Information Collection Request Submitted to OMB for Review and Approval; Comment Request; NESHAP for Gold Mine Ore Processing (Renewal), 23958-23959 [2020-09240]
Download as PDF
jbell on DSKJLSW7X2PROD with NOTICES
23958
Federal Register / Vol. 85, No. 84 / Thursday, April 30, 2020 / Notices
Pennsylvania Avenue NW, Washington,
DC 20460, (202) 564–6381,
mcgown.erin@epa.gov.
SUPPLEMENTARY INFORMATION: On
October 13, 2005, the final Cross-Media
Electronic Reporting Rule (CROMERR)
was published in the Federal Register
(70 FR 59848) and codified as part 3 of
title 40 of the CFR. CROMERR
establishes electronic reporting as an
acceptable regulatory alternative to
paper reporting and establishes
requirements to assure that electronic
documents are as legally dependable as
their paper counterparts. Subpart D of
CROMERR requires that state, tribal or
local government agencies that receive,
or wish to begin receiving, electronic
reports under their EPA-authorized
programs must apply to EPA for a
revision or modification of those
programs and obtain EPA approval.
Subpart D provides standards for such
approvals based on consideration of the
electronic document receiving systems
that the state, tribe, or local government
will use to implement the electronic
reporting. Additionally, § 3.1000(b)
through (e) of 40 CFR part 3, subpart D
provides special procedures for program
revisions and modifications to allow
electronic reporting, to be used at the
option of the state, tribe or local
government in place of procedures
available under existing programspecific authorization regulations. An
application submitted under the subpart
D procedures must show that the state,
tribe or local government has sufficient
legal authority to implement the
electronic reporting components of the
programs covered by the application
and will use electronic document
receiving systems that meet the
applicable subpart D requirements.
On March 22, 2019, the State of
Michigan Department of Environment,
Great Lakes, and Energy (EGLE)
submitted an application titled
‘‘Compliance Monitoring Data Portal
(CMDP)’’ for revision of its EPAauthorized Part 142 program under title
40 CFR. EPA reviewed EGLE’s request
to revise its EPA-authorized program
and, based on this review, EPA
determined that the application met the
standards for approval of authorized
program revision set out in 40 CFR part
3, subpart D. In accordance with 40 CFR
3.1000(d), this notice of EPA’s decision
to approve Michigan’s request to revise
its Part 142—National Primary Drinking
Water Regulations Implementation
program to allow electronic reporting
under 40 CFR part 141 is being
published in the Federal Register.
EGLE was notified of EPA’s
determination to approve its application
VerDate Sep<11>2014
18:56 Apr 29, 2020
Jkt 250001
with respect to the authorized program
listed above.
Also, in today’s notice, EPA is
informing interested persons that they
may request a public hearing on EPA’s
action to approve the State of
Michigan’s request to revise its
authorized public water system program
under 40 CFR part 142, in accordance
with 40 CFR 3.1000(f). Requests for a
hearing must be submitted to EPA
within 30 days of publication of today’s
Federal Register notice. Such requests
should include the following
information:
(1) The name, address and telephone
number of the individual, organization
or other entity requesting a hearing;
(2) A brief statement of the requesting
person’s interest in EPA’s
determination, a brief explanation as to
why EPA should hold a hearing, and
any other information that the
requesting person wants EPA to
consider when determining whether to
grant the request;
(3) The signature of the individual
making the request, or, if the request is
made on behalf of an organization or
other entity, the signature of a
responsible official of the organization
or other entity.
In the event a hearing is requested
and granted, EPA will provide notice of
the hearing in the Federal Register not
less than 15 days prior to the scheduled
hearing date. Frivolous or insubstantial
requests for hearing may be denied by
EPA. Following such a public hearing,
EPA will review the record of the
hearing and issue an order either
affirming today’s determination or
rescinding such determination. If no
timely request for a hearing is received
and granted, EPA’s approval of the State
of Michigan’s request to revise its part
142—National Primary Drinking Water
Regulations Implementation program to
allow electronic reporting will become
effective 30 days after today’s notice is
published, pursuant to CROMERR
section 3.1000(f)(4).
Dated: April 24, 2020.
Yvonne Lee,
Acting Director, Office of Information
Management.
[FR Doc. 2020–09130 Filed 4–29–20; 8:45 am]
BILLING CODE 6560–50–P
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OECA–2013–0317; FRL–10006–
06–OMS]
Information Collection Request
Submitted to OMB for Review and
Approval; Comment Request; NESHAP
for Gold Mine Ore Processing
(Renewal)
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
SUMMARY: The Environmental Protection
Agency (EPA) has submitted an
information collection request (ICR),
NESHAP for Gold Mine Ore Processing
(EPA ICR Number 2383.05, OMB
Control Number 2060–0659), to the
Office of Management and Budget
(OMB) for review and approval in
accordance with the Paperwork
Reduction Act. This is a proposed
extension of the ICR, which is currently
approved through June 30, 2020. Public
comments were previously requested
via the Federal Register on May 6, 2019
during a 60-day comment period. This
notice allows for an additional 30 days
for public comments. A fuller
description of the ICR is given below,
including its estimated burden and cost
to the public. An agency may neither
conduct nor sponsor, and a person is
not required to respond to, a collection
of information unless it displays a
currently valid OMB control number.
DATES: Additional comments may be
submitted on or before June 1, 2020.
ADDRESSES: Submit your comments to
EPA, referencing Docket ID No. EPA–
HQ–OAR–2003–0152, online using
www.regulations.gov (our preferred
method), by email to a-and-r-docket@
epa.gov, or by mail to: EPA Docket
Center, Environmental Protection
Agency, Mail Code 28221T, 1200
Pennsylvania Ave. NW, Washington, DC
20460. EPA’s policy is that all
comments received will be included in
the public docket without change
including any personal information
provided, unless the comment includes
profanity, threats, information claimed
to be Confidential Business Information
(CBI), or other information whose
disclosure is restricted by statute.
Submit written comments and
recommendations to OMB for the
proposed information collection within
30 days of publication of this notice to
www.reginfo.gov/public/do/PRAMain.
Find this particular information
collection by selecting ‘‘Currently under
30-day Review—Open for Public
Comments’’ or by using the search
function.
E:\FR\FM\30APN1.SGM
30APN1
Federal Register / Vol. 85, No. 84 / Thursday, April 30, 2020 / Notices
jbell on DSKJLSW7X2PROD with NOTICES
FOR FURTHER INFORMATION CONTACT:
Patrick Yellin, Monitoring, Assistance,
and Media Programs Division, Office of
Compliance, Mail Code 2227A,
Environmental Protection Agency, 1200
Pennsylvania Ave. NW, Washington, DC
20460; telephone number: (202) 564–
2970; fax number: (202) 564–0050;
email address: yellin.patrick@epa.gov.
SUPPLEMENTARY INFORMATION:
Supporting documents, which explain
in detail the information that the EPA
will be collecting, are available in the
public docket for this ICR. The docket
can be viewed online at
www.regulations.gov, or in person at the
EPA Docket Center, EPA West, Room
3334, 1301 Constitution Ave. NW,
Washington, DC. The telephone number
for the Docket Center is 202–566–1744.
For additional information about EPA’s
public docket, visit: https://
www.epa.gov/dockets.
Abstract: The National Emission
Standards for Hazardous Air Pollutants
(NESHAP) for Gold Mine Ore Processing
(40 CFR part 63, subpart EEEEEEE) were
proposed on April 28, 2010; and
promulgated on February 17, 2011.
These regulations apply to both existing
and new gold mine ore processing and
production facilities that are area
sources and use ore pretreatment,
carbon processes with mercury retorts,
carbon processes without mercury
retorts, and non-carbon concentrate
processes. The regulation sets mercury
emission limits for each of the affected
processes at both new and existing
facilities. New facilities include those
that either commenced construction or
reconstruction after the date of proposal.
This information is being collected to
assure compliance with 40 CFR part 63,
subpart EEEEEEE.
In general, all NESHAP standards
require initial notifications,
performance tests, and periodic reports
by the owners/operators of the affected
facilities. They are also required to
maintain records of the occurrence and
duration of any startup, shutdown, or
malfunction in the operation of an
affected facility, or any period during
which the monitoring system is
inoperative. These notifications, reports,
and records are essential in determining
compliance, and are required of all
affected facilities subject to NESHAP.
Form Numbers: None.
Respondents/affected entities: Gold
mine ore processing and production
facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
EEEEEEE).
Estimated number of respondents: 21
(total).
VerDate Sep<11>2014
18:56 Apr 29, 2020
Jkt 250001
Frequency of response: Initially,
occasionally, semiannually, and
annually.
Total estimated burden: 2,840 hours
(per year). Burden is defined at 5 CFR
1320.3(b).
Total estimated cost: $556,000 (per
year), which includes $227,000 in
annualized capital/startup and/or
operation & maintenance costs.
Changes in the Estimates: The burden
in labor hours is unchanged from the
previous ICR renewal and the number of
responses is unchanged. The costs of
performance testing and CEMS
monitoring are unchanged from the
previous ICR renewal. The regulations
have not changed over the past three
years and are not anticipated to change
over the next three years. The growth
rate for the industry is very low,
negative or non-existent, so there is no
change in the estimate of the number of
sources subject to these regulations
since the previous ICR renewal.
Courtney Kerwin,
Director, Regulatory Support Division.
[FR Doc. 2020–09240 Filed 4–29–20; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OW–2020–0193; FRL–10008–67–
OW]
Proposed Information Collection
Request; Comment Request; Effluent
Limitation Guidelines Dental Category
(Renewal)
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
SUMMARY: The Environmental Protection
Agency (EPA) is planning to submit an
information collection request (ICR),
‘‘Information Collection Request for
Effluent Limitation Guidelines for the
Dental Category (Renewal)’’ (EPA ICR
No. 2514.03, OMB Control No. 2040–
0287) to the Office of Management and
Budget (OMB) for review and approval
in accordance with the Paperwork
Reduction Act (PRA). Before doing so,
the EPA is soliciting public comments
on specific aspects of the proposed
information collection. This is a
proposed extension of the ICR which is
currently approved through November
30, 2020. An Agency may not conduct
or sponsor and a person is not required
to respond to a collection of information
unless it displays a currently valid OMB
control number.
DATES: Comments must be submitted on
or before June 29, 2020.
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
23959
You may send comments,
identified by Docket ID No. EPA–HQ–
OW–2020–0193, by any of the following
methods:
• Federal eRulemaking Portal:
https://www.regulations.gov/ (our
preferred method). Follow the online
instructions for submitting comments.
• Email: Tubbs.Marvin@epa.gov.
Include Docket ID No. EPA–HQ–OW–
2020–0193 in the subject line of the
message.
Instructions: All submissions received
must include the Docket ID No. for this
rulemaking. Comments received may be
posted without change to https://
www.regulations.gov/, including any
personal information provided. For
detailed instructions on sending
comments and additional information
on the rulemaking process, see the
‘‘How do I submit written comments?’’
heading of the SUPPLEMENTARY
INFORMATION section of this document.
Out of an abundance of caution for
members of the public and our staff, the
EPA Docket Center and Reading Room
was closed to public visitors on March
31, 2020, to reduce the risk of
transmitting COVID–19. Our Docket
Center staff will continue to provide
remote customer service via email,
phone, and webform. We encourage the
public to submit comments via https://
www.regulations.gov or email, as there
is a temporary suspension of mail
delivery to the EPA, and no hand
deliveries are currently accepted. For
further information on the EPA Docket
Center services and the current status,
please visit us online at https://
www.epa.gov/dockets.
FOR FURTHER INFORMATION CONTACT:
Marvin Tubbs, National Program
Branch, Water Permits Division, OWM
Mail Code: 4203M, Environmental
Protection Agency, 1200 Pennsylvania
Ave. NW, Washington, DC 20460;
telephone number: (202) 564–2996;
email address: Tubbs.Marvin@epa.gov.
SUPPLEMENTARY INFORMATION:
ADDRESSES:
I. How do I submit written comments?
Submit your comments, identified by
Docket ID No. EPA–HQ–OW–2020–
0193, at https://www.regulations.gov
(our preferred method), or the other
methods identified in the ADDRESSES
section. Once submitted, comments
cannot be edited or removed from the
docket. The EPA may publish any
comment received to its public docket.
Do not submit electronically any
information you consider to be
Confidential Business Information (CBI)
or other information whose disclosure is
restricted by statute. Multimedia
submissions (audio, video, etc.) must be
E:\FR\FM\30APN1.SGM
30APN1
Agencies
[Federal Register Volume 85, Number 84 (Thursday, April 30, 2020)]
[Notices]
[Pages 23958-23959]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-09240]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[EPA-HQ-OECA-2013-0317; FRL-10006-06-OMS]
Information Collection Request Submitted to OMB for Review and
Approval; Comment Request; NESHAP for Gold Mine Ore Processing
(Renewal)
AGENCY: Environmental Protection Agency (EPA).
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: The Environmental Protection Agency (EPA) has submitted an
information collection request (ICR), NESHAP for Gold Mine Ore
Processing (EPA ICR Number 2383.05, OMB Control Number 2060-0659), to
the Office of Management and Budget (OMB) for review and approval in
accordance with the Paperwork Reduction Act. This is a proposed
extension of the ICR, which is currently approved through June 30,
2020. Public comments were previously requested via the Federal
Register on May 6, 2019 during a 60-day comment period. This notice
allows for an additional 30 days for public comments. A fuller
description of the ICR is given below, including its estimated burden
and cost to the public. An agency may neither conduct nor sponsor, and
a person is not required to respond to, a collection of information
unless it displays a currently valid OMB control number.
DATES: Additional comments may be submitted on or before June 1, 2020.
ADDRESSES: Submit your comments to EPA, referencing Docket ID No. EPA-
HQ-OAR-2003-0152, online using www.regulations.gov (our preferred
method), by email to [email protected], or by mail to: EPA Docket
Center, Environmental Protection Agency, Mail Code 28221T, 1200
Pennsylvania Ave. NW, Washington, DC 20460. EPA's policy is that all
comments received will be included in the public docket without change
including any personal information provided, unless the comment
includes profanity, threats, information claimed to be Confidential
Business Information (CBI), or other information whose disclosure is
restricted by statute.
Submit written comments and recommendations to OMB for the proposed
information collection within 30 days of publication of this notice to
www.reginfo.gov/public/do/PRAMain. Find this particular information
collection by selecting ``Currently under 30-day Review--Open for
Public Comments'' or by using the search function.
[[Page 23959]]
FOR FURTHER INFORMATION CONTACT: Patrick Yellin, Monitoring,
Assistance, and Media Programs Division, Office of Compliance, Mail
Code 2227A, Environmental Protection Agency, 1200 Pennsylvania Ave. NW,
Washington, DC 20460; telephone number: (202) 564-2970; fax number:
(202) 564-0050; email address: [email protected].
SUPPLEMENTARY INFORMATION: Supporting documents, which explain in
detail the information that the EPA will be collecting, are available
in the public docket for this ICR. The docket can be viewed online at
www.regulations.gov, or in person at the EPA Docket Center, EPA West,
Room 3334, 1301 Constitution Ave. NW, Washington, DC. The telephone
number for the Docket Center is 202-566-1744. For additional
information about EPA's public docket, visit: https://www.epa.gov/dockets.
Abstract: The National Emission Standards for Hazardous Air
Pollutants (NESHAP) for Gold Mine Ore Processing (40 CFR part 63,
subpart EEEEEEE) were proposed on April 28, 2010; and promulgated on
February 17, 2011. These regulations apply to both existing and new
gold mine ore processing and production facilities that are area
sources and use ore pretreatment, carbon processes with mercury
retorts, carbon processes without mercury retorts, and non-carbon
concentrate processes. The regulation sets mercury emission limits for
each of the affected processes at both new and existing facilities. New
facilities include those that either commenced construction or
reconstruction after the date of proposal. This information is being
collected to assure compliance with 40 CFR part 63, subpart EEEEEEE.
In general, all NESHAP standards require initial notifications,
performance tests, and periodic reports by the owners/operators of the
affected facilities. They are also required to maintain records of the
occurrence and duration of any startup, shutdown, or malfunction in the
operation of an affected facility, or any period during which the
monitoring system is inoperative. These notifications, reports, and
records are essential in determining compliance, and are required of
all affected facilities subject to NESHAP.
Form Numbers: None.
Respondents/affected entities: Gold mine ore processing and
production facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart EEEEEEE).
Estimated number of respondents: 21 (total).
Frequency of response: Initially, occasionally, semiannually, and
annually.
Total estimated burden: 2,840 hours (per year). Burden is defined
at 5 CFR 1320.3(b).
Total estimated cost: $556,000 (per year), which includes $227,000
in annualized capital/startup and/or operation & maintenance costs.
Changes in the Estimates: The burden in labor hours is unchanged
from the previous ICR renewal and the number of responses is unchanged.
The costs of performance testing and CEMS monitoring are unchanged from
the previous ICR renewal. The regulations have not changed over the
past three years and are not anticipated to change over the next three
years. The growth rate for the industry is very low, negative or non-
existent, so there is no change in the estimate of the number of
sources subject to these regulations since the previous ICR renewal.
Courtney Kerwin,
Director, Regulatory Support Division.
[FR Doc. 2020-09240 Filed 4-29-20; 8:45 am]
BILLING CODE 6560-50-P