Blooming Grove Wind Energy Center LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization, 34431-34432 [2020-12056]
Download as PDF
Federal Register / Vol. 85, No. 108 / Thursday, June 4, 2020 / Notices
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is June 18,
2020.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
may mail similar pleadings to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426. Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the eLibrary link. Enter
the docket number excluding the last
three digits in the docket number field
to access the document. At this time, the
Commission has suspended access to
the Commission’s Public Reference
Room, due to the proclamation
declaring a National Emergency
concerning the Novel Coronavirus
Disease (COVID–19), issued by the
President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Dated: May 29, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–12058 Filed 6–3–20; 8:45 am]
khammond on DSKJM1Z7X2PROD with NOTICES
BILLING CODE 6717–01–P
VerDate Sep<11>2014
17:24 Jun 03, 2020
Jkt 250001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER20–1915–000]
Maverick Solar, LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of
Maverick Solar, LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is June 18,
2020.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
may mail similar pleadings to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426. Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the eLibrary link. Enter
the docket number excluding the last
three digits in the docket number field
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
34431
to access the document. At this time, the
Commission has suspended access to
the Commission’s Public Reference
Room, due to the proclamation
declaring a National Emergency
concerning the Novel Coronavirus
Disease (COVID–19), issued by the
President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Dated: May 29, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–12057 Filed 6–3–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER20–1912–000]
Blooming Grove Wind Energy Center
LLC; Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding of
Blooming Grove Wind Energy Center
LLC’s application for market-based rate
authority, with an accompanying rate
tariff, noting that such application
includes a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is June 18,
2020.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
E:\FR\FM\04JNN1.SGM
04JNN1
34432
Federal Register / Vol. 85, No. 108 / Thursday, June 4, 2020 / Notices
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
may mail similar pleadings to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426. Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the eLibrary link. Enter
the docket number excluding the last
three digits in the docket number field
to access the document. At this time, the
Commission has suspended access to
the Commission’s Public Reference
Room, due to the proclamation
declaring a National Emergency
concerning the Novel Coronavirus
Disease (COVID–19), issued by the
President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Dated: May 29, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–12056 Filed 6–3–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2816–050; Project No. 12766–
007]
khammond on DSKJM1Z7X2PROD with NOTICES
North Hartland, LLC; Green Mountain
Power Corporation; Notice Soliciting
Scoping Comments
Take notice that the following
hydroelectric applications have been
filed with Commission and are available
for public inspection:
a. Type of Application: New Major
License (2816–050), New License for
Transmission Line Project (12766–007).
b. Project Nos.: 2816–050 and 12766–
007.
c. Dates filed: November 26, 2019 (P–
2816–050), November 22, 2019 (P–
12766–007).
d. Applicants: North Hartland, LLC
(North Hartland) (P–2816–050), Green
VerDate Sep<11>2014
18:54 Jun 03, 2020
Jkt 250001
Mountain Power Corporation (Green
Mountain Power) (P–12766–007).
e. Names of Projects: North Hartland
Hydroelectric Project (P–2816–050),
Clay Hill Road Line 66 Transmission
Project (P–12766–007).
f. Location: The North Hartland
Hydroelectric Project (North Hartland
Project) is located on the Ottauquechee
River in Windsor County, Vermont. The
North Hartland Project occupies 20.8
acres of land managed by the U.S. Army
Corps of Engineers (Corps). The Clay
Hill Road Line 66 Transmission Project
(Clay Hill Project) is located along Clay
Hill Road in Windsor County, Vermont.
The Clay Hill Project does not occupy
any federal land.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contacts: Blackstone
Hydroelectric Project—Andrew J. Locke,
President, Essex Hydro Associates, LLC,
55 Union Street, Boston, MA 02108;
Phone at (617) 367–0032, or email at
alocke@essexhydro.com.
Clay Hill Project—John Greenan,
Green Mountain Power Corporation,
2152 Post Road, Rutland, VT 05701;
Phone at (802) 770–2195, or email at
John.Greenan@greenmountainpower.
com.
i. FERC Contact: Bill Connelly, (202)
502–8587 or william.connelly@ferc.gov.
j. Deadline for filing scoping
comments: June 28, 2020.
The Commission strongly encourages
electronic filing. Please file scoping
comments using the Commission’s
eFiling system at https://www.ferc.gov/
docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
All filings must clearly identify the
project name and docket number on the
first page: North Hartland Hydroelectric
Project (P–2816–050) and/or Clay Hill
Road Line 66 Transmission Project (P–
12766–007).
The Commission’s Rules of Practice
and Procedure require all interveners
filing documents with the Commission
to serve a copy of that document on
each person on the official service list
for the project. Further, if an intervener
files comments or documents with the
Commission relating to the merits of an
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
k. The applications are not ready for
environmental analysis at this time.
l. Project Descriptions:
North Hartland Project
The existing North Hartland Project
consists of: (1) A steel-lined intake
structure in the Corps’ North Hartland
Dam that is equipped with trashracks
with 2-inch clear bar spacing; (2) a 470foot-long, 12-foot-diameter steel
penstock that provides flow to a 4.0megawatt (MW) adjustable blade,
vertical shaft turbine-generator unit
located inside of a 59-foot-long, 40-footwide concrete powerhouse; (3) a 12foot-diameter bypass conduit that
branches off of the 12-foot-diameter
penstock about 100 feet before the
powerhouse, and that empties into a 60foot-long concrete-lined channel
through a bypass control gate; (4) a 30inch-diameter steel penstock that
branches off of the 12-foot-diamater
bypass conduit about 50 feet upstream
of the bypass control gate, and that
provides flow to a 0.1375–MW fixed
geometry, horizontal pump turbinegenerator unit located on a raised
platform outside of the southern wall of
the powerhouse; (5) a 400-foot-long, 50
to 150-foot-wide tailrace channel; (6) a
transmission line that comprises an
approximately 600-foot-long, 12.5
kilovolt (kV) underground segment, and
a 4,000-foot-long, 12.5-kV overhead
segment that connect the generators to
the Clay Hill Project; and (9)
appurtenant facilities.
North Hartland proposes to release
the following minimum and maximum
flows, respectively, to the downstream
reach: (1) 60 and 700 cfs from October
1 through March 31; (2) 160 and 835 cfs
from April 1 through April 31; (3) 160
and 550 cfs from May 1 through May 31;
(4) 140 and 450 cfs from June 1 through
June 30; and (5) 60 and 300 cfs from July
1 through September 30.
Clay Hill Project
The existing Clay Hill Project consists
of: (1) A 2.3-mile-long, 12.5-kV, threephase electrical line mounted on top of
Green Mountain Power’s regional
distribution line (Line 66) along Clay
Hill Road from Pole 115 to 62x; and (2)
appurtenant facilities. The project
serves as a primary transmission line for
the North Hartland Project. Green
Mountain Power is not proposing any
changes to project facilities or operation.
m. In addition to publishing the full
text of this notice in the Federal
Register, the Commission provides all
E:\FR\FM\04JNN1.SGM
04JNN1
Agencies
[Federal Register Volume 85, Number 108 (Thursday, June 4, 2020)]
[Notices]
[Pages 34431-34432]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-12056]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER20-1912-000]
Blooming Grove Wind Energy Center LLC; Supplemental Notice That
Initial Market-Based Rate Filing Includes Request for Blanket Section
204 Authorization
This is a supplemental notice in the above-referenced proceeding of
Blooming Grove Wind Energy Center LLC's application for market-based
rate authority, with an accompanying rate tariff, noting that such
application includes a request for blanket authorization, under 18 CFR
part 34, of future issuances of securities and assumptions of
liability.
Any person desiring to intervene or to protest should file with the
Federal Energy Regulatory Commission, 888 First Street NE, Washington,
DC 20426, in accordance with Rules 211 and 214 of the Commission's
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone
filing a motion to intervene or protest must serve a copy of that
document on the Applicant.
Notice is hereby given that the deadline for filing protests with
regard to the applicant's request for blanket authorization, under 18
CFR part 34, of future issuances of securities and assumptions of
liability, is June 18, 2020.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an
[[Page 34432]]
eRegistration account using the eRegistration link. Select the eFiling
link to log on and submit the intervention or protests.
Persons unable to file electronically may mail similar pleadings to
the Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426. Hand delivered submissions in docketed
proceedings should be delivered to Health and Human Services, 12225
Wilkins Avenue, Rockville, Maryland 20852.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://ferc.gov) using the
eLibrary link. Enter the docket number excluding the last three digits
in the docket number field to access the document. At this time, the
Commission has suspended access to the Commission's Public Reference
Room, due to the proclamation declaring a National Emergency concerning
the Novel Coronavirus Disease (COVID-19), issued by the President on
March 13, 2020. For assistance, contact the Federal Energy Regulatory
Commission at [email protected] or call toll-free, (886) 208-
3676 or TYY, (202) 502-8659.
Dated: May 29, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-12056 Filed 6-3-20; 8:45 am]
BILLING CODE 6717-01-P