Download as PDF 28042 Federal Register / Vol. 85, No. 92 / Tuesday, May 12, 2020 / Notices concerning support for environmental research and education. Agenda: To discuss subcommittee work and prepare for future advisory committee activities. Updated agenda will be available at https://www.nsf.gov/ ere/ereweb/minutes.jsp. Dated: May 6, 2020. Crystal Robinson, Committee Management Officer. [FR Doc. 2020–10067 Filed 5–11–20; 8:45 am] BILLING CODE 7555–01–P NUCLEAR REGULATORY COMMISSION [Docket Nos. 50–334; 50–412; 50–456; 50– 457; 50–244; 50–352; 50–353; 50–528; 50– 529; 50–530; 72–44; 50–254; 50–265; 50– 443; NRC–2020–0110] Energy Harbor Nuclear Corp.; Exelon Generation Company, LLC; NextEra Energy Seabrook, LLC; Arizona Public Service Company Nuclear Regulatory Commission. ACTION: Exemptions; issuance. AGENCY: SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) issued seven exemptions in response to requests from Energy Harbor Nuclear Corp.; Exelon Generation Company, LLC; NextEra Energy Seabrook, LLC; and Arizona Public Service Company. The exemptions allow the licensees to deviate from specific work hours requirements of the NRC’s ‘‘Fitness for Duty Programs’’ regulation and use sitespecific fatigue management controls, in response to the COVID–19 public health emergency (PHE). The NRC is issuing a single notice to announce the issuance of these exemptions. DATES: The seven exemptions were issued between April 3, 2020, and April 20, 2020. ADDRESSES: Please refer to Docket ID NRC–2020–0110 when contacting the NRC about the availability of information regarding this document. You may obtain publicly-available information related to this document using any of the following methods: • Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC–2020–0110. Address questions about NRC docket IDs in Regulations.gov to Jennifer Borges; telephone: 301–287–9127; email: Jennifer.Borges@nrc.gov. For technical questions, contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document. • NRC’s Agencywide Documents Access and Management System (ADAMS): You may obtain publiclyavailable documents online in the ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/ adams.html. To begin the search, select ‘‘Begin Web-based ADAMS Search.’’ For problems with ADAMS, please contact the NRC’s Public Document Room (PDR) reference staff at 1–800–397–4209, 301– 415–4737, or by email to pdr.resource@ nrc.gov. For the convenience of the reader, instructions about obtaining materials referenced in this document are provided in the ‘‘Availability of Documents’’ section. FOR FURTHER INFORMATION CONTACT: James Danna, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555– 0001; telephone: 301–415–7422, email: James.Danna@nrc.gov. SUPPLEMENTARY INFORMATION: Federal Regulations (10 CFR) Part 26, ‘‘Fitness for Duty Programs,’’ Section 26.205, ‘‘Work hours.’’ The exemptions from 10 CFR 26.205(d)(1) through (7) ensure that the control of work hours and management of worker fatigue do not unduly limit licensee flexibility in using personnel resources to most effectively manage the impacts of the COVID–19 PHE on maintaining the safe operation of these facilities. Specifically, the licensees stated that their staffing levels are affected or are expected to be affected by the COVID–19 PHE, and they can no longer meet or likely will not meet the work hour controls of 10 CFR 26.205(d)(1) through (d)(7). The licensees have committed to effecting site-specific administrative controls for COVID–19 PHE fatigue-management for personnel specified in 10 CFR 26.4(a). The NRC is periodically providing this compiled listing of related exemptions using a single Federal Register notice for COVID–19 related exemptions, instead of issuing individual Federal Register notices. The compiled listing provides transparency regarding the number of exemptions the NRC is issuing related to a given regulatory requirement. Additionally, the NRC publishes a list of approved licensing actions related to the COVID– 19 PHE on its public website at https:// www.nrc.gov/about-nrc/covid-19/ reactors/licensing-actions.html. I. Introduction The NRC issued seven exemptions in response to requests dated between April 2, 2020, and April 18, 2020, from Energy Harbor Nuclear Corp.; Exelon Generation Company, LLC; NextEra Energy Seabrook, LLC; and Arizona Public Service Company. The exemptions allow the licensees to deviate from specific requirements (cited below) of Title 10 of the Code of The table below provides the plant name, docket number, and ADAMS accession number for each exemption issued. Additional details on each exemption issued, including the exemption request submitted by the respective licensee, are provided in each exemption approval listed below. For additional directions on accessing information in ADAMS, see the ADDRESSES section of this document. II. Availability of Documents. ADAMS accession No. Document title Beaver Valley Power Station, Units 1 and 2 Docket Nos. 50–334 and 50–412 jbell on DSKJLSW7X2PROD with NOTICES Beaver Valley Work Hour Rule Exemption Request Due to Pandemic (L–20–140) dated April 18, 2020 ..................................... Beaver Valley Power Station, Units 1 and 2—Verbal Part 26 Exemption—Delivered 4/18/20 at 7:00 p.m ................................... Beaver Valley Power Station, Units 1 and 2—Exemption from Select Requirements of 10 CFR Part 26 (EPID L–2020–LLE– 0025 [COVID–19]) dated April 20, 2020. ML20109A008 ML20109A010 ML20109A000 Braidwood Station, Units 1 and 2 Docket Nos. 50–456 and 50–457 Braidwood Work Hours Control Exemption Request dated April 9, 2020 ....................................................................................... Braidwood Station, Units 1 and 2—Exemption from Select Requirements of 10 CFR Part 26 (EPID L–2020–LLE–0020 [COVID–19]) dated April 13, 2020. VerDate Sep<11>2014 18:47 May 11, 2020 Jkt 250001 PO 00000 Frm 00058 Fmt 4703 Sfmt 4703 E:\FR\FM\12MYN1.SGM 12MYN1 ML20100M588 ML20099A519 Federal Register / Vol. 85, No. 92 / Tuesday, May 12, 2020 / Notices 28043 ADAMS accession No. Document title R. E. Ginna Nuclear Power Plant Docket No. 50–244 Ginna—Planned Actions re Requirements for Work Hour Controls During Coronavirus Disease 2019 (COVID–19) Public Health Emergency dated April 6, 2020. R. E. Ginna Nuclear Power Plant—Exemption from Select Requirements of 10 CFR Part 26 (EPID L–2020–LLE–0016 [COVID–19]) dated April 6, 2020. ML20097D488 ML20095H256 Limerick Generating Station, Units 1 and 2 Docket Nos. 50–352 and 50–353 Limerick [50–352, 50–353] Actions Related to the Requirements for Work Hour Controls During the Coronavirus Disease 2019 Public Health Emergency) dated April 2, 2020. Limerick Generating Station, Units 1 and 2—Exemption from Select Requirements of 10 CFR Part 26 (EPID L–2020–LLE– 0014 [COVID–19]) dated April 3, 2020. ML20093M206 ML20093M820 Palo Verde Nuclear Generating Station, Units 1, 2, and 3 Docket Nos. 50–528, 50–529, 50–530, and 72–44 Palo Verde Nuclear Generating Station Units 1, 2 & 3 and Independent Spent Fuel Storage Installation (ISFSI)—Request for Exemption from Specific Requirements of 10 CFR Part 26, Fitness for Duty Programs dated April 14, 2020. Palo Verde Nuclear Generating Station, Units 1, 2, and 3—Exemption from Select Requirements of 10 CFR Part 26 (EPID L– 2020–LLE–0024 [COVID–19]) dated April 16, 2020. ML20105A481 ML20107F835 Quad Cities Nuclear Power Station, Units 1 and 2 Docket Nos. 50–254 AND 50–265 Quad Cities Nuclear Power Station Actions Related to the Requirements for Work Hour Controls During the Coronavirus Disease 2019 Public Health Emergency dated April 7, 2020. Quad Cities Nuclear Power Station, Units 1 and 2—Exemption from Select Requirements of 10 CFR Part 26 (EPID L–2020– LLE–0018 [COVID–19]) dated April 8, 2020. ML20098G313 ML20099A499 Seabrook Station, Unit No. 1 Docket No. 50–443 Seabrook Station—Requesting NRC Approval to Proactively Enter into the Alternative Work Hour Controls Delineated in NRC Letter from H. Nieh to NEI Dated March 28, 2020 During COV–19 Public Health Emergency dated April 10, 2020. Seabrook Station, Unit No. 1—Exemption from Select Requirements of 10 CFR Part 26 (EPID L–2020–LLE–0021 [COVID– 19]) dated April 13, 2020. The NRC may post additional materials to the Federal rulemaking website at https://www.regulations.gov under Docket ID NRC–2020–0110. The Federal rulemaking website allows you to receive alerts when changes or additions occur in a docket folder. To subscribe: (1) Navigate to the docket folder (NRC–2020–0110); (2) click the ‘‘Sign up for Email Alerts’’ link; and (3) enter your email address and select how frequently you would like to receive emails (daily, weekly, or monthly). Dated: May 7, 2020. For the Nuclear Regulatory Commission. James G. Danna, Chief, Plant Licensing Branch I, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation. jbell on DSKJLSW7X2PROD with NOTICES [FR Doc. 2020–10138 Filed 5–11–20; 8:45 am] BILLING CODE 7590–01–P VerDate Sep<11>2014 18:47 May 11, 2020 Jkt 250001 PEACE CORPS Information Collection Request; Submission for OMB Review Peace Corps. 60-Day notice and request for comments. AGENCY: ACTION: SUMMARY: The Peace Corps will be submitting the following information collection request to the Office of Management and Budget (OMB) for review and approval. The purpose of this notice is to allow 60 days for public comment in the Federal Register preceding submission to OMB. We are conducting this process in accordance with the Paperwork Reduction Act of 1995. Submit comments on or before July 13, 2020. ADDRESSES: Comments should be addressed to Virginia Burke, FOIA/ Privacy Act Officer. Virginia Burke can be contacted by email at pcfr@ peacecorps.gov. Email comments must be made in text and not in attachments. DATES: PO 00000 Frm 00059 Fmt 4703 Sfmt 4703 ML20101M597 ML20101G991 FOR FURTHER INFORMATION CONTACT: Virginia Burke at the Peace Corps address above. SUPPLEMENTARY INFORMATION: Title: Annual Coverdale Fellows Census. OMB Control Number: 0420–***. Type of Request: New. Affected Public: Individuals. Respondents Obligation to Reply: Voluntary. Burden to the Public: Estimated burden (hours) of the collection of information: a. Number of respondents: 223. b. Frequency of response: 1 time. c. Completion time: 15 minutes. d. Annual burden hours: 55.75 hours. General Description of Collection: The Paul D. Coverdell Fellows program is a graduate school benefit for returned Peace Corps Volunteers (RPCVs). The program, managed by the Peace Corps’ Office of University Programs, is made in formal partnership with graduate degree granting educational institutions across the United States. The partnering institutions are required to offer financial support to RPCVs who, in E:\FR\FM\12MYN1.SGM 12MYN1

Agencies

[Federal Register Volume 85, Number 92 (Tuesday, May 12, 2020)]
[Notices]
[Pages 28042-28043]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-10138]


=======================================================================
-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket Nos. 50-334; 50-412; 50-456; 50-457; 50-244; 50-352; 50-353; 
50-528; 50-529; 50-530; 72-44; 50-254; 50-265; 50-443; NRC-2020-0110]


Energy Harbor Nuclear Corp.; Exelon Generation Company, LLC; 
NextEra Energy Seabrook, LLC; Arizona Public Service Company

AGENCY: Nuclear Regulatory Commission.

ACTION: Exemptions; issuance.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) issued seven 
exemptions in response to requests from Energy Harbor Nuclear Corp.; 
Exelon Generation Company, LLC; NextEra Energy Seabrook, LLC; and 
Arizona Public Service Company. The exemptions allow the licensees to 
deviate from specific work hours requirements of the NRC's ``Fitness 
for Duty Programs'' regulation and use site-specific fatigue management 
controls, in response to the COVID-19 public health emergency (PHE). 
The NRC is issuing a single notice to announce the issuance of these 
exemptions.

DATES: The seven exemptions were issued between April 3, 2020, and 
April 20, 2020.

ADDRESSES: Please refer to Docket ID NRC-2020-0110 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document 
using any of the following methods:
     Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2020-0110. Address 
questions about NRC docket IDs in Regulations.gov to Jennifer Borges; 
telephone: 301-287-9127; email: [email protected]. For technical 
questions, contact the individual listed in the FOR FURTHER INFORMATION 
CONTACT section of this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS 
Search.'' For problems with ADAMS, please contact the NRC's Public 
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or 
by email to [email protected].
    For the convenience of the reader, instructions about obtaining 
materials referenced in this document are provided in the 
``Availability of Documents'' section.

FOR FURTHER INFORMATION CONTACT: James Danna, Office of Nuclear Reactor 
Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555-
0001; telephone: 301-415-7422, email: [email protected].

SUPPLEMENTARY INFORMATION: 

I. Introduction

    The NRC issued seven exemptions in response to requests dated 
between April 2, 2020, and April 18, 2020, from Energy Harbor Nuclear 
Corp.; Exelon Generation Company, LLC; NextEra Energy Seabrook, LLC; 
and Arizona Public Service Company. The exemptions allow the licensees 
to deviate from specific requirements (cited below) of Title 10 of the 
Code of Federal Regulations (10 CFR) Part 26, ``Fitness for Duty 
Programs,'' Section 26.205, ``Work hours.''
    The exemptions from 10 CFR 26.205(d)(1) through (7) ensure that the 
control of work hours and management of worker fatigue do not unduly 
limit licensee flexibility in using personnel resources to most 
effectively manage the impacts of the COVID-19 PHE on maintaining the 
safe operation of these facilities. Specifically, the licensees stated 
that their staffing levels are affected or are expected to be affected 
by the COVID-19 PHE, and they can no longer meet or likely will not 
meet the work hour controls of 10 CFR 26.205(d)(1) through (d)(7). The 
licensees have committed to effecting site-specific administrative 
controls for COVID-19 PHE fatigue-management for personnel specified in 
10 CFR 26.4(a).
    The NRC is periodically providing this compiled listing of related 
exemptions using a single Federal Register notice for COVID-19 related 
exemptions, instead of issuing individual Federal Register notices. The 
compiled listing provides transparency regarding the number of 
exemptions the NRC is issuing related to a given regulatory 
requirement. Additionally, the NRC publishes a list of approved 
licensing actions related to the COVID-19 PHE on its public website at 
https://www.nrc.gov/about-nrc/covid-19/reactors/licensing-actions.html.

II. Availability of Documents.

    The table below provides the plant name, docket number, and ADAMS 
accession number for each exemption issued. Additional details on each 
exemption issued, including the exemption request submitted by the 
respective licensee, are provided in each exemption approval listed 
below. For additional directions on accessing information in ADAMS, see 
the ADDRESSES section of this document.

------------------------------------------------------------------------
             Document title                    ADAMS  accession No.
------------------------------------------------------------------------
               Beaver Valley Power Station, Units 1 and 2
                      Docket Nos. 50-334 and 50-412
------------------------------------------------------------------------
Beaver Valley Work Hour Rule Exemption    ML20109A008
 Request Due to Pandemic (L-20-140)
 dated April 18, 2020.
Beaver Valley Power Station, Units 1 and  ML20109A010
 2--Verbal Part 26 Exemption--Delivered
 4/18/20 at 7:00 p.m.
Beaver Valley Power Station, Units 1 and  ML20109A000
 2--Exemption from Select Requirements
 of 10 CFR Part 26 (EPID L-2020-LLE-0025
 [COVID-19]) dated April 20, 2020.
------------------------------------------------------------------------
                    Braidwood Station, Units 1 and 2
                      Docket Nos. 50-456 and 50-457
------------------------------------------------------------------------
Braidwood Work Hours Control Exemption    ML20100M588
 Request dated April 9, 2020.
Braidwood Station, Units 1 and 2--        ML20099A519
 Exemption from Select Requirements of
 10 CFR Part 26 (EPID L-2020-LLE-0020
 [COVID-19]) dated April 13, 2020.
------------------------------------------------------------------------

[[Page 28043]]

 
                     R. E. Ginna Nuclear Power Plant
                            Docket No. 50-244
------------------------------------------------------------------------
Ginna--Planned Actions re Requirements    ML20097D488
 for Work Hour Controls During
 Coronavirus Disease 2019 (COVID-19)
 Public Health Emergency dated April 6,
 2020.
R. E. Ginna Nuclear Power Plant--         ML20095H256
 Exemption from Select Requirements of
 10 CFR Part 26 (EPID L-2020-LLE-0016
 [COVID-19]) dated April 6, 2020.
------------------------------------------------------------------------
               Limerick Generating Station, Units 1 and 2
                      Docket Nos. 50-352 and 50-353
------------------------------------------------------------------------
Limerick [50-352, 50-353] Actions         ML20093M206
 Related to the Requirements for Work
 Hour Controls During the Coronavirus
 Disease 2019 Public Health Emergency)
 dated April 2, 2020.
Limerick Generating Station, Units 1 and  ML20093M820
 2--Exemption from Select Requirements
 of 10 CFR Part 26 (EPID L-2020-LLE-0014
 [COVID-19]) dated April 3, 2020.
------------------------------------------------------------------------
        Palo Verde Nuclear Generating Station, Units 1, 2, and 3
              Docket Nos. 50-528, 50-529, 50-530, and 72-44
------------------------------------------------------------------------
Palo Verde Nuclear Generating Station     ML20105A481
 Units 1, 2 & 3 and Independent Spent
 Fuel Storage Installation (ISFSI)--
 Request for Exemption from Specific
 Requirements of 10 CFR Part 26, Fitness
 for Duty Programs dated April 14, 2020.
Palo Verde Nuclear Generating Station,    ML20107F835
 Units 1, 2, and 3--Exemption from
 Select Requirements of 10 CFR Part 26
 (EPID L-2020-LLE-0024 [COVID-19]) dated
 April 16, 2020.
------------------------------------------------------------------------
            Quad Cities Nuclear Power Station, Units 1 and 2
                      Docket Nos. 50-254 AND 50-265
------------------------------------------------------------------------
Quad Cities Nuclear Power Station         ML20098G313
 Actions Related to the Requirements for
 Work Hour Controls During the
 Coronavirus Disease 2019 Public Health
 Emergency dated April 7, 2020.
Quad Cities Nuclear Power Station, Units  ML20099A499
 1 and 2--Exemption from Select
 Requirements of 10 CFR Part 26 (EPID L-
 2020-LLE-0018 [COVID-19]) dated April
 8, 2020.
------------------------------------------------------------------------
                      Seabrook Station, Unit No. 1
                            Docket No. 50-443
------------------------------------------------------------------------
Seabrook Station--Requesting NRC          ML20101M597
 Approval to Proactively Enter into the
 Alternative Work Hour Controls
 Delineated in NRC Letter from H. Nieh
 to NEI Dated March 28, 2020 During COV-
 19 Public Health Emergency dated April
 10, 2020.
Seabrook Station, Unit No. 1--Exemption   ML20101G991
 from Select Requirements of 10 CFR Part
 26 (EPID L-2020-LLE-0021 [COVID-19])
 dated April 13, 2020.
------------------------------------------------------------------------

    The NRC may post additional materials to the Federal rulemaking 
website at https://www.regulations.gov under Docket ID NRC-2020-0110. 
The Federal rulemaking website allows you to receive alerts when 
changes or additions occur in a docket folder. To subscribe: (1) 
Navigate to the docket folder (NRC-2020-0110); (2) click the ``Sign up 
for Email Alerts'' link; and (3) enter your email address and select 
how frequently you would like to receive emails (daily, weekly, or 
monthly).

    Dated: May 7, 2020.

    For the Nuclear Regulatory Commission.
James G. Danna,
Chief, Plant Licensing Branch I, Division of Operating Reactor 
Licensing, Office of Nuclear Reactor Regulation.
[FR Doc. 2020-10138 Filed 5-11-20; 8:45 am]
BILLING CODE 7590-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.