RE Mustang Two Barbaro LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization, 21427 [2020-08157]
Download as PDF
Federal Register / Vol. 85, No. 75 / Friday, April 17, 2020 / Notices
jbell on DSKJLSW7X2PROD with NOTICES
regional grid; and (5) appurtenant
facilities.
Kesslen Development
The Kesslen Development is located
approximately 2.5 miles downstream
from the Twine Mill Development and
consists of: (1) An 18-foot-high, 140foot-long concrete gravity dam with a
114-foot-long spillway section that has a
crest elevation of 42.2 feet msl plus 1.5foot-high flashboards; (2) a 20-acre
impoundment with a normal maximum
elevation of 43.7 feet msl; (3) a
powerhouse containing a single turbinegenerator unit rated at 150 kW; (4) a
generator lead connecting the turbinegenerator unit to the regional grid; and
(5) appurtenant facilities.
The current license requires an
instantaneous minimum flow of 60
cubic feet per second (cfs) or inflow,
whichever is less, downstream of the
Kesslen Development from April 1
through June 1 each year; and a
minimum flow of 5 cfs or inflow
downstream of the Kesslen
Development from June 2 through
March 31. The licensee operates the
project in a run-of-river mode on a
voluntary basis.
America First Hydro proposes to
increase the installed generation
capacity at the Dane Perkins
Development by replacing the existing
150-kW turbine-generator unit with two
turbine-generator units that have a
combined capacity of 270 kW. America
First Hydro proposes to disconnect the
generating equipment at the Kesslen
Development and allow all flow to pass
over the dam. America First Hydro also
proposes to continue operating the
project in a run-of-river mode.
m. Locations of the Application: A
copy of the application may be viewed
on the Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY).
n. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
VerDate Sep<11>2014
18:19 Apr 16, 2020
Jkt 250001
o. Procedural Schedule: On December
19, 2019, Commission staff suspended
the Integrated Licensing Process for the
project until America First Hydro filed
the final license application. The
suspension held the pre-filing process
in abeyance, including the milestones
for the study process. In accordance
with 18 CFR 5.20, Commission staff will
notify America First Hydro on or before
April 29, 2020, as to whether or not the
application substantially conforms to
the pre-filing consultation and filing
requirements of the Commission’s
regulations. To the extent that the
application is not patently deficient,
Commission staff will issue a revised
process plan and schedule that includes
milestones and dates for the filing and
review of America First Hydro’s
outstanding study reports. After
America First Hydro completes and files
the outstanding study reports,
Commission staff will issue a revised
procedural schedule with target dates
for the post-filing milestones listed
below.
Target
date
Milestone
Notice of Acceptance/Notice of
Ready for Environmental Analysis.
Filing of recommendations, preliminary terms and conditions,
and fishway prescriptions.
Commission issues Environmental
Assessment (EA).
Comments on EA ..........................
Modified terms and conditions ......
TBD.
TBD.
TBD.
TBD.
TBD.
p. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the Notice of Ready
for Environmental Analysis.
Dated: April 13, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–08184 Filed 4–16–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER20–1537–000]
RE Mustang Two Barbaro LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced RE Mustang Two
Barbaro LLC’s application for marketbased rate authority, with an
PO 00000
Frm 00042
Fmt 4703
Sfmt 9990
21427
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is May 4, 2020.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: April 13, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–08157 Filed 4–16–20; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\17APN1.SGM
17APN1
Agencies
[Federal Register Volume 85, Number 75 (Friday, April 17, 2020)]
[Notices]
[Page 21427]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-08157]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER20-1537-000]
RE Mustang Two Barbaro LLC; Supplemental Notice That Initial
Market-Based Rate Filing Includes Request for Blanket Section 204
Authorization
This is a supplemental notice in the above-referenced RE Mustang
Two Barbaro LLC's application for market-based rate authority, with an
accompanying rate tariff, noting that such application includes a
request for blanket authorization, under 18 CFR part 34, of future
issuances of securities and assumptions of liability.
Any person desiring to intervene or to protest should file with the
Federal Energy Regulatory Commission, 888 First Street NE, Washington,
DC 20426, in accordance with Rules 211 and 214 of the Commission's
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone
filing a motion to intervene or protest must serve a copy of that
document on the Applicant.
Notice is hereby given that the deadline for filing protests with
regard to the applicant's request for blanket authorization, under 18
CFR part 34, of future issuances of securities and assumptions of
liability, is May 4, 2020.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
5 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First Street NE, Washington, DC 20426.
The filings in the above-referenced proceeding are accessible in
the Commission's eLibrary system by clicking on the appropriate link in
the above list. They are also available for electronic review in the
Commission's Public Reference Room in Washington, DC. There is an
eSubscription link on the website that enables subscribers to receive
email notification when a document is added to a subscribed docket(s).
For assistance with any FERC Online service, please email
[email protected]. or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Dated: April 13, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020-08157 Filed 4-16-20; 8:45 am]
BILLING CODE 6717-01-P