Golden Pass LNG Terminal LLC; Notice of Application, 34187-34188 [2020-11951]
Download as PDF
Federal Register / Vol. 85, No. 107 / Wednesday, June 3, 2020 / Notices
both FTA and non-FTA countries, and
short-term authorization holders that
have authority to export non-FTA
countries. The additional information
FE seeks to collect from this subset of
natural gas import and export
authorization holders includes: Longterm contracts associated with the
supply and sales of natural gas,
including compressed natural gas,
liquefied natural gas, and associated
products; changes in control of
authorization holders; registrations of
agents who import and export natural
gas; and, for long-term LNG export
authorization holders, semi-annual
reports providing information on the
status of the relevant proposed or
existing LNG export facility, and the
date the proposed LNG facility is
expected to commence first exports of
LNG (where applicable).
(5) Annual Estimated Number of
Respondents: 396 respondents.
(6) Annual Estimated Number of
Total Responses: 4,752.
(7) Annual Estimated Number of
Burden Hours: 14,256 hours.
(8) Annual Estimated Reporting and
Recordkeeping Cost Burden: $1,142,476
(14,256 annual burden hours multiplied
by $80.14 per hour); FE estimates that
respondents will have no additional
costs associated with the data proposed
for collection other than burden hours.
Statutory Authority: 15 U.S.C. 772(b)
and Section 3 of the Natural Gas Act of
1938, codified at 15 U.S.C. 717b.
Signing Authority
lotter on DSK9F5VC42PROD with NOTICES
This document of the Department of
Energy was signed on May 29, 2020, by
Shawn Bennett, Deputy Assistant
Secretary, Office of Oil and Natural Gas,
Office of Fossil Energy, pursuant to
delegated authority from the Secretary
of Energy. That document with the
original signature and date is
maintained by DOE. For administrative
purposes only, and in compliance with
requirements of the Office of the Federal
Register, the undersigned DOE Federal
Register Liaison Officer has been
authorized to sign and submit the
document in electronic format for
publication, as an official document of
the Department of Energy. This
administrative process in no way alters
the legal effect of this document upon
publication in the Federal Register.
Signed in Washington, DC, on May 29,
2020.
Treena V. Garrett,
Federal Register Liaison Officer, U.S.
Department of Energy.
[FR Doc. 2020–11973 Filed 6–2–20; 8:45 am]
BILLING CODE 6450–01–P
VerDate Sep<11>2014
18:35 Jun 02, 2020
Jkt 250001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP20–459–000]
Golden Pass LNG Terminal LLC;
Notice of Application
Take notice that on May 21, 2020,
Golden Pass LNG Terminal LLC (Golden
Pass LNG), 811 Louisiana Street,
Houston, Texas 77002, filed an
application pursuant to sections 3 of the
Natural Gas Act and Part 153 of the
Commission’s regulations, for authority
to amend its order issued on December
21, 2016, granting Golden Pass LNG
authority (Golden Pass Export Project)
to site, construct and operate facilities
for the exportation of liquefied natural
gas to increase the total LNG production
capacity of the Golden Pass Export
Project from 15.6 million metric tons
per annum (MTPA) to 18.1 MTPA, and
from 740 billion cubic feet per year (Bcf/
yr) to 937 Bcf/yr.
Any questions regarding this
application should be addressed to
Blaine Yamagata, Vice President and
General Counsel, Golden Pass LNG, 811
Louisiana Street, Suite 1500, Houston,
Texas 77002, by telephone: (713) 324–
6952; or to Kevin M. Sweeney, Law
Office of Kevin M. Sweeney, 1625 K
Street NW, Washington, DC 20006, by
telephone at (202) 609–7709.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
34187
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the EA
for this proposal. The filing of the EA
in the Commission’s public record for
this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
3 copies of filings made in the
proceeding with the Commission and
must provide a copy to the applicant
and to every other party. Only parties to
the proceeding can ask for court review
of Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list and will be
notified of any meetings associated with
the Commission’s environmental review
process. Environmental commenters
will not be required to serve copies of
E:\FR\FM\03JNN1.SGM
03JNN1
34188
Federal Register / Vol. 85, No. 107 / Wednesday, June 3, 2020 / Notices
filed documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission and will not have the right
to seek court review of the
Commission’s final order.
As of the February 27, 2018 date of
the Commission’s order in Docket No.
CP16–4–001, the Commission will
apply its revised practice concerning
out-of-time motions to intervene in any
new Natural Gas Act section 3 or section
7 proceeding.1 Persons desiring to
become a party to a certificate
proceeding are to intervene in a timely
manner. If seeking to intervene out-oftime, the movant is required to ‘‘show
good cause why the time limitation
should be waived,’’ and should provide
justification by reference to factors set
forth in Rule 214(d)(1) of the
Commission’s Rules and Regulations.2
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically may mail similar
pleadings to the Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. Hand
delivered submissions in docketed
proceedings should be delivered to
Health and Human Services, 12225
Wilkins Avenue, Rockville, Maryland
20852.
Comment Date: 5:00 p.m. Eastern
Standard Time on June 18, 2020.
Dated: May 28, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–11951 Filed 6–2–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
lotter on DSK9F5VC42PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–1801–004;
ER10–1805–005; ER10–2370–003.
Applicants: The Connecticut Light
and Power Company, Public Service
Company of New Hampshire, NSTAR
Electric Company.
Description: Supplement to December
23, 2019 Updated Market Power
1 Tennessee Gas Pipeline Company, L.L.C., 162
FERC ¶ 61,167 at ¶ 50 (2018).
2 18 CFR 385.214(d)(1).
VerDate Sep<11>2014
18:35 Jun 02, 2020
Jkt 250001
Analysis for Northeast Region of the
Eversource Companies, et al.
Filed Date: 5/28/20.
Accession Number: 20200528–5119.
Comments Due: 5 p.m. ET 6/18/20.
Docket Numbers: ER12–1933–011.
Applicants: Interstate Power and
Light Company.
Description: Amendment to February
10, 2020 Notification of Change in
Status of Interstate Power and Light
Company.
Filed Date: 5/27/20.
Accession Number: 20200527–5135.
Comments Due: 5 p.m. ET 6/17/20.
Docket Numbers: ER20–391–003.
Applicants: J. Aron & Company LLC.
Description: Notice of Non-Material
Change in Status of J. Aron & Company
LLC.
Filed Date: 5/28/20.
Accession Number: 20200528–5247.
Comments Due: 5 p.m. ET 6/18/20.
Docket Numbers: ER20–547–002.
Applicants: Goldman Sachs
Renewable Power Marketing.
Description: Compliance filing:
Compliance Filing to be effective 1/2/
2020.
Filed Date: 5/28/20.
Accession Number: 20200528–5079.
Comments Due: 5 p.m. ET 6/18/20.
Docket Numbers: ER20–547–003;
ER12–1911–004; ER12–1912–004;
ER12–1913–004; ER12–1915–004;
ER12–1916–004; ER12–1917–004;
ER14–41–004; ER14–42–004; ER16–
498–003; ER16–499–003; ER16–500–
003; ER19–2463–002.
Applicants: Goldman Sachs
Renewable Power Marketing LLC, RE
McKenzie 1 LLC, RE McKenzie 2 LLC,
RE McKenzie 3 LLC, RE McKenzie 4
LLC, RE McKenzie 5 LLC, RE McKenzie
6 LLC, RE Rosamond One LLC, RE
Rosamond Two LLC, RE Mustang LLC,
RE Mustang 3 LLC, RE Mustang 4 LLC,
Utah Red Hills Renewable Park, LLC.
Description: Notice of Non-Material
Change in Status of Goldman Sachs
Renewable Power Marketing LLC, et al.
Filed Date: 5/28/20.
Accession Number: 20200528–5152.
Comments Due: 5 p.m. ET 6/18/20.
Docket Numbers: ER20–752–001.
Applicants: Versant Power.
Description: Compliance filing:
Establish Effective Date for
Interconnection Agreement—Houlton
Water Company to be effective 5/15/
2020.
Filed Date: 5/28/20.
Accession Number: 20200528–5262.
Comments Due: 5 p.m. ET 6/18/20.
Docket Numbers: ER20–1905–000.
Applicants: Southwest Power Pool,
Inc.
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
Description: § 205(d) Rate Filing: 3651
Arkansas Electric Cooperative Corp.
NITSA NOA to be effective 7/1/2020.
Filed Date: 5/28/20.
Accession Number: 20200528–5059.
Comments Due: 5 p.m. ET 6/18/20.
Docket Numbers: ER20–1906–000.
Applicants: Story County Wind, LLC.
Description: Baseline eTariff Filing:
Reactive Power Compensation Filing to
be effective 7/27/2020.
Filed Date: 5/28/20.
Accession Number: 20200528–5074.
Comments Due: 5 p.m. ET 6/18/20.
Docket Numbers: ER20–1907–000.
Applicants: Minco Wind I, LLC.
Description: Baseline eTariff Filing:
Minco Wind I, LLC Application for
MBR Authority to be effective 7/27/
2020.
Filed Date: 5/28/20.
Accession Number: 20200528–5081.
Comments Due: 5 p.m. ET 6/18/20.
Docket Numbers: ER20–1908–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Assignment of ISA, SA No. 810, Queue
No. A36 to be effective 12/13/2001.
Filed Date: 5/28/20.
Accession Number: 20200528–5123.
Comments Due: 5 p.m. ET 6/18/20.
Docket Numbers: ER20–1909–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing: GIA
and DSA EF Oxnard LLC SA Nos. 1102–
1103 to be effective 5/25/2020.
Filed Date: 5/28/20.
Accession Number: 20200528–5153.
Comments Due: 5 p.m. ET 6/18/20.
Docket Numbers: ER20–1910–000.
Applicants: Desert Harvest, LLC.
Description: Baseline eTariff Filing:
Initial Market-Based Rate Petition of
Desert Harvest to be effective 7/28/2020.
Filed Date: 5/28/20.
Accession Number: 20200528–5162.
Comments Due: 5 p.m. ET 6/18/20.
Docket Numbers: ER20–1911–000.
Applicants: Desert Harvest II LLC.
Description: Baseline eTariff Filing:
Initial Market-Based Rate Petition of
Desert Harvest II LLC to be effective 7/
28/2020.
Filed Date: 5/28/20.
Accession Number: 20200528–5165.
Comments Due: 5 p.m. ET 6/18/20.
Docket Numbers: ER20–1912–000.
Applicants: Blooming Grove Wind
Energy Center LLC.
Description: Baseline eTariff Filing:
Application for Market-Based Rate
Authorization to be effective 7/28/2020.
Filed Date: 5/28/20.
Accession Number: 20200528–5173.
Comments Due: 5 p.m. ET 6/18/20.
E:\FR\FM\03JNN1.SGM
03JNN1
Agencies
[Federal Register Volume 85, Number 107 (Wednesday, June 3, 2020)]
[Notices]
[Pages 34187-34188]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-11951]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP20-459-000]
Golden Pass LNG Terminal LLC; Notice of Application
Take notice that on May 21, 2020, Golden Pass LNG Terminal LLC
(Golden Pass LNG), 811 Louisiana Street, Houston, Texas 77002, filed an
application pursuant to sections 3 of the Natural Gas Act and Part 153
of the Commission's regulations, for authority to amend its order
issued on December 21, 2016, granting Golden Pass LNG authority (Golden
Pass Export Project) to site, construct and operate facilities for the
exportation of liquefied natural gas to increase the total LNG
production capacity of the Golden Pass Export Project from 15.6 million
metric tons per annum (MTPA) to 18.1 MTPA, and from 740 billion cubic
feet per year (Bcf/yr) to 937 Bcf/yr.
Any questions regarding this application should be addressed to
Blaine Yamagata, Vice President and General Counsel, Golden Pass LNG,
811 Louisiana Street, Suite 1500, Houston, Texas 77002, by telephone:
(713) 324-6952; or to Kevin M. Sweeney, Law Office of Kevin M. Sweeney,
1625 K Street NW, Washington, DC 20006, by telephone at (202) 609-7709.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://ferc.gov) using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
Reference Room, due to the proclamation declaring a National Emergency
concerning the Novel Coronavirus Disease (COVID-19), issued by the
President on March 13, 2020. For assistance, contact FERC at
[email protected] or call toll-free, (886) 208-3676 or TYY,
(202) 502-8659.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the EA for this proposal. The filing of the EA in the Commission's
public record for this proceeding or the issuance of a Notice of
Schedule for Environmental Review will serve to notify federal and
state agencies of the timing for the completion of all necessary
reviews, and the subsequent need to complete all federal authorizations
within 90 days of the date of issuance of the EA.
There are two ways to become involved in the Commission's review of
this project. First, any person wishing to obtain legal status by
becoming a party to the proceedings for this project should, on or
before the comment date stated below file with the Federal Energy
Regulatory Commission, 888 First Street NE, Washington, DC 20426, a
motion to intervene in accordance with the requirements of the
Commission's Rules of Practice and Procedure (18 CFR 385.214 or
385.211) and the Regulations under the NGA (18 CFR 157.10). A person
obtaining party status will be placed on the service list maintained by
the Secretary of the Commission and will receive copies of all
documents filed by the applicant and by all other parties. A party must
submit 3 copies of filings made in the proceeding with the Commission
and must provide a copy to the applicant and to every other party. Only
parties to the proceeding can ask for court review of Commission orders
in the proceeding.
However, a person does not have to intervene in order to have
comments considered. The second way to participate is by filing with
the Secretary of the Commission, as soon as possible, an original and
two copies of comments in support of or in opposition to this project.
The Commission will consider these comments in determining the
appropriate action to be taken, but the filing of a comment alone will
not serve to make the filer a party to the proceeding. The Commission's
rules require that persons filing comments in opposition to the project
provide copies of their protests only to the party or parties directly
involved in the protest.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commenters will be
placed on the Commission's environmental mailing list and will be
notified of any meetings associated with the Commission's environmental
review process. Environmental commenters will not be required to serve
copies of
[[Page 34188]]
filed documents on all other parties. However, the non-party commenters
will not receive copies of all documents filed by other parties or
issued by the Commission and will not have the right to seek court
review of the Commission's final order.
As of the February 27, 2018 date of the Commission's order in
Docket No. CP16-4-001, the Commission will apply its revised practice
concerning out-of-time motions to intervene in any new Natural Gas Act
section 3 or section 7 proceeding.\1\ Persons desiring to become a
party to a certificate proceeding are to intervene in a timely manner.
If seeking to intervene out-of-time, the movant is required to ``show
good cause why the time limitation should be waived,'' and should
provide justification by reference to factors set forth in Rule
214(d)(1) of the Commission's Rules and Regulations.\2\
---------------------------------------------------------------------------
\1\ Tennessee Gas Pipeline Company, L.L.C., 162 FERC ] 61,167 at
] 50 (2018).
\2\ 18 CFR 385.214(d)(1).
---------------------------------------------------------------------------
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFiling'' link
at https://www.ferc.gov. Persons unable to file electronically may mail
similar pleadings to the Federal Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426. Hand delivered submissions in
docketed proceedings should be delivered to Health and Human Services,
12225 Wilkins Avenue, Rockville, Maryland 20852.
Comment Date: 5:00 p.m. Eastern Standard Time on June 18, 2020.
Dated: May 28, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-11951 Filed 6-2-20; 8:45 am]
BILLING CODE 6717-01-P