Combined Notice of Filings #1, 22727-22728 [2020-08639]
Download as PDF
Federal Register / Vol. 85, No. 79 / Thursday, April 23, 2020 / Notices
Filed Date: 4/16/20.
Accession Number: 20200416–5101.
Comments Due: 5 p.m. ET 4/28/20.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified date(s). Protests
may be considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: April 17, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–08637 Filed 4–22–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
lotter on DSKBCFDHB2PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC20–51–000.
Applicants: Tri-State Generation and
Transmission Association, Inc., Guzman
Energy, LLC.
Description: Joint Application for
Authorization Under Section 203 of the
Federal Power Act, et al. of Tri-State
Generation and Transmission
Association, Inc., et al.
Filed Date: 4/17/20.
Accession Number: 20200417–5040.
Comments Due: 5 p.m. ET 5/8/20.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG20–116–000.
Applicants: Elm Branch Solar 1, LLC.
Description: NOTICE OF SELFCERTIFICATION OF EXEMPT
WHOLESALE GENERATOR STATUS.
Filed Date: 4/16/20.
Accession Number: 20200416–5151.
Comments Due: 5 p.m. ET 5/7/20.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER12–1316–005;
ER11–2753–006.
VerDate Sep<11>2014
19:28 Apr 22, 2020
Jkt 250001
Applicants: Silver State Solar Power
North, LLC, Cedar Point Wind, LLC.
Description: Notification of Change in
Status of the Enbridge MBR Companies.
Filed Date: 4/16/20.
Accession Number: 20200416–5165.
Comments Due: 5 p.m. ET 5/7/20
Docket Numbers: ER17–1794–004.
Applicants: Innovative Solar 42, LLC.
Description: Notice of Non-Material
Change in Status of Innovative Solar 42,
LLC.
Filed Date: 4/17/20.
Accession Number: 20200417–5156.
Comments Due: 5 p.m. ET 5/8/20.
Docket Numbers: ER20–1061–001.
Applicants: Turquoise Nevada LLC.
Description: Tariff Amendment:
Deferral of Filing of First Amendment to
Amended and Restated SFA to be
effective 2/22/2020.
Filed Date: 4/16/20.
Accession Number: 20200416–5129.
Comments Due: 5 p.m. ET 5/7/20.
Docket Numbers: ER20–1582–000.
Applicants: ISO New England Inc.
Description: § 205(d) Rate Filing: ISO–
NE; Defer Eff Date of PreviouslyAccepted Resource Dispatchability
Revisions to be effective 1/1/2021.
Filed Date: 4/16/20.
Accession Number: 20200416–5115.
Comments Due: 5 p.m. ET 5/7/20.
Docket Numbers: ER20–1583–000.
Applicants: NorthWestern
Corporation.
Description: § 205(d) Rate Filing: RS
326—LGIA between Colstrip
Transmission Owners and Broadview
Solar II, LLC to be effective 4/9/2020.
Filed Date: 4/17/20.
Accession Number: 20200417–5000.
Comments Due: 5 p.m. ET 5/8/20.
Docket Numbers: ER20–1584–000.
Applicants: Niagara Mohawk Power
Corporation, New York Independent
System Operator, Inc.
Description: § 205(d) Rate Filing:
Niagara Mohawk E&P Agreement (SA
2531) between NMPC and NY Transco
to be effective 3/18/2020.
Filed Date: 4/17/20.
Accession Number: 20200417–5006.
Comments Due: 5 p.m. ET 5/8/20.
Docket Numbers: ER20–1585–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2020–04–17_SA 3475 ATXI-City of
Roses Wind Energy GIA (J848) to be
effective 4/3/2020.
Filed Date: 4/17/20.
Accession Number: 20200417–5041.
Comments Due: 5 p.m. ET 5/8/20.
Docket Numbers: ER20–1586–000.
Applicants: PJM Interconnection,
L.L.C.
PO 00000
Frm 00012
Fmt 4703
Sfmt 4703
22727
Description: § 205(d) Rate Filing:
Original ISA, SA No. 5615 and First
Revised ICSA, SA No. 5500; Queue No.
AC1–216 to be effective 3/18/2020.
Filed Date: 4/17/20.
Accession Number: 20200417–5051.
Comments Due: 5 p.m. ET 5/8/20.
Docket Numbers: ER20–1587–000.
Applicants: Alabama Power
Company.
Description: § 205(d) Rate Filing:
Columbiana PV II LGIA Filing to be
effective 4/8/2020.
Filed Date: 4/17/20.
Accession Number: 20200417–5053.
Comments Due: 5 p.m. ET 5/8/20.
Docket Numbers: ER20–1588–000.
Applicants: Portland General Electric
Company.
Description: § 205(d) Rate Filing:
Broadview Solar II LLC LGIA to be
effective 4/9/2020.
Filed Date: 4/17/20.
Accession Number: 20200417–5066.
Comments Due: 5 p.m. ET 5/8/20.
Docket Numbers: ER20–1589–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2020–04–17_SA 3476 ATC-Grant
County Solar GIA (J947) to be effective
4/3/2020.
Filed Date: 4/17/20.
Accession Number: 20200417–5074.
Comments Due: 5 p.m. ET 5/8/20.
Docket Numbers: ER20–1590–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Revisions to the PJM Tariff, OA and
RAA re Load Management Testing
Requirements to be effective 6/16/2020.
Filed Date: 4/17/20.
Accession Number: 20200417–5151.
Comments Due: 5 p.m. ET 5/8/20.
Docket Numbers: ER20–1591–000.
Applicants: Tri-State Generation and
Transmission Association, Inc.
Description: § 205(d) Rate Filing:
Filing of Rate Schedule FERC No. 279
between Tri-State and Niobrara to be
effective 4/18/2020.
Filed Date: 4/17/20.
Accession Number: 20200417–5160.
Comments Due: 5 p.m. ET 5/8/20.
Docket Numbers: ER20–1592–000.
Applicants: California Independent
System Operator Corp.
Description: § 205(d) Rate Filing:
2020–04–17 Clarify RA Obligations from
CCE3 Initiative and related matters to be
effective 7/1/2020.
Filed Date: 4/17/20.
Accession Number: 20200417–5172.
Comments Due: 5 p.m. ET 5/8/20.
Docket Numbers: ER20–1593–000.
Applicants: Highlander Solar Energy
Station 1, LLC.
E:\FR\FM\23APN1.SGM
23APN1
22728
Federal Register / Vol. 85, No. 79 / Thursday, April 23, 2020 / Notices
Description: Baseline eTariff Filing:
Highlander Solar Energy Station 1 MBR
to be effective 4/18/2020.
Filed Date: 4/17/20.
Accession Number: 20200417–5175.
Comments Due: 5 p.m. ET 5/8/20.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: April 17, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–08639 Filed 4–22–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CD20–3–000]
Town of Erie, Colorado; Notice of
Preliminary Determination of a
Qualifying Conduit Hydropower
Facility and Soliciting Comments and
Motions To Intervene
On April 15, 2020, the Town of Erie,
Colorado, filed a notice of intent to
construct a qualifying conduit
hydropower facility, pursuant to section
30 of the Federal Power Act (FPA). The
proposed Lynn R. Morgan WTF
Hydroelectric Facility would have an
installed capacity of 93 kilowatts (kW),
and would be located along an existing
raw water pipeline that feeds the
existing Lynn R. Morgan Water
Treatment Facility near the Town of
Erie, Boulder County, Colorado.
Applicant Contact: Todd Fessenden,
645 Holbrook Street, PO Box 750, Erie,
CO 80516, Phone No. 303–926–2700,
Email: tfessenden@erieco.gov.
FERC Contact: Christopher Chaney,
Phone No. (202) 502–6778, Email:
christopher.chaney@ferc.gov.
Qualifying Conduit Hydropower
Facility Description: The proposed
project would consist of: (1) A 93-kW
turbine-generator; (2) short 16-inchdiameter inlet and outlet pipelines
connecting to the existing raw water
pipeline; (3) an approximately 29-foot
by 20-foot powerhouse; and (4)
appurtenant facilities. The proposed
project would have an estimated annual
generation of up to 578 megawatt-hours.
A qualifying conduit hydropower
facility is one that is determined or
deemed to meet all the criteria shown in
the table below.
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
Statutory provision
Description
Satisfies
(Y/N)
FPA 30(a)(3)(A) .........................
The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade water conveyance that is operated for the distribution of water for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity.
The facility is constructed, operated, or maintained for the generation of electric power and
uses for such generation only the hydroelectric potential of a non-federally owned conduit.
The facility has an installed capacity that does not exceed 40 megawatts ...................................
On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA.
Y
FPA 30(a)(3)(C)(i) ......................
lotter on DSKBCFDHB2PROD with NOTICES
FPA 30(a)(3)(C)(ii) .....................
FPA 30(a)(3)(C)(iii) ....................
Preliminary Determination: The
proposed Lynn R. Morgan WTF
Hydroelectric Facility will not alter the
primary purpose of the conduit, which
is to transport raw water to a municipal
water treatment facility. Therefore,
based upon the above criteria,
Commission staff preliminarily
determines that the proposal satisfies
the requirements for a qualifying
conduit hydropower facility, which is
not required to be licensed or exempted
from licensing.
Comments and Motions to Intervene:
Deadline for filing comments contesting
whether the facility meets the qualifying
criteria is 30 days from the issuance
date of this notice.
Deadline for filing motions to
intervene is 30 days from the issuance
date of this notice.
Anyone may submit comments or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210 and
385.214. Any motions to intervene must
VerDate Sep<11>2014
19:28 Apr 22, 2020
Jkt 250001
be received on or before the specified
deadline date for the particular
proceeding.
Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the ‘‘COMMENTS
CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY’’
or ‘‘MOTION TO INTERVENE,’’ as
applicable; (2) state in the heading the
name of the applicant and the project
number of the application to which the
filing responds; (3) state the name,
address, and telephone number of the
person filing; and (4) otherwise comply
with the requirements of sections
385.2001 through 385.2005 of the
Commission’s regulations.1 All
comments contesting Commission staff’s
preliminary determination that the
facility meets the qualifying criteria
must set forth their evidentiary basis.
The Commission strongly encourages
electronic filing. Please file motions to
1 18
PO 00000
CFR 385.2001–2005 (2019).
Frm 00013
Fmt 4703
Sfmt 4703
Y
Y
Y
intervene and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
A copy of all other filings in reference
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Locations of Notice of Intent: The
Commission provides all interested
E:\FR\FM\23APN1.SGM
23APN1
Agencies
[Federal Register Volume 85, Number 79 (Thursday, April 23, 2020)]
[Notices]
[Pages 22727-22728]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-08639]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC20-51-000.
Applicants: Tri-State Generation and Transmission Association,
Inc., Guzman Energy, LLC.
Description: Joint Application for Authorization Under Section 203
of the Federal Power Act, et al. of Tri-State Generation and
Transmission Association, Inc., et al.
Filed Date: 4/17/20.
Accession Number: 20200417-5040.
Comments Due: 5 p.m. ET 5/8/20.
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG20-116-000.
Applicants: Elm Branch Solar 1, LLC.
Description: NOTICE OF SELF-CERTIFICATION OF EXEMPT WHOLESALE
GENERATOR STATUS.
Filed Date: 4/16/20.
Accession Number: 20200416-5151.
Comments Due: 5 p.m. ET 5/7/20.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER12-1316-005; ER11-2753-006.
Applicants: Silver State Solar Power North, LLC, Cedar Point Wind,
LLC.
Description: Notification of Change in Status of the Enbridge MBR
Companies.
Filed Date: 4/16/20.
Accession Number: 20200416-5165.
Comments Due: 5 p.m. ET 5/7/20
Docket Numbers: ER17-1794-004.
Applicants: Innovative Solar 42, LLC.
Description: Notice of Non-Material Change in Status of Innovative
Solar 42, LLC.
Filed Date: 4/17/20.
Accession Number: 20200417-5156.
Comments Due: 5 p.m. ET 5/8/20.
Docket Numbers: ER20-1061-001.
Applicants: Turquoise Nevada LLC.
Description: Tariff Amendment: Deferral of Filing of First
Amendment to Amended and Restated SFA to be effective 2/22/2020.
Filed Date: 4/16/20.
Accession Number: 20200416-5129.
Comments Due: 5 p.m. ET 5/7/20.
Docket Numbers: ER20-1582-000.
Applicants: ISO New England Inc.
Description: Sec. 205(d) Rate Filing: ISO-NE; Defer Eff Date of
Previously-Accepted Resource Dispatchability Revisions to be effective
1/1/2021.
Filed Date: 4/16/20.
Accession Number: 20200416-5115.
Comments Due: 5 p.m. ET 5/7/20.
Docket Numbers: ER20-1583-000.
Applicants: NorthWestern Corporation.
Description: Sec. 205(d) Rate Filing: RS 326--LGIA between
Colstrip Transmission Owners and Broadview Solar II, LLC to be
effective 4/9/2020.
Filed Date: 4/17/20.
Accession Number: 20200417-5000.
Comments Due: 5 p.m. ET 5/8/20.
Docket Numbers: ER20-1584-000.
Applicants: Niagara Mohawk Power Corporation, New York Independent
System Operator, Inc.
Description: Sec. 205(d) Rate Filing: Niagara Mohawk E&P Agreement
(SA 2531) between NMPC and NY Transco to be effective 3/18/2020.
Filed Date: 4/17/20.
Accession Number: 20200417-5006.
Comments Due: 5 p.m. ET 5/8/20.
Docket Numbers: ER20-1585-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2020-04-17_SA 3475 ATXI-City
of Roses Wind Energy GIA (J848) to be effective 4/3/2020.
Filed Date: 4/17/20.
Accession Number: 20200417-5041.
Comments Due: 5 p.m. ET 5/8/20.
Docket Numbers: ER20-1586-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original ISA, SA No. 5615
and First Revised ICSA, SA No. 5500; Queue No. AC1-216 to be effective
3/18/2020.
Filed Date: 4/17/20.
Accession Number: 20200417-5051.
Comments Due: 5 p.m. ET 5/8/20.
Docket Numbers: ER20-1587-000.
Applicants: Alabama Power Company.
Description: Sec. 205(d) Rate Filing: Columbiana PV II LGIA Filing
to be effective 4/8/2020.
Filed Date: 4/17/20.
Accession Number: 20200417-5053.
Comments Due: 5 p.m. ET 5/8/20.
Docket Numbers: ER20-1588-000.
Applicants: Portland General Electric Company.
Description: Sec. 205(d) Rate Filing: Broadview Solar II LLC LGIA
to be effective 4/9/2020.
Filed Date: 4/17/20.
Accession Number: 20200417-5066.
Comments Due: 5 p.m. ET 5/8/20.
Docket Numbers: ER20-1589-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2020-04-17_SA 3476 ATC-Grant
County Solar GIA (J947) to be effective 4/3/2020.
Filed Date: 4/17/20.
Accession Number: 20200417-5074.
Comments Due: 5 p.m. ET 5/8/20.
Docket Numbers: ER20-1590-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Revisions to the PJM Tariff,
OA and RAA re Load Management Testing Requirements to be effective 6/
16/2020.
Filed Date: 4/17/20.
Accession Number: 20200417-5151.
Comments Due: 5 p.m. ET 5/8/20.
Docket Numbers: ER20-1591-000.
Applicants: Tri-State Generation and Transmission Association, Inc.
Description: Sec. 205(d) Rate Filing: Filing of Rate Schedule FERC
No. 279 between Tri-State and Niobrara to be effective 4/18/2020.
Filed Date: 4/17/20.
Accession Number: 20200417-5160.
Comments Due: 5 p.m. ET 5/8/20.
Docket Numbers: ER20-1592-000.
Applicants: California Independent System Operator Corp.
Description: Sec. 205(d) Rate Filing: 2020-04-17 Clarify RA
Obligations from CCE3 Initiative and related matters to be effective 7/
1/2020.
Filed Date: 4/17/20.
Accession Number: 20200417-5172.
Comments Due: 5 p.m. ET 5/8/20.
Docket Numbers: ER20-1593-000.
Applicants: Highlander Solar Energy Station 1, LLC.
[[Page 22728]]
Description: Baseline eTariff Filing: Highlander Solar Energy
Station 1 MBR to be effective 4/18/2020.
Filed Date: 4/17/20.
Accession Number: 20200417-5175.
Comments Due: 5 p.m. ET 5/8/20.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: April 17, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020-08639 Filed 4-22-20; 8:45 am]
BILLING CODE 6717-01-P