Data Collection for Analytics and Surveillance and Market-Based Rate Purposes; Notice of Extension of Time, 31758-31759 [2020-11332]
Download as PDF
jbell on DSKJLSW7X2PROD with NOTICES
31758
Federal Register / Vol. 85, No. 102 / Wednesday, May 27, 2020 / Notices
DeficiencyLtr_ER20–1333 to be effective
3/19/2020.
Filed Date: 5/20/20.
Accession Number: 20200520–5122.
Comments Due: 5 p.m. ET 6/10/20.
Docket Numbers: ER20–1395–000.
Applicants: ND OTM LLC.
Description: Supplement to March 26,
2020 ND OTM LLC tariff filing (Asset
Appendix).
Filed Date: 5/20/20.
Accession Number: 20200520–5095.
Comments Due: 5 p.m. ET 6/10/20.
Docket Numbers: ER20–1487–001.
Applicants: Frontier Windpower II,
LLC.
Description: Tariff Amendment:
Amendment to Application for MarketBased Rate Authority to be effective 6/
2/2020.
Filed Date: 5/19/20.
Accession Number: 20200519–5147.
Comments Due: 5 p.m. ET 5/29/20.
Docket Numbers: ER20–1854–001.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Amendment:
Amendment to ER20–1854–000 Re:
AC2–138/AD2–044 WMPA 4869 to be
effective 2/22/2019.
Filed Date: 5/20/20.
Accession Number: 20200520–5098.
Comments Due: 5 p.m. ET 6/10/20.
Docket Numbers: ER20–1855–000.
Applicants: NSTAR Electric
Company.
Description: § 205(d) Rate Filing:
Preliminary Engineering and Design
Agreement with Mayflower Wind
Energy LLC to be effective 5/19/2020.
Filed Date: 5/19/20.
Accession Number: 20200519–5145.
Comments Due: 5 p.m. ET 6/9/20.
Docket Numbers: ER20–1856–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2020–05–19 Certificate of Concurrence
for UFA among Atlas Solar LLC, SCE &
CAISO to be effective 4/14/2020.
Filed Date: 5/19/20.
Accession Number: 20200519–5151.
Comments Due: 5 p.m. ET 6/9/20.
Docket Numbers: ER20–1857–000.
Applicants: El Paso Electric Company.
Description: § 205(d) Rate Filing:
Concurrence of EPE to APS Service
Agreement No. 376 to be effective 12/9/
2019.
Filed Date: 5/19/20.
Accession Number: 20200519–5154.
Comments Due: 5 p.m. ET 6/9/20.
Docket Numbers: ER20–1858–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2020–05–20_SA 3496 ATC-Shullsburg
VerDate Sep<11>2014
18:09 May 26, 2020
Jkt 250001
Wind Farm GIA (J819) to be effective 5/
6/2020.
Filed Date: 5/20/20.
Accession Number: 20200520–5020.
Comments Due: 5 p.m. ET 6/10/20.
Docket Numbers: ER20–1859–000.
Applicants: Tampa Electric Company.
Description: Motion for Waiver of
Open Access Transmission Tariff
Provision, et al. of Tampa Electric
Company.
Filed Date: 5/19/20.
Accession Number: 20200519–5178.
Comments Due: 5 p.m. ET 5/26/20.
Docket Numbers: ER20–1860–000.
Applicants: AEP Texas Inc.
Description: § 205(d) Rate Filing:
AEPTX-Helena Wind Interconnection
Agreement to be effective 5/5/2020.
Filed Date: 5/20/20.
Accession Number: 20200520–5058.
Comments Due: 5 p.m. ET 6/10/20.
Docket Numbers: ER20–1861–000.
Applicants: PJM Interconnection,
L.L.C., Delaware Municipal Electric
Corporation, Inc.
Description: § 205(d) Rate Filing:
Revised SA No. 2978, NITSA Among
PJM and Delaware Municipal Electric
Corp. to be effective 5/1/2020.
Filed Date: 5/20/20.
Accession Number: 20200520–5064.
Comments Due: 5 p.m. ET 6/10/20.
Docket Numbers: ER20–1862–000.
Applicants: ISO New England Inc.,
New England Power Pool Participants
Committee.
Description: § 205(d) Rate Filing:
Tariff Rev Related to Enhancements &
Clean-Up Changes Under the Billing
Policy to be effective 7/27/2020.
Filed Date: 5/20/20.
Accession Number: 20200520–5068.
Comments Due: 5 p.m. ET 6/10/20.
Docket Numbers: ER20–1863–000.
Applicants: Ingenco Wholesale
Power, L.L.C.
Description: Baseline eTariff Filing:
Reactive Power Compensation Filing to
be effective 6/1/2020.
Filed Date: 5/20/20.
Accession Number: 20200520–5086.
Comments Due: 5 p.m. ET 6/10/20.
Docket Numbers: ER20–1864–000.
Applicants: New England Power
Company.
Description: § 205(d) Rate Filing:
Filing to Revise Depreciation Rates in
Service Agreement Nos. 20 and 23 to be
effective 7/1/2020.
Filed Date: 5/20/20.
Accession Number: 20200520–5126.
Comments Due: 5 p.m. ET 6/10/20.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: May 20, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–11334 Filed 5–26–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RM16–17–000]
Data Collection for Analytics and
Surveillance and Market-Based Rate
Purposes; Notice of Extension of Time
On May 6, 2020, the Edison Electric
Institute (EEI) submitted a motion
requesting that the Commission extend
the effective date of Order No. 860 and
the deployment of the market-based rate
database (MBR Database) by four
months to February 1, 2021 and the due
date for initial baseline submission until
June 1, 2021.
EEI asserts that good cause exists to
grant the extension because the
disruption caused by the COVID–19
pandemic creates challenges in meeting
the implementation schedule
established in Order No. 860.
Upon consideration, notice is hereby
given that the effective date of Order No.
860 is extended to and including six
months to April 1, 2021, and the
deadline for baseline submissions is
extended to and including August 2,
2021. Further, other implementation
dates in Order No. 860 are extended as
shown in the attached appendix.
Dated: May 20, 2020.
Kimberly D. Bose,
Secretary.
Appendix
1 Data Collection for Analytics & Surveillance and
Market-Based Rate Purposes, Order No. 860, 168
FERC 61,039 (2019), order on reh’g, Order No. 860–
A, 170 FERC 61,129 (2020).
E:\FR\FM\27MYN1.SGM
27MYN1
Federal Register / Vol. 85, No. 102 / Wednesday, May 27, 2020 / Notices
Activity
Order No. 860
schedule
Testing period for the MBR Database ....................................................
Effective date of Order No. 860 ..............................................................
‘‘Go-live’’ date of MBR Database ............................................................
Sellers should create needed identifiers (FERC Generated IDs and
Asset IDs) in the MBR Portal and prepare their baseline submissions.
Baseline submissions are due ................................................................
First change in status filings under new timelines are due ....................
Through Sept. 30, 2020 ................
Oct. 1, 2020 ...................................
Oct. 1, 2020 ...................................
Oct. 1, 2020–Dec. 31, 2020 ..........
Through Mar. 31, 2021.
Apr. 1, 2021.
Apr. 1, 2021.
Apr. 1, 2021–June 30, 2021.
By Feb. 1, 2021 .............................
By Feb. 28, 2021 ...........................
By Aug. 2, 2021.
By Aug. 31, 2021.
[FR Doc. 2020–11332 Filed 5–26–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER20–1853–000]
Whitehorn Solar LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
jbell on DSKJLSW7X2PROD with NOTICES
31759
This is a supplemental notice in the
above-referenced Whitehorn Solar LLC’s
application for market-based rate
authority, with an accompanying rate
tariff, noting that such application
includes a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is June 9, 2020.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
may mail similar pleadings to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
VerDate Sep<11>2014
16:59 May 26, 2020
Jkt 250001
20426. Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the eLibrary link. Enter
the docket number excluding the last
three digits in the docket number field
to access the document. At this time, the
Commission has suspended access to
the Commission’s Public Reference
Room, due to the proclamation
declaring a National Emergency
concerning the Novel Coronavirus
Disease (COVID–19), issued by the
President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Dated: May 20, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–11330 Filed 5–26–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Numbers: RP20–874–000.
Applicants: Rover Pipeline LLC.
Description: § 4(d) Rate Filing:
Capacity Release Provision to be
effective 6/19/2020.
Filed Date: 5/19/20.
Accession Number: 20200519–5013.
Comments Due: 5 p.m. ET 6/1/20.
Docket Numbers: RP20–875–000.
Applicants: ETC Tiger Pipeline, LLC.
PO 00000
Frm 00024
Fmt 4703
Sfmt 9990
Revised, six-month
extension schedule
Description: § 4(d) Rate Filing:
Capacity Release Provision to be
effective 6/19/2020.
Filed Date: 5/19/20.
Accession Number: 20200519–5015.
Comments Due: 5 p.m. ET 6/1/20.
Docket Numbers: RP20–877–000.
Applicants: Rockies Express Pipeline
LLC.
Description: Compliance filing REX
2020 Annual Penalty Revenue
Reconciliation.
Filed Date: 5/19/20.
Accession Number: 20200519–5133.
Comments Due: 5 p.m. ET 6/1/20.
Docket Numbers: RP20–878–000.
Applicants: Tallgrass Interstate Gas
Transmission, LLC.
Description: Compliance filing TIGT
2020 Annual Penalty Revenue
Reconciliation.
Filed Date: 5/19/20.
Accession Number: 20200519–5134.
Comments Due: 5 p.m. ET 6/1/20.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified date(s). Protests
may be considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: May 20, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–11331 Filed 5–26–20; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\27MYN1.SGM
27MYN1
Agencies
[Federal Register Volume 85, Number 102 (Wednesday, May 27, 2020)]
[Notices]
[Pages 31758-31759]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-11332]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. RM16-17-000]
Data Collection for Analytics and Surveillance and Market-Based
Rate Purposes; Notice of Extension of Time
On May 6, 2020, the Edison Electric Institute (EEI) submitted a
motion requesting that the Commission extend the effective date of
Order No. 860 and the deployment of the market-based rate database (MBR
Database) by four months to February 1, 2021 and the due date for
initial baseline submission until June 1, 2021.
EEI asserts that good cause exists to grant the extension because
the disruption caused by the COVID-19 pandemic creates challenges in
meeting the implementation schedule established in Order No. 860.
Upon consideration, notice is hereby given that the effective date
of Order No. 860 is extended to and including six months to April 1,
2021, and the deadline for baseline submissions is extended to and
including August 2, 2021. Further, other implementation dates in Order
No. 860 are extended as shown in the attached appendix.
Dated: May 20, 2020.
Kimberly D. Bose,
Secretary.
Appendix
[[Page 31759]]
------------------------------------------------------------------------
Revised, six-month
Activity Order No. 860 extension
schedule schedule
------------------------------------------------------------------------
Testing period for the MBR Through Sept. 30, Through Mar. 31,
Database. 2020. 2021.
Effective date of Order No. 860. Oct. 1, 2020...... Apr. 1, 2021.
``Go-live'' date of MBR Database Oct. 1, 2020...... Apr. 1, 2021.
Sellers should create needed Oct. 1, 2020-Dec. Apr. 1, 2021-June
identifiers (FERC Generated IDs 31, 2020. 30, 2021.
and Asset IDs) in the MBR
Portal and prepare their
baseline submissions.
Baseline submissions are due.... By Feb. 1, 2021... By Aug. 2, 2021.
First change in status filings By Feb. 28, 2021.. By Aug. 31, 2021.
under new timelines are due.
------------------------------------------------------------------------
[FR Doc. 2020-11332 Filed 5-26-20; 8:45 am]
BILLING CODE 6717-01-P