Commission Information Collection Activities (FERC-725G); Comment Request; Extension, 31491-31493 [2020-11240]

Download as PDF Federal Register / Vol. 85, No. 101 / Tuesday, May 26, 2020 / Notices Filed Date: 5/19/20. Accession Number: 20200519–5038. Comments Due: 5 p.m. ET 6/9/20. Docket Numbers: ER20–1851–000. Applicants: Whitetail Solar 3, LLC. Description: Baseline eTariff Filing: Reactive Power Compensation to be effective 7/18/2020. Filed Date: 5/19/20. Accession Number: 20200519–5085. Comments Due: 5 p.m. ET 6/9/20. Docket Numbers: ER20–1852–000. Applicants: Midcontinent Independent System Operator, Inc., Ameren Illinois Company. Description: § 205(d) Rate Filing: 2020–05–19_SA 3498 Ameren IllinoisBPWENA Payment Agreement to be effective 7/19/2020. Filed Date: 5/19/20. Accession Number: 20200519–5088. Comments Due: 5 p.m. ET 6/9/20. Docket Numbers: ER20–1853–000. Applicants: Whitehorn Solar LLC. Description: Baseline eTariff Filing: Application for Market-Based Rate Authorization, Request for Related Waivers to be effective 7/19/2020. Filed Date: 5/19/20. Accession Number: 20200519–5091. Comments Due: 5 p.m. ET 6/9/20. Docket Numbers: ER20–1854–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Amendment to Second Revised WMPA No. 4869; Queue No. AC2–138/AD2– 044 to be effective 2/22/2019. Filed Date: 5/19/20. Accession Number: 20200519–5124. Comments Due: 5 p.m. ET 6/9/20. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: May 19, 2020. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2020–11208 Filed 5–22–20; 8:45 am] BILLING CODE 6717–01–P VerDate Sep<11>2014 19:08 May 22, 2020 Jkt 250001 31491 DEPARTMENT OF ENERGY Wilkins Avenue, Rockville, Maryland 20852. Federal Energy Regulatory Commission Instructions [Docket No. RD20–1–000] Commission Information Collection Activities (FERC–725G); Comment Request; Extension Federal Energy Regulatory Commission, Department of Energy. ACTION: Notice of information collection and request for comments. AGENCY: In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the currently approved information collection FERC– 725G (Mandatory Reliability Standards for the Bulk-Power System: PRC Standards: Regional Reliability Standard PRC–006–NPCC–2 Automatic Underfrequency Load-Shedding (UFLS)) and submitting the information collection to the Office of Management and Budget (OMB) for review. Any interested person may file comments directly with OMB and should address a copy of those comments to the Commission as explained below. DATES: Comments on the collection of information are due June 25, 2020. ADDRESSES: Comments filed with OMB, identified by OMB Control No. 1902– 0252. Send written comments on FERC– 725G to OMB thru www.reginfo.gov/ public/do/PRAMain. Attention: Federal Energy Regulatory Commission Desk Officer. Please identify the OMB Control Number (1902–0252) in the subject line of your comments and should be sent within 30 days of publication of this notice to www.reginfo.gov/public/do/ PRAMain. Using the search function under the Currently Under Review field select Federal Energy Regulatory Commission; click submit and select comment to the right of the subject collection. A copy of the comments should also be sent to the Commission, in Docket No. RD20–1–000, by either of the following methods: • eFiling at Commission’s Website: https://www.ferc.gov/docs-filing/ efiling.asp. • Mail/Express Services: Persons unable to file electronically may mail similar pleadings to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. Hand delivered submissions in docketed proceedings should be delivered to Health and Human Services, 12225 SUMMARY: PO 00000 Frm 00061 Fmt 4703 Sfmt 4703 OMB submissions: Must be formatted and filed in accordance with submission guidelines at www.reginfo.gov/public/ do/PRAMain; Using the search function under the Currently Under Review field select Federal Energy Regulatory Commission; click ‘‘submit’’ and select comment to the right of the subject collection. FERC submissions: Must be formatted and filed in accordance with submission guidelines at: https://www.ferc.gov/help/ submission-guide.asp. For user assistance, contact FERC Online Support by email at ferconlinesupport@ ferc.gov, or by phone at: (866) 208–3676 (toll-free). Docket: Users interested in receiving automatic notification of activity in this docket or in viewing/downloading comments and issuances in this docket may do so at https://www.ferc.gov/docsfiling/docs-filing.asp. FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at DataClearance@FERC.gov, telephone at (202) 502–8663. SUPPLEMENTARY INFORMATION: Title: FERC–725G (Mandatory Reliability Standards for the Bulk-Power System: Regional Reliability Standard PRC–006–NPCC–2, Automatic Underfrequency Load-Shedding (UFLS). OMB Control No.: 1902–0252. Type of Request: Revisions to the information collection, as discussed in Docket No. RD20–1–000. Abstract: The proposed regional Reliability Standard applies to generator owners, planning coordinators, distribution providers, and transmission owners in the Northeast Power Coordinating Council Region and is designed to ensure the development of an effective automatic underfrequency load shedding (UFLS) program to preserve the security and integrity of the Bulk-Power System during declining system frequency events in coordination with the NERC continent-wide UFLS Reliability Standard PRC–006–1.1 The Commission also proposes to approve the related violation risk factors, violation severity levels, implementation plan, and effective date proposed by NERC. On August 8, 2005, Congress enacted into law the Electricity Modernization Act of 2005, which is Title XII, Subtitle A, of the Energy Policy Act of 2005 1 Effective E:\FR\FM\26MYN1.SGM date of the standard is 4/1/2020. 26MYN1 31492 Federal Register / Vol. 85, No. 101 / Tuesday, May 26, 2020 / Notices (EPAct 2005).2 EPAct 2005 added a new section 215 to the FPA, which required a Commission-certified Electric Reliability Organization (ERO) to develop mandatory and enforceable Reliability Standards, which are subject to Commission review and approval. Once approved, the Reliability Standards may be enforced by the ERO subject to Commission oversight, or the Commission can independently enforce Reliability Standards.3 On February 3, 2006, the Commission issued Order No. 672, implementing section 215 of the FPA.4 Pursuant to Order No. 672, the Commission certified one organization, North American Electric Reliability Corporation (NERC), as the ERO.5 The Reliability Standards developed by the ERO and approved by the Commission apply to users, owners and operators of the Bulk-Power System as set forth in each Reliability Standard. On December 23, 2019, the North American Electric Reliability Corporation (NERC) and Northeast Power Coordinating Council, Inc. (NPCC) filed a joint petition seeking approval of proposed regional Reliability Standard PRC–006–NPCC–2 (NPCC Automatic Underfrequency Load Shedding). NERC and NPCC state that regional Reliability Standard PRC–006– NPCC–2 establishes consistent and coordinated requirements for the design, implementation, and analysis of automatic underfrequency load shedding (UFLS) programs among all NPCC applicable entities. These requirements are more stringent and specific than the NERC continent-wide UFLS Reliability Standard, PRC–006–3, and were established such that the declining frequency is arrested and recovered in accordance with NPCC performance requirements. NPCC revised currently effective Regional Reliability Standard PRC–006–NPCC–1 to remove redundancies with the Reliability Standard PRC–006–3, clarify obligations for registered entities, improve communication of island boundaries to affected registered entities, and provide entities with the flexibility to calculate net load shed for UFLS in certain situations. On February 19, 2020, the Commission issued a Delegated Letter Order, Docket No. RD20–1–000, approving proposed Reliability Standard PRC–006–NPCC–2, the associated VRFs and VSLs, the Effective Date, and the retirement of the currently effective Regional Reliability Standard PRC–006–NPCC–1. The effective date for Reliability Standard PRC–006– NPCC–2 is as of the date of this order, January 18, 2020. Type of Respondents: Generator owners, planning coordinators, distribution providers, and transmission owners in the Northeast Power Coordinating Council (NPCC) Region. Estimate of Annual Burden: 6 Our estimates are based on the NERC Compliance Registry Summary of Entities as of January 31, 2019. According to the NERC compliance registry, and Functions as of, which indicates there are registered as GO, PC, DP and TO entities. The individual burden estimates are based on the time needed to gather data, run studies, and analyze study results to design or update the underfrequency load shedding programs. Additionally, documentation and the review of underfrequency load shedding program results by supervisors and management is included in the administrative estimations. These are consistent with estimates for similar tasks in other Commission approved standards. Estimates for the additional burden and cost imposed by the order in Docket No. RD20–1–000 follow: Commission estimates the annual burden and cost 7 as follows. RD20–1–000—MANDATORY RELIABILITY STANDARDS FOR THE BULK-POWER SYSTEM: REGIONAL RELIABILITY STANDARD PRC–006–NPCC–2 AUTOMATIC UNDERFREQUENCY LOAD SHEDDING (UFLS) Reliability standard & requirement Average annual number of respondents Average annual number of responses per respondent Average annual total number of responses Average burden hours & cost ($) per response Total annual burden hours & cost ($) (rounded) Cost per respondent ($) (1) (2) (1) * (2) = (3) (4) (3) * (4) = (5) (5) ÷ (1) GO 8 ............................ PC 9 ............................. DP 10 ........................... TO 11 ........................... 125 2 51 39 1 1 1 1 125 2 51 39 24 24 24 24 hrs.; hrs.; hrs.; hrs.; $1,920 $1,920 $1,920 $1,920 ...... ...... ...... ...... Total ..................... ............................ ............................ 217 ............................... 3,000 hrs.; $240,000 48 hrs.; $3,840 .......... 1,224 hrs.; $97,920 ... 936 hrs.; $74,880 ...... 5,208 hrs.: $416,640 $1,920 1,920 1,920 1,920 .................... Comments: Comments are invited on: (1) Whether the collection of information is necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency’s estimate of the burden and cost of the collection of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information collection; and (4) ways to minimize the burden of the collection of information on those who are to respond, including the use of automated collection techniques or other forms of information technology. 2 Energy Policy Act of 2005, Public Law 109–58, Title XII, Subtitle A, 119 Stat. 594, 941 (codified at 16 U.S.C. 824o). 3 16 U.S.C. 824o(e)(3). 4 Rules Concerning Certification of the Electric Reliability Organization; and Procedures for the Establishment, Approval, and Enforcement of Electric Reliability Standards, Order No. 672, FERC Stats. & Regs. 31,204, order on reh’g, Order No. 672–A, FERC Stats. & Regs. 31,212 (2006). 5 North American Electric Reliability Corp., 116 FERC 61,062, order on reh’g and compliance, 117 FERC 61,126 (2006), order on compliance, 118 FERC 61,190, order on reh’g, 119 FERC 61,046 (2007), aff’d sub nom. Alcoa Inc. v. FERC, 564 F.3d 1342 (D.C. Cir. 2009). 6 Burden is defined as the total time, effort, or financial resources expended by persons to generate, maintain, retain, or disclose or provide information to or for a federal agency. See 5 CFR 1320 for additional information on the definition of information collection burden. 7 The Commission staff estimates that industry is similarly situated in terms of hourly cost (for wages plus benefits). Based on the Commission’s FY (Fiscal Year) 2019 average cost (for wages plus benefits), $80.00/hour is used. 8 Generator Owner. 9 Planning Coordinator. 10 Distribution Provide. 11 Transmission Owner. VerDate Sep<11>2014 19:08 May 22, 2020 Jkt 250001 PO 00000 Frm 00062 Fmt 4703 Sfmt 4703 E:\FR\FM\26MYN1.SGM 26MYN1 Federal Register / Vol. 85, No. 101 / Tuesday, May 26, 2020 / Notices Dated: May 19, 2020. Kimberly D. Bose, Secretary. [FR Doc. 2020–11240 Filed 5–22–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 10853–022] Otter Tail Power Company; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: New Major License. b. Project No.: 10853–022. c. Date Filed: November 27, 2019. d. Applicant: Otter Tail Power Company. e. Name of Project: Otter Tail River Hydroelectric Project. f. Location: The Otter Tail River Hydroelectric Project consists of five developments on the Otter Tail River that starts in the Township of Friberg, Minnesota and extends downstream (south) of the City of Fergus Falls, Minnesota. The project does not occupy federal land. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Michael Olson, Natural Gas Turbine Operations and NERC Compliance, Otter Tail Power Company, 215 South Cascade Street, Fergus Falls, Minnesota 56537; (218) 739–8411; mjolson@otpco.com. i. FERC Contact: Patrick Ely at (202) 502–8570 or email at patrick.ely@ ferc.gov. j. Deadline for filing motions to intervene and protests, comments, recommendations, preliminary terms and conditions, and preliminary prescriptions: 60 Days from the issuance date of this notice; reply comments are due 105 days from the issuance date of this notice. The Commission strongly encourages electronic filing. Please file motions to intervene, protests, comments, recommendations, preliminary terms and conditions, and preliminary fishway prescriptions using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. VerDate Sep<11>2014 19:08 May 22, 2020 Jkt 250001 Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). The Commission’s Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. This application has been accepted for filing and is now ready for environmental analysis. l. The Otter Tail River Project consists of the following five existing developments listed upstream to downstream: (1) Friberg development; (2) Hoot development; (3) Central development; (4) Pisgah development; and (5) Dayton Hollow development. The Friberg development consists of: (1) A reservoir with a surface area of 340 acres, and negligible storage capacity, at a normal water surface elevation of 1,299 feet mean sea level (msl); (2) a 341-foot-long dam which contains a 31foot-high and 61-foot-long spillway with seven bays, an 80-foot-long and 36-foothigh east earthfill dike, and a 200-footlong and 36-foot-high west earthfill dike; (3) a power canal; (4) a 194-footlong, 9-foot-diameter penstock; (5) a 27foot-wide and 27-foot-long reinforced concrete powerhouse; (6) a vertical turbine rated at 900 horsepower (hp) under a head of 35 feet, connected to a 560-kilowatt (kW) generator; (7) a tailrace; (8) a 75-foot-long, 2.4-kilovolt (kV) transmission line; and (9) appurtenant facilities. The Hoot development facilities include: (1) A reservoir with a negligible surface area and storage capacity (dam diverts river flow) at a normal water surface elevation of 1,256 feet msl; (2) a 150-foot-long, 9-foot-high dam which contains a concrete spillway with six stoplogged openings with the two outer openings 5 feet 4 inches wide and the other four openings 11 feet 4 inches wide; (3) a 500-foot-long, 90-inchdiameter concrete tunnel (Hoot Lake); (4) a 20-foot-wide, 700-foot-long channel between Hoot Lake and Wright Lake; (5) a 20-foot-wide, 300-foot-long channel leading to the intake structure; PO 00000 Frm 00063 Fmt 4703 Sfmt 4703 31493 (6) a 1,050-foot-long, 8-foot-square concrete tube; (7) a surge tank; (8) an 89foot-long, 6-foot-diameter steel penstock; (9) a reinforced concrete powerhouse; (10) a horizontal turbine rated at 1,260 hp under a head of 68 feet connected to a 1,000-kw generator; (11) a tailrace; (12) a 200-foot-long, 2.4-kV transmission line; (13) a nature-like fishway; and (14) appurtenant facilities. The Central development consists of: (1) A reservoir having a surface area of 15 acres and a storage capacity of 400 acre-feet, at a normal water surface elevation of 1,181 feet msl; (2) a 107foot-long and 25-foot-high dam which contains a 70-foot-long and 25-foot-high spillway; (3) an intake structure; (4) a 30-foot-wide and 40-foot-long brick masonry powerhouse; (5) a vertical turbine rated at 720 hp under a head of 22 feet, connected to a 400-kW generator; (6) a tailrace; (7) a 40-footlong, 2.4-kV transmission line; and (8) appurtenant facilities. The Pisgah development consists of: (1) A reservoir having a surface area of 70 acres and storage capacity of 250 acre-feet at a normal water surface elevation of 1,156 feet msl; (2) a 493foot-long concrete gravity and earthfill dam ranging in height from 21 feet to 38 feet which has (a) an earthfill dike, (b) a 123-foot-long and 38-foot-high concrete wing wall, (c) six spillway bays, (d) a 150-foot-long and 21-foothigh south earthfill embankment, and (e) a 220-foot-long and 38-foot-high north earthfill embankment; (3) an intake; (4) a 22-foot-wide and 32-footlong reinforced concrete and brick masonry powerhouse; (5) a vertical turbine rated at 850 hp under a head of 25 feet, connected to a 520-kW generator; (6) a tailrace; (7) a 330-footlong, 2.4-kV transmission line; and (8) appurtenant facilities. The Dayton Hollow development consists of: (1) A reservoir having a surface area of 230 acres and a storage capacity of 5,000 acre-feet at a normal water surface elevation of 1,107 feet msl; (2) a 265-foot-long concrete and earthfill dam varying in height from 11 feet to 40 feet which contains (a) an 80foot-long and 40-foot-high concrete spillway section, (b) a 95-foot-long and 11-foot-high east earthfill embankment, and (c) a 90-foot-long and 22-foot-high west earthfill embankment; (3) an intake structure; (4) a 22-foot-wide and 32-footlong reinforced concrete and masonry powerhouse; (5) a vertical turbine rated at 800 hp under a head of 35 feet, connected to a 520-kW generator and a horizontal 650 hp turbine connected to a 450-kW generator; (6) a tailrace; (7) an 80-foot- long, 2.4-kV transmission line; and (8) appurtenant facilities. E:\FR\FM\26MYN1.SGM 26MYN1

Agencies

[Federal Register Volume 85, Number 101 (Tuesday, May 26, 2020)]
[Notices]
[Pages 31491-31493]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-11240]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. RD20-1-000]


Commission Information Collection Activities (FERC-725G); Comment 
Request; Extension

AGENCY: Federal Energy Regulatory Commission, Department of Energy.

ACTION: Notice of information collection and request for comments.

-----------------------------------------------------------------------

SUMMARY: In compliance with the requirements of the Paperwork Reduction 
Act of 1995, the Federal Energy Regulatory Commission (Commission or 
FERC) is soliciting public comment on the currently approved 
information collection FERC-725G (Mandatory Reliability Standards for 
the Bulk-Power System: PRC Standards: Regional Reliability Standard 
PRC-006-NPCC-2 Automatic Underfrequency Load-Shedding (UFLS)) and 
submitting the information collection to the Office of Management and 
Budget (OMB) for review. Any interested person may file comments 
directly with OMB and should address a copy of those comments to the 
Commission as explained below.

DATES: Comments on the collection of information are due June 25, 2020.

ADDRESSES: Comments filed with OMB, identified by OMB Control No. 1902-
0252. Send written comments on FERC-725G to OMB thru www.reginfo.gov/public/do/PRAMain. Attention: Federal Energy Regulatory Commission Desk 
Officer. Please identify the OMB Control Number (1902-0252) in the 
subject line of your comments and should be sent within 30 days of 
publication of this notice to www.reginfo.gov/public/do/PRAMain. Using 
the search function under the Currently Under Review field select 
Federal Energy Regulatory Commission; click submit and select comment 
to the right of the subject collection.
    A copy of the comments should also be sent to the Commission, in 
Docket No. RD20-1-000, by either of the following methods:
     eFiling at Commission's Website: https://www.ferc.gov/docs-filing/efiling.asp.
     Mail/Express Services: Persons unable to file 
electronically may mail similar pleadings to the Federal Energy 
Regulatory Commission, 888 First Street NE, Washington, DC 20426. Hand 
delivered submissions in docketed proceedings should be delivered to 
Health and Human Services, 12225 Wilkins Avenue, Rockville, Maryland 
20852.

Instructions

    OMB submissions: Must be formatted and filed in accordance with 
submission guidelines at www.reginfo.gov/public/do/PRAMain; Using the 
search function under the Currently Under Review field select Federal 
Energy Regulatory Commission; click ``submit'' and select comment to 
the right of the subject collection.
    FERC submissions: Must be formatted and filed in accordance with 
submission guidelines at: https://www.ferc.gov/help/submission-guide.asp. For user assistance, contact FERC Online Support by email at 
[email protected], or by phone at: (866) 208-3676 (toll-free).
    Docket: Users interested in receiving automatic notification of 
activity in this docket or in viewing/downloading comments and 
issuances in this docket may do so at https://www.ferc.gov/docs-filing/docs-filing.asp.

FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at 
[email protected], telephone at (202) 502-8663.

SUPPLEMENTARY INFORMATION:
    Title: FERC-725G (Mandatory Reliability Standards for the Bulk-
Power System: Regional Reliability Standard PRC-006-NPCC-2, Automatic 
Underfrequency Load-Shedding (UFLS).
    OMB Control No.: 1902-0252.
    Type of Request: Revisions to the information collection, as 
discussed in Docket No. RD20-1-000.
    Abstract: The proposed regional Reliability Standard applies to 
generator owners, planning coordinators, distribution providers, and 
transmission owners in the Northeast Power Coordinating Council Region 
and is designed to ensure the development of an effective automatic 
underfrequency load shedding (UFLS) program to preserve the security 
and integrity of the Bulk-Power System during declining system 
frequency events in coordination with the NERC continent-wide UFLS 
Reliability Standard PRC-006-1.\1\ The Commission also proposes to 
approve the related violation risk factors, violation severity levels, 
implementation plan, and effective date proposed by NERC.
---------------------------------------------------------------------------

    \1\ Effective date of the standard is 4/1/2020.
---------------------------------------------------------------------------

    On August 8, 2005, Congress enacted into law the Electricity 
Modernization Act of 2005, which is Title XII, Subtitle A, of the 
Energy Policy Act of 2005

[[Page 31492]]

(EPAct 2005).\2\ EPAct 2005 added a new section 215 to the FPA, which 
required a Commission-certified Electric Reliability Organization (ERO) 
to develop mandatory and enforceable Reliability Standards, which are 
subject to Commission review and approval. Once approved, the 
Reliability Standards may be enforced by the ERO subject to Commission 
oversight, or the Commission can independently enforce Reliability 
Standards.\3\
---------------------------------------------------------------------------

    \2\ Energy Policy Act of 2005, Public Law 109-58, Title XII, 
Subtitle A, 119 Stat. 594, 941 (codified at 16 U.S.C. 824o).
    \3\ 16 U.S.C. 824o(e)(3).
---------------------------------------------------------------------------

    On February 3, 2006, the Commission issued Order No. 672, 
implementing section 215 of the FPA.\4\ Pursuant to Order No. 672, the 
Commission certified one organization, North American Electric 
Reliability Corporation (NERC), as the ERO.\5\ The Reliability 
Standards developed by the ERO and approved by the Commission apply to 
users, owners and operators of the Bulk-Power System as set forth in 
each Reliability Standard.
---------------------------------------------------------------------------

    \4\ Rules Concerning Certification of the Electric Reliability 
Organization; and Procedures for the Establishment, Approval, and 
Enforcement of Electric Reliability Standards, Order No. 672, FERC 
Stats. & Regs. 31,204, order on reh'g, Order No. 672-A, FERC Stats. 
& Regs. 31,212 (2006).
    \5\ North American Electric Reliability Corp., 116 FERC 61,062, 
order on reh'g and compliance, 117 FERC 61,126 (2006), order on 
compliance, 118 FERC 61,190, order on reh'g, 119 FERC 61,046 (2007), 
aff'd sub nom. Alcoa Inc. v. FERC, 564 F.3d 1342 (D.C. Cir. 2009).
---------------------------------------------------------------------------

    On December 23, 2019, the North American Electric Reliability 
Corporation (NERC) and Northeast Power Coordinating Council, Inc. 
(NPCC) filed a joint petition seeking approval of proposed regional 
Reliability Standard PRC-006-NPCC-2 (NPCC Automatic Underfrequency Load 
Shedding). NERC and NPCC state that regional Reliability Standard PRC-
006-NPCC-2 establishes consistent and coordinated requirements for the 
design, implementation, and analysis of automatic underfrequency load 
shedding (UFLS) programs among all NPCC applicable entities. These 
requirements are more stringent and specific than the NERC continent-
wide UFLS Reliability Standard, PRC-006-3, and were established such 
that the declining frequency is arrested and recovered in accordance 
with NPCC performance requirements. NPCC revised currently effective 
Regional Reliability Standard PRC-006-NPCC-1 to remove redundancies 
with the Reliability Standard PRC-006-3, clarify obligations for 
registered entities, improve communication of island boundaries to 
affected registered entities, and provide entities with the flexibility 
to calculate net load shed for UFLS in certain situations.
    On February 19, 2020, the Commission issued a Delegated Letter 
Order, Docket No. RD20-1-000, approving proposed Reliability Standard 
PRC-006-NPCC-2, the associated VRFs and VSLs, the Effective Date, and 
the retirement of the currently effective Regional Reliability Standard 
PRC-006-NPCC-1. The effective date for Reliability Standard PRC-006-
NPCC-2 is as of the date of this order, January 18, 2020.
    Type of Respondents: Generator owners, planning coordinators, 
distribution providers, and transmission owners in the Northeast Power 
Coordinating Council (NPCC) Region.
    Estimate of Annual Burden: \6\ Our estimates are based on the NERC 
Compliance Registry Summary of Entities as of January 31, 2019. 
According to the NERC compliance registry, and Functions as of, which 
indicates there are registered as GO, PC, DP and TO entities.
---------------------------------------------------------------------------

    \6\ Burden is defined as the total time, effort, or financial 
resources expended by persons to generate, maintain, retain, or 
disclose or provide information to or for a federal agency. See 5 
CFR 1320 for additional information on the definition of information 
collection burden.
---------------------------------------------------------------------------

    The individual burden estimates are based on the time needed to 
gather data, run studies, and analyze study results to design or update 
the underfrequency load shedding programs. Additionally, documentation 
and the review of underfrequency load shedding program results by 
supervisors and management is included in the administrative 
estimations. These are consistent with estimates for similar tasks in 
other Commission approved standards.
    Estimates for the additional burden and cost imposed by the order 
in Docket No. RD20-1-000 follow:
    Commission estimates the annual burden and cost \7\ as follows.
---------------------------------------------------------------------------

    \7\ The Commission staff estimates that industry is similarly 
situated in terms of hourly cost (for wages plus benefits). Based on 
the Commission's FY (Fiscal Year) 2019 average cost (for wages plus 
benefits), $80.00/hour is used.

    RD20-1-000--Mandatory Reliability Standards for the Bulk-Power System: Regional Reliability Standard PRC-006-NPCC-2 Automatic Underfrequency Load
                                                                     Shedding (UFLS)
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                  Average annual
    Reliability standard &      Average annual       number of       Average annual    Average burden hours &   Total annual burden hours &    Cost per
         requirement               number of       responses per    total number of     cost ($) per response        cost ($) (rounded)       respondent
                                  respondents       respondent         responses                                                                 ($)
                                            (1)               (2)    (1) * (2) = (3)  (4).....................  (3) * (4) = (5)............    (5) / (1)
--------------------------------------------------------------------------------------------------------------------------------------------------------
GO \8\.......................               125                 1                125  24 hrs.; $1,920.........  3,000 hrs.; $240,000.......       $1,920
PC \9\.......................                 2                 1                  2  24 hrs.; $1,920.........  48 hrs.; $3,840............        1,920
DP \10\......................                51                 1                 51  24 hrs.; $1,920.........  1,224 hrs.; $97,920........        1,920
TO \11\......................                39                 1                 39  24 hrs.; $1,920.........  936 hrs.; $74,880..........        1,920
                              --------------------------------------------------------------------------------------------------------------------------
    Total....................  ................  ................                217  ........................  5,208 hrs.: $416,640.......  ...........
--------------------------------------------------------------------------------------------------------------------------------------------------------

    Comments: Comments are invited on: (1) Whether the collection of 
information is necessary for the proper performance of the functions of 
the Commission, including whether the information will have practical 
utility; (2) the accuracy of the agency's estimate of the burden and 
cost of the collection of information, including the validity of the 
methodology and assumptions used; (3) ways to enhance the quality, 
utility and clarity of the information collection; and (4) ways to 
minimize the burden of the collection of information on those who are 
to respond, including the use of automated collection techniques or 
other forms of information technology.
---------------------------------------------------------------------------

    \8\ Generator Owner.
    \9\ Planning Coordinator.
    \10\ Distribution Provide.
    \11\ Transmission Owner.


[[Page 31493]]


---------------------------------------------------------------------------

    Dated: May 19, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-11240 Filed 5-22-20; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.