Freeport LNG Development, L.P., FLNG Liquefaction, LLC, FLNG Liquefaction 2, LLC, FLNG Liquefaction 3, LLC; Notice of Application, 34189-34190 [2020-11950]
Download as PDF
Federal Register / Vol. 85, No. 107 / Wednesday, June 3, 2020 / Notices
Docket Numbers: ER20–1913–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Revision to Sch. 12–Appx A (MetEd),
30-Day Comment Period Requested to
be effective 8/26/2020.
Filed Date: 5/28/20.
Accession Number: 20200528–5183.
Comments Due: 5 p.m. ET 6/18/20.
Docket Numbers: ER20–1914–000.
Applicants: Versant Power.
Description: Tariff Cancellation:
Notice of Termination of Transmission
Service Agreement—Houlton Water
Company to be effective 5/15/2020.
Filed Date: 5/28/20.
Accession Number: 20200528–5272.
Comments Due: 5 p.m. ET 6/18/20.
Take notice that the Commission
received the following electric
reliability filings.
lotter on DSK9F5VC42PROD with NOTICES
Docket Numbers: RD20–9–000.
Applicants: North American Electric
Reliability Corporation.
Description: Application of the North
American Electric Reliability
Corporation for the approval of
proposed Reliability Standard BAL–
003–2.
Filed Date: 12/19/19.
Accession Number: 20191219–5339.
Comments Due: 5 p.m. ET 6/29/20.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: May 28, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–11948 Filed 6–2–20; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
18:35 Jun 02, 2020
Jkt 250001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP20–455–000]
Freeport LNG Development, L.P., FLNG
Liquefaction, LLC, FLNG Liquefaction
2, LLC, FLNG Liquefaction 3, LLC;
Notice of Application
Take notice that on May 13, 2020,
Freeport LNG Development, L.P.; FLNG
Liquefaction, LLC; FLNG Liquefaction 2,
LLC; and FLNG Liquefaction 3, LLC
(collectively, Freeport LNG), 333 Clay
Street, Suite 5050, Houston, Texas
77002, filed in Docket No. CP20–455–
000 an application pursuant to section
3(a) of the Natural Gas Act (NGA), and
Part 153 of the Commission’s
regulations requesting authorization to
site, construct, and operate
modifications to Freeport LNG’s existing
Pretreatment Facility in Brazoria
County, Texas to allow for the
extraction of helium from the
compressed boiled-off gas pipeline, all
as more fully set forth in the application
which is on file with the Commission
and open to public inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions concerning this
application may be directed to John
Tobola, Freeport LNG Development,
L.P., 333 Clay Street, Suite 5050,
Houston, Texas 77002, by phone (713)
980–2888 or by email at JTobola@
freeportlng.com.
Pursuant to section 157.9 of the
Commission’s rules (18 CFR 157.9),
within 90 days of this Notice, the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding or
issue a Notice of Schedule for
Environmental Review. If a Notice of
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
34189
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule will serve to notify
federal and state agencies of the timing
for the completion of all necessary
reviews, and the subsequent need to
complete all federal authorizations
within 90 days of the date of issuance
of the Commission staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
five copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list and will be
notified of meetings associated with the
Commission’s environmental review
E:\FR\FM\03JNN1.SGM
03JNN1
34190
Federal Register / Vol. 85, No. 107 / Wednesday, June 3, 2020 / Notices
process. Environmental commenters
will not be required to serve copies of
filed documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission and will not have the right
to seek court review of the
Commission’s final order.
As of the February 27, 2018 date of
the Commission’s order in Docket No.
CP16–4–001, the Commission will
apply its revised practice concerning
out-of-time motions to intervene in any
new NGA section 3 or section 7
proceeding.1 Persons desiring to become
a party to a certificate proceeding are to
intervene in a timely manner. If seeking
to intervene out-of-time, the movant is
required to ‘‘show good cause why the
time limitation should be waived,’’ and
should provide justification by reference
to factors set forth in Rule 214(d)(1) of
the Commission’s Rules and
Regulations.2
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit original
and five copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426.
Comment Date: 5:00 p.m. Eastern
Time on June 18, 2020.
Dated: May 28, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–11950 Filed 6–2–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP20–460–000]
lotter on DSK9F5VC42PROD with NOTICES
Northern Natural Gas Company; Notice
of Application
Take notice that on March 21, 2020,
Northern Natural Gas Company
(Northern Natural), 1111 South 103rd
Street, Omaha, NE 68124–1000, filed in
Docket No. CP20–460–000 an
application (Clifton to Palmyra A-line
Abandonment Project) pursuant to
section 7(b) and 7(c) of the Natural Gas
Act (NGA) and Part 157 of the
Commission’s regulations for
authorization to abandon in-place
approximately 96 miles Northern
1 Tennessee Gas Pipeline Company, L.L.C., 162
FERC ¶ 61,167 at ¶ 50 (2018).
2 18 CFR 385.214(d)(1).
VerDate Sep<11>2014
18:35 Jun 02, 2020
Jkt 250001
Natural’s 24 inch-diameter A-line and
approximately 19 miles of its 20-inchdiameter J-line located in Clay and
Washington counties in Kansas, and in
Gage, Jefferson, Lancaster and Otoe
counties in Nebraska. Northern Natural
further seeks authorization to construct
and operate an additional natural gasdriven ISO rated 15,900-Solar Mars
turbine unit compressor unit at
Northern Natural ’s existing Beatrice
compressor station located in Gage
County, Nebraska at an estimated cost of
$29,730,000, all as more fully described
in their application which is on file
with the Commission and open to
public inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions concerning this
application may be directed to Michael
T. Loeffler, Senior Director Certificates
and External Affairs, Northern Natural
Gas Company, P.O. Box 3330, Omaha,
NE 68103–0330, by telephone at (402)
398–7103, by facsimile at (402) 398–
7592, or by email at mike.loeffler@
nngco.com.
Pursuant to section 157.9 of the
Commission’s rules (18 CFR 157.9),
within 90 days of this Notice, the
Commission staff will issue a Notice of
Schedule for Environmental Review. If
a Notice of Schedule for Environmental
Review is issued, it will indicate, among
other milestones, the anticipated date
for the Commission staff’s issuance of
the environmental assessment (EA) for
this proposal. The issuance of a Notice
of Schedule for Environmental Review
will serve to notify federal and state
agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s EA.
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
seven copies of filings made in the
proceeding with the Commission and
must mail a copy to the applicant and
to every other party. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenters will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
As of the February 27, 2018 date of
the Commission’s order in Docket No.
E:\FR\FM\03JNN1.SGM
03JNN1
Agencies
[Federal Register Volume 85, Number 107 (Wednesday, June 3, 2020)]
[Notices]
[Pages 34189-34190]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-11950]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP20-455-000]
Freeport LNG Development, L.P., FLNG Liquefaction, LLC, FLNG
Liquefaction 2, LLC, FLNG Liquefaction 3, LLC; Notice of Application
Take notice that on May 13, 2020, Freeport LNG Development, L.P.;
FLNG Liquefaction, LLC; FLNG Liquefaction 2, LLC; and FLNG Liquefaction
3, LLC (collectively, Freeport LNG), 333 Clay Street, Suite 5050,
Houston, Texas 77002, filed in Docket No. CP20-455-000 an application
pursuant to section 3(a) of the Natural Gas Act (NGA), and Part 153 of
the Commission's regulations requesting authorization to site,
construct, and operate modifications to Freeport LNG's existing
Pretreatment Facility in Brazoria County, Texas to allow for the
extraction of helium from the compressed boiled-off gas pipeline, all
as more fully set forth in the application which is on file with the
Commission and open to public inspection.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://ferc.gov) using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
Reference Room, due to the proclamation declaring a National Emergency
concerning the Novel Coronavirus Disease (COVID-19), issued by the
President on March 13, 2020. For assistance, contact FERC at
[email protected] or call toll-free, (886) 208-3676 or TYY,
(202) 502-8659.
Any questions concerning this application may be directed to John
Tobola, Freeport LNG Development, L.P., 333 Clay Street, Suite 5050,
Houston, Texas 77002, by phone (713) 980-2888 or by email at
[email protected].
Pursuant to section 157.9 of the Commission's rules (18 CFR 157.9),
within 90 days of this Notice, the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule will serve to
notify federal and state agencies of the timing for the completion of
all necessary reviews, and the subsequent need to complete all federal
authorizations within 90 days of the date of issuance of the Commission
staff's FEIS or EA.
There are two ways to become involved in the Commission's review of
this project. First, any person wishing to obtain legal status by
becoming a party to the proceedings for this project should, on or
before the comment date stated below, file with the Federal Energy
Regulatory Commission, 888 First Street NE, Washington, DC 20426, a
motion to intervene in accordance with the requirements of the
Commission's Rules of Practice and Procedure (18 CFR 385.214 or
385.211) and the Regulations under the NGA (18 CFR 157.10). A person
obtaining party status will be placed on the service list maintained by
the Secretary of the Commission and will receive copies of all
documents filed by the applicant and by all other parties. A party must
submit five copies of filings made with the Commission and must mail a
copy to the applicant and to every other party in the proceeding. Only
parties to the proceeding can ask for court review of Commission orders
in the proceeding.
However, a person does not have to intervene in order to have
comments considered. The second way to participate is by filing with
the Secretary of the Commission, as soon as possible, an original and
two copies of comments in support of or in opposition to this project.
The Commission will consider these comments in determining the
appropriate action to be taken, but the filing of a comment alone will
not serve to make the filer a party to the proceeding. The Commission's
rules require that persons filing comments in opposition to the project
provide copies of their protests only to the party or parties directly
involved in the protest.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commenters will be
placed on the Commission's environmental mailing list and will be
notified of meetings associated with the Commission's environmental
review
[[Page 34190]]
process. Environmental commenters will not be required to serve copies
of filed documents on all other parties. However, the non-party
commenters will not receive copies of all documents filed by other
parties or issued by the Commission and will not have the right to seek
court review of the Commission's final order.
As of the February 27, 2018 date of the Commission's order in
Docket No. CP16-4-001, the Commission will apply its revised practice
concerning out-of-time motions to intervene in any new NGA section 3 or
section 7 proceeding.\1\ Persons desiring to become a party to a
certificate proceeding are to intervene in a timely manner. If seeking
to intervene out-of-time, the movant is required to ``show good cause
why the time limitation should be waived,'' and should provide
justification by reference to factors set forth in Rule 214(d)(1) of
the Commission's Rules and Regulations.\2\
---------------------------------------------------------------------------
\1\ Tennessee Gas Pipeline Company, L.L.C., 162 FERC ] 61,167 at
] 50 (2018).
\2\ 18 CFR 385.214(d)(1).
---------------------------------------------------------------------------
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFiling'' link
at https://www.ferc.gov. Persons unable to file electronically should
submit original and five copies of the protest or intervention to the
Federal Energy Regulatory Commission, 888 First Street NE, Washington,
DC 20426.
Comment Date: 5:00 p.m. Eastern Time on June 18, 2020.
Dated: May 28, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-11950 Filed 6-2-20; 8:45 am]
BILLING CODE 6717-01-P