Combined Notice of Filings #1, 28618-28619 [2020-10279]
Download as PDF
jbell on DSKJLSW7X2PROD with NOTICES
28618
Federal Register / Vol. 85, No. 93 / Wednesday, May 13, 2020 / Notices
authorization contained in Order No.
EA–171–D.
Powerex states that it is a
‘‘corporation organized under the
Business Corporations Act of British
Columbia, with its principal place of
business . . . in Vancouver, British
Columbia, Canada.’’ App. at 2. Powerex
is a ‘‘wholly-owned marketing
subsidiary of the British Columbia
Hydro and Power Authority (‘‘BC
Hydro’’), a provincial Crown
Corporation owned by the Government
of British Columbia.’’ Id. Powerex
further states that it ‘‘will purchase the
power to be exported to Canada from
other power marketers, from
independent power producers, from
Mexican sources, or from US electric
utilities, municipalities, and federal
power marketing agencies.’’ App. at 4.
Powerex contends that its proposed
exports will not impair the sufficiency
of electric supply within the United
States and will neither impede nor tend
to impede the operational reliability of
the bulk power system.’’ See id. at 5.
The existing international
transmission facilities to be utilized by
the Applicant have previously been
authorized by Presidential permits
issued pursuant to Executive Order
10485, as amended, and are appropriate
for open access transmission by third
parties.
Procedural Matters: Any person
desiring to be heard in this proceeding
should file a comment or protest to the
Application at the address provided
above. Protests should be filed in
accordance with Rule 211 of the Federal
Energy Regulatory Commission’s (FERC)
Rules of Practice and Procedure (18 CFR
385.211). Any person desiring to
become a party to this proceeding
should file a motion to intervene at the
above address in accordance with FERC
Rule 214 (18 CFR 385.214).
Comments and other filings
concerning Powerex’s application to
export electric energy to Canada should
be clearly marked with OE Docket No.
EA–171–E. Additional copies are to be
provided directly to Connor Curson, 666
Burrard Street, Suite 1300, Vancouver,
British Columbia, Canada V6C 2X8,
connor.curson@powerex.com; Deanna E.
King, 111 Congress Avenue, Suite 2300,
Austin, TX 78701, deanna.king@
bracewell.com; and Tracey L. Bradley,
2001 M Street NW, Suite 900,
Washington, DC 20036, tracey.bradley@
bracewell.com.
A final decision will be made on this
Application after the environmental
impacts have been evaluated pursuant
to DOE’s National Environmental Policy
Act Implementing Procedures (10 CFR
part 1021) and after DOE determines
VerDate Sep<11>2014
19:53 May 12, 2020
Jkt 250001
that the proposed action will not have
an adverse impact on the sufficiency of
supply or reliability of the U.S. electric
power supply system.
Copies of this Application will be
made available, upon request, by
accessing the program website at https://
energy.gov/node/11845, or by emailing
Matthew Aronoff at matthew.aronoff@
hq.doe.gov.
Signed in Washington, DC, on May 8, 2020.
Christopher Lawrence,
Management and Program Analyst,
Transmission Permitting and Technical
Assistance, Office of Electricity.
[FR Doc. 2020–10265 Filed 5–12–20; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG20–149–000.
Applicants: Minco Wind I, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Minco Wind I, LLC.
Filed Date: 5/6/20.
Accession Number: 20200506–5248.
Comments Due: 5 p.m. ET 5/27/20.
Docket Numbers: EG20–150–000.
Applicants: Ponderosa Wind, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Ponderosa Wind,
LLC.
Filed Date: 5/6/20.
Accession Number: 20200506–5249.
Comments Due: 5 p.m. ET 5/27/20.
Docket Numbers: EG20–151–000.
Applicants: Sky Global Power Two
LLC.
Description: Notice of SelfCertification of EWG Status of Sky
Global Power Two LLC.
Filed Date: 5/6/20.
Accession Number: 20200506–5250.
Comments Due: 5 p.m. ET 5/27/20.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER19–1890–002.
Applicants: MATL LLP.
Description: Compliance filing: Order
No. 845 Compliance Filing Amendment
ER19–1890 to be effective 5/22/2019.
Filed Date: 5/7/20.
Accession Number: 20200507–5120.
Comments Due: 5 p.m. ET 5/28/20.
Docket Numbers: ER20–1452–001.
Applicants: Southern California
Edison Company.
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
Description: Tariff Amendment:
Resubmit 2020 TACBAA Update to be
effective 6/1/2020.
Filed Date: 5/7/20.
Accession Number: 20200507–5096.
Comments Due: 5 p.m. ET 5/28/20.
Docket Numbers: ER20–1777–000.
Applicants: Jersey Central Power &
Light Company.
Description: § 205(d) Rate Filing: Rate
Schedules and Agreements Yards Creek
to be effective 7/5/2020.
Filed Date: 5/6/20.
Accession Number: 20200506–5216.
Comments Due: 5 p.m. ET 5/27/20.
Docket Numbers: ER20–1778–000.
Applicants: Idaho Power Company.
Description: Tariff Cancellation:
Cancellation of NTTG Funding
Agreement to be effective 4/30/2020.
Filed Date: 5/7/20.
Accession Number: 20200507–5000.
Comments Due: 5 p.m. ET 5/28/20.
Docket Numbers: ER20–1779–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
ALLETE, Inc.
Description: § 205(d) Rate Filing:
2020–05–07_SA 3326 MP–BPU 1st Rev
T–T (Brainerd) to be effective 5/8/2020.
Filed Date: 5/7/20.
Accession Number: 20200507–5025.
Comments Due: 5 p.m. ET 5/28/20.
Docket Numbers: ER20–1780–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2020–05–07_SA 3488 MDU–MDU GIA
(R1000) to be effective 4/23/2020.
Filed Date: 5/7/20.
Accession Number: 20200507–5038.
Comments Due: 5 p.m. ET 5/28/20.
Docket Numbers: ER20–1781–000.
Applicants: Alabama Power
Company.
Description: § 205(d) Rate Filing:
Bulldog Solar (Bulldog Solar I) LGIA
Filing to be effective 4/24/2020.
Filed Date: 5/7/20.
Accession Number: 20200507–5088.
Comments Due: 5 p.m. ET 5/28/20.
Docket Numbers: ER20–1782–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
Revisions Regarding Make Whole
Payments and Minimum Run Time to be
effective 12/31/9998.
Filed Date: 5/7/20.
Accession Number: 20200507–5116.
Comments Due: 5 p.m. ET 5/28/20.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
E:\FR\FM\13MYN1.SGM
13MYN1
Federal Register / Vol. 85, No. 93 / Wednesday, May 13, 2020 / Notices
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: May 7, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–10279 Filed 5–12–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2837–000]
jbell on DSKJLSW7X2PROD with NOTICES
Erie Boulevard Hydropower, L.P.;
Notice of Authorization for Continued
Project Operation
On March 29, 2018, Erie Boulevard
Hydropower, L.P., licensee for the
Granby Hydroelectric Project, filed an
Application for a New License pursuant
to the Federal Power Act (FPA) and the
Commission’s regulations thereunder.
The Granby Hydroelectric Project is on
the Oswego River in the town of Fulton
in Oswego County, New York.
The license for Project No. 2837 was
issued for a period ending March 31,
2020. Section 15(a)(1) of the FPA, 16
U.S.C. 808(a)(1), requires the
Commission, at the expiration of a
license term, to issue from year-to-year
an annual license to the then licensee
under the terms and conditions of the
prior license until a new license is
issued, or the project is otherwise
disposed of as provided in section 15 or
any other applicable section of the FPA.
If the project’s prior license waived the
applicability of section 15 of the FPA,
then, based on section 9(b) of the
Administrative Procedure Act, 5 U.S.C.
558(c), and as set forth at 18 CFR
16.21(a), if the licensee of such project
has filed an application for a subsequent
license, the licensee may continue to
operate the project in accordance with
the terms and conditions of the license
after the minor or minor part license
expires, until the Commission acts on
its application. If the licensee of such a
project has not filed an application for
VerDate Sep<11>2014
19:53 May 12, 2020
Jkt 250001
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
to continue project operations until the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No. 2837
is issued to Erie Boulevard Hydropower,
L.P., for a period effective April 1, 2020
through March 31, 2021, or until the
issuance of a new license for the project
or other disposition under the FPA,
whichever comes first. If issuance of a
new license (or other disposition) does
not take place on or before March 31,
2021, notice is hereby given that,
pursuant to 18 CFR 16.18(c), an annual
license under section 15(a)(1) of the
FPA is renewed automatically without
further order or notice by the
Commission, unless the Commission
orders otherwise.
If the project is not subject to section
15 of the FPA, notice is hereby given
that the Erie Boulevard Hydropower,
L.P., is authorized to continue operation
of the Granby Hydroelectric Project,
until such time as the Commission acts
on its application for a subsequent
license.
Dated: May 7, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–10258 Filed 5–12–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2669–000]
Bear Swamp Power Company, LLC;
Notice of Authorization for Continued
Project Operation
On March 30, 2018, Bear Swamp
Power Company, LLC, licensee for the
Bear Swamp Hydroelectric Project, filed
an Application for a New License
pursuant to the Federal Power Act
(FPA) and the Commission’s regulations
thereunder. The Bear Swamp
Hydroelectric Project is on Deerfield
River, in Berkshire and Franklin
Counties, Massachusetts.
The license for Project No. 2669 was
issued for a period ending March 31,
2020. Section 15(a)(1) of the FPA, 16
U.S.C. 808(a)(1), requires the
Commission, at the expiration of a
license term, to issue from year-to-year
an annual license to the then licensee
under the terms and conditions of the
prior license until a new license is
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
28619
issued, or the project is otherwise
disposed of as provided in section 15 or
any other applicable section of the FPA.
If the project’s prior license waived the
applicability of section 15 of the FPA,
then, based on section 9(b) of the
Administrative Procedure Act, 5 U.S.C.
558(c), and as set forth at 18 CFR
16.21(a), if the licensee of such project
has filed an application for a subsequent
license, the licensee may continue to
operate the project in accordance with
the terms and conditions of the license
after the minor or minor part license
expires, until the Commission acts on
its application. If the licensee of such a
project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
to continue project operations until the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No. 2669
is issued to Bear Swamp Power
Company, LLC for a period effective
April 1, 2020 through March 31, 2021,
or until the issuance of a new license for
the project or other disposition under
the FPA, whichever comes first. If
issuance of a new license (or other
disposition) does not take place on or
before March 31, 2021, notice is hereby
given that, pursuant to 18 CFR 16.18(c),
an annual license under section 15(a)(1)
of the FPA is renewed automatically
without further order or notice by the
Commission, unless the Commission
orders otherwise.
If the project is not subject to section
15 of the FPA, notice is hereby given
that the Bear Swamp Power Company,
LLC, Inc. is authorized to continue
operation of the Bear Swamp
Hydroelectric Project, until such time as
the Commission acts on its application
for a subsequent license.
Dated: May 7, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–10257 Filed 5–12–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Number: PR20–44–001.
Applicants: ONEOK Gas
Transportation, L.L.C.
E:\FR\FM\13MYN1.SGM
13MYN1
Agencies
[Federal Register Volume 85, Number 93 (Wednesday, May 13, 2020)]
[Notices]
[Pages 28618-28619]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-10279]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG20-149-000.
Applicants: Minco Wind I, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of Minco Wind I, LLC.
Filed Date: 5/6/20.
Accession Number: 20200506-5248.
Comments Due: 5 p.m. ET 5/27/20.
Docket Numbers: EG20-150-000.
Applicants: Ponderosa Wind, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of Ponderosa Wind, LLC.
Filed Date: 5/6/20.
Accession Number: 20200506-5249.
Comments Due: 5 p.m. ET 5/27/20.
Docket Numbers: EG20-151-000.
Applicants: Sky Global Power Two LLC.
Description: Notice of Self-Certification of EWG Status of Sky
Global Power Two LLC.
Filed Date: 5/6/20.
Accession Number: 20200506-5250.
Comments Due: 5 p.m. ET 5/27/20.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER19-1890-002.
Applicants: MATL LLP.
Description: Compliance filing: Order No. 845 Compliance Filing
Amendment ER19-1890 to be effective 5/22/2019.
Filed Date: 5/7/20.
Accession Number: 20200507-5120.
Comments Due: 5 p.m. ET 5/28/20.
Docket Numbers: ER20-1452-001.
Applicants: Southern California Edison Company.
Description: Tariff Amendment: Resubmit 2020 TACBAA Update to be
effective 6/1/2020.
Filed Date: 5/7/20.
Accession Number: 20200507-5096.
Comments Due: 5 p.m. ET 5/28/20.
Docket Numbers: ER20-1777-000.
Applicants: Jersey Central Power & Light Company.
Description: Sec. 205(d) Rate Filing: Rate Schedules and
Agreements Yards Creek to be effective 7/5/2020.
Filed Date: 5/6/20.
Accession Number: 20200506-5216.
Comments Due: 5 p.m. ET 5/27/20.
Docket Numbers: ER20-1778-000.
Applicants: Idaho Power Company.
Description: Tariff Cancellation: Cancellation of NTTG Funding
Agreement to be effective 4/30/2020.
Filed Date: 5/7/20.
Accession Number: 20200507-5000.
Comments Due: 5 p.m. ET 5/28/20.
Docket Numbers: ER20-1779-000.
Applicants: Midcontinent Independent System Operator, Inc., ALLETE,
Inc.
Description: Sec. 205(d) Rate Filing: 2020-05-07_SA 3326 MP-BPU
1st Rev T-T (Brainerd) to be effective 5/8/2020.
Filed Date: 5/7/20.
Accession Number: 20200507-5025.
Comments Due: 5 p.m. ET 5/28/20.
Docket Numbers: ER20-1780-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2020-05-07_SA 3488 MDU-MDU
GIA (R1000) to be effective 4/23/2020.
Filed Date: 5/7/20.
Accession Number: 20200507-5038.
Comments Due: 5 p.m. ET 5/28/20.
Docket Numbers: ER20-1781-000.
Applicants: Alabama Power Company.
Description: Sec. 205(d) Rate Filing: Bulldog Solar (Bulldog Solar
I) LGIA Filing to be effective 4/24/2020.
Filed Date: 5/7/20.
Accession Number: 20200507-5088.
Comments Due: 5 p.m. ET 5/28/20.
Docket Numbers: ER20-1782-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: Revisions Regarding Make
Whole Payments and Minimum Run Time to be effective 12/31/9998.
Filed Date: 5/7/20.
Accession Number: 20200507-5116.
Comments Due: 5 p.m. ET 5/28/20.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings
[[Page 28619]]
must file in accordance with Rules 211 and 214 of the Commission's
Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern
time on the specified comment date. Protests may be considered, but
intervention is necessary to become a party to the proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: May 7, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020-10279 Filed 5-12-20; 8:45 am]
BILLING CODE 6717-01-P