Central 40, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization, 35299 [2020-12464]
Download as PDF
Federal Register / Vol. 85, No. 111 / Tuesday, June 9, 2020 / Notices
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the eLibrary link. Enter
the docket number excluding the last
three digits in the docket number field
to access the document. At this time, the
Commission has suspended access to
the Commission’s Public Reference
Room, due to the proclamation
declaring a National Emergency
concerning the Novel Coronavirus
Disease (COVID–19), issued by the
President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Dated: June 3, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–12462 Filed 6–8–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER20–1983–000]
jbell on DSKJLSW7X2PROD with NOTICES
Central 40, LLC; Supplemental Notice
That Initial Market-Based Rate Filing
Includes Request for Blanket Section
204 Authorization
This is a supplemental notice in the
above-referenced Central 40, LLC’s
application for market-based rate
authority, with an accompanying rate
tariff, noting that such application
includes a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is June 23,
2020.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
VerDate Sep<11>2014
23:08 Jun 08, 2020
Jkt 250001
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
may mail similar pleadings to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426. Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the eLibrary link. Enter
the docket number excluding the last
three digits in the docket number field
to access the document. At this time, the
Commission has suspended access to
the Commission’s Public Reference
Room, due to the proclamation
declaring a National Emergency
concerning the Novel Coronavirus
Disease (COVID–19), issued by the
President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at FERCOnline
Support@ferc.gov or call toll-free, (886)
208–3676 or TYY, (202) 502–8659.
Dated: June 3, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–12464 Filed 6–8–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 15024–000]
Pumped Hydro Storage LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On March 12, 2020, the Pumped
Hydro Storage LLC, filed an application
for a preliminary permit, pursuant to
section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility
of Big Canyon Pumped Storage Project 1
1 In its application, Pumped Hydro Storage
named the project the Navajo Nation Big Canyon
Pumped Storage Project. We note that the proposed
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
35299
to be located about 23 miles west of
Tuba City, Arizona. The sole purpose of
a preliminary permit, if issued, is to
grant the permit holder priority to file
a license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would be
located entirely on Navajo Nation land
and consist of the following new
facilities: (1) A 450-foot-long, 200-foothigh concrete arch dam (Upper West
Dam), a 1,000-foot-long, 150-foot-high
earth filled dam (Middle Dam), and a
10,000-foot-long, 200-foot-high concrete
arch dam (Upper East Dam), each of
which would impound three separate
upper reservoirs with a combine surface
area of 400 acres and a total storage
capacity of 29,000 acre-feet at a normal
maximum operating elevation of 5,390
feet average mean sea level (msl); (2) a
600-foot-long, 400-foot-high concrete
arch dam (Lower Dam) that would
impound a lower reservoir with a
surface area of 260 acres and a total
storage capacity of 44,000 acre-feet at a
normal maximum operating elevation of
3,790 feet msl; (3) three 10,000-footlong, 30-foot-diameter reinforced
concrete penstocks; (4) a 1,100-footlong, 160-foot-wide, 140-foot-high
reinforced concrete powerhouse
housing nine 400-kilowatt pumpturbine generators; (5) a 1,000-foot-long,
120-foot-wide, 40-foot-high reinforced
concrete tailrace; (6) three water supply
wells with a capacity of 700 horsepower
each and a 1,800-foot-long, 36-inchdiameter well water supply pipeline; (7)
two new double circuit 500-kilovolt
(kV) electric transmission lines that
connect the project switchyard to the
existing 500-kV and 345-kV
transmission lines located 14 miles east
of the proposed project; and (8)
appurtenant facilities. The estimated
annual power generation at the Navajo
Nation Big Canyon Pumped Storage
Project would be 7,900 Gigawatt-hours.
Applicant Contact: Mr. Steve Irwin,
Manager, Pumped Hydro Storage LLC.
6514 S 41st Lane, Phoenix, AZ 85041
Swirwin7@gmail.com.
FERC Contact: Ousmane Sidibe;
Phone: (202) 502–6245.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
project is not in any way affiliated with the Navajo
Nation and the Navajo Nation has not had any role
in Pumped Hydro Storage’s pursuit of this project.
To avoid any confusion as to the identity of the
project proponent, we have omitted ‘‘Navajo
Nation’’ from the project name.
E:\FR\FM\09JNN1.SGM
09JNN1
Agencies
[Federal Register Volume 85, Number 111 (Tuesday, June 9, 2020)]
[Notices]
[Page 35299]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-12464]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER20-1983-000]
Central 40, LLC; Supplemental Notice That Initial Market-Based
Rate Filing Includes Request for Blanket Section 204 Authorization
This is a supplemental notice in the above-referenced Central 40,
LLC's application for market-based rate authority, with an accompanying
rate tariff, noting that such application includes a request for
blanket authorization, under 18 CFR part 34, of future issuances of
securities and assumptions of liability.
Any person desiring to intervene or to protest should file with the
Federal Energy Regulatory Commission, 888 First Street NE, Washington,
DC 20426, in accordance with Rules 211 and 214 of the Commission's
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone
filing a motion to intervene or protest must serve a copy of that
document on the Applicant.
Notice is hereby given that the deadline for filing protests with
regard to the applicant's request for blanket authorization, under 18
CFR part 34, of future issuances of securities and assumptions of
liability, is June 23, 2020.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically may mail similar pleadings to
the Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426. Hand delivered submissions in docketed
proceedings should be delivered to Health and Human Services, 12225
Wilkins Avenue, Rockville, Maryland 20852.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://ferc.gov) using the
eLibrary link. Enter the docket number excluding the last three digits
in the docket number field to access the document. At this time, the
Commission has suspended access to the Commission's Public Reference
Room, due to the proclamation declaring a National Emergency concerning
the Novel Coronavirus Disease (COVID-19), issued by the President on
March 13, 2020. For assistance, contact the Federal Energy Regulatory
Commission at [email protected] or call toll-free, (886) 208-
3676 or TYY, (202) 502-8659.
Dated: June 3, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020-12464 Filed 6-8-20; 8:45 am]