Federal Register / Vol. 85, No. 74 / Thursday, April 16, 2020 / Notices
g. Filed Pursuant to: Rule 602 of the
Commission’s Rules of Practice and
Procedure, 18 CFR 385.602.
h. Applicant Contact: David W. Dick,
Manager, NYSEG and RG&E Hydro
Engineering, 1300 Scottsville Road,
Rochester, NY 14624; (585) 724–8535;
david_dick@rge.com.
i. FERC Contact: Jody Callihan, (202)
502–8278 or jody.callihan@ferc.gov.
j. Deadline for filing comments:
Comments on the Settlement Agreement
are due on Thursday, April 30, 2020.
Reply comments are due on Monday,
May 11, 2020.
The Commission strongly encourages
electronic filing. Please file comments
using the Commission’s eFiling system
at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY).
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. NYSEG filed an Offer of Settlement
(Settlement Agreement) on behalf of
itself, the New York State Department of
Environmental Conservation (New York
DEC), U.S. Fish and Wildlife Service,
and New York State Council of Trout
Unlimited. The Settlement Agreement
includes protection, mitigation, and
enhancement measures addressing
impoundment elevations and allowable
fluctuations, a seasonal minimum flow,
fish passage and protection for
American eel, and by reference,
management plans for northern longeared bat (Appendix A), bald eagles
(Appendix B), and invasive species
(Appendix D). NYSEG requests that the
measures in the Settlement Agreement
be incorporated as license conditions,
without modification, in any new
license issued for the project. The
signatories to the Settlement Agreement
also request a 50-year license term for
the project.
l. A copy of the Settlement Agreement
is available for review on the
VerDate Sep<11>2014
18:20 Apr 15, 2020
Jkt 250001
Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number, excluding the
last three digits, in the docket number
field to access the document. For
assistance, contact FERC Online
Support.
Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: April 10, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–08023 Filed 4–15–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP20–52–000]
WBI Energy Transmission, Inc.; Notice
of Schedule for Environmental Review
of the North Bakken Expansion Project
On February 14, 2020, WBI Energy
Transmission, Inc. (WBI Energy) filed an
application in Docket No. CP20–52–000
requesting a Certificate of Public
Convenience and Necessity pursuant to
7(c) of the Natural Gas Act to construct
and operate certain natural gas facilities
in Burke, McKenzie, Mountrail, and
Williams Counties, North Dakota. The
proposed project is known as the North
Bakken Expansion Project (Project), and
would provide incremental firm
transportation capacity from natural gas
processing plants to a proposed
interconnect with Northern Border
Pipeline Company in McKenzie County,
North Dakota.
On February 26, 2020, the Federal
Energy Regulatory Commission
(Commission or FERC) issued its Notice
of Application for the Project. Among
other things, that notice alerted agencies
issuing federal authorizations of the
requirement to complete all necessary
reviews and to reach a final decision on
a request for a federal authorization
within 90 days of the date of issuance
of the Commission staff’s Environmental
Assessment (EA) for the Project. This
instant notice identifies the FERC staff’s
planned schedule for the completion of
the EA for the Project.
Schedule for Environmental Review
Issuance of EA—September 4, 2020
90-day Federal Authorization Decision
Deadline—December 3, 2020
PO 00000
Frm 00066
Fmt 4703
Sfmt 4703
21227
If a schedule change becomes
necessary, additional notice will be
provided so that the relevant agencies
are kept informed of the Project’s
progress.
Project Description
WBI Energy proposes to construct and
operate five sections of new natural gas
pipeline, a new compressor station, and
modifications to an existing compressor
station (totaling 92.5 miles of pipeline
and 26,250 horsepower of compression),
all in North Dakota. The Project would
provide about 350 million standard
cubic feet of natural gas per day to the
Midwest via Northern Border Pipeline
Company’s existing mainline.
The Project includes: (i) 61.9 Miles of
24-inch-diameter pipeline from WBI
Energy’s Tioga Compressor Station in
Williams County to the proposed
Elkhorn Creek Compressor Station in
McKenzie County; (ii) 0.3 mile of 24inch-diameter pipeline from the
proposed Elkhorn Creek Compressor
Station to a new interconnect with
Northern Border Pipeline Company; (iii)
20.4 miles of 12-inch-diameter pipeline
looping along WBI Energy’s Line
Section 25 in Mountrail and Burke
Counties- 1; (iv) 9.4 miles of 12-inchdiameter pipeline looping along WBI
Energy’s Line Section 30 in Williams
County; (v) 0.5 mile of 20-inch-diameter
receipt lateral to the Tioga Compressor
Station; (vi) uprating WBI Energy’s Line
Section 25; (vii) installing 22,500
additional horsepower at the existing
Tioga Compressor Station; (viii)
constructing a new 3,750 horsepower
compressor station, the Elkhorn Creek
Compressor Station, in McKenzie
County; and (ix) and other associated
appurtenances.
Background
On July 3, 2019, the Commission staff
granted WBI Energy’s request to use the
FERC’s pre-filing environmental review
process and assigned the Project Docket
No. PF19–7–000. On September 13,
2019, the Commission issued a Notice of
Intent to Prepare an Environmental
Assessment for the Planned North
Bakken Expansion Project, Request for
Comments on Environmental Issues,
and Notice of Public Scoping Session
(NOI). The NOI was issued during the
pre-filing review of the Project and was
sent to affected landowners; federal,
state, and local government agencies;
elected officials; environmental interest
groups; Native American tribes; other
interested parties; and local libraries.
1 A pipeline loop is a segment of pipe constructed
parallel to an existing pipeline to increase capacity.
E:\FR\FM\16APN1.SGM
16APN1
21228
Federal Register / Vol. 85, No. 74 / Thursday, April 16, 2020 / Notices
In response to the NOI, the
Commission received comments from
the North Dakota Department of
Environmental Quality (DEQ) and two
landowners. The North Dakota DEQ
recommended the Project avoid Source
Water Protection Areas, section 303(d)
Waters, and surface and groundwater
drinking sources. The DEQ also stated
that WBI Energy should obtain a
Stormwater Construction Permit and
implement proper monitoring for the
early leak detection. The primary
environmental issues raised by the other
commentors were project location,
trespassing, impacts on water resources
and soils, seeding, and spreading of
weeds. All substantive comments will
be addressed in the EA.
The Bureau of Land Management, the
U.S. Army Corps of Engineers, and the
U.S. Forest Service are cooperating
agencies in the preparation of the EA.
Additional Information
jbell on DSKJLSW7X2PROD with NOTICES
In order to receive notification of the
issuance of the EA and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC
website (www.ferc.gov). Using the
‘‘eLibrary’’ link, select ‘‘General Search’’
from the eLibrary menu, enter the
selected date range and ‘‘Docket
Number’’ excluding the last three digits
(i.e., CP20–52), and follow the
instructions. For assistance with access
to eLibrary, the helpline can be reached
at (866) 208–3676, TTY (202) 502–8659,
or at FERCOnlineSupport@ferc.gov. The
eLibrary link on the FERC website also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and rule
makings.
Dated: April 10, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–08036 Filed 4–15–20; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
18:20 Apr 15, 2020
Jkt 250001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG20–112–000.
Applicants: Cedar Creek II, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Cedar Creek II, LLC.
Filed Date: 4/10/20.
Accession Number: 20200410–5097.
Comments Due: 5 p.m. ET 5/1/20.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER20–595–001.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Tariff Amendment:
2020–04–10_Deficiency response to
Solar DIR Filing to be effective 3/15/
2020.
Filed Date: 4/10/20.
Accession Number: 20200410–5020.
Comments Due: 5 p.m. ET 5/1/20.
Docket Numbers: ER20–1208–001.
Applicants: David Energy Supply,
LLC.
Description: Tariff Amendment:
Amendment to MBR Application Filing
to be effective 4/1/2020.
Filed Date: 4/9/20.
Accession Number: 20200409–5188.
Comments Due: 5 p.m. ET 4/30/20.
Docket Numbers: ER20–1533–000.
Applicants: CenterPoint Energy
Houston Electric, LLC.
Description: § 205(d) Rate Filing: TFO
Tariff Rate Revision to Conform with
PUCT-Approved Rate to be effective
4/23/2020.
Filed Date: 4/9/20.
Accession Number: 20200409–5187.
Comments Due: 5 p.m. ET 4/30/20.
Docket Numbers: ER20–1534–000.
Applicants: PacifiCorp.
Description: § 205(d) Rate Filing: ESM
Construction Agmt—Swift Troutdale to
be effective 4/10/2020.
Filed Date: 4/9/20.
Accession Number: 20200409–5189.
Comments Due: 5 p.m. ET 4/30/20.
Docket Numbers: ER20–1535–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original WMPA, Service Agreement No.
5626; Queue No. AE1–160 to be
effective 3/16/2020.
Filed Date: 4/10/20.
Accession Number: 20200410–5039.
Comments Due: 5 p.m. ET 5/1/20.
PO 00000
Frm 00067
Fmt 4703
Sfmt 4703
Docket Numbers: ER20–1536–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
Revisions to Implement Generator
Replacement Process to be effective 7/1/
2020.
Filed Date: 4/10/20.
Accession Number: 20200410–5064.
Comments Due: 5 p.m. ET 5/1/20.
Docket Numbers: ER20–1537–000.
Applicants: RE Mustang Two Barbaro
LLC.
Description: Baseline eTariff Filing:
RE Mustang Two Barbaro LLC MBR
Tariff to be effective 4/11/2020.
Filed Date: 4/10/20.
Accession Number: 20200410–5074.
Comments Due: 5 p.m. ET 5/1/20.
Docket Numbers: ER20–1538–000.
Applicants: RE Mustang Two
Whirlaway, LLC.
Description: Baseline eTariff Filing:
RE Mustang Two Whirlaway MBR Tariff
to be effective 4/11/2020.
Filed Date: 4/10/20.
Accession Number: 20200410–5085.
Comments Due: 5 p.m. ET 5/1/20.
Docket Numbers: ER20–1539–000.
Applicants: Neighborhood Sun
Benefit Corp.
Description: Compliance filing:
Market Based Rate Tariff—Baseline to
be effective 4/10/2020.
Filed Date: 4/10/20.
Accession Number: 20200410–5108.
Comments Due: 5 p.m. ET 5/1/20.
Docket Numbers: ER20–1540–000.
Applicants: San Diego Gas & Electric
Company.
Description: Compliance filing: Order
No. 864 Compliance Filing to be
effective 1/27/2020.
Filed Date: 4/10/20.
Accession Number: 20200410–5110.
Comments Due: 5 p.m. ET 5/1/20.
Docket Numbers: ER20–1541–000.
Applicants: Tri-State Generation and
Transmission Association, Inc.
Description: § 205(d) Rate Filing: Rate
Schedule FERC No. 278 between TriState and DMEA to be effective 12/31/
9998.
Filed Date: 4/10/20.
Accession Number: 20200410–5115.
Comments Due: 5 p.m. ET 5/1/20.
Docket Numbers: ER20–1542–000.
Applicants: Tri-State Generation and
Transmission Association, Inc.
Description: § 205(d) Rate Filing: Rate
Schedule FERC No. 262 between TriState and DMEA to be effective 6/10/
2020.
Filed Date: 4/10/20.
Accession Number: 20200410–5116.
Comments Due: 5 p.m. ET 5/1/20.
Docket Numbers: ER20–1543–000.
E:\FR\FM\16APN1.SGM
16APN1
Agencies
[Federal Register Volume 85, Number 74 (Thursday, April 16, 2020)]
[Notices]
[Pages 21227-21228]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-08036]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP20-52-000]
WBI Energy Transmission, Inc.; Notice of Schedule for
Environmental Review of the North Bakken Expansion Project
On February 14, 2020, WBI Energy Transmission, Inc. (WBI Energy)
filed an application in Docket No. CP20-52-000 requesting a Certificate
of Public Convenience and Necessity pursuant to 7(c) of the Natural Gas
Act to construct and operate certain natural gas facilities in Burke,
McKenzie, Mountrail, and Williams Counties, North Dakota. The proposed
project is known as the North Bakken Expansion Project (Project), and
would provide incremental firm transportation capacity from natural gas
processing plants to a proposed interconnect with Northern Border
Pipeline Company in McKenzie County, North Dakota.
On February 26, 2020, the Federal Energy Regulatory Commission
(Commission or FERC) issued its Notice of Application for the Project.
Among other things, that notice alerted agencies issuing federal
authorizations of the requirement to complete all necessary reviews and
to reach a final decision on a request for a federal authorization
within 90 days of the date of issuance of the Commission staff's
Environmental Assessment (EA) for the Project. This instant notice
identifies the FERC staff's planned schedule for the completion of the
EA for the Project.
Schedule for Environmental Review
Issuance of EA--September 4, 2020
90-day Federal Authorization Decision Deadline--December 3, 2020
If a schedule change becomes necessary, additional notice will be
provided so that the relevant agencies are kept informed of the
Project's progress.
Project Description
WBI Energy proposes to construct and operate five sections of new
natural gas pipeline, a new compressor station, and modifications to an
existing compressor station (totaling 92.5 miles of pipeline and 26,250
horsepower of compression), all in North Dakota. The Project would
provide about 350 million standard cubic feet of natural gas per day to
the Midwest via Northern Border Pipeline Company's existing mainline.
The Project includes: (i) 61.9 Miles of 24-inch-diameter pipeline
from WBI Energy's Tioga Compressor Station in Williams County to the
proposed Elkhorn Creek Compressor Station in McKenzie County; (ii) 0.3
mile of 24-inch-diameter pipeline from the proposed Elkhorn Creek
Compressor Station to a new interconnect with Northern Border Pipeline
Company; (iii) 20.4 miles of 12-inch-diameter pipeline looping along
WBI Energy's Line Section 25 in Mountrail and Burke Counties- \1\; (iv)
9.4 miles of 12-inch-diameter pipeline looping along WBI Energy's Line
Section 30 in Williams County; (v) 0.5 mile of 20-inch-diameter receipt
lateral to the Tioga Compressor Station; (vi) uprating WBI Energy's
Line Section 25; (vii) installing 22,500 additional horsepower at the
existing Tioga Compressor Station; (viii) constructing a new 3,750
horsepower compressor station, the Elkhorn Creek Compressor Station, in
McKenzie County; and (ix) and other associated appurtenances.
---------------------------------------------------------------------------
\1\ A pipeline loop is a segment of pipe constructed parallel to
an existing pipeline to increase capacity.
---------------------------------------------------------------------------
Background
On July 3, 2019, the Commission staff granted WBI Energy's request
to use the FERC's pre-filing environmental review process and assigned
the Project Docket No. PF19-7-000. On September 13, 2019, the
Commission issued a Notice of Intent to Prepare an Environmental
Assessment for the Planned North Bakken Expansion Project, Request for
Comments on Environmental Issues, and Notice of Public Scoping Session
(NOI). The NOI was issued during the pre-filing review of the Project
and was sent to affected landowners; federal, state, and local
government agencies; elected officials; environmental interest groups;
Native American tribes; other interested parties; and local libraries.
[[Page 21228]]
In response to the NOI, the Commission received comments from the
North Dakota Department of Environmental Quality (DEQ) and two
landowners. The North Dakota DEQ recommended the Project avoid Source
Water Protection Areas, section 303(d) Waters, and surface and
groundwater drinking sources. The DEQ also stated that WBI Energy
should obtain a Stormwater Construction Permit and implement proper
monitoring for the early leak detection. The primary environmental
issues raised by the other commentors were project location,
trespassing, impacts on water resources and soils, seeding, and
spreading of weeds. All substantive comments will be addressed in the
EA.
The Bureau of Land Management, the U.S. Army Corps of Engineers,
and the U.S. Forest Service are cooperating agencies in the preparation
of the EA.
Additional Information
In order to receive notification of the issuance of the EA and to
keep track of all formal issuances and submittals in specific dockets,
the Commission offers a free service called eSubscription. This can
reduce the amount of time you spend researching proceedings by
automatically providing you with notification of these filings,
document summaries, and direct links to the documents. Go to
www.ferc.gov/docs-filing/esubscription.asp.
Additional information about the Project is available from the
Commission's Office of External Affairs at (866) 208-FERC or on the
FERC website (www.ferc.gov). Using the ``eLibrary'' link, select
``General Search'' from the eLibrary menu, enter the selected date
range and ``Docket Number'' excluding the last three digits (i.e.,
CP20-52), and follow the instructions. For assistance with access to
eLibrary, the helpline can be reached at (866) 208-3676, TTY (202) 502-
8659, or at [email protected]. The eLibrary link on the FERC
website also provides access to the texts of formal documents issued by
the Commission, such as orders, notices, and rule makings.
Dated: April 10, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-08036 Filed 4-15-20; 8:45 am]
BILLING CODE 6717-01-P