Renewable Energy Aggregators, Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 34430 [2020-12052]
Download as PDF
34430
Federal Register / Vol. 85, No. 108 / Thursday, June 4, 2020 / Notices
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2020–05–29_SA 3190 Alta Farms WindAmeren Illinois 1st Rev GIA (J474) to be
effective 5/14/2020.
Filed Date: 5/29/20.
Accession Number: 20200529–5134.
Comments Due: 5 p.m. ET 6/19/20.
Docket Numbers: ER20–1923–000.
Applicants: Louisiana Generating
LLC.
Description: Request to Recover Costs
Associated with Acting as a Local
Balancing Authority of Louisiana
Generating LLC.
Filed Date: 5/29/20.
Accession Number: 20200529–5155.
Comments Due: 5 p.m. ET 6/19/20.
Docket Numbers: ER20–1924–000.
Applicants: Aequitas Energy, Inc.
Description: Tariff Cancellation: Tariff
cancellation to be effective 6/1/2020.
Filed Date: 5/29/20.
Accession Number: 20200529–5219
Comments Due: 5 p.m. ET 6/19/20.
khammond on DSKJM1Z7X2PROD with NOTICES
Docket Numbers: ER20–1925–000.
Applicants: energy.me midwest, llc.
Description: Tariff Cancellation: Tariff
cancellation to be effective 6/1/2020.
Filed Date: 5/29/20.
Accession Number: 20200529–5223.
Comments Due: 5 p.m. ET 6/19/20.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: May 29, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–12053 Filed 6–3–20; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
17:24 Jun 03, 2020
Jkt 250001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 15011–000]
Renewable Energy Aggregators, Inc.;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
On October 11, 2019, Renewable
Energy Aggregators, Inc. filed an
application for a preliminary permit,
pursuant to section 4(f) of the Federal
Power Act (FPA), proposing to study the
feasibility of the Delaney Pumped
Storage Project (Delaney Project or
project) to be located near the town of
Tonopah, Maricopa County, Arizona.
The sole purpose of a preliminary
permit, if issued, is to grant the permit
holder priority to file a license
application during the permit term. A
preliminary permit does not authorize
the permit holder to perform any landdisturbing activities or otherwise enter
upon lands or waters owned by others
without the owners’ express permission.
The proposed project would consist of
the following: (1) A newly constructed
upper reservoir with an earthen/rollercompacted concrete dam and a surface
area of 150 acres with a storage capacity
of 11,525 acre-feet of water; (2) a newly
constructed lower reservoir of 2,000
acres with a storage capacity of
approximately 15,250 acre-feet; (3) two
22,000-foot-long, 19-foot-diameter
penstocks; (4) a powerhouse with
dimensions of 750 feet long by 175 feet
high by 70 feet wide containing as many
as two ternary style pump/generating
units; (5) two 3,000-foot-long, 21-footdiameter tailrace tunnels; and (6) a
connection to the existing Delaney
Substation within the project boundary.
The estimated annual generation of the
Delaney Project would be 864,000
megawatt-hours.
Applicant Contact: Mr. Adam
Rousselle, Renewable Energy
Aggregators, 2113 Middle Street, Suite
201, Sullivan’s Island, South Carolina
29482; phone: (267) 254–6107.
FERC Contact: Rebecca Kipp; phone:
(202) 502–8846.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–15011–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the eLibrary
link of Commission’s website at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–15011) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: May 29, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–12052 Filed 6–3–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER20–1916–000]
Maverick Solar 4, LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of
Blooming Grove Wind Energy Center
LLC’s application for market-based rate
authority, with an accompanying rate
tariff, noting that such application
includes a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
E:\FR\FM\04JNN1.SGM
04JNN1
Agencies
[Federal Register Volume 85, Number 108 (Thursday, June 4, 2020)]
[Notices]
[Page 34430]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-12052]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 15011-000]
Renewable Energy Aggregators, Inc.; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
On October 11, 2019, Renewable Energy Aggregators, Inc. filed an
application for a preliminary permit, pursuant to section 4(f) of the
Federal Power Act (FPA), proposing to study the feasibility of the
Delaney Pumped Storage Project (Delaney Project or project) to be
located near the town of Tonopah, Maricopa County, Arizona. The sole
purpose of a preliminary permit, if issued, is to grant the permit
holder priority to file a license application during the permit term. A
preliminary permit does not authorize the permit holder to perform any
land-disturbing activities or otherwise enter upon lands or waters
owned by others without the owners' express permission.
The proposed project would consist of the following: (1) A newly
constructed upper reservoir with an earthen/roller-compacted concrete
dam and a surface area of 150 acres with a storage capacity of 11,525
acre-feet of water; (2) a newly constructed lower reservoir of 2,000
acres with a storage capacity of approximately 15,250 acre-feet; (3)
two 22,000-foot-long, 19-foot-diameter penstocks; (4) a powerhouse with
dimensions of 750 feet long by 175 feet high by 70 feet wide containing
as many as two ternary style pump/generating units; (5) two 3,000-foot-
long, 21-foot-diameter tailrace tunnels; and (6) a connection to the
existing Delaney Substation within the project boundary. The estimated
annual generation of the Delaney Project would be 864,000 megawatt-
hours.
Applicant Contact: Mr. Adam Rousselle, Renewable Energy
Aggregators, 2113 Middle Street, Suite 201, Sullivan's Island, South
Carolina 29482; phone: (267) 254-6107.
FERC Contact: Rebecca Kipp; phone: (202) 502-8846.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426. The first page of any filing should include
docket number P-15011-000.
More information about this project, including a copy of the
application, can be viewed or printed on the eLibrary link of
Commission's website at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-15011) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: May 29, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-12052 Filed 6-3-20; 8:45 am]