Enable Gas Transmission, LLC, Enable Gulf Run Transmission, LLC; Notice of Schedule for Environmental Review of the Gulf Run and Line CP Modifications Project, 26453 [2020-09431]
Download as PDF
Federal Register / Vol. 85, No. 86 / Monday, May 4, 2020 / Notices
Docket No.
File date
Prohibited:
NONE.
Exempt:
EL16–49–000 ..................................................................................................
provided so that the relevant agencies
are kept informed of the Project’s
progress.
[FR Doc. 2020–09441 Filed 5–1–20; 8:45 am]
Project Description
The Project includes two components:
(1) Approximately 134 miles of new 42inch-diameter pipeline, seven
associated mainline valves, one new
meter/regulating station, and other
ancillary facilities in Louisiana; and (2)
modifications to two existing Line CP
compressor stations and three existing
meter/regulating stations, and two new
meter/regulating stations in Texas and
Louisiana.
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. CP20–68–000; CP20–70–000]
Enable Gas Transmission, LLC, Enable
Gulf Run Transmission, LLC; Notice of
Schedule for Environmental Review of
the Gulf Run and Line CP
Modifications Project
jbell on DSKJLSW7X2PROD with NOTICES
On February 28, 2020, Enable Gas
Transmission, LLC (EGT) and Enable
Gulf Run Transmission, LLC (Gulf Run)
(collectively, Enable) filed applications
in Docket Nos. CP20–68–000 and CP20–
70–000 requesting a Certificate of Public
Convenience and Necessity pursuant to
Section 7(c) of the Natural Gas Act to
construct and operate certain natural gas
pipeline facilities in Texas and
Louisiana. The proposed project
combination is known as the Gulf Run
and Line CP Modifications Project
(Project) and would include
modifications to existing facilities to
allow bi-directional flow, a new natural
gas pipeline, and ancillary facilities
which would allow transport of about
1,650,000 dekatherms of natural gas per
day.
On March 13, 2020, the Federal
Energy Regulatory Commission
(Commission or FERC) issued its Notice
of Application for the Project. Among
other things, that notice alerted agencies
issuing federal authorizations of the
requirement to complete all necessary
reviews and to reach a final decision on
a request for a federal authorization
within 90 days of the date of issuance
of the Commission staff’s Environmental
Assessment (EA) for the Project. This
instant notice identifies the FERC staff’s
planned schedule for the completion of
the EA for the Project.
Schedule for Environmental Review
Issuance of EA, July 31, 2020.
90-day Federal Authorization
Decision Deadline, October 29, 2020.
If a schedule change becomes
necessary, additional notice will be
VerDate Sep<11>2014
19:03 May 01, 2020
Jkt 250001
Background
On April 12, 2019, the Commission
staff granted Enable’s request to use the
FERC’s Pre-filing environmental review
process and assigned the Gulf Run and
Line CP Modifications Project Docket
No. PF19–3–000. On June 12, 2019, the
Commission issued a Notice of Intent to
Prepare an Environmental Impact
Statement for the Proposed Gulf Run
and Line CP Modifications Project,
Request for Comments on
Environmental Issues, and Notice of
Public Scoping Sessions (NOI).
The NOI was issued during the prefiling review of the Project and was sent
to federal, state, and local government
agencies; elected officials; affected
landowners; environmental and public
interest groups; Native American tribes
and regional organizations; commentors
and other interested parties; and local
libraries and newspapers. Major issues
raised during scoping include pipeline
safety, Project necessity, route
alternatives, threatened and endangered
species, inland fisheries, water quality
and turbidity, and wildlife management
areas.
At the time of filing its application,
Enable had determined that certain
originally planned pipeline and
compression facilities considered
during the pre-filing review were no
longer necessary for the Project. Upon
review of Enable’s proposed facilities in
its filed application, FERC staff
determined that an EA is the
appropriate means to evaluate the
Project’s environmental impacts, rather
than an environmental impact
statement. Due to Enable’s removal of
certain originally planned facilities in
the filed application, many of the
PO 00000
Frm 00014
Fmt 4703
Sfmt 4703
Presenter or requester
4–17–2020
Dated: April 28, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
26453
U.S. Senator Tammy Duckworth.
comments received in response to the
NOI are no longer relevant. All
applicable and substantive comments
will be addressed in the EA.
Additional Information
In order to receive notification of the
issuance of the EA and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC
website (www.ferc.gov). Using the
‘‘eLibrary’’ link, select ‘‘General Search’’
from the eLibrary menu, enter the
selected date range and ‘‘Docket
Number’’ excluding the last three digits
(i.e., CP20–68 or CP20–70), and follow
the instructions. For assistance with
access to eLibrary, the helpline can be
reached at (866) 208–3676, TTY (202)
502–8659, or at FERCOnlineSupport@
ferc.gov. The eLibrary link on the FERC
website also provides access to the texts
of formal documents issued by the
Commission, such as orders, notices,
and rule makings.
Dated: April 28, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–09431 Filed 5–1–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER20–1564–000]
Northern Colorado Wind Energy
Center, LLC; Supplemental Notice that
Initial Market-Based Rate Filing
Includes Request for Blanket Section
204 Authorization
This is a supplemental notice in the
above-referenced Northern Colorado
Wind Energy Center, LLC’s application
for market-based rate authority, with an
accompanying rate tariff, noting that
E:\FR\FM\04MYN1.SGM
04MYN1
Agencies
[Federal Register Volume 85, Number 86 (Monday, May 4, 2020)]
[Notices]
[Page 26453]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-09431]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. CP20-68-000; CP20-70-000]
Enable Gas Transmission, LLC, Enable Gulf Run Transmission, LLC;
Notice of Schedule for Environmental Review of the Gulf Run and Line CP
Modifications Project
On February 28, 2020, Enable Gas Transmission, LLC (EGT) and Enable
Gulf Run Transmission, LLC (Gulf Run) (collectively, Enable) filed
applications in Docket Nos. CP20-68-000 and CP20-70-000 requesting a
Certificate of Public Convenience and Necessity pursuant to Section
7(c) of the Natural Gas Act to construct and operate certain natural
gas pipeline facilities in Texas and Louisiana. The proposed project
combination is known as the Gulf Run and Line CP Modifications Project
(Project) and would include modifications to existing facilities to
allow bi-directional flow, a new natural gas pipeline, and ancillary
facilities which would allow transport of about 1,650,000 dekatherms of
natural gas per day.
On March 13, 2020, the Federal Energy Regulatory Commission
(Commission or FERC) issued its Notice of Application for the Project.
Among other things, that notice alerted agencies issuing federal
authorizations of the requirement to complete all necessary reviews and
to reach a final decision on a request for a federal authorization
within 90 days of the date of issuance of the Commission staff's
Environmental Assessment (EA) for the Project. This instant notice
identifies the FERC staff's planned schedule for the completion of the
EA for the Project.
Schedule for Environmental Review
Issuance of EA, July 31, 2020.
90-day Federal Authorization Decision Deadline, October 29, 2020.
If a schedule change becomes necessary, additional notice will be
provided so that the relevant agencies are kept informed of the
Project's progress.
Project Description
The Project includes two components: (1) Approximately 134 miles of
new 42-inch-diameter pipeline, seven associated mainline valves, one
new meter/regulating station, and other ancillary facilities in
Louisiana; and (2) modifications to two existing Line CP compressor
stations and three existing meter/regulating stations, and two new
meter/regulating stations in Texas and Louisiana.
Background
On April 12, 2019, the Commission staff granted Enable's request to
use the FERC's Pre-filing environmental review process and assigned the
Gulf Run and Line CP Modifications Project Docket No. PF19-3-000. On
June 12, 2019, the Commission issued a Notice of Intent to Prepare an
Environmental Impact Statement for the Proposed Gulf Run and Line CP
Modifications Project, Request for Comments on Environmental Issues,
and Notice of Public Scoping Sessions (NOI).
The NOI was issued during the pre-filing review of the Project and
was sent to federal, state, and local government agencies; elected
officials; affected landowners; environmental and public interest
groups; Native American tribes and regional organizations; commentors
and other interested parties; and local libraries and newspapers. Major
issues raised during scoping include pipeline safety, Project
necessity, route alternatives, threatened and endangered species,
inland fisheries, water quality and turbidity, and wildlife management
areas.
At the time of filing its application, Enable had determined that
certain originally planned pipeline and compression facilities
considered during the pre-filing review were no longer necessary for
the Project. Upon review of Enable's proposed facilities in its filed
application, FERC staff determined that an EA is the appropriate means
to evaluate the Project's environmental impacts, rather than an
environmental impact statement. Due to Enable's removal of certain
originally planned facilities in the filed application, many of the
comments received in response to the NOI are no longer relevant. All
applicable and substantive comments will be addressed in the EA.
Additional Information
In order to receive notification of the issuance of the EA and to
keep track of all formal issuances and submittals in specific dockets,
the Commission offers a free service called eSubscription. This can
reduce the amount of time you spend researching proceedings by
automatically providing you with notification of these filings,
document summaries, and direct links to the documents. Go to
www.ferc.gov/docs-filing/esubscription.asp.
Additional information about the Project is available from the
Commission's Office of External Affairs at (866) 208-FERC or on the
FERC website (www.ferc.gov). Using the ``eLibrary'' link, select
``General Search'' from the eLibrary menu, enter the selected date
range and ``Docket Number'' excluding the last three digits (i.e.,
CP20-68 or CP20-70), and follow the instructions. For assistance with
access to eLibrary, the helpline can be reached at (866) 208-3676, TTY
(202) 502-8659, or at [email protected]. The eLibrary link on
the FERC website also provides access to the texts of formal documents
issued by the Commission, such as orders, notices, and rule makings.
Dated: April 28, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-09431 Filed 5-1-20; 8:45 am]
BILLING CODE 6717-01-P