America First Hydro LLC; Notice of Application Tendered for Filing With the Commission, 21426-21427 [2020-08184]

Download as PDF 21426 Federal Register / Vol. 85, No. 75 / Friday, April 17, 2020 / Notices stakeholders to submit comments on the Settlement Agreement and comments, recommendations, terms and conditions, and prescriptions regarding the license application on the same date, and allow Chittenden Falls Hydro sufficient time to submit reply comments. The application will be processed according to the following revised Hydro Licensing Schedule. Revisions to the schedule may be made as appropriate. Milestone Target date Filing of comments, recommendations, terms and conditions, and prescriptions (per the REA Notice) and comments on the Settlement Agreement. Reply comments due .................................................................................................................................................................... Commission Issues EA ................................................................................................................................................................. Comments on EA .......................................................................................................................................................................... Dated: April 13, 2020. Kimberly D. Bose, Secretary. time on the specified date(s). Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. [FR Doc. 2020–08185 Filed 4–16–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission jbell on DSKJLSW7X2PROD with NOTICES Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Docket Numbers: PR20–49–000. Applicants: The East Ohio Gas Company. Description: Tariff filing per 284.123(b),(e)/: Operating Statement of The East Ohio Gas Company 4/8/2020. Filed Date: 4/8/2020. Accession Number: 202004085101. Comments/Protests Due: 5 p.m. ET 4/ 29/2020. Docket Numbers: RP20–530–001. Applicants: National Fuel Gas Supply Corporation. Description: Compliance filing RP20– 530 Fuel Tracker Compliance Filing to be effective 4/1/2020. Filed Date: 4/9/20. Accession Number: 20200409–5068. Comments Due: 5 p.m. ET 4/21/20. Docket Numbers: RP20–778–000. Applicants: Dominion Energy Overthrust Pipeline, LLC. Description: § 4(d) Rate Filing: Statement of Negotiated Rates Version 9.0.0 to be effective 5/9/2020. Filed Date: 4/9/20. Accession Number: 20200409–5060. Comments Due: 5 p.m. ET 4/21/20. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern VerDate Sep<11>2014 18:19 Apr 16, 2020 Jkt 250001 Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2020–08154 Filed 4–16–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14856–002] Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Subsequent Minor License. b. Project No.: 14856–002. c. Date Filed: March 30, 2020. d. Applicant: America First Hydro LLC (America First Hydro). e. Name of Project: Lower Mousam Project. f. Location: The project is located on the Mousam River in York County, Maine. The project does not affect federal lands. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Ian Clark, America First Hydro LLC; 65 Ellen Ave, Mahopac, New York 10541, (914) 297– 7645, or email at info@ dichotomycapital.com. i. FERC Contact: Michael Watts, (202) 502–6123 or michael.watts@ferc.gov. j. The application is not ready for environmental analysis at this time. Frm 00041 Fmt 4703 Sfmt 4703 June 17, 2020. October 2020. November 2020. k. Kennebunk Light and Power District currently owns and holds a license to operate and maintain the Lower Mousam Project as FERC Project No. 5362. On March 29, 2017, Kennebunk Light and Power District filed a notice stating that it does not intend to file an application for a subsequent license. In response to a solicitation notice issued by the Commission on May 15, 2017, America First Hydro filed a pre-application document and a notice of intent to file an application for a license for the Lower Mousam Project, pursuant to 18 CFR 5.5 and 5.6. Commission staff assigned Project No. 14856 for the licensing proceeding initiated by America First Hydro’s filing. l. Project Description: The existing Lower Mousam Project consists of the following three developments: Dane Perkins Development America First Hydro LLC; Notice of Application Tendered for Filing With the Commission PO 00000 May 4, 2020. The Dane Perkins Development consists of: (1) A 12-foot-high, 83-footlong concrete gravity dam with a 50foot-long spillway section that has a crest elevation of 81.8 feet mean seal level (msl) plus 2.5-foot-high flashboards; (2) a 25-acre impoundment with a normal maximum elevation of 84.3 feet msl; (3) a powerhouse containing a single turbine-generator unit rated at 150 kilowatts (kW); (4) a generator lead connecting the turbinegenerator unit to the regional grid; and (5) appurtenant facilities. Twine Mill Development The Twine Mill Development is located approximately 0.5 mile downstream from the Dane Perkins Development and consists of: (1) An 18foot-high, 223-foot-long concrete gravity dam with an 81-foot-long spillway section that has a crest elevation of 68.8 feet msl plus 3.0-foot-high flashboards; (2) a 12-acre impoundment with a normal maximum elevation of 71.8 feet msl; (3) a powerhouse containing a single turbine-generator unit rated at 300 kW; (4) a generator lead connecting the turbine-generator unit to the E:\FR\FM\17APN1.SGM 17APN1 Federal Register / Vol. 85, No. 75 / Friday, April 17, 2020 / Notices jbell on DSKJLSW7X2PROD with NOTICES regional grid; and (5) appurtenant facilities. Kesslen Development The Kesslen Development is located approximately 2.5 miles downstream from the Twine Mill Development and consists of: (1) An 18-foot-high, 140foot-long concrete gravity dam with a 114-foot-long spillway section that has a crest elevation of 42.2 feet msl plus 1.5foot-high flashboards; (2) a 20-acre impoundment with a normal maximum elevation of 43.7 feet msl; (3) a powerhouse containing a single turbinegenerator unit rated at 150 kW; (4) a generator lead connecting the turbinegenerator unit to the regional grid; and (5) appurtenant facilities. The current license requires an instantaneous minimum flow of 60 cubic feet per second (cfs) or inflow, whichever is less, downstream of the Kesslen Development from April 1 through June 1 each year; and a minimum flow of 5 cfs or inflow downstream of the Kesslen Development from June 2 through March 31. The licensee operates the project in a run-of-river mode on a voluntary basis. America First Hydro proposes to increase the installed generation capacity at the Dane Perkins Development by replacing the existing 150-kW turbine-generator unit with two turbine-generator units that have a combined capacity of 270 kW. America First Hydro proposes to disconnect the generating equipment at the Kesslen Development and allow all flow to pass over the dam. America First Hydro also proposes to continue operating the project in a run-of-river mode. m. Locations of the Application: A copy of the application may be viewed on the Commission’s website at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). n. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. VerDate Sep<11>2014 18:19 Apr 16, 2020 Jkt 250001 o. Procedural Schedule: On December 19, 2019, Commission staff suspended the Integrated Licensing Process for the project until America First Hydro filed the final license application. The suspension held the pre-filing process in abeyance, including the milestones for the study process. In accordance with 18 CFR 5.20, Commission staff will notify America First Hydro on or before April 29, 2020, as to whether or not the application substantially conforms to the pre-filing consultation and filing requirements of the Commission’s regulations. To the extent that the application is not patently deficient, Commission staff will issue a revised process plan and schedule that includes milestones and dates for the filing and review of America First Hydro’s outstanding study reports. After America First Hydro completes and files the outstanding study reports, Commission staff will issue a revised procedural schedule with target dates for the post-filing milestones listed below. Target date Milestone Notice of Acceptance/Notice of Ready for Environmental Analysis. Filing of recommendations, preliminary terms and conditions, and fishway prescriptions. Commission issues Environmental Assessment (EA). Comments on EA .......................... Modified terms and conditions ...... TBD. TBD. TBD. TBD. TBD. p. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the Notice of Ready for Environmental Analysis. Dated: April 13, 2020. Kimberly D. Bose, Secretary. [FR Doc. 2020–08184 Filed 4–16–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER20–1537–000] RE Mustang Two Barbaro LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced RE Mustang Two Barbaro LLC’s application for marketbased rate authority, with an PO 00000 Frm 00042 Fmt 4703 Sfmt 9990 21427 accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is May 4, 2020. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: April 13, 2020. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2020–08157 Filed 4–16–20; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\17APN1.SGM 17APN1

Agencies

[Federal Register Volume 85, Number 75 (Friday, April 17, 2020)]
[Notices]
[Pages 21426-21427]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-08184]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14856-002]


America First Hydro LLC; Notice of Application Tendered for 
Filing With the Commission

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Subsequent Minor License.
    b. Project No.: 14856-002.
    c. Date Filed: March 30, 2020.
    d. Applicant: America First Hydro LLC (America First Hydro).
    e. Name of Project: Lower Mousam Project.
    f. Location: The project is located on the Mousam River in York 
County, Maine. The project does not affect federal lands.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Ian Clark, America First Hydro LLC; 65 Ellen 
Ave, Mahopac, New York 10541, (914) 297-7645, or email at 
[email protected]hotomycapital.com.
    i. FERC Contact: Michael Watts, (202) 502-6123 or 
[email protected].
    j. The application is not ready for environmental analysis at this 
time.
    k. Kennebunk Light and Power District currently owns and holds a 
license to operate and maintain the Lower Mousam Project as FERC 
Project No. 5362. On March 29, 2017, Kennebunk Light and Power District 
filed a notice stating that it does not intend to file an application 
for a subsequent license. In response to a solicitation notice issued 
by the Commission on May 15, 2017, America First Hydro filed a pre-
application document and a notice of intent to file an application for 
a license for the Lower Mousam Project, pursuant to 18 CFR 5.5 and 5.6. 
Commission staff assigned Project No. 14856 for the licensing 
proceeding initiated by America First Hydro's filing.
    l. Project Description:
    The existing Lower Mousam Project consists of the following three 
developments:
Dane Perkins Development
    The Dane Perkins Development consists of: (1) A 12-foot-high, 83-
foot-long concrete gravity dam with a 50-foot-long spillway section 
that has a crest elevation of 81.8 feet mean seal level (msl) plus 2.5-
foot-high flashboards; (2) a 25-acre impoundment with a normal maximum 
elevation of 84.3 feet msl; (3) a powerhouse containing a single 
turbine-generator unit rated at 150 kilowatts (kW); (4) a generator 
lead connecting the turbine-generator unit to the regional grid; and 
(5) appurtenant facilities.
Twine Mill Development
    The Twine Mill Development is located approximately 0.5 mile 
downstream from the Dane Perkins Development and consists of: (1) An 
18-foot-high, 223-foot-long concrete gravity dam with an 81-foot-long 
spillway section that has a crest elevation of 68.8 feet msl plus 3.0-
foot-high flashboards; (2) a 12-acre impoundment with a normal maximum 
elevation of 71.8 feet msl; (3) a powerhouse containing a single 
turbine-generator unit rated at 300 kW; (4) a generator lead connecting 
the turbine-generator unit to the

[[Page 21427]]

regional grid; and (5) appurtenant facilities.
Kesslen Development
    The Kesslen Development is located approximately 2.5 miles 
downstream from the Twine Mill Development and consists of: (1) An 18-
foot-high, 140-foot-long concrete gravity dam with a 114-foot-long 
spillway section that has a crest elevation of 42.2 feet msl plus 1.5-
foot-high flashboards; (2) a 20-acre impoundment with a normal maximum 
elevation of 43.7 feet msl; (3) a powerhouse containing a single 
turbine-generator unit rated at 150 kW; (4) a generator lead connecting 
the turbine-generator unit to the regional grid; and (5) appurtenant 
facilities.
    The current license requires an instantaneous minimum flow of 60 
cubic feet per second (cfs) or inflow, whichever is less, downstream of 
the Kesslen Development from April 1 through June 1 each year; and a 
minimum flow of 5 cfs or inflow downstream of the Kesslen Development 
from June 2 through March 31. The licensee operates the project in a 
run-of-river mode on a voluntary basis.
    America First Hydro proposes to increase the installed generation 
capacity at the Dane Perkins Development by replacing the existing 150-
kW turbine-generator unit with two turbine-generator units that have a 
combined capacity of 270 kW. America First Hydro proposes to disconnect 
the generating equipment at the Kesslen Development and allow all flow 
to pass over the dam. America First Hydro also proposes to continue 
operating the project in a run-of-river mode.
    m. Locations of the Application: A copy of the application may be 
viewed on the Commission's website at https://www.ferc.gov using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. At this time, 
the Commission has suspended access to the Commission's Public 
Reference Room, due to the proclamation declaring a National Emergency 
concerning the Novel Coronavirus Disease (COVID-19), issued by the 
President on March 13, 2020. For assistance, please contact FERC Online 
Support at [email protected], (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY).
    n. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    o. Procedural Schedule: On December 19, 2019, Commission staff 
suspended the Integrated Licensing Process for the project until 
America First Hydro filed the final license application. The suspension 
held the pre-filing process in abeyance, including the milestones for 
the study process. In accordance with 18 CFR 5.20, Commission staff 
will notify America First Hydro on or before April 29, 2020, as to 
whether or not the application substantially conforms to the pre-filing 
consultation and filing requirements of the Commission's regulations. 
To the extent that the application is not patently deficient, 
Commission staff will issue a revised process plan and schedule that 
includes milestones and dates for the filing and review of America 
First Hydro's outstanding study reports. After America First Hydro 
completes and files the outstanding study reports, Commission staff 
will issue a revised procedural schedule with target dates for the 
post-filing milestones listed below.

------------------------------------------------------------------------
                 Milestone                           Target date
------------------------------------------------------------------------
Notice of Acceptance/Notice of Ready for    TBD.
 Environmental Analysis.
Filing of recommendations, preliminary      TBD.
 terms and conditions, and fishway
 prescriptions.
Commission issues Environmental Assessment  TBD.
 (EA).
Comments on EA............................  TBD.
Modified terms and conditions.............  TBD.
------------------------------------------------------------------------

    p. Final amendments to the application must be filed with the 
Commission no later than 30 days from the issuance date of the Notice 
of Ready for Environmental Analysis.

    Dated: April 13, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-08184 Filed 4-16-20; 8:45 am]