Information Collection Request Submitted to OMB for Review and Approval; Comment Request; NESHAP for Gold Mine Ore Processing (Renewal), 23958-23959 [2020-09240]

Download as PDF jbell on DSKJLSW7X2PROD with NOTICES 23958 Federal Register / Vol. 85, No. 84 / Thursday, April 30, 2020 / Notices Pennsylvania Avenue NW, Washington, DC 20460, (202) 564–6381, mcgown.erin@epa.gov. SUPPLEMENTARY INFORMATION: On October 13, 2005, the final Cross-Media Electronic Reporting Rule (CROMERR) was published in the Federal Register (70 FR 59848) and codified as part 3 of title 40 of the CFR. CROMERR establishes electronic reporting as an acceptable regulatory alternative to paper reporting and establishes requirements to assure that electronic documents are as legally dependable as their paper counterparts. Subpart D of CROMERR requires that state, tribal or local government agencies that receive, or wish to begin receiving, electronic reports under their EPA-authorized programs must apply to EPA for a revision or modification of those programs and obtain EPA approval. Subpart D provides standards for such approvals based on consideration of the electronic document receiving systems that the state, tribe, or local government will use to implement the electronic reporting. Additionally, § 3.1000(b) through (e) of 40 CFR part 3, subpart D provides special procedures for program revisions and modifications to allow electronic reporting, to be used at the option of the state, tribe or local government in place of procedures available under existing programspecific authorization regulations. An application submitted under the subpart D procedures must show that the state, tribe or local government has sufficient legal authority to implement the electronic reporting components of the programs covered by the application and will use electronic document receiving systems that meet the applicable subpart D requirements. On March 22, 2019, the State of Michigan Department of Environment, Great Lakes, and Energy (EGLE) submitted an application titled ‘‘Compliance Monitoring Data Portal (CMDP)’’ for revision of its EPAauthorized Part 142 program under title 40 CFR. EPA reviewed EGLE’s request to revise its EPA-authorized program and, based on this review, EPA determined that the application met the standards for approval of authorized program revision set out in 40 CFR part 3, subpart D. In accordance with 40 CFR 3.1000(d), this notice of EPA’s decision to approve Michigan’s request to revise its Part 142—National Primary Drinking Water Regulations Implementation program to allow electronic reporting under 40 CFR part 141 is being published in the Federal Register. EGLE was notified of EPA’s determination to approve its application VerDate Sep<11>2014 18:56 Apr 29, 2020 Jkt 250001 with respect to the authorized program listed above. Also, in today’s notice, EPA is informing interested persons that they may request a public hearing on EPA’s action to approve the State of Michigan’s request to revise its authorized public water system program under 40 CFR part 142, in accordance with 40 CFR 3.1000(f). Requests for a hearing must be submitted to EPA within 30 days of publication of today’s Federal Register notice. Such requests should include the following information: (1) The name, address and telephone number of the individual, organization or other entity requesting a hearing; (2) A brief statement of the requesting person’s interest in EPA’s determination, a brief explanation as to why EPA should hold a hearing, and any other information that the requesting person wants EPA to consider when determining whether to grant the request; (3) The signature of the individual making the request, or, if the request is made on behalf of an organization or other entity, the signature of a responsible official of the organization or other entity. In the event a hearing is requested and granted, EPA will provide notice of the hearing in the Federal Register not less than 15 days prior to the scheduled hearing date. Frivolous or insubstantial requests for hearing may be denied by EPA. Following such a public hearing, EPA will review the record of the hearing and issue an order either affirming today’s determination or rescinding such determination. If no timely request for a hearing is received and granted, EPA’s approval of the State of Michigan’s request to revise its part 142—National Primary Drinking Water Regulations Implementation program to allow electronic reporting will become effective 30 days after today’s notice is published, pursuant to CROMERR section 3.1000(f)(4). Dated: April 24, 2020. Yvonne Lee, Acting Director, Office of Information Management. [FR Doc. 2020–09130 Filed 4–29–20; 8:45 am] BILLING CODE 6560–50–P PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OECA–2013–0317; FRL–10006– 06–OMS] Information Collection Request Submitted to OMB for Review and Approval; Comment Request; NESHAP for Gold Mine Ore Processing (Renewal) Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: SUMMARY: The Environmental Protection Agency (EPA) has submitted an information collection request (ICR), NESHAP for Gold Mine Ore Processing (EPA ICR Number 2383.05, OMB Control Number 2060–0659), to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act. This is a proposed extension of the ICR, which is currently approved through June 30, 2020. Public comments were previously requested via the Federal Register on May 6, 2019 during a 60-day comment period. This notice allows for an additional 30 days for public comments. A fuller description of the ICR is given below, including its estimated burden and cost to the public. An agency may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. DATES: Additional comments may be submitted on or before June 1, 2020. ADDRESSES: Submit your comments to EPA, referencing Docket ID No. EPA– HQ–OAR–2003–0152, online using www.regulations.gov (our preferred method), by email to a-and-r-docket@ epa.gov, or by mail to: EPA Docket Center, Environmental Protection Agency, Mail Code 28221T, 1200 Pennsylvania Ave. NW, Washington, DC 20460. EPA’s policy is that all comments received will be included in the public docket without change including any personal information provided, unless the comment includes profanity, threats, information claimed to be Confidential Business Information (CBI), or other information whose disclosure is restricted by statute. Submit written comments and recommendations to OMB for the proposed information collection within 30 days of publication of this notice to www.reginfo.gov/public/do/PRAMain. Find this particular information collection by selecting ‘‘Currently under 30-day Review—Open for Public Comments’’ or by using the search function. E:\FR\FM\30APN1.SGM 30APN1 Federal Register / Vol. 85, No. 84 / Thursday, April 30, 2020 / Notices jbell on DSKJLSW7X2PROD with NOTICES FOR FURTHER INFORMATION CONTACT: Patrick Yellin, Monitoring, Assistance, and Media Programs Division, Office of Compliance, Mail Code 2227A, Environmental Protection Agency, 1200 Pennsylvania Ave. NW, Washington, DC 20460; telephone number: (202) 564– 2970; fax number: (202) 564–0050; email address: yellin.patrick@epa.gov. SUPPLEMENTARY INFORMATION: Supporting documents, which explain in detail the information that the EPA will be collecting, are available in the public docket for this ICR. The docket can be viewed online at www.regulations.gov, or in person at the EPA Docket Center, EPA West, Room 3334, 1301 Constitution Ave. NW, Washington, DC. The telephone number for the Docket Center is 202–566–1744. For additional information about EPA’s public docket, visit: https:// www.epa.gov/dockets. Abstract: The National Emission Standards for Hazardous Air Pollutants (NESHAP) for Gold Mine Ore Processing (40 CFR part 63, subpart EEEEEEE) were proposed on April 28, 2010; and promulgated on February 17, 2011. These regulations apply to both existing and new gold mine ore processing and production facilities that are area sources and use ore pretreatment, carbon processes with mercury retorts, carbon processes without mercury retorts, and non-carbon concentrate processes. The regulation sets mercury emission limits for each of the affected processes at both new and existing facilities. New facilities include those that either commenced construction or reconstruction after the date of proposal. This information is being collected to assure compliance with 40 CFR part 63, subpart EEEEEEE. In general, all NESHAP standards require initial notifications, performance tests, and periodic reports by the owners/operators of the affected facilities. They are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These notifications, reports, and records are essential in determining compliance, and are required of all affected facilities subject to NESHAP. Form Numbers: None. Respondents/affected entities: Gold mine ore processing and production facilities. Respondent’s obligation to respond: Mandatory (40 CFR part 63, subpart EEEEEEE). Estimated number of respondents: 21 (total). VerDate Sep<11>2014 18:56 Apr 29, 2020 Jkt 250001 Frequency of response: Initially, occasionally, semiannually, and annually. Total estimated burden: 2,840 hours (per year). Burden is defined at 5 CFR 1320.3(b). Total estimated cost: $556,000 (per year), which includes $227,000 in annualized capital/startup and/or operation & maintenance costs. Changes in the Estimates: The burden in labor hours is unchanged from the previous ICR renewal and the number of responses is unchanged. The costs of performance testing and CEMS monitoring are unchanged from the previous ICR renewal. The regulations have not changed over the past three years and are not anticipated to change over the next three years. The growth rate for the industry is very low, negative or non-existent, so there is no change in the estimate of the number of sources subject to these regulations since the previous ICR renewal. Courtney Kerwin, Director, Regulatory Support Division. [FR Doc. 2020–09240 Filed 4–29–20; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OW–2020–0193; FRL–10008–67– OW] Proposed Information Collection Request; Comment Request; Effluent Limitation Guidelines Dental Category (Renewal) Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: SUMMARY: The Environmental Protection Agency (EPA) is planning to submit an information collection request (ICR), ‘‘Information Collection Request for Effluent Limitation Guidelines for the Dental Category (Renewal)’’ (EPA ICR No. 2514.03, OMB Control No. 2040– 0287) to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act (PRA). Before doing so, the EPA is soliciting public comments on specific aspects of the proposed information collection. This is a proposed extension of the ICR which is currently approved through November 30, 2020. An Agency may not conduct or sponsor and a person is not required to respond to a collection of information unless it displays a currently valid OMB control number. DATES: Comments must be submitted on or before June 29, 2020. PO 00000 Frm 00018 Fmt 4703 Sfmt 4703 23959 You may send comments, identified by Docket ID No. EPA–HQ– OW–2020–0193, by any of the following methods: • Federal eRulemaking Portal: https://www.regulations.gov/ (our preferred method). Follow the online instructions for submitting comments. • Email: Tubbs.Marvin@epa.gov. Include Docket ID No. EPA–HQ–OW– 2020–0193 in the subject line of the message. Instructions: All submissions received must include the Docket ID No. for this rulemaking. Comments received may be posted without change to https:// www.regulations.gov/, including any personal information provided. For detailed instructions on sending comments and additional information on the rulemaking process, see the ‘‘How do I submit written comments?’’ heading of the SUPPLEMENTARY INFORMATION section of this document. Out of an abundance of caution for members of the public and our staff, the EPA Docket Center and Reading Room was closed to public visitors on March 31, 2020, to reduce the risk of transmitting COVID–19. Our Docket Center staff will continue to provide remote customer service via email, phone, and webform. We encourage the public to submit comments via https:// www.regulations.gov or email, as there is a temporary suspension of mail delivery to the EPA, and no hand deliveries are currently accepted. For further information on the EPA Docket Center services and the current status, please visit us online at https:// www.epa.gov/dockets. FOR FURTHER INFORMATION CONTACT: Marvin Tubbs, National Program Branch, Water Permits Division, OWM Mail Code: 4203M, Environmental Protection Agency, 1200 Pennsylvania Ave. NW, Washington, DC 20460; telephone number: (202) 564–2996; email address: Tubbs.Marvin@epa.gov. SUPPLEMENTARY INFORMATION: ADDRESSES: I. How do I submit written comments? Submit your comments, identified by Docket ID No. EPA–HQ–OW–2020– 0193, at https://www.regulations.gov (our preferred method), or the other methods identified in the ADDRESSES section. Once submitted, comments cannot be edited or removed from the docket. The EPA may publish any comment received to its public docket. Do not submit electronically any information you consider to be Confidential Business Information (CBI) or other information whose disclosure is restricted by statute. Multimedia submissions (audio, video, etc.) must be E:\FR\FM\30APN1.SGM 30APN1

Agencies

[Federal Register Volume 85, Number 84 (Thursday, April 30, 2020)]
[Notices]
[Pages 23958-23959]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-09240]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[EPA-HQ-OECA-2013-0317; FRL-10006-06-OMS]


Information Collection Request Submitted to OMB for Review and 
Approval; Comment Request; NESHAP for Gold Mine Ore Processing 
(Renewal)

AGENCY: Environmental Protection Agency (EPA).

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: The Environmental Protection Agency (EPA) has submitted an 
information collection request (ICR), NESHAP for Gold Mine Ore 
Processing (EPA ICR Number 2383.05, OMB Control Number 2060-0659), to 
the Office of Management and Budget (OMB) for review and approval in 
accordance with the Paperwork Reduction Act. This is a proposed 
extension of the ICR, which is currently approved through June 30, 
2020. Public comments were previously requested via the Federal 
Register on May 6, 2019 during a 60-day comment period. This notice 
allows for an additional 30 days for public comments. A fuller 
description of the ICR is given below, including its estimated burden 
and cost to the public. An agency may neither conduct nor sponsor, and 
a person is not required to respond to, a collection of information 
unless it displays a currently valid OMB control number.

DATES: Additional comments may be submitted on or before June 1, 2020.

ADDRESSES: Submit your comments to EPA, referencing Docket ID No. EPA-
HQ-OAR-2003-0152, online using www.regulations.gov (our preferred 
method), by email to [email protected], or by mail to: EPA Docket 
Center, Environmental Protection Agency, Mail Code 28221T, 1200 
Pennsylvania Ave. NW, Washington, DC 20460. EPA's policy is that all 
comments received will be included in the public docket without change 
including any personal information provided, unless the comment 
includes profanity, threats, information claimed to be Confidential 
Business Information (CBI), or other information whose disclosure is 
restricted by statute.
    Submit written comments and recommendations to OMB for the proposed 
information collection within 30 days of publication of this notice to 
www.reginfo.gov/public/do/PRAMain. Find this particular information 
collection by selecting ``Currently under 30-day Review--Open for 
Public Comments'' or by using the search function.

[[Page 23959]]


FOR FURTHER INFORMATION CONTACT: Patrick Yellin, Monitoring, 
Assistance, and Media Programs Division, Office of Compliance, Mail 
Code 2227A, Environmental Protection Agency, 1200 Pennsylvania Ave. NW, 
Washington, DC 20460; telephone number: (202) 564-2970; fax number: 
(202) 564-0050; email address: [email protected].

SUPPLEMENTARY INFORMATION: Supporting documents, which explain in 
detail the information that the EPA will be collecting, are available 
in the public docket for this ICR. The docket can be viewed online at 
www.regulations.gov, or in person at the EPA Docket Center, EPA West, 
Room 3334, 1301 Constitution Ave. NW, Washington, DC. The telephone 
number for the Docket Center is 202-566-1744. For additional 
information about EPA's public docket, visit: https://www.epa.gov/dockets.
    Abstract: The National Emission Standards for Hazardous Air 
Pollutants (NESHAP) for Gold Mine Ore Processing (40 CFR part 63, 
subpart EEEEEEE) were proposed on April 28, 2010; and promulgated on 
February 17, 2011. These regulations apply to both existing and new 
gold mine ore processing and production facilities that are area 
sources and use ore pretreatment, carbon processes with mercury 
retorts, carbon processes without mercury retorts, and non-carbon 
concentrate processes. The regulation sets mercury emission limits for 
each of the affected processes at both new and existing facilities. New 
facilities include those that either commenced construction or 
reconstruction after the date of proposal. This information is being 
collected to assure compliance with 40 CFR part 63, subpart EEEEEEE.
    In general, all NESHAP standards require initial notifications, 
performance tests, and periodic reports by the owners/operators of the 
affected facilities. They are also required to maintain records of the 
occurrence and duration of any startup, shutdown, or malfunction in the 
operation of an affected facility, or any period during which the 
monitoring system is inoperative. These notifications, reports, and 
records are essential in determining compliance, and are required of 
all affected facilities subject to NESHAP.
    Form Numbers: None.
    Respondents/affected entities: Gold mine ore processing and 
production facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart EEEEEEE).
    Estimated number of respondents: 21 (total).
    Frequency of response: Initially, occasionally, semiannually, and 
annually.
    Total estimated burden: 2,840 hours (per year). Burden is defined 
at 5 CFR 1320.3(b).
    Total estimated cost: $556,000 (per year), which includes $227,000 
in annualized capital/startup and/or operation & maintenance costs.
    Changes in the Estimates: The burden in labor hours is unchanged 
from the previous ICR renewal and the number of responses is unchanged. 
The costs of performance testing and CEMS monitoring are unchanged from 
the previous ICR renewal. The regulations have not changed over the 
past three years and are not anticipated to change over the next three 
years. The growth rate for the industry is very low, negative or non-
existent, so there is no change in the estimate of the number of 
sources subject to these regulations since the previous ICR renewal.

Courtney Kerwin,
Director, Regulatory Support Division.
[FR Doc. 2020-09240 Filed 4-29-20; 8:45 am]
BILLING CODE 6560-50-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.