Data Collection for Analytics and Surveillance and Market-Based Rate Purposes; Notice of Extension of Time, 31758-31759 [2020-11332]

Download as PDF jbell on DSKJLSW7X2PROD with NOTICES 31758 Federal Register / Vol. 85, No. 102 / Wednesday, May 27, 2020 / Notices DeficiencyLtr_ER20–1333 to be effective 3/19/2020. Filed Date: 5/20/20. Accession Number: 20200520–5122. Comments Due: 5 p.m. ET 6/10/20. Docket Numbers: ER20–1395–000. Applicants: ND OTM LLC. Description: Supplement to March 26, 2020 ND OTM LLC tariff filing (Asset Appendix). Filed Date: 5/20/20. Accession Number: 20200520–5095. Comments Due: 5 p.m. ET 6/10/20. Docket Numbers: ER20–1487–001. Applicants: Frontier Windpower II, LLC. Description: Tariff Amendment: Amendment to Application for MarketBased Rate Authority to be effective 6/ 2/2020. Filed Date: 5/19/20. Accession Number: 20200519–5147. Comments Due: 5 p.m. ET 5/29/20. Docket Numbers: ER20–1854–001. Applicants: PJM Interconnection, L.L.C. Description: Tariff Amendment: Amendment to ER20–1854–000 Re: AC2–138/AD2–044 WMPA 4869 to be effective 2/22/2019. Filed Date: 5/20/20. Accession Number: 20200520–5098. Comments Due: 5 p.m. ET 6/10/20. Docket Numbers: ER20–1855–000. Applicants: NSTAR Electric Company. Description: § 205(d) Rate Filing: Preliminary Engineering and Design Agreement with Mayflower Wind Energy LLC to be effective 5/19/2020. Filed Date: 5/19/20. Accession Number: 20200519–5145. Comments Due: 5 p.m. ET 6/9/20. Docket Numbers: ER20–1856–000. Applicants: California Independent System Operator Corporation. Description: § 205(d) Rate Filing: 2020–05–19 Certificate of Concurrence for UFA among Atlas Solar LLC, SCE & CAISO to be effective 4/14/2020. Filed Date: 5/19/20. Accession Number: 20200519–5151. Comments Due: 5 p.m. ET 6/9/20. Docket Numbers: ER20–1857–000. Applicants: El Paso Electric Company. Description: § 205(d) Rate Filing: Concurrence of EPE to APS Service Agreement No. 376 to be effective 12/9/ 2019. Filed Date: 5/19/20. Accession Number: 20200519–5154. Comments Due: 5 p.m. ET 6/9/20. Docket Numbers: ER20–1858–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2020–05–20_SA 3496 ATC-Shullsburg VerDate Sep<11>2014 18:09 May 26, 2020 Jkt 250001 Wind Farm GIA (J819) to be effective 5/ 6/2020. Filed Date: 5/20/20. Accession Number: 20200520–5020. Comments Due: 5 p.m. ET 6/10/20. Docket Numbers: ER20–1859–000. Applicants: Tampa Electric Company. Description: Motion for Waiver of Open Access Transmission Tariff Provision, et al. of Tampa Electric Company. Filed Date: 5/19/20. Accession Number: 20200519–5178. Comments Due: 5 p.m. ET 5/26/20. Docket Numbers: ER20–1860–000. Applicants: AEP Texas Inc. Description: § 205(d) Rate Filing: AEPTX-Helena Wind Interconnection Agreement to be effective 5/5/2020. Filed Date: 5/20/20. Accession Number: 20200520–5058. Comments Due: 5 p.m. ET 6/10/20. Docket Numbers: ER20–1861–000. Applicants: PJM Interconnection, L.L.C., Delaware Municipal Electric Corporation, Inc. Description: § 205(d) Rate Filing: Revised SA No. 2978, NITSA Among PJM and Delaware Municipal Electric Corp. to be effective 5/1/2020. Filed Date: 5/20/20. Accession Number: 20200520–5064. Comments Due: 5 p.m. ET 6/10/20. Docket Numbers: ER20–1862–000. Applicants: ISO New England Inc., New England Power Pool Participants Committee. Description: § 205(d) Rate Filing: Tariff Rev Related to Enhancements & Clean-Up Changes Under the Billing Policy to be effective 7/27/2020. Filed Date: 5/20/20. Accession Number: 20200520–5068. Comments Due: 5 p.m. ET 6/10/20. Docket Numbers: ER20–1863–000. Applicants: Ingenco Wholesale Power, L.L.C. Description: Baseline eTariff Filing: Reactive Power Compensation Filing to be effective 6/1/2020. Filed Date: 5/20/20. Accession Number: 20200520–5086. Comments Due: 5 p.m. ET 6/10/20. Docket Numbers: ER20–1864–000. Applicants: New England Power Company. Description: § 205(d) Rate Filing: Filing to Revise Depreciation Rates in Service Agreement Nos. 20 and 23 to be effective 7/1/2020. Filed Date: 5/20/20. Accession Number: 20200520–5126. Comments Due: 5 p.m. ET 6/10/20. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: May 20, 2020. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2020–11334 Filed 5–26–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RM16–17–000] Data Collection for Analytics and Surveillance and Market-Based Rate Purposes; Notice of Extension of Time On May 6, 2020, the Edison Electric Institute (EEI) submitted a motion requesting that the Commission extend the effective date of Order No. 860 and the deployment of the market-based rate database (MBR Database) by four months to February 1, 2021 and the due date for initial baseline submission until June 1, 2021. EEI asserts that good cause exists to grant the extension because the disruption caused by the COVID–19 pandemic creates challenges in meeting the implementation schedule established in Order No. 860. Upon consideration, notice is hereby given that the effective date of Order No. 860 is extended to and including six months to April 1, 2021, and the deadline for baseline submissions is extended to and including August 2, 2021. Further, other implementation dates in Order No. 860 are extended as shown in the attached appendix. Dated: May 20, 2020. Kimberly D. Bose, Secretary. Appendix 1 Data Collection for Analytics & Surveillance and Market-Based Rate Purposes, Order No. 860, 168 FERC 61,039 (2019), order on reh’g, Order No. 860– A, 170 FERC 61,129 (2020). E:\FR\FM\27MYN1.SGM 27MYN1 Federal Register / Vol. 85, No. 102 / Wednesday, May 27, 2020 / Notices Activity Order No. 860 schedule Testing period for the MBR Database .................................................... Effective date of Order No. 860 .............................................................. ‘‘Go-live’’ date of MBR Database ............................................................ Sellers should create needed identifiers (FERC Generated IDs and Asset IDs) in the MBR Portal and prepare their baseline submissions. Baseline submissions are due ................................................................ First change in status filings under new timelines are due .................... Through Sept. 30, 2020 ................ Oct. 1, 2020 ................................... Oct. 1, 2020 ................................... Oct. 1, 2020–Dec. 31, 2020 .......... Through Mar. 31, 2021. Apr. 1, 2021. Apr. 1, 2021. Apr. 1, 2021–June 30, 2021. By Feb. 1, 2021 ............................. By Feb. 28, 2021 ........................... By Aug. 2, 2021. By Aug. 31, 2021. [FR Doc. 2020–11332 Filed 5–26–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER20–1853–000] Whitehorn Solar LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization jbell on DSKJLSW7X2PROD with NOTICES 31759 This is a supplemental notice in the above-referenced Whitehorn Solar LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is June 9, 2020. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically may mail similar pleadings to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC VerDate Sep<11>2014 16:59 May 26, 2020 Jkt 250001 20426. Hand delivered submissions in docketed proceedings should be delivered to Health and Human Services, 12225 Wilkins Avenue, Rockville, Maryland 20852. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// ferc.gov) using the eLibrary link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Dated: May 20, 2020. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2020–11330 Filed 5–26–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Docket Numbers: RP20–874–000. Applicants: Rover Pipeline LLC. Description: § 4(d) Rate Filing: Capacity Release Provision to be effective 6/19/2020. Filed Date: 5/19/20. Accession Number: 20200519–5013. Comments Due: 5 p.m. ET 6/1/20. Docket Numbers: RP20–875–000. Applicants: ETC Tiger Pipeline, LLC. PO 00000 Frm 00024 Fmt 4703 Sfmt 9990 Revised, six-month extension schedule Description: § 4(d) Rate Filing: Capacity Release Provision to be effective 6/19/2020. Filed Date: 5/19/20. Accession Number: 20200519–5015. Comments Due: 5 p.m. ET 6/1/20. Docket Numbers: RP20–877–000. Applicants: Rockies Express Pipeline LLC. Description: Compliance filing REX 2020 Annual Penalty Revenue Reconciliation. Filed Date: 5/19/20. Accession Number: 20200519–5133. Comments Due: 5 p.m. ET 6/1/20. Docket Numbers: RP20–878–000. Applicants: Tallgrass Interstate Gas Transmission, LLC. Description: Compliance filing TIGT 2020 Annual Penalty Revenue Reconciliation. Filed Date: 5/19/20. Accession Number: 20200519–5134. Comments Due: 5 p.m. ET 6/1/20. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified date(s). Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: May 20, 2020. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2020–11331 Filed 5–26–20; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\27MYN1.SGM 27MYN1

Agencies

[Federal Register Volume 85, Number 102 (Wednesday, May 27, 2020)]
[Notices]
[Pages 31758-31759]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-11332]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. RM16-17-000]


Data Collection for Analytics and Surveillance and Market-Based 
Rate Purposes; Notice of Extension of Time

    On May 6, 2020, the Edison Electric Institute (EEI) submitted a 
motion requesting that the Commission extend the effective date of 
Order No. 860 and the deployment of the market-based rate database (MBR 
Database) by four months to February 1, 2021 and the due date for 
initial baseline submission until June 1, 2021.
    EEI asserts that good cause exists to grant the extension because 
the disruption caused by the COVID-19 pandemic creates challenges in 
meeting the implementation schedule established in Order No. 860.
    Upon consideration, notice is hereby given that the effective date 
of Order No. 860 is extended to and including six months to April 1, 
2021, and the deadline for baseline submissions is extended to and 
including August 2, 2021. Further, other implementation dates in Order 
No. 860 are extended as shown in the attached appendix.

    Dated: May 20, 2020.
Kimberly D. Bose,
Secretary.

Appendix

[[Page 31759]]



------------------------------------------------------------------------
                                                      Revised, six-month
            Activity                 Order No. 860         extension
                                       schedule            schedule
------------------------------------------------------------------------
Testing period for the MBR        Through Sept. 30,   Through Mar. 31,
 Database.                         2020.               2021.
Effective date of Order No. 860.  Oct. 1, 2020......  Apr. 1, 2021.
``Go-live'' date of MBR Database  Oct. 1, 2020......  Apr. 1, 2021.
Sellers should create needed      Oct. 1, 2020-Dec.   Apr. 1, 2021-June
 identifiers (FERC Generated IDs   31, 2020.           30, 2021.
 and Asset IDs) in the MBR
 Portal and prepare their
 baseline submissions.
Baseline submissions are due....  By Feb. 1, 2021...  By Aug. 2, 2021.
First change in status filings    By Feb. 28, 2021..  By Aug. 31, 2021.
 under new timelines are due.
------------------------------------------------------------------------

[FR Doc. 2020-11332 Filed 5-26-20; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.