Combined Notice of Filings #1, 23516 [2020-08986]
Download as PDF
23516
Federal Register / Vol. 85, No. 82 / Tuesday, April 28, 2020 / Notices
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
4.34(b) and 385.2010.
o. A license applicant must file no
later than 60 days following the date of
issuance of this notice: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
p. Procedural schedule: The
application will be processed according
to the following schedule. Revisions to
the schedule will be made as
appropriate.
Commission issued EA—November
2020
Comments on EA—December 2020
Dated: April 21, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–08911 Filed 4–27–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
jbell on DSKJLSW7X2PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC20–54–000.
Applicants: Mankato Energy Center,
LLC, SWG Minnesota Holdings, LLC,
Mankato Energy Center II, LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act, et al. of Mankato
Energy Center, LLC, et al.
Filed Date: 4/21/20.
Accession Number: 20200421–5246.
Comments Due: 5 p.m. ET 5/12/20.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG20–129–000.
Applicants: Bighorn Solar 1, LLC.
Description: Bighorn Solar 1, LLC,
Notice of Self-Certification of Exempt
Wholesale Generator Status.
Filed Date: 4/22/20.
Accession Number: 20200422–5092.
Comments Due: 5 p.m. ET 5/13/20.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER19–2224–002.
Applicants: Turtle Creek Wind Farm
LLC.
Description: Compliance filing: Turtle
Creek Wind Farm LLC, Docket No.
VerDate Sep<11>2014
18:43 Apr 27, 2020
Jkt 250001
ER19–2224–002 to be effective 9/1/
2019.
Filed Date: 4/21/20.
Accession Number: 20200421–5243.
Comments Due: 5 p.m. ET 5/12/20.
Docket Numbers: ER20–1626–000.
Applicants: New England Power
Company.
Description: § 205(d) Rate Filing: Sch.
20A Service Agmt with Brookfield
Renewable Trading and Marketing LP to
be effective 9/1/2020.
Filed Date: 4/21/20.
Accession Number: 20200421–5168.
Comments Due: 5 p.m. ET 5/12/20.
Docket Numbers: ER20–1627–000.
Applicants: Basin Electric Power
Cooperative, Inc.
Description: Notice of cancellation of
Open Access Transmission Tariff, et al
of Basin Electric Power Cooperative.
Filed Date: 4/21/20.
Accession Number: 20200421–5250.
Comments Due: 5 p.m. ET 5/12/20.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: April 22, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–08986 Filed 4–27–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 15028–000]
Whitewater Green Energy, LLC; Notice
of Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On February 12, 2020, the Whitewater
Green Energy, LLC filed an application
for a preliminary permit, pursuant to
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
section 4(f) of the Federal Power Act,
proposing to study the feasibility of the
proposed Whitewater Creek
Hydroelectric Project No. 15028–000, to
be located on Russel and Whitewater
Creeks, near the town of Idanha, in
Marion and Linn Counties, Oregon. The
project would be located entirely on
U.S. Forest Service lands. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist of
the following: (1) A 9.5-foot-high, 40foot-wide weir on Russell Creek; (2) a
19,500-foot-long, 60-inch-diameter steel
penstock; (3) a 50-foot-long by 40-footwide concrete powerhouse containing
one Pelton turbine rated at 7 megawatts;
(4) a 160-foot-long, 72-inch-diameter
tailrace discharging into Whitewater
Creek; (5) a 2.25-mile-long, 12,000
kilovolt-amperes transmission line
extending underground from the project
to a point of interconnection to an
existing outside transmission line (the
point of interconnection); (6) an access
road along side of the penstock; and (7)
appurtenant facilities. The estimated
annual generation of the Whitewater
Creek Project would be 50 gigawatthours.
Applicant Contact: David Harmon,
2532 Santiam Highway, Albany, Oregon
97322; phone: (541) 405–5236; email:
dave@wwgreenenergy.com.
FERC Contact: John Matkowski;
phone: (202) 502–8576; email:
john.matkowski@ferc.gov.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
E:\FR\FM\28APN1.SGM
28APN1
Agencies
[Federal Register Volume 85, Number 82 (Tuesday, April 28, 2020)]
[Notices]
[Page 23516]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-08986]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC20-54-000.
Applicants: Mankato Energy Center, LLC, SWG Minnesota Holdings,
LLC, Mankato Energy Center II, LLC.
Description: Application for Authorization Under Section 203 of the
Federal Power Act, et al. of Mankato Energy Center, LLC, et al.
Filed Date: 4/21/20.
Accession Number: 20200421-5246.
Comments Due: 5 p.m. ET 5/12/20.
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG20-129-000.
Applicants: Bighorn Solar 1, LLC.
Description: Bighorn Solar 1, LLC, Notice of Self-Certification of
Exempt Wholesale Generator Status.
Filed Date: 4/22/20.
Accession Number: 20200422-5092.
Comments Due: 5 p.m. ET 5/13/20.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER19-2224-002.
Applicants: Turtle Creek Wind Farm LLC.
Description: Compliance filing: Turtle Creek Wind Farm LLC, Docket
No. ER19-2224-002 to be effective 9/1/2019.
Filed Date: 4/21/20.
Accession Number: 20200421-5243.
Comments Due: 5 p.m. ET 5/12/20.
Docket Numbers: ER20-1626-000.
Applicants: New England Power Company.
Description: Sec. 205(d) Rate Filing: Sch. 20A Service Agmt with
Brookfield Renewable Trading and Marketing LP to be effective 9/1/2020.
Filed Date: 4/21/20.
Accession Number: 20200421-5168.
Comments Due: 5 p.m. ET 5/12/20.
Docket Numbers: ER20-1627-000.
Applicants: Basin Electric Power Cooperative, Inc.
Description: Notice of cancellation of Open Access Transmission
Tariff, et al of Basin Electric Power Cooperative.
Filed Date: 4/21/20.
Accession Number: 20200421-5250.
Comments Due: 5 p.m. ET 5/12/20.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: April 22, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020-08986 Filed 4-27-20; 8:45 am]