Combined Notice of Filings #1, 23516 [2020-08986]

Download as PDF 23516 Federal Register / Vol. 85, No. 82 / Tuesday, April 28, 2020 / Notices accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. o. A license applicant must file no later than 60 days following the date of issuance of this notice: (1) A copy of the water quality certification; (2) a copy of the request for certification, including proof of the date on which the certifying agency received the request; or (3) evidence of waiver of water quality certification. p. Procedural schedule: The application will be processed according to the following schedule. Revisions to the schedule will be made as appropriate. Commission issued EA—November 2020 Comments on EA—December 2020 Dated: April 21, 2020. Kimberly D. Bose, Secretary. [FR Doc. 2020–08911 Filed 4–27–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission jbell on DSKJLSW7X2PROD with NOTICES Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC20–54–000. Applicants: Mankato Energy Center, LLC, SWG Minnesota Holdings, LLC, Mankato Energy Center II, LLC. Description: Application for Authorization Under Section 203 of the Federal Power Act, et al. of Mankato Energy Center, LLC, et al. Filed Date: 4/21/20. Accession Number: 20200421–5246. Comments Due: 5 p.m. ET 5/12/20. Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG20–129–000. Applicants: Bighorn Solar 1, LLC. Description: Bighorn Solar 1, LLC, Notice of Self-Certification of Exempt Wholesale Generator Status. Filed Date: 4/22/20. Accession Number: 20200422–5092. Comments Due: 5 p.m. ET 5/13/20. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER19–2224–002. Applicants: Turtle Creek Wind Farm LLC. Description: Compliance filing: Turtle Creek Wind Farm LLC, Docket No. VerDate Sep<11>2014 18:43 Apr 27, 2020 Jkt 250001 ER19–2224–002 to be effective 9/1/ 2019. Filed Date: 4/21/20. Accession Number: 20200421–5243. Comments Due: 5 p.m. ET 5/12/20. Docket Numbers: ER20–1626–000. Applicants: New England Power Company. Description: § 205(d) Rate Filing: Sch. 20A Service Agmt with Brookfield Renewable Trading and Marketing LP to be effective 9/1/2020. Filed Date: 4/21/20. Accession Number: 20200421–5168. Comments Due: 5 p.m. ET 5/12/20. Docket Numbers: ER20–1627–000. Applicants: Basin Electric Power Cooperative, Inc. Description: Notice of cancellation of Open Access Transmission Tariff, et al of Basin Electric Power Cooperative. Filed Date: 4/21/20. Accession Number: 20200421–5250. Comments Due: 5 p.m. ET 5/12/20. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: April 22, 2020. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2020–08986 Filed 4–27–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 15028–000] Whitewater Green Energy, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On February 12, 2020, the Whitewater Green Energy, LLC filed an application for a preliminary permit, pursuant to PO 00000 Frm 00016 Fmt 4703 Sfmt 4703 section 4(f) of the Federal Power Act, proposing to study the feasibility of the proposed Whitewater Creek Hydroelectric Project No. 15028–000, to be located on Russel and Whitewater Creeks, near the town of Idanha, in Marion and Linn Counties, Oregon. The project would be located entirely on U.S. Forest Service lands. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) A 9.5-foot-high, 40foot-wide weir on Russell Creek; (2) a 19,500-foot-long, 60-inch-diameter steel penstock; (3) a 50-foot-long by 40-footwide concrete powerhouse containing one Pelton turbine rated at 7 megawatts; (4) a 160-foot-long, 72-inch-diameter tailrace discharging into Whitewater Creek; (5) a 2.25-mile-long, 12,000 kilovolt-amperes transmission line extending underground from the project to a point of interconnection to an existing outside transmission line (the point of interconnection); (6) an access road along side of the penstock; and (7) appurtenant facilities. The estimated annual generation of the Whitewater Creek Project would be 50 gigawatthours. Applicant Contact: David Harmon, 2532 Santiam Highway, Albany, Oregon 97322; phone: (541) 405–5236; email: dave@wwgreenenergy.com. FERC Contact: John Matkowski; phone: (202) 502–8576; email: john.matkowski@ferc.gov. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) E:\FR\FM\28APN1.SGM 28APN1

Agencies

[Federal Register Volume 85, Number 82 (Tuesday, April 28, 2020)]
[Notices]
[Page 23516]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-08986]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC20-54-000.
    Applicants: Mankato Energy Center, LLC, SWG Minnesota Holdings, 
LLC, Mankato Energy Center II, LLC.
    Description: Application for Authorization Under Section 203 of the 
Federal Power Act, et al. of Mankato Energy Center, LLC, et al.
    Filed Date: 4/21/20.
    Accession Number: 20200421-5246.
    Comments Due: 5 p.m. ET 5/12/20.

    Take notice that the Commission received the following exempt 
wholesale generator filings:

    Docket Numbers: EG20-129-000.
    Applicants: Bighorn Solar 1, LLC.
    Description: Bighorn Solar 1, LLC, Notice of Self-Certification of 
Exempt Wholesale Generator Status.
    Filed Date: 4/22/20.
    Accession Number: 20200422-5092.
    Comments Due: 5 p.m. ET 5/13/20.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER19-2224-002.
    Applicants: Turtle Creek Wind Farm LLC.
    Description: Compliance filing: Turtle Creek Wind Farm LLC, Docket 
No. ER19-2224-002 to be effective 9/1/2019.
    Filed Date: 4/21/20.
    Accession Number: 20200421-5243.
    Comments Due: 5 p.m. ET 5/12/20.

    Docket Numbers: ER20-1626-000.
    Applicants: New England Power Company.
    Description: Sec.  205(d) Rate Filing: Sch. 20A Service Agmt with 
Brookfield Renewable Trading and Marketing LP to be effective 9/1/2020.
    Filed Date: 4/21/20.
    Accession Number: 20200421-5168.
    Comments Due: 5 p.m. ET 5/12/20.

    Docket Numbers: ER20-1627-000.
    Applicants: Basin Electric Power Cooperative, Inc.
    Description: Notice of cancellation of Open Access Transmission 
Tariff, et al of Basin Electric Power Cooperative.
    Filed Date: 4/21/20.
    Accession Number: 20200421-5250.
    Comments Due: 5 p.m. ET 5/12/20.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: April 22, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020-08986 Filed 4-27-20; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.