency is seeking nominees who are
from appropriate state and local
agencies concerned with water hygiene
and public water supply;
representatives of private organizations
or groups demonstrating an active
interest in the field of water hygiene and
public water supply, including
nominees associated with small, rural
public water systems; and from the
general public.
DATES: Nominations should be
submitted no later than July 13, 2020.
ADDRESSES: We encourage you to submit
nominations electronically, with the
subject line ‘‘NDWAC Membership
2020,’’ to corr.elizabeth@epa.gov, as
there may be a delay in processing U.S.
mail and no hand deliveries are
currently accepted due to the COVID–19
pandemic. If you have concerns about
submitting your nomination
electronically, you may contact
Elizabeth Corr, the Designated Federal
Officer (DFO) for the NDWAC, by email
at corr.elizabeth@epa.gov, with the
subject line ‘‘NDWAC Membership
2020,’’ or by phone at (202) 564–3798,
to discuss a possible alternative delivery
method.
FOR FURTHER INFORMATION CONTACT:
Email your questions to Elizabeth Corr
at corr.elizabeth@epa.gov; or call (202)
564–3798. You may also mail Elizabeth
Corr, at the Office of Ground Water and
Drinking Water, MC: 4601M,
Environmental Protection Agency, 1200
Pennsylvania Avenue NW, Washington,
DC 20460, but be advised that there may
be a delay in processing U.S. mail and
no hand deliveries will be accepted due
to the COVID–19 pandemic.
SUPPLEMENTARY INFORMATION:
National Drinking Water Advisory
Council: The Council was created by
Congress on December 16, 1974, as part
of the Safe Drinking Water Act of 1974,
Public Law 93–523, 42 U.S.C. 300j–5,
and is operated in accordance with the
provisions of the Federal Advisory
Committee Act (FACA), 5 U.S.C. App. 2.
The Council consists of 15 members,
including the chairperson, all of whom
are appointed by the EPA
Administrator. Five members are from
appropriate state and local agencies
concerned with water hygiene and
public water supply; five members
represent private organizations or
groups demonstrating an active interest
in the field of water hygiene and public
water supply—of which two such
E:\FR\FM\12JNN1.SGM
12JNN1
Agencies
[Federal Register Volume 85, Number 114 (Friday, June 12, 2020)]
[Notices]
[Pages 35929-35930]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-12719]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 4428-011]
Walden Hydro, LLC; Notice of Application Tendered for Filing With
the Commission and Soliciting Additional Study Requests and
Establishing Procedural Schedule for Relicensing and a Deadline for
Submission of Final Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 4428-011.
c. Date filed: May 29, 2020.
d. Applicant: Walden Hydro, LLC.
e. Name of Project: Walden Hydroelectric Project.
f. Location: On the Wallkill River, in the Village of Walden,
Orange County, New York. The project does not occupy any federal land.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Ms. Elise Anderson, Senior Environmental
Permitting Specialist, Walden Hydro, LLC, Enel Green Power North
America, Inc., 100 Brickstone Square, Suite 300, Andover, MA 01810;
Phone at (978) 447-4408 or email at [email protected].
i. FERC Contact: Samantha Pollak at (202) 502-6419, or
[email protected].
j. Cooperating agencies: Federal, state, local, and tribal agencies
with jurisdiction and/or special expertise with respect to
environmental issues that wish to cooperate in the preparation of the
environmental document should follow the instructions for filing such
requests described in item l below. Cooperating agencies should note
the Commission's policy that agencies that cooperate in the preparation
of the environmental document cannot also intervene. See, 94 FERC ]
61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission's
regulations, if any resource agency, Indian Tribe, or person believes
that an additional scientific study should be conducted in order to
form an adequate factual basis for a complete analysis of the
application on its merit, the resource agency, Indian Tribe, or person
must file a request for a study with the Commission not later than 60
days from the date of filing of the application, and serve a copy of
the request on the applicant.
l. Deadline for filing additional study requests and requests for
cooperating agency status: July 28, 2020.
The Commission strongly encourages electronic filing. Please file
additional study requests and requests for cooperating agency status
using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support
at [email protected], (866) 208-3676 (toll free), or (202)
502-8659 (TTY).
m. The application is not ready for environmental analysis at this
time.
n. The Walden Project consists of the following existing
facilities: (1) A 417-foot-long, V-shaped concrete dam topped with 2-
foot-high flashboards; (2) an impoundment with a surface area of 69
acres at the normal pool elevation of 321.3 feet National Geodetic
Vertical Datum of 1929 (NGVD29); (3) an intake structure consisting of
a 252-foot-long, 56-foot-wide, 18-foot-deep canal forebay; (4) four 40-
foot-long steel penstocks; (5) a 60-foot-long, 45-foot-wide, 29-foot-
high powerhouse containing three horizontal double-runner Francis
turbine units with ratings of 980 kilowatts (kW), 630 kW, and 500 kW,
respectively for a total rated capacity of 2,110 kW; (6) a 30-foot-
long, 37-foot-wide tailrace; (7) a 230-foot-long bypass reach
consisting primarily of bedrock; (8) a transmission line; (9) a
substation with a single-phase 12.5-kilovolt transformer; and (10)
appurtenant facilities.
The project operates in a run-of-river mode with a minimum flow of
31 cubic feet per second. The project has an average annual generation
of 3,333 megawatt-hours between 2012 and 2019.
o. A copy of the application may be viewed on the Commission's
website at https://www.ferc.gov using the ``eLibrary'' link. Enter the
docket number excluding the last three digits in the docket number
field to access the document (P-4428). For assistance, contact FERC
Online Support. At this time, the Commission has suspended access to
the Commission's Public Reference Room due to the proclamation
declaring a National Emergency concerning the Novel Coronavirus Disease
(COVID-19) issued by the President on March 13, 2020. For assistance,
contact FERC at [email protected] or call toll-free, (866)
208-3676 or (202) 502-8659 (TTY).
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via
[[Page 35930]]
email of new filings and issuances related to this or other pending
projects. For assistance, contact FERC Online Support.
p. Procedural schedule and final amendments: The application will
be processed according to the following preliminary schedule. Revisions
to the schedule will be made as appropriate.
Issue Deficiency Letter (if necessary)--July 2020
Request Additional Information--July 2020
Issue Acceptance Letter--October 2020
Issue Scoping Document 1 for comments--November 2020
Request Additional Information (if necessary)--January 2021
Issue Scoping Document 2 (if necessary)--February 2021
Issue Notice of Ready for Environmental Analysis--February 2021
Commission issues EA--September 2021
Comments on EA--October 2021
Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Dated: June 8, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-12719 Filed 6-11-20; 8:45 am]