Notice of Attendance at PJM Interconnection, L.L.C. Meetings, 22422-22423 [2020-08444]
Download as PDF
khammond on DSKJM1Z7X2PROD with NOTICES
22422
Federal Register / Vol. 85, No. 78 / Wednesday, April 22, 2020 / Notices
Description: § 4(d) Rate Filing: 2020
Expiring Negotiated Rate Agreements to
be effective 5/1/2020.
Filed Date: 4/15/20.
Accession Number: 20200415–5036.
Comments Due: 5 p.m. ET 4/27/20.
Docket Numbers: RP20–786–000.
Applicants: Gas Transmission
Northwest LLC.
Description: § 4(d) Rate Filing: GTN
2020 Housekeeping Filing to be effective
5/15/2020.
Filed Date: 4/15/20.
Accession Number: 20200415–5074.
Comments Due: 5 p.m. ET 4/27/20.
Docket Numbers: RP20–787–000.
Applicants: Bison Pipeline LLC.
Description: § 4(d) Rate Filing: 2020
Bison Housekeeping Filing to be
effective 5/15/2020.
Filed Date: 4/15/20.
Accession Number: 20200415–5076.
Comments Due: 5 p.m. ET 4/27/20.
Docket Numbers: RP20–788–000.
Applicants: Kinetica Energy Express,
LLC.
Description: Compliance filing
Petition for Approval of Settlement.
Filed Date: 4/15/20.
Accession Number: 20200415–5137.
Comments Due: 5 p.m. ET 4/27/20.
Docket Numbers: RP20–789–000.
Applicants: Enable Mississippi River
Transmission, LLC.
Description: § 4(d) Rate Filing:
Negotiated Rate Filing—CES 5801
RP18–923 & RP20–131 Settlement to be
effective 1/1/2019.
Filed Date: 4/15/20.
Accession Number: 20200415–5166.
Comments Due: 5 p.m. ET 4/27/20.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified date(s). Protests
may be considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
Combined Notice of Filings
[Project No. 6756–011]
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Green Mountain Power Corporation;
Sugar River Power LLC; Notice of
Transfer of Exemption
Docket Numbers: RP20–417–001.
Applicants: Spire STL Pipeline LLC.
Description: Compliance filing Spire
STL NAESB Compliance Filing to be
effective 11/18/2019.
Filed Date: 4/13/20.
Accession Number: 20200413–5144.
Comments Due: 5 p.m. ET 4/27/20.
1. On March 20, 2020, Green
Mountain Power Corporation, exemptee
for the Lower Valley Hydroelectric
Project No. 6756, filed a letter notifying
the Commission that the project was
transferred from Green Mountain Power
Corporation to Sugar River Power LLC.
The exemption from licensing was
originally issued on November 9, 1982.1
The project is located on the Sugar River
in Sullivan County, New Hampshire.
The transfer of an exemption does not
require Commission approval.
2. Sugar River Power LLC is now the
exemptee of the Lower Valley
Hydroelectric Project No. 6756. All
correspondence must be forwarded to:
Sugar River Power LLC, c/o Mr. Robert
E. King, 42 Hurricane Road, Keene, NH
03431, Email: bking31415@gmail.com.
Dated: April 16, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
Dated: April 15, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–08513 Filed 4–21–20; 8:45 am]
[FR Doc. 2020–08445 Filed 4–21–20; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
VerDate Sep<11>2014
17:59 Apr 21, 2020
Jkt 250001
Docket Numbers: RP20–781–000.
Applicants: Discovery Gas
Transmission LLC.
Description: Imbalance Cash-out
Report for 2019 Activity for Discovery
Gas Transmission LLC under RP20–781.
Filed Date: 4/13/20.
Accession Number: 20200413–5140.
Comments Due: 5 p.m. ET 4/27/20.
Docket Numbers: RP20–782–000.
Applicants: Rover Pipeline LLC.
Description: § 4(d) Rate Filing:
Revised Summary of Negotiated Rate
Capacity Release Agreements on 4–13–
2020 to be effective 4/1/2020.
Filed Date: 4/13/20.
Accession Number: 20200413–5169.
Comments Due: 5 p.m. ET 4/27/20.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified date(s). Protests
may be considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
Dated: April 15, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–08443 Filed 4–21–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Attendance at PJM
Interconnection, L.L.C. Meetings
The Federal Energy Regulatory
Commission (Commission) hereby gives
notice that members of the Commission
and Commission staff may attend
upcoming PJM Interconnection, L.L.C.
(PJM) Members Committee and Markets
and Reliability Committee meetings, as
well as other PJM committee,
subcommittee or task force meetings.1
The Commission and Commission staff
may attend the following meetings:
PJM Members Committee
• May 4, 2020 (Conference Call)
1 Claremont Hydro Associates, 21 FERC ¶ 62,216
(1982). The project was transferred to Green
Mountain Power Corporation on August 15, 2017.
1 For example, PJM subcommittees and task
forces of the standing committees (Operating,
Planning and Market Implementation) and senior
standing committees (Members and Markets and
Reliability) meet on a variety of different topics;
they convene and dissolve on an as-needed basis.
Therefore, the Commission and Commission staff
may monitor the various meetings posted on the
PJM website.
E:\FR\FM\22APN1.SGM
22APN1
Federal Register / Vol. 85, No. 78 / Wednesday, April 22, 2020 / Notices
•
•
•
•
•
•
•
May 28, 2020 (Audubon, PA)
June 18, 2020 (Audubon, PA)
July 23, 2020 (Audubon, PA)
September 17, 2020 (Audubon, PA)
October 29, 2020 (Audubon, PA)
November 19, 2020 (Audubon, PA)
December 17, 2020 (Audubon, PA)
khammond on DSKJM1Z7X2PROD with NOTICES
PJM Markets and Reliability Committee
• April 30, 2020 (Conference Call)
• May 28, 2020 (Audubon, PA)
• June 18, 2020 (Audubon, PA)
• July 23, 2020 (Audubon, PA)
• August 20, 2020 (Audubon, PA)
• September 17, 2020 (Audubon, PA)
• October 29, 2020 (Audubon, PA)
• November 19, 2020 (Audubon, PA)
• December 17, 2020 (Audubon, PA)
PJM Market Implementation Committee
• April 15, 2020 (Conference Call)
• May 13, 2020 (Audubon, PA)
• June 3, 2020 (Audubon, PA)
• July 8, 2020 (Audubon, PA)
• August 5, 2020 (Audubon, PA)
• September 2, 2020 (Audubon, PA)
• October 7, 2020 (Audubon, PA)
• November 5, 2020 (Audubon, PA)
• December 2, 2020 (Audubon, PA)
The discussions at each of the
meetings described above may address
matters at issue in pending proceedings
before the Commission, including the
following currently pending
proceedings:
Docket No. ER12–2708, PotomacAppalachian Transmission Highline,
LLC. et. al.
Docket No. EL14–37, PJM
Interconnection, L.L.C.
Docket No. ER14–972, PJM
Interconnection, L.L.C.
Docket Nos. EL14–48, ER18–988, PJM
Interconnection, L.L.C.
Docket No. EL15–18, Consolidated
Edison Company of New York, Inc. v.
PJM Interconnection, L.L.C.
Docket No. EL15–67, Linden VFT, LLC
v. PJM Interconnection, L.L.C.
Docket No. EL15–95, Maryland and
Delaware State Commissions v. PJM
Interconnection, L.L.C.
Docket No. ER15–1387, PJM
Interconnection, L.L.C
Docket Nos. ER15–2562, ER15–2563,
PJM Interconnection, L.L.C.
Docket No. EL16–49, Calpine
Corporation, et. al., v. PJM
Interconnection, L.L.C.
Docket No. EL17–31, Northern Illinois
Municipal Power Agency v. PJM
Interconnection, L.L.C.
Docket No. EL17–37, American
Municipal Power, Inc. v. PJM
Interconnection, L.L.C.
Docket No. EL17–62, Potomac
Economics, Ltd. v. PJM
Interconnection, L.L.C.
Docket No. EL17–64, Energy Storage
Association v. PJM Interconnection,
L.L.C.
VerDate Sep<11>2014
17:59 Apr 21, 2020
Jkt 250001
Docket No. EL17–65, Renewable Energy
Systems America v. PJM
Interconnection, L.L.C.
Docket No. EL17–68, Linden VFT, LLC
v. PJM Interconnection, L.L.C.
Docket No. ER17–725, PJM
Interconnection, L.L.C.
Docket No. ER17–950, PJM
Interconnection, L.L.C.
Docket No. ER17–1138, PJM
Interconnection, L.L.C.
Docket No. ER17–1420, PJM
Interconnection, L.L.C.
Docket No. ER17–1433, PJM
Interconnection, L.L.C.
Docket No. EL18–7, American Electric
Power Service Corporation v.
Midcontinent Independent System
Operator, Inc.
Docket No. EL18–26, EDF Renewable
Energy, Inc. v. Midcontinent
Independent System Operator, Inc.,
Southwest Power Pool, Inc. and PJM
Interconnection, L.L.C.
Docket No. EL18–34, PJM
Interconnection, L.L.C.
Docket No. EL18–54, New Jersey Board
of Public Utilities v. PJM
Interconnection, L.L.C., New York
Independent System Operator, Inc.,
Consolidated Edison Company of New
York, Inc., Linden VFT, LLC, Hudson
Transmission Partners, LLC and New
York Power Authority
Docket No. EL18–61, Public Citizen, Inc.
v. PJM Interconnection, L.L.C.
Docket No. EL18–145, Tilton Energy
L.L.C. v PJM Interconnection, L.L.C.
Docket No. EL18–178, PJM
Interconnection, L.L.C.
Docket No. EL18–170, DC Energy, LLC v.
PJM Interconnection, L.L.C.
Docket No. EL18–183, Radford’s Run
Wind Farm, L.L.C. v. PJM
Interconnection, L.L.C.
Docket No. ER18–87, PJM
Interconnection, L.L.C.
Docket No. ER18–579, PJM
Interconnection, L.L.C.
Docket No. ER18–680, PJM
Interconnection, L.L.C.
Docket No. ER18–1314, PJM
Interconnection, L.L.C.
Docket No. ER18–2102, PJM
Interconnection, L.L.C.
Docket No. EL19–34, Brookfield Energy
Marketing LP v. PJM Interconnection,
L.L.C.
Docket No. EL19–47, Independent
Market Monitor for PJM
Interconnection, L.L.C. v. PJM
Interconnection, L.L.C.
Docket No. EL19–51, Cube Yadkin
Generation, L.L.C. v. PJM
Interconnection, L.L.C.
Docket No. EL19–58, ER19–1486, PJM
Interconnection, L.L.C.
Docket No. EL19–63, Joint Consumer
Advocates v. PJM Interconnection,
L.L.C.
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
22423
Docket Nos. EL19–90, EL19–91, EL19–
92, ISO New England Inc., PJM
Interconnection, L.L.C., Southwest
Power Pool, Inc., Order Instituting
Section 206 Proceedings
Docket No. ER19–100, PJM
Interconnection, L.L.C.
Docket No. ER19–105, PJM
Interconnection, L.L.C.
Docket No. ER19–469, PJM
Interconnection, L.L.C.
Docket No. ER19–1958, PJM
Interconnection, L.L.C.
Docket No. ER19–2722, PJM
Interconnection, L.L.C.
Docket No. ER19–2915, PJM
Interconnection, L.L.C.
Docket No. EL20–10, Anabric
Development Partners, LLC v. PJM
Interconnection, L.L.C.
Docket No. ER20–457, PJM
Interconnection, L.L.C.
Docket No. ER20–584, PJM
Interconnection, L.L.C.
Docket No. ER20–939, PJM
Interconnection, L.L.C.
Docket No. ER20–955, PJM
Interconnection, L.L.C.
Docket No. ER20–1258, PJM
Interconnection, L.L.C.
Docket No. ER20–1392, PJM
Interconnection, L.L.C.
Docket No. ER20–1414, PJM
Interconnection, L.L.C.
Docket No. ER20–1416, PJM
Interconnection, L.L.C.
Docket No. ER20–1451, PJM
Interconnection, L.L.C.
For additional meeting information,
see: https://www.pjm.com/committeesand-groups.aspx and https://
www.pjm.com/Calendar.aspx.
The meetings are open to
stakeholders. For more information,
contact Valerie Martin, Office of Energy
Market Regulation, Federal Energy
Regulatory Commission at (202) 502–
6139 or Valerie.Martin@ferc.gov.
Dated: April 15, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–08444 Filed 4–21–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC19–120–001.
Applicants: Sun Jupiter Holdings
LLC, El Paso Electric Company.
Description: Proposed Mitigation
Options for Alternative Analysis
E:\FR\FM\22APN1.SGM
22APN1
Agencies
[Federal Register Volume 85, Number 78 (Wednesday, April 22, 2020)]
[Notices]
[Pages 22422-22423]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-08444]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Attendance at PJM Interconnection, L.L.C. Meetings
The Federal Energy Regulatory Commission (Commission) hereby gives
notice that members of the Commission and Commission staff may attend
upcoming PJM Interconnection, L.L.C. (PJM) Members Committee and
Markets and Reliability Committee meetings, as well as other PJM
committee, subcommittee or task force meetings.\1\ The Commission and
Commission staff may attend the following meetings:
---------------------------------------------------------------------------
\1\ For example, PJM subcommittees and task forces of the
standing committees (Operating, Planning and Market Implementation)
and senior standing committees (Members and Markets and Reliability)
meet on a variety of different topics; they convene and dissolve on
an as-needed basis. Therefore, the Commission and Commission staff
may monitor the various meetings posted on the PJM website.
---------------------------------------------------------------------------
PJM Members Committee
May 4, 2020 (Conference Call)
[[Page 22423]]
May 28, 2020 (Audubon, PA)
June 18, 2020 (Audubon, PA)
July 23, 2020 (Audubon, PA)
September 17, 2020 (Audubon, PA)
October 29, 2020 (Audubon, PA)
November 19, 2020 (Audubon, PA)
December 17, 2020 (Audubon, PA)
PJM Markets and Reliability Committee
April 30, 2020 (Conference Call)
May 28, 2020 (Audubon, PA)
June 18, 2020 (Audubon, PA)
July 23, 2020 (Audubon, PA)
August 20, 2020 (Audubon, PA)
September 17, 2020 (Audubon, PA)
October 29, 2020 (Audubon, PA)
November 19, 2020 (Audubon, PA)
December 17, 2020 (Audubon, PA)
PJM Market Implementation Committee
April 15, 2020 (Conference Call)
May 13, 2020 (Audubon, PA)
June 3, 2020 (Audubon, PA)
July 8, 2020 (Audubon, PA)
August 5, 2020 (Audubon, PA)
September 2, 2020 (Audubon, PA)
October 7, 2020 (Audubon, PA)
November 5, 2020 (Audubon, PA)
December 2, 2020 (Audubon, PA)
The discussions at each of the meetings described above may address
matters at issue in pending proceedings before the Commission,
including the following currently pending proceedings:
Docket No. ER12-2708, Potomac-Appalachian Transmission Highline, LLC.
et. al.
Docket No. EL14-37, PJM Interconnection, L.L.C.
Docket No. ER14-972, PJM Interconnection, L.L.C.
Docket Nos. EL14-48, ER18-988, PJM Interconnection, L.L.C.
Docket No. EL15-18, Consolidated Edison Company of New York, Inc. v.
PJM Interconnection, L.L.C.
Docket No. EL15-67, Linden VFT, LLC v. PJM Interconnection, L.L.C.
Docket No. EL15-95, Maryland and Delaware State Commissions v. PJM
Interconnection, L.L.C.
Docket No. ER15-1387, PJM Interconnection, L.L.C
Docket Nos. ER15-2562, ER15-2563, PJM Interconnection, L.L.C.
Docket No. EL16-49, Calpine Corporation, et. al., v. PJM
Interconnection, L.L.C.
Docket No. EL17-31, Northern Illinois Municipal Power Agency v. PJM
Interconnection, L.L.C.
Docket No. EL17-37, American Municipal Power, Inc. v. PJM
Interconnection, L.L.C.
Docket No. EL17-62, Potomac Economics, Ltd. v. PJM Interconnection,
L.L.C.
Docket No. EL17-64, Energy Storage Association v. PJM Interconnection,
L.L.C.
Docket No. EL17-65, Renewable Energy Systems America v. PJM
Interconnection, L.L.C.
Docket No. EL17-68, Linden VFT, LLC v. PJM Interconnection, L.L.C.
Docket No. ER17-725, PJM Interconnection, L.L.C.
Docket No. ER17-950, PJM Interconnection, L.L.C.
Docket No. ER17-1138, PJM Interconnection, L.L.C.
Docket No. ER17-1420, PJM Interconnection, L.L.C.
Docket No. ER17-1433, PJM Interconnection, L.L.C.
Docket No. EL18-7, American Electric Power Service Corporation v.
Midcontinent Independent System Operator, Inc.
Docket No. EL18-26, EDF Renewable Energy, Inc. v. Midcontinent
Independent System Operator, Inc., Southwest Power Pool, Inc. and PJM
Interconnection, L.L.C.
Docket No. EL18-34, PJM Interconnection, L.L.C.
Docket No. EL18-54, New Jersey Board of Public Utilities v. PJM
Interconnection, L.L.C., New York Independent System Operator, Inc.,
Consolidated Edison Company of New York, Inc., Linden VFT, LLC, Hudson
Transmission Partners, LLC and New York Power Authority
Docket No. EL18-61, Public Citizen, Inc. v. PJM Interconnection, L.L.C.
Docket No. EL18-145, Tilton Energy L.L.C. v PJM Interconnection, L.L.C.
Docket No. EL18-178, PJM Interconnection, L.L.C.
Docket No. EL18-170, DC Energy, LLC v. PJM Interconnection, L.L.C.
Docket No. EL18-183, Radford's Run Wind Farm, L.L.C. v. PJM
Interconnection, L.L.C.
Docket No. ER18-87, PJM Interconnection, L.L.C.
Docket No. ER18-579, PJM Interconnection, L.L.C.
Docket No. ER18-680, PJM Interconnection, L.L.C.
Docket No. ER18-1314, PJM Interconnection, L.L.C.
Docket No. ER18-2102, PJM Interconnection, L.L.C.
Docket No. EL19-34, Brookfield Energy Marketing LP v. PJM
Interconnection, L.L.C.
Docket No. EL19-47, Independent Market Monitor for PJM Interconnection,
L.L.C. v. PJM Interconnection, L.L.C.
Docket No. EL19-51, Cube Yadkin Generation, L.L.C. v. PJM
Interconnection, L.L.C.
Docket No. EL19-58, ER19-1486, PJM Interconnection, L.L.C.
Docket No. EL19-63, Joint Consumer Advocates v. PJM Interconnection,
L.L.C.
Docket Nos. EL19-90, EL19-91, EL19-92, ISO New England Inc., PJM
Interconnection, L.L.C., Southwest Power Pool, Inc., Order Instituting
Section 206 Proceedings
Docket No. ER19-100, PJM Interconnection, L.L.C.
Docket No. ER19-105, PJM Interconnection, L.L.C.
Docket No. ER19-469, PJM Interconnection, L.L.C.
Docket No. ER19-1958, PJM Interconnection, L.L.C.
Docket No. ER19-2722, PJM Interconnection, L.L.C.
Docket No. ER19-2915, PJM Interconnection, L.L.C.
Docket No. EL20-10, Anabric Development Partners, LLC v. PJM
Interconnection, L.L.C.
Docket No. ER20-457, PJM Interconnection, L.L.C.
Docket No. ER20-584, PJM Interconnection, L.L.C.
Docket No. ER20-939, PJM Interconnection, L.L.C.
Docket No. ER20-955, PJM Interconnection, L.L.C.
Docket No. ER20-1258, PJM Interconnection, L.L.C.
Docket No. ER20-1392, PJM Interconnection, L.L.C.
Docket No. ER20-1414, PJM Interconnection, L.L.C.
Docket No. ER20-1416, PJM Interconnection, L.L.C.
Docket No. ER20-1451, PJM Interconnection, L.L.C.
For additional meeting information, see: https://www.pjm.com/committees-and-groups.aspx and https://www.pjm.com/Calendar.aspx.
The meetings are open to stakeholders. For more information,
contact Valerie Martin, Office of Energy Market Regulation, Federal
Energy Regulatory Commission at (202) 502-6139 or
[email protected].
Dated: April 15, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-08444 Filed 4-21-20; 8:45 am]
BILLING CODE 6717-01-P