Combined Notice of Filings #1, 31490-31491 [2020-11208]

Download as PDF 31490 Federal Register / Vol. 85, No. 101 / Tuesday, May 26, 2020 / Notices criteria, Commission staff preliminarily determines that the proposal satisfies the requirements for a qualifying conduit hydropower facility, which is not required to be licensed or exempted from licensing. Comments and Motions to Intervene: Deadline for filing comments contesting whether the facility meets the qualifying criteria is 30 days from the issuance date of this notice. Deadline for filing motions to intervene is 30 days from the issuance date of this notice. Anyone may submit comments or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210 and 385.214. Any motions to intervene must be received on or before the specified deadline date for the particular proceeding. Filing and Service of Responsive Documents: All filings must (1) bear in all capital letters the COMMENTS CONTESTING QUALIFICATION FOR A CONDUIT HYDROPOWER FACILITY or MOTION TO INTERVENE, as applicable; (2) state in the heading the name of the applicant and the project number of the application to which the filing responds; (3) state the name, address, and telephone number of the person filing; and (4) otherwise comply with the requirements of sections 385.2001 through 385.2005 of the Commission’s regulations.1 All comments contesting Commission staff’s preliminary determination that the facility meets the qualifying criteria must set forth their evidentiary basis. The Commission strongly encourages electronic filing. Please file motions to intervene and comments using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street, NE, Washington, DC 20426. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. 1 18 CFR 385.2001–2005 (2019). VerDate Sep<11>2014 19:08 May 22, 2020 Jkt 250001 Poseidon Wind, LLC and the Avangrid Southwest MBR Sellers. Filed Date: 5/18/20. Accession Number: 20200518–5195. Comments Due: 5 p.m. ET 6/8/20. Docket Numbers: ER20–681–001. Applicants: Tri-State Generation and Transmission Association, Inc. Description: Compliance filing: Compliance Filing Re-submittal to be effective 2/22/2020. Filed Date: 5/19/20. Accession Number: 20200519–5132. Comments Due: 5 p.m. ET 6/9/20. Docket Numbers: ER20–1499–001. Applicants: Appalachian Power Company. Description: Tariff Amendment: OATT—AEP Texas Inc. 1-Co Rate Update, Attach K & Misc revisions— Amend Pending to be effective 5/15/ 2020. Filed Date: 5/19/20. Accession Number: 20200519–5064. Comments Due: 5 p.m. ET 6/9/20. Docket Numbers: ER20–1846–000. Applicants: Midcontinent Dated: May 19, 2020. Independent System Operator, Inc. Nathaniel J. Davis, Sr., Description: § 205(d) Rate Filing: Deputy Secretary. 2020–05–18_Filing to Enhance Accreditation of Load Modifying [FR Doc. 2020–11207 Filed 5–22–20; 8:45 am] Resources to be effective 8/16/2020. BILLING CODE 6717–01–P Filed Date: 5/18/20. Accession Number: 20200518–5159. Comments Due: 5 p.m. ET 6/8/20. DEPARTMENT OF ENERGY Docket Numbers: ER20–1847–000. Federal Energy Regulatory Applicants: PJM Interconnection, Commission L.L.C. Description: § 205(d) Rate Filing: Combined Notice of Filings #1 Original WMPA, Service Agreement No. 5639; Queue No. AF1–041 to be Take notice that the Commission effective 4/23/2020. received the following electric rate Filed Date: 5/19/20. filings: Accession Number: 20200519–5020. Docket Numbers: ER19–2235–002. Comments Due: 5 p.m. ET 6/9/20. Applicants: Tuscola Bay Wind, LLC. Docket Numbers: ER20–1848–000. Description: Compliance filing: Applicants: Southwest Power Pool, Tuscola Bay Wind, LLC, Docket No. Inc. ER19–2235–002 to be effective 9/1/ Description: § 205(d) Rate Filing: 2019. NorthWestern Formula Rate Revisions Filed Date: 5/18/20. to Incorporate Changes File in ER20– Accession Number: 20200518–5165. 1090 to be effective 1/27/2020. Comments Due: 5 p.m. ET 6/8/20. Filed Date: 5/19/20. Docket Numbers: ER19–2707–002; Accession Number: 20200519–5031. ER10–2822–016; ER10–3158–009; Comments Due: 5 p.m. ET 6/9/20. ER10–3161–009; ER10–3162–009; Docket Numbers: ER20–1849–000. ER12–308–009; ER16–1238–003; ER16– Applicants: Hardin Wind Energy LLC. 1250–008; ER17–1242–002; ER17–1392– Description: Tariff Cancellation: 003. Notice of Cancellation of Market-Based Applicants: Poseidon Wind, LLC, Rate Tariff to be effective 7/19/2020. Atlantic Renewable Projects II LLC, Filed Date: 5/19/20. Avangrid Arizona Renewables, LLC, Accession Number: 20200519–5037. Comments Due: 5 p.m. ET 6/9/20. Avangrid Renewables, LLC, El Cabo Wind LLC, Dillon Wind LLC, Manzana Docket Numbers: ER20–1850–000. Wind LLC, Mountain View Power Applicants: Hardin Wind Energy Partners III, LLC, Shiloh I Wind Project, Holdings LLC. LLC, Tule Wind LLC. Description: Tariff Cancellation: Description: Supplement to December Notice of Cancellation of Market-Based 19, 2019 Notice of Change in Status of Rate Tariff to be effective 7/19/2020. Locations of Notice of Intent: The Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s website at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket number (i.e., CD20–5) in the docket number field to access the document. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. Copies of the notice of intent can be obtained directly from the applicant. At this time, the Commission has suspended access to the Commission’s Public Reference Room due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, call toll-free 1–866–208– 3676 or email FERCOnlineSupport@ ferc.gov. For TTY, call (202) 502–8659. PO 00000 Frm 00060 Fmt 4703 Sfmt 4703 E:\FR\FM\26MYN1.SGM 26MYN1 Federal Register / Vol. 85, No. 101 / Tuesday, May 26, 2020 / Notices Filed Date: 5/19/20. Accession Number: 20200519–5038. Comments Due: 5 p.m. ET 6/9/20. Docket Numbers: ER20–1851–000. Applicants: Whitetail Solar 3, LLC. Description: Baseline eTariff Filing: Reactive Power Compensation to be effective 7/18/2020. Filed Date: 5/19/20. Accession Number: 20200519–5085. Comments Due: 5 p.m. ET 6/9/20. Docket Numbers: ER20–1852–000. Applicants: Midcontinent Independent System Operator, Inc., Ameren Illinois Company. Description: § 205(d) Rate Filing: 2020–05–19_SA 3498 Ameren IllinoisBPWENA Payment Agreement to be effective 7/19/2020. Filed Date: 5/19/20. Accession Number: 20200519–5088. Comments Due: 5 p.m. ET 6/9/20. Docket Numbers: ER20–1853–000. Applicants: Whitehorn Solar LLC. Description: Baseline eTariff Filing: Application for Market-Based Rate Authorization, Request for Related Waivers to be effective 7/19/2020. Filed Date: 5/19/20. Accession Number: 20200519–5091. Comments Due: 5 p.m. ET 6/9/20. Docket Numbers: ER20–1854–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Amendment to Second Revised WMPA No. 4869; Queue No. AC2–138/AD2– 044 to be effective 2/22/2019. Filed Date: 5/19/20. Accession Number: 20200519–5124. Comments Due: 5 p.m. ET 6/9/20. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: May 19, 2020. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2020–11208 Filed 5–22–20; 8:45 am] BILLING CODE 6717–01–P VerDate Sep<11>2014 19:08 May 22, 2020 Jkt 250001 31491 DEPARTMENT OF ENERGY Wilkins Avenue, Rockville, Maryland 20852. Federal Energy Regulatory Commission Instructions [Docket No. RD20–1–000] Commission Information Collection Activities (FERC–725G); Comment Request; Extension Federal Energy Regulatory Commission, Department of Energy. ACTION: Notice of information collection and request for comments. AGENCY: In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the currently approved information collection FERC– 725G (Mandatory Reliability Standards for the Bulk-Power System: PRC Standards: Regional Reliability Standard PRC–006–NPCC–2 Automatic Underfrequency Load-Shedding (UFLS)) and submitting the information collection to the Office of Management and Budget (OMB) for review. Any interested person may file comments directly with OMB and should address a copy of those comments to the Commission as explained below. DATES: Comments on the collection of information are due June 25, 2020. ADDRESSES: Comments filed with OMB, identified by OMB Control No. 1902– 0252. Send written comments on FERC– 725G to OMB thru www.reginfo.gov/ public/do/PRAMain. Attention: Federal Energy Regulatory Commission Desk Officer. Please identify the OMB Control Number (1902–0252) in the subject line of your comments and should be sent within 30 days of publication of this notice to www.reginfo.gov/public/do/ PRAMain. Using the search function under the Currently Under Review field select Federal Energy Regulatory Commission; click submit and select comment to the right of the subject collection. A copy of the comments should also be sent to the Commission, in Docket No. RD20–1–000, by either of the following methods: • eFiling at Commission’s Website: https://www.ferc.gov/docs-filing/ efiling.asp. • Mail/Express Services: Persons unable to file electronically may mail similar pleadings to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. Hand delivered submissions in docketed proceedings should be delivered to Health and Human Services, 12225 SUMMARY: PO 00000 Frm 00061 Fmt 4703 Sfmt 4703 OMB submissions: Must be formatted and filed in accordance with submission guidelines at www.reginfo.gov/public/ do/PRAMain; Using the search function under the Currently Under Review field select Federal Energy Regulatory Commission; click ‘‘submit’’ and select comment to the right of the subject collection. FERC submissions: Must be formatted and filed in accordance with submission guidelines at: https://www.ferc.gov/help/ submission-guide.asp. For user assistance, contact FERC Online Support by email at ferconlinesupport@ ferc.gov, or by phone at: (866) 208–3676 (toll-free). Docket: Users interested in receiving automatic notification of activity in this docket or in viewing/downloading comments and issuances in this docket may do so at https://www.ferc.gov/docsfiling/docs-filing.asp. FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at DataClearance@FERC.gov, telephone at (202) 502–8663. SUPPLEMENTARY INFORMATION: Title: FERC–725G (Mandatory Reliability Standards for the Bulk-Power System: Regional Reliability Standard PRC–006–NPCC–2, Automatic Underfrequency Load-Shedding (UFLS). OMB Control No.: 1902–0252. Type of Request: Revisions to the information collection, as discussed in Docket No. RD20–1–000. Abstract: The proposed regional Reliability Standard applies to generator owners, planning coordinators, distribution providers, and transmission owners in the Northeast Power Coordinating Council Region and is designed to ensure the development of an effective automatic underfrequency load shedding (UFLS) program to preserve the security and integrity of the Bulk-Power System during declining system frequency events in coordination with the NERC continent-wide UFLS Reliability Standard PRC–006–1.1 The Commission also proposes to approve the related violation risk factors, violation severity levels, implementation plan, and effective date proposed by NERC. On August 8, 2005, Congress enacted into law the Electricity Modernization Act of 2005, which is Title XII, Subtitle A, of the Energy Policy Act of 2005 1 Effective E:\FR\FM\26MYN1.SGM date of the standard is 4/1/2020. 26MYN1

Agencies

[Federal Register Volume 85, Number 101 (Tuesday, May 26, 2020)]
[Notices]
[Pages 31490-31491]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-11208]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER19-2235-002.
    Applicants: Tuscola Bay Wind, LLC.
    Description: Compliance filing: Tuscola Bay Wind, LLC, Docket No. 
ER19-2235-002 to be effective 9/1/2019.
    Filed Date: 5/18/20.
    Accession Number: 20200518-5165.
    Comments Due: 5 p.m. ET 6/8/20.

    Docket Numbers: ER19-2707-002; ER10-2822-016; ER10-3158-009; ER10-
3161-009; ER10-3162-009; ER12-308-009; ER16-1238-003; ER16-1250-008; 
ER17-1242-002; ER17-1392-003.
    Applicants: Poseidon Wind, LLC, Atlantic Renewable Projects II LLC, 
Avangrid Arizona Renewables, LLC, Avangrid Renewables, LLC, El Cabo 
Wind LLC, Dillon Wind LLC, Manzana Wind LLC, Mountain View Power 
Partners III, LLC, Shiloh I Wind Project, LLC, Tule Wind LLC.
    Description: Supplement to December 19, 2019 Notice of Change in 
Status of Poseidon Wind, LLC and the Avangrid Southwest MBR Sellers.
    Filed Date: 5/18/20.
    Accession Number: 20200518-5195.
    Comments Due: 5 p.m. ET 6/8/20.

    Docket Numbers: ER20-681-001.
    Applicants: Tri-State Generation and Transmission Association, Inc.
    Description: Compliance filing: Compliance Filing Re-submittal to 
be effective 2/22/2020.
    Filed Date: 5/19/20.
    Accession Number: 20200519-5132.
    Comments Due: 5 p.m. ET 6/9/20.

    Docket Numbers: ER20-1499-001.
    Applicants: Appalachian Power Company.
    Description: Tariff Amendment: OATT--AEP Texas Inc. 1-Co Rate 
Update, Attach K & Misc revisions--Amend Pending to be effective 5/15/
2020.
    Filed Date: 5/19/20.
    Accession Number: 20200519-5064.
    Comments Due: 5 p.m. ET 6/9/20.

    Docket Numbers: ER20-1846-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: 2020-05-18_Filing to Enhance 
Accreditation of Load Modifying Resources to be effective 8/16/2020.
    Filed Date: 5/18/20.
    Accession Number: 20200518-5159.
    Comments Due: 5 p.m. ET 6/8/20.

    Docket Numbers: ER20-1847-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Original WMPA, Service 
Agreement No. 5639; Queue No. AF1-041 to be effective 4/23/2020.
    Filed Date: 5/19/20.
    Accession Number: 20200519-5020.
    Comments Due: 5 p.m. ET 6/9/20.

    Docket Numbers: ER20-1848-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Sec.  205(d) Rate Filing: NorthWestern Formula Rate 
Revisions to Incorporate Changes File in ER20-1090 to be effective 1/
27/2020.
    Filed Date: 5/19/20.
    Accession Number: 20200519-5031.
    Comments Due: 5 p.m. ET 6/9/20.

    Docket Numbers: ER20-1849-000.
    Applicants: Hardin Wind Energy LLC.
    Description: Tariff Cancellation: Notice of Cancellation of Market-
Based Rate Tariff to be effective 7/19/2020.
    Filed Date: 5/19/20.
    Accession Number: 20200519-5037.
    Comments Due: 5 p.m. ET 6/9/20.

    Docket Numbers: ER20-1850-000.
    Applicants: Hardin Wind Energy Holdings LLC.
    Description: Tariff Cancellation: Notice of Cancellation of Market-
Based Rate Tariff to be effective 7/19/2020.

[[Page 31491]]

    Filed Date: 5/19/20.
    Accession Number: 20200519-5038.
    Comments Due: 5 p.m. ET 6/9/20.

    Docket Numbers: ER20-1851-000.
    Applicants: Whitetail Solar 3, LLC.
    Description: Baseline eTariff Filing: Reactive Power Compensation 
to be effective 7/18/2020.
    Filed Date: 5/19/20.
    Accession Number: 20200519-5085.
    Comments Due: 5 p.m. ET 6/9/20.

    Docket Numbers: ER20-1852-000.
    Applicants: Midcontinent Independent System Operator, Inc., Ameren 
Illinois Company.
    Description: Sec.  205(d) Rate Filing: 2020-05-19_SA 3498 Ameren 
Illinois-BPWENA Payment Agreement to be effective 7/19/2020.
    Filed Date: 5/19/20.
    Accession Number: 20200519-5088.
    Comments Due: 5 p.m. ET 6/9/20.

    Docket Numbers: ER20-1853-000.
    Applicants: Whitehorn Solar LLC.
    Description: Baseline eTariff Filing: Application for Market-Based 
Rate Authorization, Request for Related Waivers to be effective 7/19/
2020.
    Filed Date: 5/19/20.
    Accession Number: 20200519-5091.
    Comments Due: 5 p.m. ET 6/9/20.

    Docket Numbers: ER20-1854-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Amendment to Second Revised 
WMPA No. 4869; Queue No. AC2-138/AD2-044 to be effective 2/22/2019.
    Filed Date: 5/19/20.
    Accession Number: 20200519-5124.
    Comments Due: 5 p.m. ET 6/9/20.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: May 19, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020-11208 Filed 5-22-20; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.