Texas Eastern Transmission, LP; Notice of Intent To Prepare an Environmental Assessment for the Proposed Appalachia to Market Project and Request for Comments on Environmental Issues, 31179-31180 [2020-11120]
Download as PDF
Federal Register / Vol. 85, No. 100 / Friday, May 22, 2020 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP20–436–000]
Texas Eastern Transmission, LP;
Notice of Intent To Prepare an
Environmental Assessment for the
Proposed Appalachia to Market Project
and Request for Comments on
Environmental Issues
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Appalachia to Market Project
involving construction and operation of
facilities by Texas Eastern
Transmission, LP (Texas Eastern) in
Westmoreland, Berks, and Fayette
Counties, Pennsylvania. The
Commission will use this EA in its
decision-making process to determine
whether the project is in the public
convenience and necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies about issues
regarding the project. The National
Environmental Policy Act (NEPA)
requires the Commission to take into
account the environmental impacts that
could result from its action whenever it
considers the issuance of a Certificate of
Public Convenience and Necessity.
NEPA also requires the Commission to
discover concerns the public may have
about proposals. This process is referred
to as ‘‘scoping.’’ The main goal of the
scoping process is to focus the analysis
in the EA on the important
environmental issues. By this notice, the
Commission requests public comments
on the scope of issues to address in the
EA. To ensure that your comments are
timely and properly recorded, please
submit your comments so that the
Commission receives them in
Washington, DC on or before 5:00 p.m.
Eastern Time on June 19, 2020.
You can make a difference by
submitting your specific comments or
concerns about the project. Your
comments should focus on the potential
environmental effects, reasonable
alternatives, and measures to avoid or
lessen environmental impacts. Your
input will help the Commission staff
determine what issues they need to
evaluate in the EA. Commission staff
will consider all filed comments during
the preparation of the EA.
If you sent comments on this project
to the Commission before the opening of
this docket on May 1, 2020, you will
VerDate Sep<11>2014
18:07 May 21, 2020
Jkt 250001
need to file those comments in Docket
No. CP20–436–000 to ensure they are
considered as part of this proceeding.
This notice is being sent to the
Commission’s current environmental
mailing list for this project. State and
local government representatives should
notify their constituents of this
proposed project and encourage them to
comment on their areas of concern.
If you are a landowner receiving this
notice, a pipeline company
representative may contact you about
the acquisition of an easement to
construct, operate, and maintain the
proposed facilities. The company would
seek to negotiate a mutually acceptable
easement agreement. You are not
required to enter into an agreement.
However, if the Commission approves
the project, that approval conveys with
it the right of eminent domain.
Therefore, if you and the company do
not reach an easement agreement, the
pipeline company could initiate
condemnation proceedings in court. In
such instances, compensation would be
determined by a judge in accordance
with state law.
Texas Eastern provided landowners
with a fact sheet prepared by the FERC
entitled An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know? This fact sheet addresses a
number of typically asked questions,
including the use of eminent domain
and how to participate in the
Commission’s proceedings. It is also
available for viewing on the FERC
website (www.ferc.gov) at https://
www.ferc.gov/resources/guides/gas/
gas.pdf.
Public Participation
The Commission offers a free service
called eSubscription which makes it
easy to stay informed of all issuances
and submittals regarding the dockets/
projects to which you subscribe. These
instant email notifications are the fastest
way to receive notification and provide
a link to the document files which can
reduce the amount of time you spend
researching proceedings. To sign up go
to www.ferc.gov/docs-filing/
esubscription.asp.
For your convenience, there are three
methods you can use to submit your
comments to the Commission. The
Commission encourages electronic filing
of comments and has staff available to
assist you at (866) 208–3676 or
FercOnlineSupport@ferc.gov. Please
carefully follow these instructions so
that your comments are properly
recorded.
(1) You can file your comments
electronically using the eComment
feature, which is located on the
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
31179
Commission’s website (www.ferc.gov)
under the link to Documents and
Filings. Using eComment is an easy
method for submitting brief, text-only
comments on a project;
(2) You can file your comments
electronically by using the eFiling
feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to Documents and
Filings. With eFiling, you can provide
comments in a variety of formats by
attaching them as a file with your
submission. New eFiling users must
first create an account by clicking on
eRegister. You will be asked to select the
type of filing you are making; a
comment on a particular project is
considered a Comment on a Filing; or
(3) You can file a paper copy of your
comments by mailing them to the
following address. Be sure to reference
the project docket number (CP20–436–
000) with your submission: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Room 1A, Washington, DC 20426.
Summary of the Proposed Project
The Appalachia to Market Project
would consist of the following facilities
and actions, all in Pennsylvania.
Specifically, Texas Eastern would
construct:
• Approximately 0.8 mile of 30-inchdiameter pipeline loop 1 in the sametrench as a segment of an abandoned 30inch-diameter pipe (that would be
removed for this project) on the Texas
Eastern system in Westmoreland
County;
• one crossover at the existing
Bechtelsville pig 2-launcher site in Berks
County;
• one crossover at the existing
Uniontown pig-receiver site in Fayette
County; and
• other related appurtenances.
The Appalachia to Market Project
would provide up to 18,000 dekatherms
per day of firm natural gas
transportation service to UGI Utilities
Inc. at an existing delivery point near
Reading, Pennsylvania. The general
location of the project facilities is shown
in appendix 1.3
1 A pipeline loop is a segment of pipe constructed
parallel to an existing pipeline to increase capacity.
2 A pig is a tool that the pipeline company inserts
into and pushes through the pipeline for cleaning
the pipeline, conducting internal inspections, or
other purposes.
3 The appendices referenced in this notice will
not appear in the Federal Register. Copies of
appendices were sent to all those receiving this
notice in the mail and are available at www.ferc.gov
using the link called ‘‘eLibrary’’ or from the
Commission’s Public Reference Room, 888 First
Street NE, Washington, DC 20426, or call (202) 502–
E:\FR\FM\22MYN1.SGM
Continued
22MYN1
31180
Federal Register / Vol. 85, No. 100 / Friday, May 22, 2020 / Notices
Land Requirements for Construction
The proposed project has been
designed to minimize impacts by
replacing existing pipeline and
installing crossovers at previously
existing aboveground facilities within
and directly adjacent to Texas Eastern’s
existing right-of-way. Construction of
the proposed facilities would disturb
about 16.2 acres of land for the
aboveground facilities and the pipeline.
Following construction, Texas Eastern
would maintain 12.9 acres for
permanent operation of the project’s
facilities. The entire proposed 0.8-mile
Delmont Loop pipeline route parallels
existing pipeline, utility, or road rightsof-way with the exception of the
proposed launcher and receiver barrels,
which will convert 3.6 acres of land use
from open land to industrial/
commercial.
The EA Process
The EA will discuss impacts that
could occur as a result of the
construction and operation of the
proposed project under these general
headings:
• geology and soils;
• water resources and wetlands;
• vegetation and wildlife;
• threatened and endangered species;
• cultural resources;
• land use;
• air quality and noise;
• public safety; and
• cumulative impacts.
Commission staff will also evaluate
reasonable alternatives to the proposed
project or portions of the project, and
make recommendations on how to
lessen or avoid impacts on the various
resource areas.
The EA will present Commission
staff’s independent analysis of the
issues. The EA will be available in
electronic format in the public record
through eLibrary 4 and the
Commission’s website (https://
www.ferc.gov/industries/gas/enviro/
eis.asp). If eSubscribed, you will receive
instant email notification when the EA
is issued. The EA may be issued for an
allotted public comment period.
Commission staff will consider all
comments on the EA before making
recommendations to the Commission.
To ensure Commission staff have the
opportunity to address your comments,
please carefully follow the instructions
in the Public Participation section,
beginning on page 2 of this notice.
8371. For instructions on connecting to eLibrary,
refer to the last page of this notice.
4 For instructions on connecting to eLibrary, refer
to the last page of this notice.
VerDate Sep<11>2014
18:07 May 21, 2020
Jkt 250001
With this notice, the Commission is
asking agencies with jurisdiction by law
and/or special expertise with respect to
the environmental issues of this project
to formally cooperate in the preparation
of the EA.5 Agencies that would like to
request cooperating agency status
should follow the instructions for filing
comments provided under the Public
Participation section of this notice.
and will provide instructions to access
the electronic document on the FERC’s
website (www.ferc.gov).
If you need to make changes to your
name/address, or if you would like to
remove your name from the mailing list,
please return the attached ‘‘Mailing List
Update Form’’ (appendix 2).
Consultation Under Section 106 of the
National Historic Preservation Act
In accordance with the Advisory
Council on Historic Preservation’s
implementing regulations for section
106 of the National Historic
Preservation Act, the Commission is
using this notice to initiate consultation
with the Pennsylvania State Historic
Preservation Office, and to solicit their
views and those of other government
agencies, interested Indian tribes, and
the public on the project’s potential
effects on historic properties.6 The EA
for this project will document findings
on the impacts on historic properties
and summarize the status of
consultations under section 106.
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website at www.ferc.gov using the
eLibrary link. Click on the eLibrary link,
click on General Search and enter the
docket number in the Docket Number
field, excluding the last three digits (i.e.,
CP20–436). Be sure you have selected
an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or (866) 208–3676, or for TTY, contact
(202) 502–8659. The eLibrary link also
provides access to the texts of all formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
Public sessions or site visits will be
posted on the Commission’s calendar
located at www.ferc.gov/EventCalendar/
EventsList.aspx along with other related
information.
Environmental Mailing List
The environmental mailing list
includes federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American Tribes; other
interested parties; and local libraries
and newspapers. This list also includes
all affected landowners (as defined in
the Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the project. Commission
staff will update the environmental
mailing list as the analysis proceeds to
ensure that Commission notices related
to this environmental review are sent to
all individuals, organizations, and
government entities interested in and/or
potentially affected by the proposed
project.
If the Commission issues the EA for
an allotted public comment period, a
Notice of Availability of the EA will be
sent to the environmental mailing list
5 The Council on Environmental Quality
regulations addressing cooperating agency
responsibilities are at Title 40, Code of Federal
Regulations, Part 1501.6.
6 The Advisory Council on Historic Preservation’s
regulations are at Title 36, Code of Federal
Regulations, Part 800. Those regulations define
historic properties as any prehistoric or historic
district, site, building, structure, or object included
in or eligible for inclusion in the National Register
of Historic Places.
PO 00000
Frm 00046
Fmt 4703
Sfmt 4703
Additional Information
Dated: May 18, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–11120 Filed 5–21–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Western Area Power Administration
Agency Information Collection
Extension
Western Area Power
Administration, Department of Energy.
ACTION: Notice and request for
comments.
AGENCY:
The Western Area Power
Administration (WAPA), pursuant to
the Paperwork Reduction Act of 1995,
intends to extend an information
collection request with the Office of
Management and Budget (OMB) for
three years with ministerial changes.
The current OMB control number 1910–
5136 for WAPA’s Applicant Profile Data
(APD) form expires November 30, 2020.
WAPA intends to extend the APD form
under the OMB control number to
November 30, 2023. WAPA is seeking
comments on this proposed information
collection extension.
SUMMARY:
E:\FR\FM\22MYN1.SGM
22MYN1
Agencies
[Federal Register Volume 85, Number 100 (Friday, May 22, 2020)]
[Notices]
[Pages 31179-31180]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-11120]
[[Page 31179]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP20-436-000]
Texas Eastern Transmission, LP; Notice of Intent To Prepare an
Environmental Assessment for the Proposed Appalachia to Market Project
and Request for Comments on Environmental Issues
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental assessment (EA) that will
discuss the environmental impacts of the Appalachia to Market Project
involving construction and operation of facilities by Texas Eastern
Transmission, LP (Texas Eastern) in Westmoreland, Berks, and Fayette
Counties, Pennsylvania. The Commission will use this EA in its
decision-making process to determine whether the project is in the
public convenience and necessity.
This notice announces the opening of the scoping process the
Commission will use to gather input from the public and interested
agencies about issues regarding the project. The National Environmental
Policy Act (NEPA) requires the Commission to take into account the
environmental impacts that could result from its action whenever it
considers the issuance of a Certificate of Public Convenience and
Necessity. NEPA also requires the Commission to discover concerns the
public may have about proposals. This process is referred to as
``scoping.'' The main goal of the scoping process is to focus the
analysis in the EA on the important environmental issues. By this
notice, the Commission requests public comments on the scope of issues
to address in the EA. To ensure that your comments are timely and
properly recorded, please submit your comments so that the Commission
receives them in Washington, DC on or before 5:00 p.m. Eastern Time on
June 19, 2020.
You can make a difference by submitting your specific comments or
concerns about the project. Your comments should focus on the potential
environmental effects, reasonable alternatives, and measures to avoid
or lessen environmental impacts. Your input will help the Commission
staff determine what issues they need to evaluate in the EA. Commission
staff will consider all filed comments during the preparation of the
EA.
If you sent comments on this project to the Commission before the
opening of this docket on May 1, 2020, you will need to file those
comments in Docket No. CP20-436-000 to ensure they are considered as
part of this proceeding.
This notice is being sent to the Commission's current environmental
mailing list for this project. State and local government
representatives should notify their constituents of this proposed
project and encourage them to comment on their areas of concern.
If you are a landowner receiving this notice, a pipeline company
representative may contact you about the acquisition of an easement to
construct, operate, and maintain the proposed facilities. The company
would seek to negotiate a mutually acceptable easement agreement. You
are not required to enter into an agreement. However, if the Commission
approves the project, that approval conveys with it the right of
eminent domain. Therefore, if you and the company do not reach an
easement agreement, the pipeline company could initiate condemnation
proceedings in court. In such instances, compensation would be
determined by a judge in accordance with state law.
Texas Eastern provided landowners with a fact sheet prepared by the
FERC entitled An Interstate Natural Gas Facility On My Land? What Do I
Need To Know? This fact sheet addresses a number of typically asked
questions, including the use of eminent domain and how to participate
in the Commission's proceedings. It is also available for viewing on
the FERC website (www.ferc.gov) at https://www.ferc.gov/resources/guides/gas/gas.pdf.
Public Participation
The Commission offers a free service called eSubscription which
makes it easy to stay informed of all issuances and submittals
regarding the dockets/projects to which you subscribe. These instant
email notifications are the fastest way to receive notification and
provide a link to the document files which can reduce the amount of
time you spend researching proceedings. To sign up go to www.ferc.gov/docs-filing/esubscription.asp.
For your convenience, there are three methods you can use to submit
your comments to the Commission. The Commission encourages electronic
filing of comments and has staff available to assist you at (866) 208-
3676 or [email protected]. Please carefully follow these
instructions so that your comments are properly recorded.
(1) You can file your comments electronically using the eComment
feature, which is located on the Commission's website (www.ferc.gov)
under the link to Documents and Filings. Using eComment is an easy
method for submitting brief, text-only comments on a project;
(2) You can file your comments electronically by using the eFiling
feature, which is located on the Commission's website (www.ferc.gov)
under the link to Documents and Filings. With eFiling, you can provide
comments in a variety of formats by attaching them as a file with your
submission. New eFiling users must first create an account by clicking
on eRegister. You will be asked to select the type of filing you are
making; a comment on a particular project is considered a Comment on a
Filing; or
(3) You can file a paper copy of your comments by mailing them to
the following address. Be sure to reference the project docket number
(CP20-436-000) with your submission: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street NE, Room 1A,
Washington, DC 20426.
Summary of the Proposed Project
The Appalachia to Market Project would consist of the following
facilities and actions, all in Pennsylvania. Specifically, Texas
Eastern would construct:
Approximately 0.8 mile of 30-inch-diameter pipeline loop
\1\ in the same-trench as a segment of an abandoned 30-inch-diameter
pipe (that would be removed for this project) on the Texas Eastern
system in Westmoreland County;
---------------------------------------------------------------------------
\1\ A pipeline loop is a segment of pipe constructed parallel to
an existing pipeline to increase capacity.
---------------------------------------------------------------------------
one crossover at the existing Bechtelsville pig \2\-
launcher site in Berks County;
---------------------------------------------------------------------------
\2\ A pig is a tool that the pipeline company inserts into and
pushes through the pipeline for cleaning the pipeline, conducting
internal inspections, or other purposes.
---------------------------------------------------------------------------
one crossover at the existing Uniontown pig-receiver site
in Fayette County; and
other related appurtenances.
The Appalachia to Market Project would provide up to 18,000
dekatherms per day of firm natural gas transportation service to UGI
Utilities Inc. at an existing delivery point near Reading,
Pennsylvania. The general location of the project facilities is shown
in appendix 1.\3\
---------------------------------------------------------------------------
\3\ The appendices referenced in this notice will not appear in
the Federal Register. Copies of appendices were sent to all those
receiving this notice in the mail and are available at www.ferc.gov
using the link called ``eLibrary'' or from the Commission's Public
Reference Room, 888 First Street NE, Washington, DC 20426, or call
(202) 502-8371. For instructions on connecting to eLibrary, refer to
the last page of this notice.
---------------------------------------------------------------------------
[[Page 31180]]
Land Requirements for Construction
The proposed project has been designed to minimize impacts by
replacing existing pipeline and installing crossovers at previously
existing aboveground facilities within and directly adjacent to Texas
Eastern's existing right-of-way. Construction of the proposed
facilities would disturb about 16.2 acres of land for the aboveground
facilities and the pipeline. Following construction, Texas Eastern
would maintain 12.9 acres for permanent operation of the project's
facilities. The entire proposed 0.8-mile Delmont Loop pipeline route
parallels existing pipeline, utility, or road rights-of-way with the
exception of the proposed launcher and receiver barrels, which will
convert 3.6 acres of land use from open land to industrial/commercial.
The EA Process
The EA will discuss impacts that could occur as a result of the
construction and operation of the proposed project under these general
headings:
geology and soils;
water resources and wetlands;
vegetation and wildlife;
threatened and endangered species;
cultural resources;
land use;
air quality and noise;
public safety; and
cumulative impacts.
Commission staff will also evaluate reasonable alternatives to the
proposed project or portions of the project, and make recommendations
on how to lessen or avoid impacts on the various resource areas.
The EA will present Commission staff's independent analysis of the
issues. The EA will be available in electronic format in the public
record through eLibrary \4\ and the Commission's website (https://www.ferc.gov/industries/gas/enviro/eis.asp). If eSubscribed, you will
receive instant email notification when the EA is issued. The EA may be
issued for an allotted public comment period. Commission staff will
consider all comments on the EA before making recommendations to the
Commission. To ensure Commission staff have the opportunity to address
your comments, please carefully follow the instructions in the Public
Participation section, beginning on page 2 of this notice.
---------------------------------------------------------------------------
\4\ For instructions on connecting to eLibrary, refer to the
last page of this notice.
---------------------------------------------------------------------------
With this notice, the Commission is asking agencies with
jurisdiction by law and/or special expertise with respect to the
environmental issues of this project to formally cooperate in the
preparation of the EA.\5\ Agencies that would like to request
cooperating agency status should follow the instructions for filing
comments provided under the Public Participation section of this
notice.
---------------------------------------------------------------------------
\5\ The Council on Environmental Quality regulations addressing
cooperating agency responsibilities are at Title 40, Code of Federal
Regulations, Part 1501.6.
---------------------------------------------------------------------------
Consultation Under Section 106 of the National Historic Preservation
Act
In accordance with the Advisory Council on Historic Preservation's
implementing regulations for section 106 of the National Historic
Preservation Act, the Commission is using this notice to initiate
consultation with the Pennsylvania State Historic Preservation Office,
and to solicit their views and those of other government agencies,
interested Indian tribes, and the public on the project's potential
effects on historic properties.\6\ The EA for this project will
document findings on the impacts on historic properties and summarize
the status of consultations under section 106.
---------------------------------------------------------------------------
\6\ The Advisory Council on Historic Preservation's regulations
are at Title 36, Code of Federal Regulations, Part 800. Those
regulations define historic properties as any prehistoric or
historic district, site, building, structure, or object included in
or eligible for inclusion in the National Register of Historic
Places.
---------------------------------------------------------------------------
Environmental Mailing List
The environmental mailing list includes federal, state, and local
government representatives and agencies; elected officials;
environmental and public interest groups; Native American Tribes; other
interested parties; and local libraries and newspapers. This list also
includes all affected landowners (as defined in the Commission's
regulations) who are potential right-of-way grantors, whose property
may be used temporarily for project purposes, or who own homes within
certain distances of aboveground facilities, and anyone who submits
comments on the project. Commission staff will update the environmental
mailing list as the analysis proceeds to ensure that Commission notices
related to this environmental review are sent to all individuals,
organizations, and government entities interested in and/or potentially
affected by the proposed project.
If the Commission issues the EA for an allotted public comment
period, a Notice of Availability of the EA will be sent to the
environmental mailing list and will provide instructions to access the
electronic document on the FERC's website (www.ferc.gov).
If you need to make changes to your name/address, or if you would
like to remove your name from the mailing list, please return the
attached ``Mailing List Update Form'' (appendix 2).
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC website at www.ferc.gov using the eLibrary link. Click on the
eLibrary link, click on General Search and enter the docket number in
the Docket Number field, excluding the last three digits (i.e., CP20-
436). Be sure you have selected an appropriate date range. For
assistance, please contact FERC Online Support at
[email protected] or (866) 208-3676, or for TTY, contact (202)
502-8659. The eLibrary link also provides access to the texts of all
formal documents issued by the Commission, such as orders, notices, and
rulemakings.
Public sessions or site visits will be posted on the Commission's
calendar located at www.ferc.gov/EventCalendar/EventsList.aspx along
with other related information.
Dated: May 18, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-11120 Filed 5-21-20; 8:45 am]
BILLING CODE 6717-01-P