Renewable Energy Aggregators, Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 34430 [2020-12052]

Download as PDF 34430 Federal Register / Vol. 85, No. 108 / Thursday, June 4, 2020 / Notices Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2020–05–29_SA 3190 Alta Farms WindAmeren Illinois 1st Rev GIA (J474) to be effective 5/14/2020. Filed Date: 5/29/20. Accession Number: 20200529–5134. Comments Due: 5 p.m. ET 6/19/20. Docket Numbers: ER20–1923–000. Applicants: Louisiana Generating LLC. Description: Request to Recover Costs Associated with Acting as a Local Balancing Authority of Louisiana Generating LLC. Filed Date: 5/29/20. Accession Number: 20200529–5155. Comments Due: 5 p.m. ET 6/19/20. Docket Numbers: ER20–1924–000. Applicants: Aequitas Energy, Inc. Description: Tariff Cancellation: Tariff cancellation to be effective 6/1/2020. Filed Date: 5/29/20. Accession Number: 20200529–5219 Comments Due: 5 p.m. ET 6/19/20. khammond on DSKJM1Z7X2PROD with NOTICES Docket Numbers: ER20–1925–000. Applicants: energy.me midwest, llc. Description: Tariff Cancellation: Tariff cancellation to be effective 6/1/2020. Filed Date: 5/29/20. Accession Number: 20200529–5223. Comments Due: 5 p.m. ET 6/19/20. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: May 29, 2020. Kimberly D. Bose, Secretary. [FR Doc. 2020–12053 Filed 6–3–20; 8:45 am] BILLING CODE 6717–01–P VerDate Sep<11>2014 17:24 Jun 03, 2020 Jkt 250001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 15011–000] Renewable Energy Aggregators, Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On October 11, 2019, Renewable Energy Aggregators, Inc. filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Delaney Pumped Storage Project (Delaney Project or project) to be located near the town of Tonopah, Maricopa County, Arizona. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any landdisturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) A newly constructed upper reservoir with an earthen/rollercompacted concrete dam and a surface area of 150 acres with a storage capacity of 11,525 acre-feet of water; (2) a newly constructed lower reservoir of 2,000 acres with a storage capacity of approximately 15,250 acre-feet; (3) two 22,000-foot-long, 19-foot-diameter penstocks; (4) a powerhouse with dimensions of 750 feet long by 175 feet high by 70 feet wide containing as many as two ternary style pump/generating units; (5) two 3,000-foot-long, 21-footdiameter tailrace tunnels; and (6) a connection to the existing Delaney Substation within the project boundary. The estimated annual generation of the Delaney Project would be 864,000 megawatt-hours. Applicant Contact: Mr. Adam Rousselle, Renewable Energy Aggregators, 2113 Middle Street, Suite 201, Sullivan’s Island, South Carolina 29482; phone: (267) 254–6107. FERC Contact: Rebecca Kipp; phone: (202) 502–8846. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 and competing applications using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–15011–000. More information about this project, including a copy of the application, can be viewed or printed on the eLibrary link of Commission’s website at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–15011) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: May 29, 2020. Kimberly D. Bose, Secretary. [FR Doc. 2020–12052 Filed 6–3–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER20–1916–000] Maverick Solar 4, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Blooming Grove Wind Energy Center LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard E:\FR\FM\04JNN1.SGM 04JNN1

Agencies

[Federal Register Volume 85, Number 108 (Thursday, June 4, 2020)]
[Notices]
[Page 34430]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-12052]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 15011-000]


Renewable Energy Aggregators, Inc.; Notice of Preliminary Permit 
Application Accepted for Filing and Soliciting Comments, Motions To 
Intervene, and Competing Applications

    On October 11, 2019, Renewable Energy Aggregators, Inc. filed an 
application for a preliminary permit, pursuant to section 4(f) of the 
Federal Power Act (FPA), proposing to study the feasibility of the 
Delaney Pumped Storage Project (Delaney Project or project) to be 
located near the town of Tonopah, Maricopa County, Arizona. The sole 
purpose of a preliminary permit, if issued, is to grant the permit 
holder priority to file a license application during the permit term. A 
preliminary permit does not authorize the permit holder to perform any 
land-disturbing activities or otherwise enter upon lands or waters 
owned by others without the owners' express permission.
    The proposed project would consist of the following: (1) A newly 
constructed upper reservoir with an earthen/roller-compacted concrete 
dam and a surface area of 150 acres with a storage capacity of 11,525 
acre-feet of water; (2) a newly constructed lower reservoir of 2,000 
acres with a storage capacity of approximately 15,250 acre-feet; (3) 
two 22,000-foot-long, 19-foot-diameter penstocks; (4) a powerhouse with 
dimensions of 750 feet long by 175 feet high by 70 feet wide containing 
as many as two ternary style pump/generating units; (5) two 3,000-foot-
long, 21-foot-diameter tailrace tunnels; and (6) a connection to the 
existing Delaney Substation within the project boundary. The estimated 
annual generation of the Delaney Project would be 864,000 megawatt-
hours.
    Applicant Contact: Mr. Adam Rousselle, Renewable Energy 
Aggregators, 2113 Middle Street, Suite 201, Sullivan's Island, South 
Carolina 29482; phone: (267) 254-6107.
    FERC Contact: Rebecca Kipp; phone: (202) 502-8846.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426. The first page of any filing should include 
docket number P-15011-000.
    More information about this project, including a copy of the 
application, can be viewed or printed on the eLibrary link of 
Commission's website at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-15011) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: May 29, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-12052 Filed 6-3-20; 8:45 am]
 BILLING CODE 6717-01-P