Combined Notice of Filings #1, 34614-34617 [2020-12230]
Download as PDF
34614
Federal Register / Vol. 85, No. 109 / Friday, June 5, 2020 / Notices
lotter on DSK9F5VC42PROD with NOTICES
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the Natural
Gas Act (18 CFR 157.10).1
As a matter of practice, the
Commission itself generally acts on
requests for extensions of time to
complete construction for Natural Gas
Act facilities when such requests are
contested before order issuance. For
those extension requests that are
contested,2 the Commission will aim to
issue an order acting on the request
within 45 days.3 The Commission will
address all arguments relating to
whether the applicant has demonstrated
there is good cause to grant the
extension.4 The Commission will not
consider arguments that re-litigate the
issuance of the certificate order,
including whether the Commission
properly found the project to be in the
public convenience and necessity and
whether the Commission’s
environmental analysis for the
certificate complied with the National
Environmental Policy Act.5 At the time
a pipeline requests an extension of time,
orders on certificates of public
convenience and necessity are final and
the Commission will not re-litigate their
issuance.6 The OEP Director, or his or
her designee, will act on all of those
extension requests that are uncontested.
In addition to publishing the full text
of this document in the Federal
Register, The Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the eLibrary link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
1 Only motions to intervene from entities that
were party to the underlying proceeding will be
accepted. Algonquin Gas Transmission, LLC, 170
FERC 61,144, at P 39 (2020).
2 Contested proceedings are those where an
intervenor disputes any material issue of the filing.
18 CFR 385.2201(c)(1) (2019).
3 Algonquin Gas Transmission, LLC, 170 FERC
61,144, at P 40 (2020).
4 Id. at P 40.
5 Similarly, the Commission will not re-litigate
the issuance of an NGA section 3 authorization,
including whether a proposed project is not
inconsistent with the public interest and whether
the Commission’s environmental analysis for the
permit order complied with NEPA.
6 Algonquin Gas Transmission, LLC, 170 FERC
61,144, at P 40 (2020).
VerDate Sep<11>2014
18:21 Jun 04, 2020
Jkt 250001
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and three
copies of the protest or intervention to
the Federal Energy Regulatory
Commission, 888 First Street NE,
Washington, DC 20426.
Comment Date: 5:00 p.m. Eastern
Time on June 16, 2020.
Dated: June 1, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–12235 Filed 6–4–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the eLibrary link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to Commission’ s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Comment Date: 5:00 p.m. Eastern
Time on July 1, 2020.
Federal Energy Regulatory
Commission
Dated: June 1, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[Project No. 2629–014]
[FR Doc. 2020–12219 Filed 6–4–20; 8:45 am]
Village or Morrisville, Vermont; Notice
of Petition for Declaratory Order
Take notice that on May 28, 2020, the
Village of Morrisville (Morrisville),
applicant for relicensing the Morrisville
Hydroelectric Project No. 2629, filed a
petition for declaratory order (petition)
pursuant to Rule 207(a)(2) of the Federal
Energy Regulatory Commission’s Rules
of Practice and Procedure, 18 CFR
385.207(a)(2). Morrisville requests that
the Commission declare that the
Vermont Agency of Natural Resources
has waived its authority to issue a
certification for the Morrisville
Hydroelectric Project under Section 401
of the Clean Water Act, 33 U.S.C.
1341(a)(1), as more fully explained in
the petition.
Any person wishing to comment on
Morrisville’s petition may do so.1 The
deadline for filing comments is 30 days
from the issuance of this notice. The
Commission encourages electronic
submission of comments in lieu of
paper using the eFiling link at https://
www.ferc.gov. Persons unable to file
electronically should send comments to
the following address: Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. Be sure to
reference the project docket number (P–
2629–014) with your submission.
In addition to publishing the full text
of this document in the Federal
1 Morrisville’s request is part of its relicensing
proceeding in Project No. 2629–014. Thus, any
person that intervened in the relicensing
proceeding is already a party. The filing of the
petition in this case does not trigger a new
opportunity to intervene.
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC20–67–000.
Applicants: Broadview Energy JN,
LLC, Broadview Energy KW, LLC.
Description: Supplement to May 15,
2020 Application for Authorization
Under Section 203 of the Federal Power
Act, et al. of Broadview Energy JN, LLC,
et al.
Filed Date: 5/29/20.
Accession Number: 20200529–5510.
Comments Due: 5 p.m. ET 6/19/20.
Docket Numbers: EC20–69–000.
Applicants: Northern States Power
Company, a Minnesota corporation, FPL
Energy Mower County, LLC.
Description: Joint Application for
Authorization Under Section 203 of the
Federal Power Act, et al. of Northern
States Power Company, a Minnesota
corporation, et al.
Filed Date: 5/29/20.
Accession Number: 20200529–5521.
Comments Due: 5 p.m. ET 6/19/20.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG20–173–000.
Applicants: Little Bear Solar 1, LLC.
Description: Updated Notice of SelfCertification of Exempt Wholesale
E:\FR\FM\05JNN1.SGM
05JNN1
lotter on DSK9F5VC42PROD with NOTICES
Federal Register / Vol. 85, No. 109 / Friday, June 5, 2020 / Notices
Generator Status of Little Bear Solar 1,
LLC.
Filed Date: 5/29/20.
Accession Number: 20200529–5323.
Comments Due: 5 p.m. ET 6/19/20.
Docket Numbers: EG20–174–000.
Applicants: Calpine Northeast
Development, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status.
Filed Date: 5/29/20.
Accession Number: 20200529–5402.
Comments Due: 5 p.m. ET 6/19/20.
Docket Numbers: EG20–175–000.
Applicants: Cerro Gordo Wind, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Cerro Gordo Wind,
LLC.
Filed Date: 5/29/20.
Accession Number: 20200529–5405.
Comments Due: 5 p.m. ET 6/19/20.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–1852–038.
Applicants: Florida Power & Light
Company.
Description: Notification of Change in
Status of Florida Power & Light
Company.
Filed Date: 6/1/20.
Accession Number: 20200601–5150.
Comments Due: 5 p.m. ET 6/22/20.
Docket Numbers: ER10–2475–021;
ER10–2474–021; ER10–2605–014;
ER10–2611–021; ER10–2984–046;
ER10–3246–015; ER11–2044–033;
ER11–3876–024; ER12–162–028; ER12–
1626–011; ER13–1266–029; ER13–1267–
010; ER13–1268–010; ER13–1269–010;
ER13–1270–010; ER13–1271–010;
ER13–1272–010; ER13–1273–010;
ER13–1441–010; ER13–1442–010;
ER13–520–010; ER13–521–010; ER15–
2211–026; ER16–1258–003; ER16–438–
005; ER18–1419–002.
Applicants: Nevada Power Company,
Sierra Pacific Power Company,
PacifiCorp, Pinyon Pines Wind I, LLC,
Pinyon Pines Wind II, LLC, Solar Star
California XIX, LLC, Solar Star
California XX, LLC, Topaz Solar Farms
LLC, CE Leathers Company, Elmore
Company, Del Ranch Company, Fish
Lake Power LLC, Salton Sea Power
Generation Company, Vulcan/BN
Geothermal Power Company, Yuma
Cogeneration Associates, Bishop Hill
Energy II LLC, MidAmerican Energy
Company, Cordova Energy Company
LLC, Walnut Ridge Wind, LLC, Grande
Prairie Wind, LLC, Marshall Wind
Energy LLC, Saranac Power Partners,
L.P., CalEnergy, LLC, MidAmerican
Energy Services, LLC, Merrill Lynch
Commodities, Inc., Salton Sea Power
L.L.C.
VerDate Sep<11>2014
18:21 Jun 04, 2020
Jkt 250001
Description: Notice of Non-Material
Change in Status of the BHE MBR
Sellers and Merrill Lynch Commodities,
Inc.
Filed Date: 5/29/20.
Accession Number: 20200529–5534.
Comments Due: 5 p.m. ET 6/19/20.
Docket Numbers: ER10–2756–009.
Applicants: Griffith Energy LLC.
Description: Notice of Non-Material
Change in Status of Griffith Energy LLC.
Filed Date: 5/29/20.
Accession Number: 20200529–5512.
Comments Due: 5 p.m. ET 6/19/20.
Docket Numbers: ER17–996–003.
Applicants: New York Independent
System Operator, Inc.
Description: Compliance filing:
Compliance to exclude State Program
language as directed by FERC 5/12/20
Order to be effective 5/12/2020.
Filed Date: 5/29/20.
Accession Number: 20200529–5508.
Comments Due: 5 p.m. ET 6/19/20.
Docket Numbers: ER18–680–003.
Applicants: PJM Interconnection,
L.L.C.
Description: Compliance filing:
Compliance filing per Commission’s
3/31/2020 Order in Docket No. ER18–
680 to be effective 1/1/2018.
Filed Date: 6/1/20.
Accession Number: 20200601–5075.
Comments Due: 5 p.m. ET 6/22/20.
Docket Numbers: ER20–1926–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2020–05–29_TOA Amendment
Advisory Committee Affiliate Sector to
be effective 7/29/2020.
Filed Date: 5/29/20.
Accession Number: 20200529–5252.
Comments Due: 5 p.m. ET 6/19/20.
Docket Numbers: ER20–1927–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Consumers Energy Company.
Description: Compliance filing: 2020–
05–29_Consumers’ Compliance on
Order 864 for ADIT to be effective
1/27/2020.
Filed Date: 5/29/20.
Accession Number: 20200529–5257.
Comments Due: 5 p.m. ET 6/19/20.
Docket Numbers: ER20–1928–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2020–05–29_Attachment FF True-up
Filing to be effective 6/1/2020.
Filed Date: 5/29/20.
Accession Number: 20200529–5259.
Comments Due: 5 p.m. ET 6/19/20.
Docket Numbers: ER20–1929–000.
Applicants: Baltimore Gas and
Electric Company, PJM Interconnection,
L.L.C.
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
34615
Description: § 205(d) Rate Filing: BGE
submits Revisions to PJM Tariff, Att.
H–2A re: Stated Depreciation Rates to be
effective 8/1/2020.
Filed Date: 5/29/20.
Accession Number: 20200529–5267.
Comments Due: 5 p.m. ET 6/19/20.
Docket Numbers: ER20–1930–000.
Applicants: Tri-State Generation and
Transmission Association, Inc.
Description: § 205(d) Rate Filing:
Certificate of Concurrence for Amended
and Restated Service Agreement No. 854
to be effective 5/30/2020.
Filed Date: 5/29/20.
Accession Number: 20200529–5275.
Comments Due: 5 p.m. ET 6/19/20.
Docket Numbers: ER20–1931–000.
Applicants: Pacific Gas and Electric
Company.
Description: § 205(d) Rate Filing: May
2020 Western Interconnection
Agreement Biannual Filing to be
effective 8/1/2020.
Filed Date: 5/29/20.
Accession Number: 20200529–5280.
Comments Due: 5 p.m. ET 6/19/20.
Docket Numbers: ER20–1932–000.
Applicants: Pacific Gas and Electric
Company.
Description: § 205(d) Rate Filing: May
2020 Western WDT Service Agreement
Biannual Filing to be effective 8/1/2020.
Filed Date: 5/29/20.
Accession Number: 20200529–5285.
Comments Due: 5 p.m. ET 6/19/20.
Docket Numbers: ER20–1933–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Second Revised ISA, SA No. 4608;
Queue No. AE2–155 to be effective
4/30/2020.
Filed Date: 5/29/20.
Accession Number: 20200529–5305.
Comments Due: 5 p.m. ET 6/19/20.
Docket Numbers: ER20–1934–000.
Applicants: Entergy Nuclear Indian
Point 2, LLC.
Description: Tariff Cancellation:
Entergy Nuclear Indian Point 2, LLC to
be effective 6/1/2020.
Filed Date: 5/29/20.
Accession Number: 20200529–5504.
Comments Due: 5 p.m. ET 6/19/20.
Docket Numbers: ER20–1935–000.
Applicants: Tampa Electric Company.
Description: § 205(d) Rate Filing:
Section 205 Solar Intangible
Depreciation Filing—2020 to be
effective 1/1/2019.
Filed Date: 5/29/20.
Accession Number: 20200529–5329.
Comments Due: 5 p.m. ET 6/19/20.
Docket Numbers: ER20–1936–000.
Applicants: Walnut Ridge Wind, LLC.
Description: § 205(d) Rate Filing:
Reactive Power Compensation Tariff
Filing to be effective 6/1/2020.
E:\FR\FM\05JNN1.SGM
05JNN1
lotter on DSK9F5VC42PROD with NOTICES
34616
Federal Register / Vol. 85, No. 109 / Friday, June 5, 2020 / Notices
Filed Date: 5/29/20.
Accession Number: 20200529–5354.
Comments Due: 5 p.m. ET 6/19/20.
Docket Numbers: ER20–1937–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2020–05–29 EIM Implementation
Agreement with Public Service Co—
Colorado to be effective 7/31/2020.
Filed Date: 5/29/20.
Accession Number: 20200529–5435.
Comments Due: 5 p.m. ET 6/19/20.
Docket Numbers: ER20–1938–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing:
LGIA Luz Solar Partners LTD., VIII,
Kramer Junction 8 SA No. 247 to be
effective 5/30/2020.
Filed Date: 5/29/20.
Accession Number: 20200529–5446.
Comments Due: 5 p.m. ET 6/19/20.
Docket Numbers: ER20–1939–000.
Applicants: Calpine Northeast
Development, LLC.
Description: Baseline eTariff Filing:
Application for Market-Based Rate
Authorization under Section 205 of the
FPA to be effective 5/30/2020.
Filed Date: 5/29/20.
Accession Number: 20200529–5454.
Comments Due: 5 p.m. ET 6/19/20.
Docket Numbers: ER20–1940–000.
Applicants: Agera Energy LLC.
Description: Tariff Cancellation: Tariff
Cancellation to be effective 6/1/2020.
Filed Date: 5/29/20.
Accession Number: 20200529–5474.
Comments Due: 5 p.m. ET 6/19/20.
Docket Numbers: ER20–1941–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing: 3687
GridLiance High Plains & Evergy Kansas
Central Int Agr to be effective 8/1/2020.
Filed Date: 5/29/20.
Accession Number: 20200529–5488.
Comments Due: 5 p.m. ET 6/19/20.
Docket Numbers: ER20–1942–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2020–05–29_Conventional Deliverable
ICAP Filing to be effective 8/12/2020.
Filed Date: 5/29/20.
Accession Number: 20200529–5493.
Comments Due: 5 p.m. ET 6/19/20.
Docket Numbers: ER20–1943–000.
Applicants: New England Power Pool
Participants Committee.
Description: § 205(d) Rate Filing: June
2020 Membership Filing to be effective
5/1/2020.
Filed Date: 6/1/20.
Accession Number: 20200601–5006.
Comments Due: 5 p.m. ET 6/22/20.
VerDate Sep<11>2014
18:21 Jun 04, 2020
Jkt 250001
Docket Numbers: ER20–1944–000.
Applicants: Alabama Power
Company.
Description: § 205(d) Rate Filing:
Attachment S (MPCo) 2020 Updated
Depreciation Rates Filing to be effective
4/1/2020.
Filed Date: 6/1/20.
Accession Number: 20200601–5062.
Comments Due: 5 p.m. ET 6/22/20.
Docket Numbers: ER20–1945–000.
Applicants: Duke Energy Ohio, Inc.,
PJM Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
Duke Energy Ohio submits IA SA No.
5186 to be effective 7/31/2020.
Filed Date: 6/1/20.
Accession Number: 20200601–5064.
Comments Due: 5 p.m. ET 6/22/20.
Docket Numbers: ER20–1946–000.
Applicants: Beech Ridge Energy II
LLC.
Description: § 205(d) Rate Filing:
Amendment to Beech Ridge Energy II
MBR Tariff to be effective 6/2/2020.
Filed Date: 6/1/20.
Accession Number: 20200601–5085.
Comments Due: 5 p.m. ET 6/22/20.
Docket Numbers: ER20–1947–000.
Applicants: Greenleaf Energy Unit 2
LLC.
Description: Baseline eTariff Filing:
Rate Schedules and Agreements
baseleine to be effective 6/2/2020.
Filed Date: 6/1/20.
Accession Number: 20200601–5129.
Comments Due: 5 p.m. ET 6/22/20.
Docket Numbers: ER20–1948–000.
Applicants: Potomac-Appalachian
Highline Transmission, PJM
Interconnection, L.L.C.
Description: Compliance filing: PATH
submits Compliance Filing re: Order
864 to be effective 1/27/2020.
Filed Date: 6/1/20.
Accession Number: 20200601–5131.
Comments Due: 5 p.m. ET 6/22/20.
Docket Numbers: ER20–1949–000.
Applicants: Georgia Power Company.
Description: § 205(d) Rate Filing: JEA
Scherer Unit 4 TSA 2020 GPCo Updated
Depreciation Rate and Errata Filing to be
effective 1/1/2020.
Filed Date: 6/1/20.
Accession Number: 20200601–5140.
Comments Due: 5 p.m. ET 6/22/20.
Docket Numbers: ER20–1950–000.
Applicants: Georgia Power Company.
Description: § 205(d) Rate Filing:
FP&L Scherer Unit 4 TSA 2020 GPCo
Updated Depreciation Rate and Errata
Filing to be effective 1/1/2020.
Filed Date: 6/1/20.
Accession Number: 20200601–5142.
Comments Due: 5 p.m. ET 6/22/20.
Docket Numbers: ER20–1951–000.
Applicants: Mid-Atlantic Interstate
Transmission, LLC, PJM
Interconnection, L.L.C.
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
Description: Compliance filing: MAIT
submits Compliance Filing re: Order
864 to be effective 1/27/2020.
Filed Date: 6/1/20.
Accession Number: 20200601–5141.
Comments Due: 5 p.m. ET 6/22/20.
Docket Numbers: ER20–1952–000.
Applicants: North Star Solar PV LLC.
Description: Baseline eTariff Filing:
Reactive Power Compensation Filing to
be effective 7/31/2020.
Filed Date: 6/1/20.
Accession Number: 20200601–5148.
Comments Due: 5 p.m. ET 6/22/20.
Docket Numbers: ER20–1953–000.
Applicants: AEP Texas Inc.
Description: § 205(d) Rate Filing:
AEPTX–LCRA TSC Heines Facility
Development Agreement to be effective
5/20/2020.
Filed Date: 6/1/20.
Accession Number: 20200601–5157.
Comments Due: 5 p.m. ET 6/22/20.
Docket Numbers: ER20–1954–000.
Applicants: ITC Great Plains, LLC,
Southwest Power Pool, Inc.
Description: Compliance filing: ITC
Great Plains, LLC Order No. 864
Compliance Filing to be effective 1/27/
2020.
Filed Date: 6/1/20.
Accession Number: 20200601–5160.
Comments Due: 5 p.m. ET 6/22/20.
Docket Numbers: ER20–1955–000.
Applicants: Public Service Company
of New Mexico.
Description: § 205(d) Rate Filing: PNM
Compliance with Order No. 864 to be
effective 1/27/2020.
Filed Date: 6/1/20.
Accession Number: 20200601–5172.
Comments Due: 5 p.m. ET 6/22/20.
Take notice that the Commission
received the following electric
reliability filings:
Docket Numbers: RR20–3–000.
Applicants: North American Electric
Reliability Corp.
Description: North American Electric
Reliability Corporation’s Report of
Comparison of Budgeted to Actual Costs
for 2019 for NERC and the Regional
Entities.
Filed Date: 5/29/20.
Accession Number: 20200529–5528.
Comments Due: 5 p.m. ET 6/19/20.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
E:\FR\FM\05JNN1.SGM
05JNN1
Federal Register / Vol. 85, No. 109 / Friday, June 5, 2020 / Notices
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: June 1, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–12230 Filed 6–4–20; 8:45 am]
BILLING CODE 6717–01–P
Dated: June 1, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
DEPARTMENT OF ENERGY
[FR Doc. 2020–12233 Filed 6–4–20; 8:45 am]
Federal Energy Regulatory
Commission
BILLING CODE 6717–01–P
[Project No. 10721–033]
DEPARTMENT OF ENERGY
lotter on DSK9F5VC42PROD with NOTICES
Big Creek Lodge & Outfitters Inc.;
Idaho Aviation Foundation; Notice of
Application for Transfer of License and
Soliciting Comments, Motions To
Intervene, and Protests
On April 28, 2020, J Curtis Earl Idaho
Aviation Foundation Inc., dba Idaho
Aviation Foundation (transferee) filed
an application for an after-the-fact
transfer of license of the Big Creek
Hydroelectric Project No. 10721. The
project is located on McCorkle Creek, in
Valley County, Idaho, and within the
Payette National Forest.
The applicant seeks Commission
approval to transfer the license for the
Big Creek Hydroelectric Project from Big
Creek Lodge & Outfitters Inc. (transferor)
to the transferee. The Big Creek Lodge
tragically burned to the ground in
October 2008 and Idaho Aviation
Foundation purchased the assets of Big
Creek Lodge & Outfitters Inc. including
the hydropower project.
Applicant’s Contacts: Vic Jaro, Idaho
Aviation Foundation, Board Member,
1297 Quail Hollow, Buhl, ID 83316,
Phone: (208) 404–9627; Email: info@
idahoaviationfoundation.org and
Nadine Burak, Secretary/Treasurer, P.O.
Box 2016, Eagle, ID 83616.
FERC Contact: Anumzziatta
Purchiaroni, (202) 502–6191,
anumzziatta.purchiaroni@ferc.gov.
Deadline for filing comments, motions
to intervene, and protests: 30 days from
the date that the Commission issues this
notice. The Commission strongly
encourages electronic filing. Please file
comments, motions to intervene, and
protests using the Commission’s eFiling
system at https://www.ferc.gov/docsfiling/efiling.asp. Commenters can
VerDate Sep<11>2014
18:21 Jun 04, 2020
submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–10721–033.
Jkt 250001
Federal Energy Regulatory
Commission
[Docket No. ER20–1939–000]
Calpine Northeast Development, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced Calpine Northeast
Development, LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is June 22,
2020.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
34617
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
may mail similar pleadings to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426. Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the eLibrary link. Enter
the docket number excluding the last
three digits in the docket number field
to access the document. At this time, the
Commission has suspended access to
the Commission’s Public Reference
Room, due to the proclamation
declaring a National Emergency
concerning the Novel Coronavirus
Disease (COVID–19), issued by the
President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Dated: June 1, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–12232 Filed 6–4–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2153–066]
United Water Conservation District;
Notice of Application Accepted for
Filing, Soliciting Comments, Motions
To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Types of Application: Amend
license to replace outlet works and
modify spillway.
b. Project No.: 2153–066.
c. Date Filed: May 26, 2020.
d. Applicants: United Water
Conservation District.
e. Name of Projects: Santa Felicia.
E:\FR\FM\05JNN1.SGM
05JNN1
Agencies
[Federal Register Volume 85, Number 109 (Friday, June 5, 2020)]
[Notices]
[Pages 34614-34617]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-12230]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC20-67-000.
Applicants: Broadview Energy JN, LLC, Broadview Energy KW, LLC.
Description: Supplement to May 15, 2020 Application for
Authorization Under Section 203 of the Federal Power Act, et al. of
Broadview Energy JN, LLC, et al.
Filed Date: 5/29/20.
Accession Number: 20200529-5510.
Comments Due: 5 p.m. ET 6/19/20.
Docket Numbers: EC20-69-000.
Applicants: Northern States Power Company, a Minnesota corporation,
FPL Energy Mower County, LLC.
Description: Joint Application for Authorization Under Section 203
of the Federal Power Act, et al. of Northern States Power Company, a
Minnesota corporation, et al.
Filed Date: 5/29/20.
Accession Number: 20200529-5521.
Comments Due: 5 p.m. ET 6/19/20.
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG20-173-000.
Applicants: Little Bear Solar 1, LLC.
Description: Updated Notice of Self-Certification of Exempt
Wholesale
[[Page 34615]]
Generator Status of Little Bear Solar 1, LLC.
Filed Date: 5/29/20.
Accession Number: 20200529-5323.
Comments Due: 5 p.m. ET 6/19/20.
Docket Numbers: EG20-174-000.
Applicants: Calpine Northeast Development, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status.
Filed Date: 5/29/20.
Accession Number: 20200529-5402.
Comments Due: 5 p.m. ET 6/19/20.
Docket Numbers: EG20-175-000.
Applicants: Cerro Gordo Wind, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of Cerro Gordo Wind, LLC.
Filed Date: 5/29/20.
Accession Number: 20200529-5405.
Comments Due: 5 p.m. ET 6/19/20.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-1852-038.
Applicants: Florida Power & Light Company.
Description: Notification of Change in Status of Florida Power &
Light Company.
Filed Date: 6/1/20.
Accession Number: 20200601-5150.
Comments Due: 5 p.m. ET 6/22/20.
Docket Numbers: ER10-2475-021; ER10-2474-021; ER10-2605-014; ER10-
2611-021; ER10-2984-046; ER10-3246-015; ER11-2044-033; ER11-3876-024;
ER12-162-028; ER12-1626-011; ER13-1266-029; ER13-1267-010; ER13-1268-
010; ER13-1269-010; ER13-1270-010; ER13-1271-010; ER13-1272-010; ER13-
1273-010; ER13-1441-010; ER13-1442-010; ER13-520-010; ER13-521-010;
ER15-2211-026; ER16-1258-003; ER16-438-005; ER18-1419-002.
Applicants: Nevada Power Company, Sierra Pacific Power Company,
PacifiCorp, Pinyon Pines Wind I, LLC, Pinyon Pines Wind II, LLC, Solar
Star California XIX, LLC, Solar Star California XX, LLC, Topaz Solar
Farms LLC, CE Leathers Company, Elmore Company, Del Ranch Company, Fish
Lake Power LLC, Salton Sea Power Generation Company, Vulcan/BN
Geothermal Power Company, Yuma Cogeneration Associates, Bishop Hill
Energy II LLC, MidAmerican Energy Company, Cordova Energy Company LLC,
Walnut Ridge Wind, LLC, Grande Prairie Wind, LLC, Marshall Wind Energy
LLC, Saranac Power Partners, L.P., CalEnergy, LLC, MidAmerican Energy
Services, LLC, Merrill Lynch Commodities, Inc., Salton Sea Power L.L.C.
Description: Notice of Non-Material Change in Status of the BHE MBR
Sellers and Merrill Lynch Commodities, Inc.
Filed Date: 5/29/20.
Accession Number: 20200529-5534.
Comments Due: 5 p.m. ET 6/19/20.
Docket Numbers: ER10-2756-009.
Applicants: Griffith Energy LLC.
Description: Notice of Non-Material Change in Status of Griffith
Energy LLC.
Filed Date: 5/29/20.
Accession Number: 20200529-5512.
Comments Due: 5 p.m. ET 6/19/20.
Docket Numbers: ER17-996-003.
Applicants: New York Independent System Operator, Inc.
Description: Compliance filing: Compliance to exclude State Program
language as directed by FERC 5/12/20 Order to be effective 5/12/2020.
Filed Date: 5/29/20.
Accession Number: 20200529-5508.
Comments Due: 5 p.m. ET 6/19/20.
Docket Numbers: ER18-680-003.
Applicants: PJM Interconnection, L.L.C.
Description: Compliance filing: Compliance filing per Commission's
3/31/2020 Order in Docket No. ER18-680 to be effective 1/1/2018.
Filed Date: 6/1/20.
Accession Number: 20200601-5075.
Comments Due: 5 p.m. ET 6/22/20.
Docket Numbers: ER20-1926-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2020-05-29_TOA Amendment
Advisory Committee Affiliate Sector to be effective 7/29/2020.
Filed Date: 5/29/20.
Accession Number: 20200529-5252.
Comments Due: 5 p.m. ET 6/19/20.
Docket Numbers: ER20-1927-000.
Applicants: Midcontinent Independent System Operator, Inc.,
Consumers Energy Company.
Description: Compliance filing: 2020-05-29_Consumers' Compliance on
Order 864 for ADIT to be effective 1/27/2020.
Filed Date: 5/29/20.
Accession Number: 20200529-5257.
Comments Due: 5 p.m. ET 6/19/20.
Docket Numbers: ER20-1928-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2020-05-29_Attachment FF
True-up Filing to be effective 6/1/2020.
Filed Date: 5/29/20.
Accession Number: 20200529-5259.
Comments Due: 5 p.m. ET 6/19/20.
Docket Numbers: ER20-1929-000.
Applicants: Baltimore Gas and Electric Company, PJM
Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: BGE submits Revisions to PJM
Tariff, Att. H-2A re: Stated Depreciation Rates to be effective 8/1/
2020.
Filed Date: 5/29/20.
Accession Number: 20200529-5267.
Comments Due: 5 p.m. ET 6/19/20.
Docket Numbers: ER20-1930-000.
Applicants: Tri-State Generation and Transmission Association, Inc.
Description: Sec. 205(d) Rate Filing: Certificate of Concurrence
for Amended and Restated Service Agreement No. 854 to be effective 5/
30/2020.
Filed Date: 5/29/20.
Accession Number: 20200529-5275.
Comments Due: 5 p.m. ET 6/19/20.
Docket Numbers: ER20-1931-000.
Applicants: Pacific Gas and Electric Company.
Description: Sec. 205(d) Rate Filing: May 2020 Western
Interconnection Agreement Biannual Filing to be effective 8/1/2020.
Filed Date: 5/29/20.
Accession Number: 20200529-5280.
Comments Due: 5 p.m. ET 6/19/20.
Docket Numbers: ER20-1932-000.
Applicants: Pacific Gas and Electric Company.
Description: Sec. 205(d) Rate Filing: May 2020 Western WDT Service
Agreement Biannual Filing to be effective 8/1/2020.
Filed Date: 5/29/20.
Accession Number: 20200529-5285.
Comments Due: 5 p.m. ET 6/19/20.
Docket Numbers: ER20-1933-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Second Revised ISA, SA No.
4608; Queue No. AE2-155 to be effective 4/30/2020.
Filed Date: 5/29/20.
Accession Number: 20200529-5305.
Comments Due: 5 p.m. ET 6/19/20.
Docket Numbers: ER20-1934-000.
Applicants: Entergy Nuclear Indian Point 2, LLC.
Description: Tariff Cancellation: Entergy Nuclear Indian Point 2,
LLC to be effective 6/1/2020.
Filed Date: 5/29/20.
Accession Number: 20200529-5504.
Comments Due: 5 p.m. ET 6/19/20.
Docket Numbers: ER20-1935-000.
Applicants: Tampa Electric Company.
Description: Sec. 205(d) Rate Filing: Section 205 Solar Intangible
Depreciation Filing--2020 to be effective 1/1/2019.
Filed Date: 5/29/20.
Accession Number: 20200529-5329.
Comments Due: 5 p.m. ET 6/19/20.
Docket Numbers: ER20-1936-000.
Applicants: Walnut Ridge Wind, LLC.
Description: Sec. 205(d) Rate Filing: Reactive Power Compensation
Tariff Filing to be effective 6/1/2020.
[[Page 34616]]
Filed Date: 5/29/20.
Accession Number: 20200529-5354.
Comments Due: 5 p.m. ET 6/19/20.
Docket Numbers: ER20-1937-000.
Applicants: California Independent System Operator Corporation.
Description: Sec. 205(d) Rate Filing: 2020-05-29 EIM
Implementation Agreement with Public Service Co--Colorado to be
effective 7/31/2020.
Filed Date: 5/29/20.
Accession Number: 20200529-5435.
Comments Due: 5 p.m. ET 6/19/20.
Docket Numbers: ER20-1938-000.
Applicants: Southern California Edison Company.
Description: Sec. 205(d) Rate Filing: LGIA Luz Solar Partners
LTD., VIII, Kramer Junction 8 SA No. 247 to be effective 5/30/2020.
Filed Date: 5/29/20.
Accession Number: 20200529-5446.
Comments Due: 5 p.m. ET 6/19/20.
Docket Numbers: ER20-1939-000.
Applicants: Calpine Northeast Development, LLC.
Description: Baseline eTariff Filing: Application for Market-Based
Rate Authorization under Section 205 of the FPA to be effective 5/30/
2020.
Filed Date: 5/29/20.
Accession Number: 20200529-5454.
Comments Due: 5 p.m. ET 6/19/20.
Docket Numbers: ER20-1940-000.
Applicants: Agera Energy LLC.
Description: Tariff Cancellation: Tariff Cancellation to be
effective 6/1/2020.
Filed Date: 5/29/20.
Accession Number: 20200529-5474.
Comments Due: 5 p.m. ET 6/19/20.
Docket Numbers: ER20-1941-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 3687 GridLiance High Plains
& Evergy Kansas Central Int Agr to be effective 8/1/2020.
Filed Date: 5/29/20.
Accession Number: 20200529-5488.
Comments Due: 5 p.m. ET 6/19/20.
Docket Numbers: ER20-1942-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2020-05-29_Conventional
Deliverable ICAP Filing to be effective 8/12/2020.
Filed Date: 5/29/20.
Accession Number: 20200529-5493.
Comments Due: 5 p.m. ET 6/19/20.
Docket Numbers: ER20-1943-000.
Applicants: New England Power Pool Participants Committee.
Description: Sec. 205(d) Rate Filing: June 2020 Membership Filing
to be effective 5/1/2020.
Filed Date: 6/1/20.
Accession Number: 20200601-5006.
Comments Due: 5 p.m. ET 6/22/20.
Docket Numbers: ER20-1944-000.
Applicants: Alabama Power Company.
Description: Sec. 205(d) Rate Filing: Attachment S (MPCo) 2020
Updated Depreciation Rates Filing to be effective 4/1/2020.
Filed Date: 6/1/20.
Accession Number: 20200601-5062.
Comments Due: 5 p.m. ET 6/22/20.
Docket Numbers: ER20-1945-000.
Applicants: Duke Energy Ohio, Inc., PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Duke Energy Ohio submits IA
SA No. 5186 to be effective 7/31/2020.
Filed Date: 6/1/20.
Accession Number: 20200601-5064.
Comments Due: 5 p.m. ET 6/22/20.
Docket Numbers: ER20-1946-000.
Applicants: Beech Ridge Energy II LLC.
Description: Sec. 205(d) Rate Filing: Amendment to Beech Ridge
Energy II MBR Tariff to be effective 6/2/2020.
Filed Date: 6/1/20.
Accession Number: 20200601-5085.
Comments Due: 5 p.m. ET 6/22/20.
Docket Numbers: ER20-1947-000.
Applicants: Greenleaf Energy Unit 2 LLC.
Description: Baseline eTariff Filing: Rate Schedules and Agreements
baseleine to be effective 6/2/2020.
Filed Date: 6/1/20.
Accession Number: 20200601-5129.
Comments Due: 5 p.m. ET 6/22/20.
Docket Numbers: ER20-1948-000.
Applicants: Potomac-Appalachian Highline Transmission, PJM
Interconnection, L.L.C.
Description: Compliance filing: PATH submits Compliance Filing re:
Order 864 to be effective 1/27/2020.
Filed Date: 6/1/20.
Accession Number: 20200601-5131.
Comments Due: 5 p.m. ET 6/22/20.
Docket Numbers: ER20-1949-000.
Applicants: Georgia Power Company.
Description: Sec. 205(d) Rate Filing: JEA Scherer Unit 4 TSA 2020
GPCo Updated Depreciation Rate and Errata Filing to be effective 1/1/
2020.
Filed Date: 6/1/20.
Accession Number: 20200601-5140.
Comments Due: 5 p.m. ET 6/22/20.
Docket Numbers: ER20-1950-000.
Applicants: Georgia Power Company.
Description: Sec. 205(d) Rate Filing: FP&L Scherer Unit 4 TSA 2020
GPCo Updated Depreciation Rate and Errata Filing to be effective 1/1/
2020.
Filed Date: 6/1/20.
Accession Number: 20200601-5142.
Comments Due: 5 p.m. ET 6/22/20.
Docket Numbers: ER20-1951-000.
Applicants: Mid-Atlantic Interstate Transmission, LLC, PJM
Interconnection, L.L.C.
Description: Compliance filing: MAIT submits Compliance Filing re:
Order 864 to be effective 1/27/2020.
Filed Date: 6/1/20.
Accession Number: 20200601-5141.
Comments Due: 5 p.m. ET 6/22/20.
Docket Numbers: ER20-1952-000.
Applicants: North Star Solar PV LLC.
Description: Baseline eTariff Filing: Reactive Power Compensation
Filing to be effective 7/31/2020.
Filed Date: 6/1/20.
Accession Number: 20200601-5148.
Comments Due: 5 p.m. ET 6/22/20.
Docket Numbers: ER20-1953-000.
Applicants: AEP Texas Inc.
Description: Sec. 205(d) Rate Filing: AEPTX-LCRA TSC Heines
Facility Development Agreement to be effective 5/20/2020.
Filed Date: 6/1/20.
Accession Number: 20200601-5157.
Comments Due: 5 p.m. ET 6/22/20.
Docket Numbers: ER20-1954-000.
Applicants: ITC Great Plains, LLC, Southwest Power Pool, Inc.
Description: Compliance filing: ITC Great Plains, LLC Order No. 864
Compliance Filing to be effective 1/27/2020.
Filed Date: 6/1/20.
Accession Number: 20200601-5160.
Comments Due: 5 p.m. ET 6/22/20.
Docket Numbers: ER20-1955-000.
Applicants: Public Service Company of New Mexico.
Description: Sec. 205(d) Rate Filing: PNM Compliance with Order
No. 864 to be effective 1/27/2020.
Filed Date: 6/1/20.
Accession Number: 20200601-5172.
Comments Due: 5 p.m. ET 6/22/20.
Take notice that the Commission received the following electric
reliability filings:
Docket Numbers: RR20-3-000.
Applicants: North American Electric Reliability Corp.
Description: North American Electric Reliability Corporation's
Report of Comparison of Budgeted to Actual Costs for 2019 for NERC and
the Regional Entities.
Filed Date: 5/29/20.
Accession Number: 20200529-5528.
Comments Due: 5 p.m. ET 6/19/20.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date.
[[Page 34617]]
Protests may be considered, but intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: June 1, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020-12230 Filed 6-4-20; 8:45 am]