Town of Erie, Colorado; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene, 22728-22729 [2020-08635]
Download as PDF
22728
Federal Register / Vol. 85, No. 79 / Thursday, April 23, 2020 / Notices
Description: Baseline eTariff Filing:
Highlander Solar Energy Station 1 MBR
to be effective 4/18/2020.
Filed Date: 4/17/20.
Accession Number: 20200417–5175.
Comments Due: 5 p.m. ET 5/8/20.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: April 17, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–08639 Filed 4–22–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CD20–3–000]
Town of Erie, Colorado; Notice of
Preliminary Determination of a
Qualifying Conduit Hydropower
Facility and Soliciting Comments and
Motions To Intervene
On April 15, 2020, the Town of Erie,
Colorado, filed a notice of intent to
construct a qualifying conduit
hydropower facility, pursuant to section
30 of the Federal Power Act (FPA). The
proposed Lynn R. Morgan WTF
Hydroelectric Facility would have an
installed capacity of 93 kilowatts (kW),
and would be located along an existing
raw water pipeline that feeds the
existing Lynn R. Morgan Water
Treatment Facility near the Town of
Erie, Boulder County, Colorado.
Applicant Contact: Todd Fessenden,
645 Holbrook Street, PO Box 750, Erie,
CO 80516, Phone No. 303–926–2700,
Email: tfessenden@erieco.gov.
FERC Contact: Christopher Chaney,
Phone No. (202) 502–6778, Email:
christopher.chaney@ferc.gov.
Qualifying Conduit Hydropower
Facility Description: The proposed
project would consist of: (1) A 93-kW
turbine-generator; (2) short 16-inchdiameter inlet and outlet pipelines
connecting to the existing raw water
pipeline; (3) an approximately 29-foot
by 20-foot powerhouse; and (4)
appurtenant facilities. The proposed
project would have an estimated annual
generation of up to 578 megawatt-hours.
A qualifying conduit hydropower
facility is one that is determined or
deemed to meet all the criteria shown in
the table below.
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
Statutory provision
Description
Satisfies
(Y/N)
FPA 30(a)(3)(A) .........................
The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade water conveyance that is operated for the distribution of water for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity.
The facility is constructed, operated, or maintained for the generation of electric power and
uses for such generation only the hydroelectric potential of a non-federally owned conduit.
The facility has an installed capacity that does not exceed 40 megawatts ...................................
On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA.
Y
FPA 30(a)(3)(C)(i) ......................
lotter on DSKBCFDHB2PROD with NOTICES
FPA 30(a)(3)(C)(ii) .....................
FPA 30(a)(3)(C)(iii) ....................
Preliminary Determination: The
proposed Lynn R. Morgan WTF
Hydroelectric Facility will not alter the
primary purpose of the conduit, which
is to transport raw water to a municipal
water treatment facility. Therefore,
based upon the above criteria,
Commission staff preliminarily
determines that the proposal satisfies
the requirements for a qualifying
conduit hydropower facility, which is
not required to be licensed or exempted
from licensing.
Comments and Motions to Intervene:
Deadline for filing comments contesting
whether the facility meets the qualifying
criteria is 30 days from the issuance
date of this notice.
Deadline for filing motions to
intervene is 30 days from the issuance
date of this notice.
Anyone may submit comments or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210 and
385.214. Any motions to intervene must
VerDate Sep<11>2014
19:28 Apr 22, 2020
Jkt 250001
be received on or before the specified
deadline date for the particular
proceeding.
Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the ‘‘COMMENTS
CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY’’
or ‘‘MOTION TO INTERVENE,’’ as
applicable; (2) state in the heading the
name of the applicant and the project
number of the application to which the
filing responds; (3) state the name,
address, and telephone number of the
person filing; and (4) otherwise comply
with the requirements of sections
385.2001 through 385.2005 of the
Commission’s regulations.1 All
comments contesting Commission staff’s
preliminary determination that the
facility meets the qualifying criteria
must set forth their evidentiary basis.
The Commission strongly encourages
electronic filing. Please file motions to
1 18
PO 00000
CFR 385.2001–2005 (2019).
Frm 00013
Fmt 4703
Sfmt 4703
Y
Y
Y
intervene and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
A copy of all other filings in reference
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Locations of Notice of Intent: The
Commission provides all interested
E:\FR\FM\23APN1.SGM
23APN1
Federal Register / Vol. 85, No. 79 / Thursday, April 23, 2020 / Notices
persons an opportunity to view and/or
print the contents of this document via
the internet through the Commission’s
website at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number (i.e., CD20–3) in the docket
number field to access the document.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
Copies of the notice of intent can be
obtained directly from the applicant. At
this time, the Commission has
suspended access to the Commission’s
Public Reference Room due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, call toll-free 1–866–208–
3676 or email FERCOnlineSupport@
ferc.gov. For TTY, call (202) 502–8659.
Dated: April 16, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–08635 Filed 4–22–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14797–001]
lotter on DSKBCFDHB2PROD with NOTICES
California Department of Water
Resources; Notice of Application
Accepted for Filing and Soliciting
Motions To Intervene and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 14797–001.
c. Date filed: November 20, 2019.
d. Applicant: California Department
of Water Resources.
e. Name of Project: Devil Canyon
Project.1
f. Location: Along the East Branch of
the California Aqueduct, in San
Bernardino County, California. The
project occupies 220.98 acres of United
States lands administered by the U.S.
Department of Agriculture, Forest
Service, as part of the San Bernardino
National Forest.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
1 The proposed Devil Canyon Project is currently
licensed as part of the South SWP Project (P–2426).
The applicant proposes to relicense the Devil
Canyon Project separately.
VerDate Sep<11>2014
19:28 Apr 22, 2020
Jkt 250001
h. Applicant Contact: Gwen
Knittweis, Chief, Hydropower License
Planning and Compliance Office,
California Department of Water
Resources, P.O. Box 924836,
Sacramento, California 94236–0001;
(916) 557–4554; email—
Gwen.Knittweis@water.ca.gov.
i. FERC Contact: Kyle Olcott at (202)
502–8963; or email at kyle.olcott@
ferc.gov.
j. Deadline for filing motions to
intervene and protests and requests for
cooperating agency status: 60 days from
the issuance date of this notice.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and protests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. The first
page of any filing should include docket
number P–14797–001.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted,
but is not ready for environmental
analysis at this time.
l. The project consists of: (1) A 249foot-tall, 2,230-foot-long zoned earth
and rockfill dam impounding a 995-acre
reservoir; (2) intake structures and two
1.3-mile-long steel penstocks; (3) a
powerhouse with four turbinegenerating units; (4) a switchyard with
four step-up transformers; and (5)
appurtenant facilities. The project’s
estimated annual generation is 836
gigawatt-hours.
m. In addition to publishing the full
text of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
PO 00000
Frm 00014
Fmt 4703
Sfmt 4703
22729
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact FERC Online
Support.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Anyone may submit a protest or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210,
385.211, and 385.214. In determining
the appropriate action to take, the
Commission will consider all protests
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any protests or
motions to intervene must be received
on or before the specified deadline date
for the particular application.
All filings must (1) bear in all capital
letters the title ‘‘PROTEST’’ or
‘‘MOTION TO INTERVENE;’’ (2) set
forth in the heading the name of the
applicant and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
protesting or intervening; and (4)
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
Agencies may obtain copies of the
application directly from the applicant.
A copy of any protest or motion to
intervene must be served upon each
representative of the applicant specified
in the particular application.
o. Procedural schedule: The
application will be processed according
to the following schedule. Revisions to
the schedule will be made as
appropriate.
Issue Scoping Document 1 for
comments—July 2020
Request Additional Information (if
necessary)—September 2020
Issue Scoping Document 2—October
2020
Issue notice of ready for environmental
analysis—October 2020
Commission issues EA—April 2021
Comments on EA—May 2021
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
date of the notice of ready for
environmental analysis.
E:\FR\FM\23APN1.SGM
23APN1
Agencies
[Federal Register Volume 85, Number 79 (Thursday, April 23, 2020)]
[Notices]
[Pages 22728-22729]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-08635]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CD20-3-000]
Town of Erie, Colorado; Notice of Preliminary Determination of a
Qualifying Conduit Hydropower Facility and Soliciting Comments and
Motions To Intervene
On April 15, 2020, the Town of Erie, Colorado, filed a notice of
intent to construct a qualifying conduit hydropower facility, pursuant
to section 30 of the Federal Power Act (FPA). The proposed Lynn R.
Morgan WTF Hydroelectric Facility would have an installed capacity of
93 kilowatts (kW), and would be located along an existing raw water
pipeline that feeds the existing Lynn R. Morgan Water Treatment
Facility near the Town of Erie, Boulder County, Colorado.
Applicant Contact: Todd Fessenden, 645 Holbrook Street, PO Box 750,
Erie, CO 80516, Phone No. 303-926-2700, Email: [email protected].
FERC Contact: Christopher Chaney, Phone No. (202) 502-6778, Email:
[email protected].
Qualifying Conduit Hydropower Facility Description: The proposed
project would consist of: (1) A 93-kW turbine-generator; (2) short 16-
inch-diameter inlet and outlet pipelines connecting to the existing raw
water pipeline; (3) an approximately 29-foot by 20-foot powerhouse; and
(4) appurtenant facilities. The proposed project would have an
estimated annual generation of up to 578 megawatt-hours.
A qualifying conduit hydropower facility is one that is determined
or deemed to meet all the criteria shown in the table below.
Table 1--Criteria for Qualifying Conduit Hydropower Facility
----------------------------------------------------------------------------------------------------------------
Satisfies (Y/
Statutory provision Description N)
----------------------------------------------------------------------------------------------------------------
FPA 30(a)(3)(A)................................ The conduit the facility uses is a tunnel, canal, Y
pipeline, aqueduct, flume, ditch, or similar
manmade water conveyance that is operated for
the distribution of water for agricultural,
municipal, or industrial consumption and not
primarily for the generation of electricity.
FPA 30(a)(3)(C)(i)............................. The facility is constructed, operated, or Y
maintained for the generation of electric power
and uses for such generation only the
hydroelectric potential of a non-federally owned
conduit.
FPA 30(a)(3)(C)(ii)............................ The facility has an installed capacity that does Y
not exceed 40 megawatts.
FPA 30(a)(3)(C)(iii)........................... On or before August 9, 2013, the facility is not Y
licensed, or exempted from the licensing
requirements of Part I of the FPA.
----------------------------------------------------------------------------------------------------------------
Preliminary Determination: The proposed Lynn R. Morgan WTF
Hydroelectric Facility will not alter the primary purpose of the
conduit, which is to transport raw water to a municipal water treatment
facility. Therefore, based upon the above criteria, Commission staff
preliminarily determines that the proposal satisfies the requirements
for a qualifying conduit hydropower facility, which is not required to
be licensed or exempted from licensing.
Comments and Motions to Intervene: Deadline for filing comments
contesting whether the facility meets the qualifying criteria is 30
days from the issuance date of this notice.
Deadline for filing motions to intervene is 30 days from the
issuance date of this notice.
Anyone may submit comments or a motion to intervene in accordance
with the requirements of Rules of Practice and Procedure, 18 CFR
385.210 and 385.214. Any motions to intervene must be received on or
before the specified deadline date for the particular proceeding.
Filing and Service of Responsive Documents: All filings must (1)
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as
applicable; (2) state in the heading the name of the applicant and the
project number of the application to which the filing responds; (3)
state the name, address, and telephone number of the person filing; and
(4) otherwise comply with the requirements of sections 385.2001 through
385.2005 of the Commission's regulations.\1\ All comments contesting
Commission staff's preliminary determination that the facility meets
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------
\1\ 18 CFR 385.2001-2005 (2019).
---------------------------------------------------------------------------
The Commission strongly encourages electronic filing. Please file
motions to intervene and comments using the Commission's eFiling system
at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at [email protected], (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper
copy to: Secretary, Federal Energy Regulatory Commission, 888 First
Street NE, Washington, DC 20426. A copy of all other filings in
reference to this application must be accompanied by proof of service
on all persons listed in the service list prepared by the Commission in
this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
Locations of Notice of Intent: The Commission provides all
interested
[[Page 22729]]
persons an opportunity to view and/or print the contents of this
document via the internet through the Commission's website at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (i.e.,
CD20-3) in the docket number field to access the document. You may also
register online at https://www.ferc.gov/docs-filing/esubscription.asp to
be notified via email of new filings and issuances related to this or
other pending projects. Copies of the notice of intent can be obtained
directly from the applicant. At this time, the Commission has suspended
access to the Commission's Public Reference Room due to the
proclamation declaring a National Emergency concerning the Novel
Coronavirus Disease (COVID-19), issued by the President on March 13,
2020. For assistance, call toll-free 1-866-208-3676 or email
[email protected]. For TTY, call (202) 502-8659.
Dated: April 16, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-08635 Filed 4-22-20; 8:45 am]