Common Performance Metrics; Request for Information on Performance Metrics for ISOs, RTOs, and Regions Outside ISOs and RTOs, 33660 [2020-11872]
Download as PDF
33660
Federal Register / Vol. 85, No. 106 / Tuesday, June 2, 2020 / Notices
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Dated: May 27, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
be made using the OMB-approved
Information Collection Input
Spreadsheet (Excel workbook) and the
associated Common Metrics Information
Collection User Guide.3
For further information, please
contact: Darren Sheets, Office of Energy
Policy and Innovation, Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426,
(202) 502–8742, Darren.Sheets@
FERC.gov.
Dated: May 27, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–11872 Filed 6–1–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[FR Doc. 2020–11835 Filed 6–1–20; 8:45 am]
[Docket No. CP20–461–000]
BILLING CODE 6717–01–P
Lower Valley Energy, Inc.; Notice of
Application
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AD19–16–000]
Common Performance Metrics;
Request for Information on
Performance Metrics for ISOs, RTOs,
and Regions Outside ISOs and RTOs
khammond on DSKJM1Z7X2PROD with NOTICES
On April 21, 2020, the Office of
Management and Budget (OMB)
approved the Federal Energy Regulatory
Commission (Commission or FERC)
staff’s request for reinstatement and
revision of the FERC–922 (Performance
Metrics for ISOs, RTOs, and Regions
Outside ISOs and RTOs, OMB Control
No. 1902–0262) information collection,
as discussed in Docket No. AD19–16–
000. Consistent with the OMB-approved
information collection, ISOs, RTOs, and
utilities in regions outside ISOs and
RTOs are encouraged to submit
responsive information by October 30,
2020.1
Respondents should submit their
responses in Docket No. AD19–16–000
via the Commission’s electronic filing
(eFiling) system.2 Submissions should
1 In the OMB request for reinstatement and
revision of the FERC–922 information collection,
Commission staff indicated that respondents would
be given 90 days to submit responses to the
information collection. However, given the
emergency conditions caused by the Novel
Coronavirus Disease (COVID–19), there is good
cause to extend the deadline for submitting
responses to this information collection an
additional 60 days.
2 More information on the Commission’s eFiling
system is posted at: https://www.ferc.gov/docs-
VerDate Sep<11>2014
20:46 Jun 01, 2020
Jkt 250001
Take notice that on May 22, 2020,
Lower Valley Energy, Inc. (LVE), 236
North Washington, P.O. Box 188, Afton,
Wyoming 83110 filed in Docket No.
CP20–461–000, an application pursuant
to section 7(f) of the Natural Gas Act
and Part 157 of the Commission’s
regulations requesting that the
Commission grant it a determination of
service area within which LVE may,
without further Commission
authorization, own and operate an
approximately 49-mile pipeline from
Montpelier, Idaho to Afton Wyoming to
displace semi-trailer deliveries of LNG
to its Afton LNG storage and
distribution facilities and for possible
natural gas delivery to seven properties
within its existing electric service
territory in Caribou County Idaho. LVE
also requests a finding that it qualifies
for treatment as an LDC for purposes of
Section 311 of the Natural Gas Policy
Act and a waiver of various Commission
requirements as appropriate and
consistent with the requested
determination.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
filing/efiling.asp. All submissions to the
Commission must be formatted and filed in
accordance with submission guidelines described
at: https://www.ferc.gov/help/submission-guide.asp.
3 Links to the approved Information Collection
Input Spreadsheet (Excel workbook) and the
Common Metrics Information Collection User
Guide can be found at: https://www.ferc.gov/
industries/electric/indus-act/rto/rto-isoperformance.asp.
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions regarding this
application should be directed to Craig
Coles, Director of Gas Operations, Lower
Valley Energy, Inc, P.O. Box 188, Afton,
Wyoming 83110 or via email at ccoles@
lvenergy.com.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the EA
for this proposal. The filing of the EA
in the Commission’s public record for
this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
3 copies of filings made with the
E:\FR\FM\02JNN1.SGM
02JNN1
Agencies
[Federal Register Volume 85, Number 106 (Tuesday, June 2, 2020)]
[Notices]
[Page 33660]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-11872]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. AD19-16-000]
Common Performance Metrics; Request for Information on
Performance Metrics for ISOs, RTOs, and Regions Outside ISOs and RTOs
On April 21, 2020, the Office of Management and Budget (OMB)
approved the Federal Energy Regulatory Commission (Commission or FERC)
staff's request for reinstatement and revision of the FERC-922
(Performance Metrics for ISOs, RTOs, and Regions Outside ISOs and RTOs,
OMB Control No. 1902-0262) information collection, as discussed in
Docket No. AD19-16-000. Consistent with the OMB-approved information
collection, ISOs, RTOs, and utilities in regions outside ISOs and RTOs
are encouraged to submit responsive information by October 30, 2020.\1\
---------------------------------------------------------------------------
\1\ In the OMB request for reinstatement and revision of the
FERC-922 information collection, Commission staff indicated that
respondents would be given 90 days to submit responses to the
information collection. However, given the emergency conditions
caused by the Novel Coronavirus Disease (COVID-19), there is good
cause to extend the deadline for submitting responses to this
information collection an additional 60 days.
---------------------------------------------------------------------------
Respondents should submit their responses in Docket No. AD19-16-000
via the Commission's electronic filing (eFiling) system.\2\ Submissions
should be made using the OMB-approved Information Collection Input
Spreadsheet (Excel workbook) and the associated Common Metrics
Information Collection User Guide.\3\
---------------------------------------------------------------------------
\2\ More information on the Commission's eFiling system is
posted at: https://www.ferc.gov/docs-filing/efiling.asp. All
submissions to the Commission must be formatted and filed in
accordance with submission guidelines described at: https://www.ferc.gov/help/submission-guide.asp.
\3\ Links to the approved Information Collection Input
Spreadsheet (Excel workbook) and the Common Metrics Information
Collection User Guide can be found at: https://www.ferc.gov/industries/electric/indus-act/rto/rto-iso-performance.asp.
---------------------------------------------------------------------------
For further information, please contact: Darren Sheets, Office of
Energy Policy and Innovation, Federal Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
(202) 502-8742, [email protected].
Dated: May 27, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-11872 Filed 6-1-20; 8:45 am]
BILLING CODE 6717-01-P