Download as PDF 33150 Federal Register / Vol. 85, No. 105 / Monday, June 1, 2020 / Notices Accession Number: 20200526–5177. Comments Due: 5 p.m. ET 6/16/20. Take notice that the Commission received the following electric securities filings: Docket Numbers: ES20–23–000. Applicants: Mississippi Power Company. Description: Amendment to April 14, 2020 Application Under Section 204 of the Federal Power Act for Authorization to Issue Securities of Mississippi Power Company. Filed Date: 5/22/20. Accession Number: 20200522–5292 Comments Due: 5 p.m. ET 5/27/20. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: May 26, 2020. Nathaniel J. Davis, Sr., Deputy Secretary. Description: § 4(d) Rate Filing: Negotiated Rate—Manchester Street K511085 to be effective 6/1/2020. Filed Date: 5/21/20. Accession Number: 20200521–5095. Comments Due: 5 p.m. ET 6/2/20. Docket Numbers: RP20–883–000. Applicants: White River Hub, LLC. Description: Annual Fuel Gas Reimbursement Percentage Report of White River Hub, LLC under RP20–883. Filed Date: 5/22/20. Accession Number: 20200522–5131. Comments Due: 5 p.m. ET 6/3/20. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified date(s). Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: May 26, 2020. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2020–11687 Filed 5–29–20; 8:45 am] BILLING CODE 6717–01–P [FR Doc. 2020–11686 Filed 5–29–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 15029–000] Federal Energy Regulatory Commission jbell on DSKJLSW7X2PROD with NOTICES Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Docket Numbers: RP20–871–000. Applicants: Natural Gas Pipeline Company of America. Description: § 4(d) Rate Filing: Update Filing—Removal of Expired Agreements to be effective 6/14/2020. Filed Date: 5/15/20. Accession Number: 20200515–5000. Comments Due: 5 p.m. ET 5/28/20. Docket Numbers: RP20–882–000. Applicants: Algonquin Gas Transmission, LLC. VerDate Sep<11>2014 19:40 May 29, 2020 Jkt 250001 SV Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On April 23, 2020, SV Hydro, LLC, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Itasca County Pumped Storage Project (Itasca County Project or project) to be located near the City of Marble, Itasca County, Minnesota. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform PO 00000 Frm 00072 Fmt 4703 Sfmt 4703 any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project is a closed loop pumped storage project and would consist of the following: (1) A 50-foothigh, 120-acre-area circular upper reservoir constructed as a rockfill embankment with a total storage capacity of approximately 4,500 acrefeet at a maximum operating elevation of 1,455 feet mean sea level (msl); (2) an 18-foot-diameter upper intake; (3) a 2,800-foot-long, 16-foot-diameter vertical penstock excavated in granitic bedrock and lined with steel extending between the upper intake and the pump/turbines below; (4) a 5,400-foot to 4,200-foot-circular underground lower reservoir excavated in granitic bedrock, located 2,500 feet below the ground surface elevation of 1,410 msl with a usable storage capacity approximately the same as the upper reservoir and operational water elevations between minus 1,012.5 feet msl and minus 1,055 feet msl; (5) a 200-foot-long, 70-footwide, 130-foot-high powerhouse located 250 feet below the lower reservoir containing two vertical Francis reversible pump/turbine-motor/ generator units rated for 333 megawatts each; (6) a 240-foot-long, 50-foot-wide, 40-foot-high underground transformer gallery; (7) a 200-foot-square above ground substation; (8) a 200 to 500-footlong, 230 kilovolts (kV) transmission line extending from the substation to an existing 230 kV transmission line owned by others; and (9) appurtenant facilities. There would be no federal land within the proposed project boundary. The estimated annual generation of the Itasca County Project would be 1,500 gigawatt-hours. Applicant Contact: Mr. Douglas Spaulding, P.E., Nelson Energy, 8441 Wayzata Blvd., Suite 101 Golden Valley, MN 55426; phone: (952) 544–8133. FERC Contact: Sergiu Serban; phone: (202) 502–6211. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system E:\FR\FM\01JNN1.SGM 01JNN1

Agencies

[Federal Register Volume 85, Number 105 (Monday, June 1, 2020)]
[Notices]
[Page 33150]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-11687]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings

    Take notice that the Commission has received the following Natural 
Gas Pipeline Rate and Refund Report filings:

    Docket Numbers: RP20-871-000.
    Applicants: Natural Gas Pipeline Company of America.
    Description: Sec.  4(d) Rate Filing: Update Filing--Removal of 
Expired Agreements to be effective 6/14/2020.
    Filed Date: 5/15/20.
    Accession Number: 20200515-5000.
    Comments Due: 5 p.m. ET 5/28/20.

    Docket Numbers: RP20-882-000.
    Applicants: Algonquin Gas Transmission, LLC.
    Description: Sec.  4(d) Rate Filing: Negotiated Rate--Manchester 
Street K511085 to be effective 6/1/2020.
    Filed Date: 5/21/20.
    Accession Number: 20200521-5095.
    Comments Due: 5 p.m. ET 6/2/20.

    Docket Numbers: RP20-883-000.
    Applicants: White River Hub, LLC.
    Description: Annual Fuel Gas Reimbursement Percentage Report of 
White River Hub, LLC under RP20-883.
    Filed Date: 5/22/20.
    Accession Number: 20200522-5131.
    Comments Due: 5 p.m. ET 6/3/20.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified date(s). Protests may be considered, 
but intervention is necessary to become a party to the proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: May 26, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020-11687 Filed 5-29-20; 8:45 am]
 BILLING CODE 6717-01-P