Town of Erie, Colorado; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene, 22728-22729 [2020-08635]

Download as PDF 22728 Federal Register / Vol. 85, No. 79 / Thursday, April 23, 2020 / Notices Description: Baseline eTariff Filing: Highlander Solar Energy Station 1 MBR to be effective 4/18/2020. Filed Date: 4/17/20. Accession Number: 20200417–5175. Comments Due: 5 p.m. ET 5/8/20. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: April 17, 2020. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2020–08639 Filed 4–22–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CD20–3–000] Town of Erie, Colorado; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene On April 15, 2020, the Town of Erie, Colorado, filed a notice of intent to construct a qualifying conduit hydropower facility, pursuant to section 30 of the Federal Power Act (FPA). The proposed Lynn R. Morgan WTF Hydroelectric Facility would have an installed capacity of 93 kilowatts (kW), and would be located along an existing raw water pipeline that feeds the existing Lynn R. Morgan Water Treatment Facility near the Town of Erie, Boulder County, Colorado. Applicant Contact: Todd Fessenden, 645 Holbrook Street, PO Box 750, Erie, CO 80516, Phone No. 303–926–2700, Email: tfessenden@erieco.gov. FERC Contact: Christopher Chaney, Phone No. (202) 502–6778, Email: christopher.chaney@ferc.gov. Qualifying Conduit Hydropower Facility Description: The proposed project would consist of: (1) A 93-kW turbine-generator; (2) short 16-inchdiameter inlet and outlet pipelines connecting to the existing raw water pipeline; (3) an approximately 29-foot by 20-foot powerhouse; and (4) appurtenant facilities. The proposed project would have an estimated annual generation of up to 578 megawatt-hours. A qualifying conduit hydropower facility is one that is determined or deemed to meet all the criteria shown in the table below. TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY Statutory provision Description Satisfies (Y/N) FPA 30(a)(3)(A) ......................... The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade water conveyance that is operated for the distribution of water for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity. The facility is constructed, operated, or maintained for the generation of electric power and uses for such generation only the hydroelectric potential of a non-federally owned conduit. The facility has an installed capacity that does not exceed 40 megawatts ................................... On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA. Y FPA 30(a)(3)(C)(i) ...................... lotter on DSKBCFDHB2PROD with NOTICES FPA 30(a)(3)(C)(ii) ..................... FPA 30(a)(3)(C)(iii) .................... Preliminary Determination: The proposed Lynn R. Morgan WTF Hydroelectric Facility will not alter the primary purpose of the conduit, which is to transport raw water to a municipal water treatment facility. Therefore, based upon the above criteria, Commission staff preliminarily determines that the proposal satisfies the requirements for a qualifying conduit hydropower facility, which is not required to be licensed or exempted from licensing. Comments and Motions to Intervene: Deadline for filing comments contesting whether the facility meets the qualifying criteria is 30 days from the issuance date of this notice. Deadline for filing motions to intervene is 30 days from the issuance date of this notice. Anyone may submit comments or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210 and 385.214. Any motions to intervene must VerDate Sep<11>2014 19:28 Apr 22, 2020 Jkt 250001 be received on or before the specified deadline date for the particular proceeding. Filing and Service of Responsive Documents: All filings must (1) bear in all capital letters the ‘‘COMMENTS CONTESTING QUALIFICATION FOR A CONDUIT HYDROPOWER FACILITY’’ or ‘‘MOTION TO INTERVENE,’’ as applicable; (2) state in the heading the name of the applicant and the project number of the application to which the filing responds; (3) state the name, address, and telephone number of the person filing; and (4) otherwise comply with the requirements of sections 385.2001 through 385.2005 of the Commission’s regulations.1 All comments contesting Commission staff’s preliminary determination that the facility meets the qualifying criteria must set forth their evidentiary basis. The Commission strongly encourages electronic filing. Please file motions to 1 18 PO 00000 CFR 385.2001–2005 (2019). Frm 00013 Fmt 4703 Sfmt 4703 Y Y Y intervene and comments using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Locations of Notice of Intent: The Commission provides all interested E:\FR\FM\23APN1.SGM 23APN1 Federal Register / Vol. 85, No. 79 / Thursday, April 23, 2020 / Notices persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s website at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket number (i.e., CD20–3) in the docket number field to access the document. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. Copies of the notice of intent can be obtained directly from the applicant. At this time, the Commission has suspended access to the Commission’s Public Reference Room due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, call toll-free 1–866–208– 3676 or email FERCOnlineSupport@ ferc.gov. For TTY, call (202) 502–8659. Dated: April 16, 2020. Kimberly D. Bose, Secretary. [FR Doc. 2020–08635 Filed 4–22–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14797–001] lotter on DSKBCFDHB2PROD with NOTICES California Department of Water Resources; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: New Major License. b. Project No.: 14797–001. c. Date filed: November 20, 2019. d. Applicant: California Department of Water Resources. e. Name of Project: Devil Canyon Project.1 f. Location: Along the East Branch of the California Aqueduct, in San Bernardino County, California. The project occupies 220.98 acres of United States lands administered by the U.S. Department of Agriculture, Forest Service, as part of the San Bernardino National Forest. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). 1 The proposed Devil Canyon Project is currently licensed as part of the South SWP Project (P–2426). The applicant proposes to relicense the Devil Canyon Project separately. VerDate Sep<11>2014 19:28 Apr 22, 2020 Jkt 250001 h. Applicant Contact: Gwen Knittweis, Chief, Hydropower License Planning and Compliance Office, California Department of Water Resources, P.O. Box 924836, Sacramento, California 94236–0001; (916) 557–4554; email— Gwen.Knittweis@water.ca.gov. i. FERC Contact: Kyle Olcott at (202) 502–8963; or email at kyle.olcott@ ferc.gov. j. Deadline for filing motions to intervene and protests and requests for cooperating agency status: 60 days from the issuance date of this notice. The Commission strongly encourages electronic filing. Please file motions to intervene and protests and requests for cooperating agency status using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–14797–001. The Commission’s Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. This application has been accepted, but is not ready for environmental analysis at this time. l. The project consists of: (1) A 249foot-tall, 2,230-foot-long zoned earth and rockfill dam impounding a 995-acre reservoir; (2) intake structures and two 1.3-mile-long steel penstocks; (3) a powerhouse with four turbinegenerating units; (4) a switchyard with four step-up transformers; and (5) appurtenant facilities. The project’s estimated annual generation is 836 gigawatt-hours. m. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s website at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended PO 00000 Frm 00014 Fmt 4703 Sfmt 4703 22729 access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact FERC Online Support. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Anyone may submit a protest or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In determining the appropriate action to take, the Commission will consider all protests filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any protests or motions to intervene must be received on or before the specified deadline date for the particular application. All filings must (1) bear in all capital letters the title ‘‘PROTEST’’ or ‘‘MOTION TO INTERVENE;’’ (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. o. Procedural schedule: The application will be processed according to the following schedule. Revisions to the schedule will be made as appropriate. Issue Scoping Document 1 for comments—July 2020 Request Additional Information (if necessary)—September 2020 Issue Scoping Document 2—October 2020 Issue notice of ready for environmental analysis—October 2020 Commission issues EA—April 2021 Comments on EA—May 2021 Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis. E:\FR\FM\23APN1.SGM 23APN1

Agencies

[Federal Register Volume 85, Number 79 (Thursday, April 23, 2020)]
[Notices]
[Pages 22728-22729]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-08635]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CD20-3-000]


Town of Erie, Colorado; Notice of Preliminary Determination of a 
Qualifying Conduit Hydropower Facility and Soliciting Comments and 
Motions To Intervene

    On April 15, 2020, the Town of Erie, Colorado, filed a notice of 
intent to construct a qualifying conduit hydropower facility, pursuant 
to section 30 of the Federal Power Act (FPA). The proposed Lynn R. 
Morgan WTF Hydroelectric Facility would have an installed capacity of 
93 kilowatts (kW), and would be located along an existing raw water 
pipeline that feeds the existing Lynn R. Morgan Water Treatment 
Facility near the Town of Erie, Boulder County, Colorado.
    Applicant Contact: Todd Fessenden, 645 Holbrook Street, PO Box 750, 
Erie, CO 80516, Phone No. 303-926-2700, Email: [email protected].
    FERC Contact: Christopher Chaney, Phone No. (202) 502-6778, Email: 
[email protected].
    Qualifying Conduit Hydropower Facility Description: The proposed 
project would consist of: (1) A 93-kW turbine-generator; (2) short 16-
inch-diameter inlet and outlet pipelines connecting to the existing raw 
water pipeline; (3) an approximately 29-foot by 20-foot powerhouse; and 
(4) appurtenant facilities. The proposed project would have an 
estimated annual generation of up to 578 megawatt-hours.
    A qualifying conduit hydropower facility is one that is determined 
or deemed to meet all the criteria shown in the table below.

                          Table 1--Criteria for Qualifying Conduit Hydropower Facility
----------------------------------------------------------------------------------------------------------------
                                                                                                    Satisfies (Y/
              Statutory provision                                   Description                          N)
----------------------------------------------------------------------------------------------------------------
FPA 30(a)(3)(A)................................  The conduit the facility uses is a tunnel, canal,            Y
                                                  pipeline, aqueduct, flume, ditch, or similar
                                                  manmade water conveyance that is operated for
                                                  the distribution of water for agricultural,
                                                  municipal, or industrial consumption and not
                                                  primarily for the generation of electricity.
FPA 30(a)(3)(C)(i).............................  The facility is constructed, operated, or                    Y
                                                  maintained for the generation of electric power
                                                  and uses for such generation only the
                                                  hydroelectric potential of a non-federally owned
                                                  conduit.
FPA 30(a)(3)(C)(ii)............................  The facility has an installed capacity that does             Y
                                                  not exceed 40 megawatts.
FPA 30(a)(3)(C)(iii)...........................  On or before August 9, 2013, the facility is not             Y
                                                  licensed, or exempted from the licensing
                                                  requirements of Part I of the FPA.
----------------------------------------------------------------------------------------------------------------

    Preliminary Determination: The proposed Lynn R. Morgan WTF 
Hydroelectric Facility will not alter the primary purpose of the 
conduit, which is to transport raw water to a municipal water treatment 
facility. Therefore, based upon the above criteria, Commission staff 
preliminarily determines that the proposal satisfies the requirements 
for a qualifying conduit hydropower facility, which is not required to 
be licensed or exempted from licensing.
    Comments and Motions to Intervene: Deadline for filing comments 
contesting whether the facility meets the qualifying criteria is 30 
days from the issuance date of this notice.
    Deadline for filing motions to intervene is 30 days from the 
issuance date of this notice.
    Anyone may submit comments or a motion to intervene in accordance 
with the requirements of Rules of Practice and Procedure, 18 CFR 
385.210 and 385.214. Any motions to intervene must be received on or 
before the specified deadline date for the particular proceeding.
    Filing and Service of Responsive Documents: All filings must (1) 
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR 
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as 
applicable; (2) state in the heading the name of the applicant and the 
project number of the application to which the filing responds; (3) 
state the name, address, and telephone number of the person filing; and 
(4) otherwise comply with the requirements of sections 385.2001 through 
385.2005 of the Commission's regulations.\1\ All comments contesting 
Commission staff's preliminary determination that the facility meets 
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------

    \1\ 18 CFR 385.2001-2005 (2019).
---------------------------------------------------------------------------

    The Commission strongly encourages electronic filing. Please file 
motions to intervene and comments using the Commission's eFiling system 
at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at [email protected], (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE, Washington, DC 20426. A copy of all other filings in 
reference to this application must be accompanied by proof of service 
on all persons listed in the service list prepared by the Commission in 
this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
    Locations of Notice of Intent: The Commission provides all 
interested

[[Page 22729]]

persons an opportunity to view and/or print the contents of this 
document via the internet through the Commission's website at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (i.e., 
CD20-3) in the docket number field to access the document. You may also 
register online at https://www.ferc.gov/docs-filing/esubscription.asp to 
be notified via email of new filings and issuances related to this or 
other pending projects. Copies of the notice of intent can be obtained 
directly from the applicant. At this time, the Commission has suspended 
access to the Commission's Public Reference Room due to the 
proclamation declaring a National Emergency concerning the Novel 
Coronavirus Disease (COVID-19), issued by the President on March 13, 
2020. For assistance, call toll-free 1-866-208-3676 or email 
[email protected]. For TTY, call (202) 502-8659.

    Dated: April 16, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-08635 Filed 4-22-20; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.