Freeport LNG Development, L.P., FLNG Liquefaction, LLC, FLNG Liquefaction 2, LLC, FLNG Liquefaction 3, LLC; Notice of Application, 34189-34190 [2020-11950]

Download as PDF Federal Register / Vol. 85, No. 107 / Wednesday, June 3, 2020 / Notices Docket Numbers: ER20–1913–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Revision to Sch. 12–Appx A (MetEd), 30-Day Comment Period Requested to be effective 8/26/2020. Filed Date: 5/28/20. Accession Number: 20200528–5183. Comments Due: 5 p.m. ET 6/18/20. Docket Numbers: ER20–1914–000. Applicants: Versant Power. Description: Tariff Cancellation: Notice of Termination of Transmission Service Agreement—Houlton Water Company to be effective 5/15/2020. Filed Date: 5/28/20. Accession Number: 20200528–5272. Comments Due: 5 p.m. ET 6/18/20. Take notice that the Commission received the following electric reliability filings. lotter on DSK9F5VC42PROD with NOTICES Docket Numbers: RD20–9–000. Applicants: North American Electric Reliability Corporation. Description: Application of the North American Electric Reliability Corporation for the approval of proposed Reliability Standard BAL– 003–2. Filed Date: 12/19/19. Accession Number: 20191219–5339. Comments Due: 5 p.m. ET 6/29/20. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: May 28, 2020. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2020–11948 Filed 6–2–20; 8:45 am] BILLING CODE 6717–01–P VerDate Sep<11>2014 18:35 Jun 02, 2020 Jkt 250001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP20–455–000] Freeport LNG Development, L.P., FLNG Liquefaction, LLC, FLNG Liquefaction 2, LLC, FLNG Liquefaction 3, LLC; Notice of Application Take notice that on May 13, 2020, Freeport LNG Development, L.P.; FLNG Liquefaction, LLC; FLNG Liquefaction 2, LLC; and FLNG Liquefaction 3, LLC (collectively, Freeport LNG), 333 Clay Street, Suite 5050, Houston, Texas 77002, filed in Docket No. CP20–455– 000 an application pursuant to section 3(a) of the Natural Gas Act (NGA), and Part 153 of the Commission’s regulations requesting authorization to site, construct, and operate modifications to Freeport LNG’s existing Pretreatment Facility in Brazoria County, Texas to allow for the extraction of helium from the compressed boiled-off gas pipeline, all as more fully set forth in the application which is on file with the Commission and open to public inspection. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Any questions concerning this application may be directed to John Tobola, Freeport LNG Development, L.P., 333 Clay Street, Suite 5050, Houston, Texas 77002, by phone (713) 980–2888 or by email at JTobola@ freeportlng.com. Pursuant to section 157.9 of the Commission’s rules (18 CFR 157.9), within 90 days of this Notice, the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding or issue a Notice of Schedule for Environmental Review. If a Notice of PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 34189 Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below, file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit five copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission’s environmental mailing list and will be notified of meetings associated with the Commission’s environmental review E:\FR\FM\03JNN1.SGM 03JNN1 34190 Federal Register / Vol. 85, No. 107 / Wednesday, June 3, 2020 / Notices process. Environmental commenters will not be required to serve copies of filed documents on all other parties. However, the non-party commenters will not receive copies of all documents filed by other parties or issued by the Commission and will not have the right to seek court review of the Commission’s final order. As of the February 27, 2018 date of the Commission’s order in Docket No. CP16–4–001, the Commission will apply its revised practice concerning out-of-time motions to intervene in any new NGA section 3 or section 7 proceeding.1 Persons desiring to become a party to a certificate proceeding are to intervene in a timely manner. If seeking to intervene out-of-time, the movant is required to ‘‘show good cause why the time limitation should be waived,’’ and should provide justification by reference to factors set forth in Rule 214(d)(1) of the Commission’s Rules and Regulations.2 The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit original and five copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. Comment Date: 5:00 p.m. Eastern Time on June 18, 2020. Dated: May 28, 2020. Kimberly D. Bose, Secretary. [FR Doc. 2020–11950 Filed 6–2–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP20–460–000] lotter on DSK9F5VC42PROD with NOTICES Northern Natural Gas Company; Notice of Application Take notice that on March 21, 2020, Northern Natural Gas Company (Northern Natural), 1111 South 103rd Street, Omaha, NE 68124–1000, filed in Docket No. CP20–460–000 an application (Clifton to Palmyra A-line Abandonment Project) pursuant to section 7(b) and 7(c) of the Natural Gas Act (NGA) and Part 157 of the Commission’s regulations for authorization to abandon in-place approximately 96 miles Northern 1 Tennessee Gas Pipeline Company, L.L.C., 162 FERC ¶ 61,167 at ¶ 50 (2018). 2 18 CFR 385.214(d)(1). VerDate Sep<11>2014 18:35 Jun 02, 2020 Jkt 250001 Natural’s 24 inch-diameter A-line and approximately 19 miles of its 20-inchdiameter J-line located in Clay and Washington counties in Kansas, and in Gage, Jefferson, Lancaster and Otoe counties in Nebraska. Northern Natural further seeks authorization to construct and operate an additional natural gasdriven ISO rated 15,900-Solar Mars turbine unit compressor unit at Northern Natural ’s existing Beatrice compressor station located in Gage County, Nebraska at an estimated cost of $29,730,000, all as more fully described in their application which is on file with the Commission and open to public inspection. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Any questions concerning this application may be directed to Michael T. Loeffler, Senior Director Certificates and External Affairs, Northern Natural Gas Company, P.O. Box 3330, Omaha, NE 68103–0330, by telephone at (402) 398–7103, by facsimile at (402) 398– 7592, or by email at mike.loeffler@ nngco.com. Pursuant to section 157.9 of the Commission’s rules (18 CFR 157.9), within 90 days of this Notice, the Commission staff will issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the environmental assessment (EA) for this proposal. The issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s EA. PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit seven copies of filings made in the proceeding with the Commission and must mail a copy to the applicant and to every other party. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. However, the non-party commenters will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. As of the February 27, 2018 date of the Commission’s order in Docket No. E:\FR\FM\03JNN1.SGM 03JNN1

Agencies

[Federal Register Volume 85, Number 107 (Wednesday, June 3, 2020)]
[Notices]
[Pages 34189-34190]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-11950]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP20-455-000]


Freeport LNG Development, L.P., FLNG Liquefaction, LLC, FLNG 
Liquefaction 2, LLC, FLNG Liquefaction 3, LLC; Notice of Application

    Take notice that on May 13, 2020, Freeport LNG Development, L.P.; 
FLNG Liquefaction, LLC; FLNG Liquefaction 2, LLC; and FLNG Liquefaction 
3, LLC (collectively, Freeport LNG), 333 Clay Street, Suite 5050, 
Houston, Texas 77002, filed in Docket No. CP20-455-000 an application 
pursuant to section 3(a) of the Natural Gas Act (NGA), and Part 153 of 
the Commission's regulations requesting authorization to site, 
construct, and operate modifications to Freeport LNG's existing 
Pretreatment Facility in Brazoria County, Texas to allow for the 
extraction of helium from the compressed boiled-off gas pipeline, all 
as more fully set forth in the application which is on file with the 
Commission and open to public inspection.
    In addition to publishing the full text of this document in the 
Federal Register, the Commission provides all interested persons an 
opportunity to view and/or print the contents of this document via the 
internet through the Commission's Home Page (https://ferc.gov) using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. At this time, 
the Commission has suspended access to the Commission's Public 
Reference Room, due to the proclamation declaring a National Emergency 
concerning the Novel Coronavirus Disease (COVID-19), issued by the 
President on March 13, 2020. For assistance, contact FERC at 
[email protected] or call toll-free, (886) 208-3676 or TYY, 
(202) 502-8659.
    Any questions concerning this application may be directed to John 
Tobola, Freeport LNG Development, L.P., 333 Clay Street, Suite 5050, 
Houston, Texas 77002, by phone (713) 980-2888 or by email at 
[email protected].
    Pursuant to section 157.9 of the Commission's rules (18 CFR 157.9), 
within 90 days of this Notice, the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule will serve to 
notify federal and state agencies of the timing for the completion of 
all necessary reviews, and the subsequent need to complete all federal 
authorizations within 90 days of the date of issuance of the Commission 
staff's FEIS or EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below, file with the Federal Energy 
Regulatory Commission, 888 First Street NE, Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit five copies of filings made with the Commission and must mail a 
copy to the applicant and to every other party in the proceeding. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commenters will be 
placed on the Commission's environmental mailing list and will be 
notified of meetings associated with the Commission's environmental 
review

[[Page 34190]]

process. Environmental commenters will not be required to serve copies 
of filed documents on all other parties. However, the non-party 
commenters will not receive copies of all documents filed by other 
parties or issued by the Commission and will not have the right to seek 
court review of the Commission's final order.
    As of the February 27, 2018 date of the Commission's order in 
Docket No. CP16-4-001, the Commission will apply its revised practice 
concerning out-of-time motions to intervene in any new NGA section 3 or 
section 7 proceeding.\1\ Persons desiring to become a party to a 
certificate proceeding are to intervene in a timely manner. If seeking 
to intervene out-of-time, the movant is required to ``show good cause 
why the time limitation should be waived,'' and should provide 
justification by reference to factors set forth in Rule 214(d)(1) of 
the Commission's Rules and Regulations.\2\
---------------------------------------------------------------------------

    \1\ Tennessee Gas Pipeline Company, L.L.C., 162 FERC ] 61,167 at 
] 50 (2018).
    \2\ 18 CFR 385.214(d)(1).
---------------------------------------------------------------------------

    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at https://www.ferc.gov. Persons unable to file electronically should 
submit original and five copies of the protest or intervention to the 
Federal Energy Regulatory Commission, 888 First Street NE, Washington, 
DC 20426.
    Comment Date: 5:00 p.m. Eastern Time on June 18, 2020.

    Dated: May 28, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-11950 Filed 6-2-20; 8:45 am]
 BILLING CODE 6717-01-P