Download as PDF khammond on DSKJM1Z7X2PROD with NOTICES 22422 Federal Register / Vol. 85, No. 78 / Wednesday, April 22, 2020 / Notices Description: § 4(d) Rate Filing: 2020 Expiring Negotiated Rate Agreements to be effective 5/1/2020. Filed Date: 4/15/20. Accession Number: 20200415–5036. Comments Due: 5 p.m. ET 4/27/20. Docket Numbers: RP20–786–000. Applicants: Gas Transmission Northwest LLC. Description: § 4(d) Rate Filing: GTN 2020 Housekeeping Filing to be effective 5/15/2020. Filed Date: 4/15/20. Accession Number: 20200415–5074. Comments Due: 5 p.m. ET 4/27/20. Docket Numbers: RP20–787–000. Applicants: Bison Pipeline LLC. Description: § 4(d) Rate Filing: 2020 Bison Housekeeping Filing to be effective 5/15/2020. Filed Date: 4/15/20. Accession Number: 20200415–5076. Comments Due: 5 p.m. ET 4/27/20. Docket Numbers: RP20–788–000. Applicants: Kinetica Energy Express, LLC. Description: Compliance filing Petition for Approval of Settlement. Filed Date: 4/15/20. Accession Number: 20200415–5137. Comments Due: 5 p.m. ET 4/27/20. Docket Numbers: RP20–789–000. Applicants: Enable Mississippi River Transmission, LLC. Description: § 4(d) Rate Filing: Negotiated Rate Filing—CES 5801 RP18–923 & RP20–131 Settlement to be effective 1/1/2019. Filed Date: 4/15/20. Accession Number: 20200415–5166. Comments Due: 5 p.m. ET 4/27/20. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified date(s). Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission Combined Notice of Filings [Project No. 6756–011] Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Green Mountain Power Corporation; Sugar River Power LLC; Notice of Transfer of Exemption Docket Numbers: RP20–417–001. Applicants: Spire STL Pipeline LLC. Description: Compliance filing Spire STL NAESB Compliance Filing to be effective 11/18/2019. Filed Date: 4/13/20. Accession Number: 20200413–5144. Comments Due: 5 p.m. ET 4/27/20. 1. On March 20, 2020, Green Mountain Power Corporation, exemptee for the Lower Valley Hydroelectric Project No. 6756, filed a letter notifying the Commission that the project was transferred from Green Mountain Power Corporation to Sugar River Power LLC. The exemption from licensing was originally issued on November 9, 1982.1 The project is located on the Sugar River in Sullivan County, New Hampshire. The transfer of an exemption does not require Commission approval. 2. Sugar River Power LLC is now the exemptee of the Lower Valley Hydroelectric Project No. 6756. All correspondence must be forwarded to: Sugar River Power LLC, c/o Mr. Robert E. King, 42 Hurricane Road, Keene, NH 03431, Email: bking31415@gmail.com. Dated: April 16, 2020. Nathaniel J. Davis, Sr., Deputy Secretary. Dated: April 15, 2020. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2020–08513 Filed 4–21–20; 8:45 am] [FR Doc. 2020–08445 Filed 4–21–20; 8:45 am] BILLING CODE 6717–01–P BILLING CODE 6717–01–P VerDate Sep<11>2014 17:59 Apr 21, 2020 Jkt 250001 Docket Numbers: RP20–781–000. Applicants: Discovery Gas Transmission LLC. Description: Imbalance Cash-out Report for 2019 Activity for Discovery Gas Transmission LLC under RP20–781. Filed Date: 4/13/20. Accession Number: 20200413–5140. Comments Due: 5 p.m. ET 4/27/20. Docket Numbers: RP20–782–000. Applicants: Rover Pipeline LLC. Description: § 4(d) Rate Filing: Revised Summary of Negotiated Rate Capacity Release Agreements on 4–13– 2020 to be effective 4/1/2020. Filed Date: 4/13/20. Accession Number: 20200413–5169. Comments Due: 5 p.m. ET 4/27/20. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified date(s). Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 Dated: April 15, 2020. Kimberly D. Bose, Secretary. [FR Doc. 2020–08443 Filed 4–21–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Attendance at PJM Interconnection, L.L.C. Meetings The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission and Commission staff may attend upcoming PJM Interconnection, L.L.C. (PJM) Members Committee and Markets and Reliability Committee meetings, as well as other PJM committee, subcommittee or task force meetings.1 The Commission and Commission staff may attend the following meetings: PJM Members Committee • May 4, 2020 (Conference Call) 1 Claremont Hydro Associates, 21 FERC ¶ 62,216 (1982). The project was transferred to Green Mountain Power Corporation on August 15, 2017. 1 For example, PJM subcommittees and task forces of the standing committees (Operating, Planning and Market Implementation) and senior standing committees (Members and Markets and Reliability) meet on a variety of different topics; they convene and dissolve on an as-needed basis. Therefore, the Commission and Commission staff may monitor the various meetings posted on the PJM website. E:\FR\FM\22APN1.SGM 22APN1

Agencies

[Federal Register Volume 85, Number 78 (Wednesday, April 22, 2020)]
[Notices]
[Page 22422]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-08443]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 6756-011]


Green Mountain Power Corporation; Sugar River Power LLC; Notice 
of Transfer of Exemption

    1. On March 20, 2020, Green Mountain Power Corporation, exemptee 
for the Lower Valley Hydroelectric Project No. 6756, filed a letter 
notifying the Commission that the project was transferred from Green 
Mountain Power Corporation to Sugar River Power LLC. The exemption from 
licensing was originally issued on November 9, 1982.\1\ The project is 
located on the Sugar River in Sullivan County, New Hampshire. The 
transfer of an exemption does not require Commission approval.
---------------------------------------------------------------------------

    \1\ Claremont Hydro Associates, 21 FERC ] 62,216 (1982). The 
project was transferred to Green Mountain Power Corporation on 
August 15, 2017.
---------------------------------------------------------------------------

    2. Sugar River Power LLC is now the exemptee of the Lower Valley 
Hydroelectric Project No. 6756. All correspondence must be forwarded 
to: Sugar River Power LLC, c/o Mr. Robert E. King, 42 Hurricane Road, 
Keene, NH 03431, Email: [email protected].

    Dated: April 15, 2020.
Kimberly D. Bose,
 Secretary.
[FR Doc. 2020-08443 Filed 4-21-20; 8:45 am]
 BILLING CODE 6717-01-P