Download as PDF 20178 Federal Register / Vol. 85, No. 70 / Friday, April 10, 2020 / Rules and Regulations Dated: March 25, 2020. Gregory Sopkin, Regional Administrator, Region 8. Subpart G—Colorado 2. Section 52.353 is amended by adding paragraph (e) to read as follows: ■ 40 CFR part 52 is amended as follows: PART 52—APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS * * * * * (e) The Colorado Department of Environmental Quality submitted certification of Colorado’s infrastructure SIP for the 2015 O3 NAAQS on September 17, 2018. Colorado’s infrastructure certification demonstrates how the State, where applicable, has plans in place that meet the 1. The authority citation for part 52 continues to read as follows: ■ Authority: 42 U.S.C. 7401 et seq. Rule No. State effective date Rule title * § 52.353 Section 110(a)(2) infrastructure requirements. * EPA effective date * requirements of section 110 for the 2015 O3 NAAQS. The State’s Infrastructure SIP for 2015 O3 NAAQS is approved with respect to CAA section 110(a)(1) and (2). Subpart JJ—North Dakota 3. In § 52.1820, the table in paragraph (c) is amended by revising the entry ‘‘33.1–15–15–01.2’’ to read as follows: ■ § 52.1820 * Identification of plan. * * (c) * * * * Final rule citation/date * * Comments * * * * * 33.1–15–15. Prevention of Significant Deterioration of Air Quality * * 33.1–15–15–01.2 ............ * * * * Scope ......... 1/1/2019 * * * * 4. Section 52.1833 is amended by adding paragraph (i) to read as follows: § 52.1833 Section 110(a)(2) infrastructure requirements. * * * * * (i) The North Dakota Department of Environmental Quality submitted certification of North Dakota’s infrastructure SIP for the 2015 O3 NAAQS on November 6, 2018. North Dakota’s infrastructure certification demonstrates how the State, where applicable, has plans in place that meet the requirements of section 110 for (A), (B), (C), (D)(i)(I) (Prongs 1 and 2), (D)(i)(II) (Prong 3), (D)(ii), (E), (F), (G), (H), (J), (K), (L), and (M). The EPA is disapproving (D)(i)(II) (Prong 4). [FR Doc. 2020–06685 Filed 4–9–20; 8:45 am] lotter on DSKBCFDHB2PROD with RULES BILLING CODE 6560–50–P 16:16 Apr 09, 2020 Jkt 250001 * 5/11/2020 * ■ VerDate Sep<11>2014 * [insert Federal Register citation], 4/10/2020. * Originally approved as 33–15–15–01 on 10/21/2016, 81 FR 72718. * * This rule is effective on May 11, ENVIRONMENTAL PROTECTION AGENCY DATES: 40 CFR Part 52 ADDRESSES: [EPA–R06–OAR–2018–0208; FRL–10006– 28–Region 6] Air Plan Approval; Oklahoma; Updates to the General SIP and New Source Review Permitting Requirements Environmental Protection Agency (EPA). ACTION: Final rule. AGENCY: Pursuant to the Federal Clean Air Act (CAA or the Act), the Environmental Protection Agency (EPA) is approving identified portions of revisions to the State Implementation Plan (SIP) for Oklahoma submitted by the State of Oklahoma designee by letters dated May 16, 1994; July 26, 2010; January 8, 2018; May 16, 2018; and December 19, 2018, and as clarified by letter dated May 16, 2018. This action addresses submitted revisions to the Oklahoma SIP pertaining to the incorporation by reference of federal requirements, updates to the general SIP provisions, and updates to the New Source Review (NSR) permit programs to address public notice and modeling requirements, including certain statutory provisions. SUMMARY: PO 00000 Frm 00028 Fmt 4700 Sfmt 4700 * 2020. The EPA has established a docket for this action under Docket ID No. EPA–R06–OAR–2018–0208. All documents in the docket are listed on the https://www.regulations.gov website. Although listed in the index, some information is not publicly available, e.g., Confidential Business Information or other information whose disclosure is restricted by statute. Certain other material, such as copyrighted material, is not placed on the internet and will be publicly available only in hard copy form. Publicly available docket materials are available either electronically through https://www.regulations.gov or in hard copy at the EPA Region 6 Office, 1201 Elm Street, Suite 500, Dallas, Texas 75270. FOR FURTHER INFORMATION CONTACT: Adina Wiley, EPA Region 6 Office, Air Permits Section, 1201 Elm Street, Suite 500, Dallas, TX 75270, 214–665–2115, wiley.adina@epa.gov. To inspect the hard copy materials, please schedule an appointment with Ms. Adina Wiley or Mr. Bill Deese at 214–665–7253. SUPPLEMENTARY INFORMATION: Throughout this document ‘‘we,’’ ‘‘us,’’ and ‘‘our’’ means the EPA. E:\FR\FM\10APR1.SGM 10APR1 Federal Register / Vol. 85, No. 70 / Friday, April 10, 2020 / Rules and Regulations I. Background The background for this action is discussed in detail in our December 3, 2019 proposal (84 FR 66103). In that document we proposed to approve revisions to the Oklahoma SIP submitted on May 16, 1994; July 26, 2010; January 8, 2018; May 16, 2018; and December 19, 2018, and as clarified by letter dated May 16, 2018. The revisions include the incorporation by reference dates for federal requirements and updates to the NSR Prevention of Significant Deterioration (PSD) and Nonattainment NSR permitting programs to maintain consistency with federal requirements. Our proposal included an analysis of these provisions and made a preliminary determination that the revisions were developed in accordance with the CAA and EPA’s regulations, policy, and guidance for SIP development and NSR permitting. We received one relevant comment on our proposed approval; the comment and our response are presented below. lotter on DSKBCFDHB2PROD with RULES II. Response to Comments Comment: The commenter stated that the EPA needs to be clearer when it is approving regulations into the SIP, especially when acting on multiple SIP submittals at once. As an example, the commenter noted that the EPA appears to be trying to approve the January 8, 2018, and December 19, 2018 versions of Oklahoma Administrative Code (OAC) 252:100, Subchapter 2 and Appendix Q, both of which incorporate by reference federal rules as of a date certain. The commenter maintained that the EPA cannot approve both versions simultaneously, because the SIP can only incorporate by reference one version of the federal rules at a time. The commenter asserted that the EPA must find all instances of overlapping rules in all the SIP submissions and only approve one. Once the EPA decides which of the overlapping rules should be approved (i.e., which submission is more recent), the commenter stated that the EPA must then disapprove the older versions of the rule as moot. The commenter concluded that the EPA approval of multiple overlapping SIPs would simply confuse the public. Response: We agree with the commenter that action on multiple SIP submittals in a single rulemaking can present unique challenges; however, we present the following discussion in order to clarify our action and ensure the commenter, as well as the public, that we are approving only one version of each State regulation addressed by this action, as identified in the VerDate Sep<11>2014 16:16 Apr 09, 2020 Jkt 250001 amendatory language included below. The Technical Support Document (TSD) associated with this rulemaking identifies each time the State regulatory section has been revised and submitted by Oklahoma as a proposed SIP revision. For each submission, our TSD provides a line-by-line evaluation of whether the submitted revision is approvable under federal requirements. Where a section has been revised multiple times, our TSD will show these multiple submissions side-by-side with a corresponding evaluation as to the approvability of the revisions. The amendatory language included in this final rule revises the Oklahoma SIP at 40 CFR 52.1920 based on the analysis presented in our TSD and the December 3, 2019 proposal. For example, the table at 40 CFR 52.1920(c) titled ‘‘EPA Approved Oklahoma Regulations’’ identifies each component of the Oklahoma SIP by the state citation, name of the section, state effective date, date and citation of EPA’s final approval, and any comments pertinent to that section. Finally, the commenter is incorrect in stating that the EPA must disapprove older versions of the submitted rules as moot. As demonstrated in the TSD, the sequential Oklahoma regulations build on the earlier revisions. To disapprove older submittals as moot would be contrary to the State’s intended rulemaking. No changes have been made as a result of this comment. III. Final Action We are approving the following as revisions to the Oklahoma SIP: • Removal of Regulation 3.8, adopted on March 30, 1994, submitted May 16, 1994; • New OAC 252:100–8–36.1, Public Participation, adopted on April 28, 2006, effective on June 15, 2006, submitted July 16, 2010; • Submitted on January 8, 2018: Æ Revisions to OAC 252:100–1–3, Definitions, adopted on June 13, 2017 and effective September 15, 2017; Æ Revisions to OAC 252:100–2–3 and Appendix Q for Incorporation by Reference, adopted on June 13, 2017 and effective September 15, 2017; Æ Revisions to OAC 252:100–8–31, Definitions, adopted on June 13, 2017 and effective September 15, 2017; Æ Revisions to OAC 252:100–8–33, Exemptions, adopted on June 13, 2017 and effective September 15, 2017; Æ Revisions to OAC 252:100–8–35, Air quality impact evaluation, adopted on June 13, 2017 and effective September 15, 2017; and Æ Revisions to OAC 252:100–8–51.1, Emissions reductions and offsets, PO 00000 Frm 00029 Fmt 4700 Sfmt 4700 20179 adopted on June 13, 2017 and effective September 15, 2017. • Submitted on May 16, 2018: Æ Revisions to OAC 252:4–1–2, Definitions, adopted on June 9, 2016, effective September 15, 2016; Æ Revisions to OAC 252:4–1–3, Organization, adopted on April 25, 2013, effective July 1, 2013, and revisions adopted on June 9, 2016, effective September 15, 2016; Æ Revisions to OAC 252:4–1–5, Availability of a record, adopted on May 6, 2005, effective June 15, 2005, and revisions adopted on April 25, 2013, effective July 1, 2013; Æ Revisions to OAC 252:4–1–6, Administrative fees, adopted on May 6, 2005, effective June 15, 2005; Æ Revisions to OAC 252:4–3–1, Meetings, adopted on March 27, 2007, effective June 15, 2007; Æ Revisions to OAC 252:4–7–5, Fees and fee refunds, adopted on June 13, 2017, effective September 15, 2017; Æ Revisions to OAC 252:4–7–13, Notices, adopted on March 25, 2003, effective June 1, 2003, except for OAC 252:4–7–13(g)(4); and revisions adopted June 13, 2017, effective September 15, 2017; Æ Revisions to OAC 252:4–7–15, Permit issuance or denial, adopted on May 28, 2002, effective June 1, 2002, and revisions adopted April 25, 2013, effective July 1, 2013; Æ Revisions to OAC 252:4–7–18, Preissuance permit review and correction, adopted April 25, 2013, effective July 1, 2013; Æ New OAC 252:4–7–20, Agency review of final permit decision, adopted April 25, 2013, effective July 1, 2013; Æ Revisions to OAC 252:4–7–32, Air quality applications—Tier I, adopted March 25, 2003, effective June 1, 2003; Æ Revisions to OAC 252:4–7–33, Air quality applications—Tier II, adopted March 25, 2003, effective June 1, 2003, except for OAC 252:4–7–33(c)(4); Æ Revisions to OAC 252:4–9–32, Individual proceedings filed by others, as adopted on May 1, 2009, effective July 1, 2009 and revisions adopted April 25, 2013, effective July 1, 2013; Æ Revisions to OAC 252:4–9–51, In general, adopted on March 24, 2004, effective June 1, 2004; Æ Revisions to OAC 252:4–9–52, Individual proceedings, adopted on March 24, 2004, effective June 1, 2004; Æ New OAC 252:4–17, Electronic Reporting, sections OAC 252:4–17–1— OAC 252:4–17–7, adopted April 27, 2007, effective June 15, 2017; Æ Revisions to OAC 252:4–17–2, Definitions, adopted June 9, 2016, effective September 15, 2016; Æ Revisions to OAC 252:4–17–4, Electronic signature agreement, adopted E:\FR\FM\10APR1.SGM 10APR1 20180 Federal Register / Vol. 85, No. 70 / Friday, April 10, 2020 / Rules and Regulations lotter on DSKBCFDHB2PROD with RULES June 9, 2016, effective September 15, 2016; Æ Letter to Ms. Anne Idsal, Regional Administrator, EPA Region 6, dated May 16, 2018 regarding ‘‘Clarification of PSD Public Participation Procedures under 2017 Revisions to the Oklahoma State Implementation Plan (SIP)’’; Æ Definitions of ‘‘Process Meeting’’ and ‘‘Response to Comments’’ at 27A Oklahoma Statutes (O.S.) 2–14–103 added July 1, 1994, and last modified and effective November 1, 2015; Æ The provisions for notification to an affected state at 27A O.S. 2–5–112(E) added May 15, 1992, and last modified and effective June 3, 2004; Æ 27A O.S. 2–14–301, 2–14–302, and 2–14–303 added and in effect July 1, 1996; Æ 27A O.S. 2–14–304 added July 1, 1996, and last modified and effective May 9, 2002; Æ Definition of ‘‘Record’’ at 51 O.S. 24A.3, added November 1, 1985, and last modified and effective November 1, 2014; Æ The requirement to maintain, and the description of the contents of the rulemaking record at 75 O.S. 302(B) promulgated in 1963 and last modified and effective November 1, 1998; Æ The process for adoption, amendment or revocation of a rule at 75 O.S. 303 promulgated in 1963 and last modified and affective November 1, 2013; and Æ Definition of ‘‘Meeting’’ at 25 O.S. 304(2) added October 1, 1977, and last modified and effective in 2010. • Submitted December 19, 2018: Æ Revisions to OAC 252:100–2–3 and Appendix Q adopted on June 18, 2018 and effective September 15, 2018; and Æ Revisions to OAC 252:100–8–35, Air quality impact evaluation, adopted on June 18, 2018 and effective September 15, 2018. The EPA finds that the provisions in OAC 252:4–1–1, 4–1–2, 4–1–3, 4–1–4, 4–1–5, 4–1–6, 4–1–7, 4–1–8, and 4–1–9, and OAC 252:100–5–1, 5–1.1 and 5–2.2 are applicable to the entirety of the Oklahoma SIP and the amendatory language table at 40 CFR 52.1920(c) is modified to reflect this finding. Additionally, the EPA is removing the disapprovals listed in 40 CFR 52.1922(b)(2), (b)(3), (b)(4), and (c), because the state has submitted appropriate revisions to the SIP to correct the disapprovals. IV. Incorporation by Reference In this rule, the EPA is finalizing regulatory text that includes incorporation by reference. In accordance with requirements of 1 CFR 51.5, the EPA is finalizing the VerDate Sep<11>2014 16:16 Apr 09, 2020 Jkt 250001 incorporation by reference the revisions to the Oklahoma regulations as described in the Final Action section above. The EPA has made, and will continue to make, these materials generally available through www.regulations.gov and at the EPA Region 6 Office (please contact the person identified in the FOR FURTHER INFORMATION CONTACT section of this preamble for more information). Therefore, these materials have been approved by the EPA for inclusion in the SIP, have been incorporated by reference by the EPA into that plan, are fully federally enforceable under sections 110 and 113 of the CAA as of the effective date of the final rulemaking of EPA’s approval, and will be incorporated by reference in the next update to the SIP compilation. V. Statutory and Executive Order Reviews Under the Clean Air Act, the Administrator is required to approve a SIP submission that complies with the provisions of the Act and applicable Federal regulations. 42 U.S.C. 7410(k); 40 CFR 52.02(a). Thus, in reviewing SIP submissions, the EPA’s role is to approve state choices, provided that they meet the criteria of the Clean Air Act. Accordingly, this action merely approves state law as meeting Federal requirements and does not impose additional requirements beyond those imposed by state law. For that reason, this action: • Is not a ‘‘significant regulatory action’’ subject to review by the Office of Management and Budget under Executive Orders 12866 (58 FR 51735, October 4, 1993) and 13563 (76 FR 3821, January 21, 2011); • Is not an Executive Order 13771 (82 FR 9339, February 2, 2017) regulatory action because SIP approvals are exempted under Executive Order 12866; • Does not impose an information collection burden under the provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq.); • Is certified as not having a significant economic impact on a substantial number of small entities under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.); • Does not contain any unfunded mandate or significantly or uniquely affect small governments, described in the Unfunded Mandates Reform Act of 1995 (Pub. L. 104–4); • Does not have federalism implications as specified in Executive Order 13132 (64 FR 43255, August 10, 1999); • Is not an economically significant regulatory action based on health or PO 00000 Frm 00030 Fmt 4700 Sfmt 4700 safety risks subject to Executive Order 13045 (62 FR 19885, April 23, 1997); • Is not a significant regulatory action subject to Executive Order 13211 (66 FR 28355, May 22, 2001); • Is not subject to requirements of section 12(d) of the National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 note) because application of those requirements would be inconsistent with the CAA; and • Does not provide the EPA with the discretionary authority to address, as appropriate, disproportionate human health or environmental effects, using practicable and legally permissible methods, under Executive Order 12898 (59 FR 7629, February 16, 1994). In addition, the SIP is not approved to apply on any Indian reservation land or in any other area where the EPA or an Indian tribe has demonstrated that a tribe has jurisdiction. In those areas of Indian country, the rule does not have tribal implications and will not impose substantial direct costs on tribal governments or preempt tribal law as specified by Executive Order 13175 (65 FR 67249, November 9, 2000). The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the Small Business Regulatory Enforcement Fairness Act of 1996, generally provides that before a rule may take effect, the agency promulgating the rule must submit a rule report, which includes a copy of the rule, to each House of the Congress and to the Comptroller General of the United States. EPA will submit a report containing this action and other required information to the U.S. Senate, the U.S. House of Representatives, and the Comptroller General of the United States prior to publication of the rule in the Federal Register. A major rule cannot take effect until 60 days after it is published in the Federal Register. This action is not a ‘‘major rule’’ as defined by 5 U.S.C. 804(2). Under section 307(b)(1) of the Clean Air Act, petitions for judicial review of this action must be filed in the United States Court of Appeals for the appropriate circuit by June 9, 2020. Filing a petition for reconsideration by the Administrator of this final rule does not affect the finality of this action for the purposes of judicial review nor does it extend the time within which a petition for judicial review may be filed, and shall not postpone the effectiveness of such rule or action. This action may not be challenged later in proceedings to enforce its requirements. (See CAA section 307(b)(2).) List of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control, Carbon monoxide, E:\FR\FM\10APR1.SGM 10APR1 20181 Federal Register / Vol. 85, No. 70 / Friday, April 10, 2020 / Rules and Regulations Incorporation by reference, Intergovernmental relations, Lead, Nitrogen dioxide, Ozone, Particulate matter, Reporting and recordkeeping requirements, Sulfur oxides, Volatile organic compounds. a. In paragraph (c), amend the table titled ‘‘EPA Approved Oklahoma Regulations’’ by: ■ i. Removing the entries for Regulation ‘‘3.8’’, ‘‘3.8(a)’’, ‘‘3.8(b)’’, and ‘‘3.8(c)’’; ■ ii. Adding entries for ‘‘52:4–7–20’’, ‘‘252:4–17–1’’, ‘‘252:4–17–2’’, ‘‘252:4– 17–3’’, ‘‘252:4–17–4’’, ‘‘252:4–17–5’’, ‘‘252:4–17–6’’, ‘‘252:4–17–7’’, ‘‘252:100– 8–36.1’’; and ■ iii. Revising the entries for ‘‘252:4–1– 1’’; ‘‘252:4–1–2’’; ‘‘252:4–1–3’’; ‘‘252:4– 1–4’’; ‘‘252:4–1–5’’; ‘‘252:4–1–6’’; ‘‘252:4–1–7’’; ‘‘252:4–1–8’’; ‘‘252:4–1– 9’’; ‘‘252:4–3–1’’; ‘‘252:4–7–5’’; ‘‘252:4– 7–13’’; ‘‘252–4–7–15’’; ‘‘252:4–7–18’’; ‘‘252:4–7–32’’; ‘‘252:4–7–33’’; ‘‘252:4–9– 32’’; ‘‘252:4–9–51’’; ‘‘252:4–9–52’’; ‘‘252:100–1–3’’; ‘‘252:100–2–3’’; ‘‘252:100–5–1’’; ‘‘252:100–5–1.1’’; ‘‘252:100–5–2.2’’; ‘‘252:100–8–31’’; ‘‘252:100–8–33’’; ‘‘252:100–8–35’’; ‘‘252:100–8–51.1’’; and ‘‘252:100, Appendix Q’’. ■ b. In paragraph (e), ■ Dated: March 19, 2020. Kenley McQueen, Regional Administrator, Region 6. For the reasons stated in the preamble, the Environmental Protection Agency amends 40 CFR part 52 as follows: PART 52—APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS 1. The authority citation for part 52 continues to read as follows: ■ Authority: 42 U.S.C. 7401 et seq. Subpart LL—Oklahoma ■ 2. In § 52.1920: i. Amend the table titled ‘‘EPAApproved Nonregulatory Provisions and Quasi-Regulatory Measures in the Oklahoma SIP’’ by adding an entry for: ‘‘Letter to Ms. Anne Idsal, Regional Administrator, EPA Region 6, dated May 16, 2018 regarding ‘‘Clarification of PSD Public Participation Procedures under 2017 Revisions to the Oklahoma State Implementation Plan’’.’’ ■ ii. Amend the second table titled ‘‘EPA Approved Statutes in the Oklahoma SIP’’ by adding entries for ‘‘25 O.S. 304(2)’’, ‘‘27A O.S. 2–5– 112(E)’’, ‘‘2–14–103, O.S. 2–14–301’’, ‘‘2–14–302’’, ‘‘2–14–303’’, ‘‘2–14–304’’; ‘‘51 O.S. 24A.3’’, ‘‘75 O.S. 302(B)’’, and ‘‘75 O.S. 303’’. The additions and revisions read as follows: ■ § 52.1920 * Identification of plan. * * (c) * * * * * EPA APPROVED OKLAHOMA REGULATIONS State citation State effective date Title/subject * * * EPA approval date * Explanation * * * OKLAHOMA ADMINISTRATIVE CODE, TITLE 252. DEPARTMENT OF ENVIRONMENTAL QUALITY Chapter 4 (OAC 252:4). Rules of Practice and Procedure Subchapter 1. General Provisions 252:4–1–1 .......................... Purpose and authority ...... 6/11/2001 252:4–1–2 .......................... Definitions ......................... 9/15/2016 252:4–1–3 .......................... Organization ..................... 9/15/2016 252:4–1–4 .......................... 6/11/2001 252:4–1–5 .......................... Office location and hours; communications. Availability of a record ...... 252:4–1–6 .......................... Administrative fees ........... 6/15/2005 252:4–1–7 .......................... 6/11/2001 252:4–1–8 .......................... Fee credits for regulatory fees. Board and councils ........... 252:4–1–9 .......................... Severability ....................... 6/11/2001 7/1/2013 6/11/2001 4/10/2020, [Insert Federal Register citation]. 4/10/2020, [Insert Federal Register citation]. 4/10/2020, [Insert Federal Register citation]. 4/10/2020, [Insert Federal Register citation]. 4/10/2020, [Insert Federal Register citation]. 4/10/2020, [Insert Federal Register citation]. 4/10/2020, [Insert Federal Register citation]. 4/10/2020, [Insert Federal Register citation]. 4/10/2020, [Insert Federal Register citation]. Subchapter 3. Meetings and Public Forums lotter on DSKBCFDHB2PROD with RULES 252:4–3–1 .......................... * Meetings ........................... * 6/15/2007 * 4/10/2020, [Insert Federal Register citation]. * * * Subchapter 7. Environmental Permit Process Part 1. The Process VerDate Sep<11>2014 16:16 Apr 09, 2020 Jkt 250001 PO 00000 Frm 00031 Fmt 4700 Sfmt 4700 E:\FR\FM\10APR1.SGM 10APR1 * 20182 Federal Register / Vol. 85, No. 70 / Friday, April 10, 2020 / Rules and Regulations EPA APPROVED OKLAHOMA REGULATIONS—Continued State effective date State citation Title/subject EPA approval date Explanation * 252:4–7–5 .......................... * * Fees and fee refunds ....... * 9/15/2017 * 4/10/2020, [Insert Federal Register citation]. * * Applicable to minor NSR permitting under OAC 252:100–7 and major NSR permitting under OAC 252:100– 8. * 252:4–7–13 ........................ * * Notices .............................. * 9/15/2017 * 4/10/2020, [Insert Federal Register citation]. * * The SIP does NOT include (e), (f), or (g)(4). Applicable to minor NSR permitting under OAC 252:100–7 and major NSR permitting under OAC 252:100–8. * 252:4–7–15 ........................ * * Permit issuance or denial * 7/1/2013 * 4/10/2020, [Insert Federal Register citation]. * * Applicable to minor NSR permitting under OAC 252:100–7 and major NSR permitting under OAC 252:100– 8. * 252:4–7–18 ........................ * * Pre-issuance permit review and correction. * 7/1/2013 * 4/10/2020, [Insert Federal Register citation]. * * Applicable to minor NSR permitting under OAC 252:100–7 and major NSR permitting under OAC 252:100– 8. * 252:4–7–20 ........................ * * Agency review of final permit decision. * 7/1/2013 * 4/10/2020, [Insert Federal Register citation]. * * * * * * * * * Part 3. Air Quality Division Tiers and Time Lines * 252:4–7–32 ........................ * * Air quality applications— Tier I. * 6/1/2003 * 4/10/2020, [Insert Federal Register citation]. 252:4–7–33 ........................ Air quality applications— Tier II. 6/1/2003 4/10/2020, [Insert Federal Register citation]. * * * * * * Applicable to minor NSR permitting under OAC 252:100–7. The SIP does NOT include (a), (b), or (c)(1). The SIP does NOT include (c)(4). * * * * * * * * * * * Subchapter 9. Administrative Proceedings * * * * * Part 3. Individual Proceedings * 252:4–9–32 ........................ * * * Individual proceedings filed by others. * * 7/1/2013 * * 4/10/2020, [Insert Federal Register citation]. * * lotter on DSKBCFDHB2PROD with RULES Part 5. Air Quality Advisory Council Hearings 252:4–9–51 ........................ In general ......................... 6/1/2004 252:4–9–52 ........................ Individual proceedings ...... 6/1/2004 * * * 4/10/2020, [Insert Federal Register citation]. 4/10/2020, [Insert Federal Register citation]. * * Subchapter 17. Electronic Reporting 252:4–17–1 ........................ VerDate Sep<11>2014 Purpose, authority and applicability. 16:16 Apr 09, 2020 Jkt 250001 PO 00000 Frm 00032 6/15/2007 Fmt 4700 4/10/2020, [Insert Federal Register citation]. Sfmt 4700 E:\FR\FM\10APR1.SGM 10APR1 20183 Federal Register / Vol. 85, No. 70 / Friday, April 10, 2020 / Rules and Regulations EPA APPROVED OKLAHOMA REGULATIONS—Continued State effective date State citation Title/subject 252:4–17–2 ........................ Definitions ......................... 9/15/2016 252:4–17–3 ........................ Use of electronic document receiving system. Electronic signature agreement. Valid electronic signature 6/15/2007 Effect of electronic signature. Enforcement ..................... 6/15/2007 252:4–17–4 ........................ 252:4–17–5 ........................ 252:4–17–6 ........................ 252:4–17–7 ........................ * * 9/15/2016 6/15/2007 6/15/2007 * EPA approval date Explanation 4/10/2020, [Insert Federal Register citation]. 4/10/2020, [Insert Federal Register citation]. 4/10/2020, [Insert Federal Register citation]. 4/10/2020, [Insert Federal Register citation]. 4/10/2020, [Insert Federal Register citation]. 4/10/2020, [Insert Federal Register citation]. * * * * * * * * * * * * * * * * * * Chapter 100 (OAC 252:100). Air Pollution Control Subchapter 1. General Provisions * 252:100–1–3 ...................... * * * Definitions ......................... * * 9/15/2017 * * 4/10/2020, [Insert Federal Register citation]. * * Subchapter 2. Incorporation by Reference * 252:100–2–3 ...................... * * * Incorporation by reference * * 9/15/2018 * * 4/10/2020, [Insert Federal Register citation]. * * Subchapter 5. Registration, Emission Inventory and Annual Operating Fees 252:100–5–1 ...................... Purpose ............................ 6/11/2001 252:100–5–1.1 ................... Definitions ......................... 6/15/2007 * 252:100–5–2.2 ................... * * Annual operating fees ...... * 6/11/2001 * * * 4/10/2020, [Insert Federal Register citation]. 4/10/2020, [Insert Federal Register citation]. * 4/10/2020, [Insert Federal Register citation]. * * Subchapter 8. Permits for Part 70 Sources * * * * * lotter on DSKBCFDHB2PROD with RULES Part 7. Prevention of Significant Deterioration (PSD) Requirements for Attainment Areas * 252:100–8–31 .................... * * Definitions ......................... * 9/15/2017 * 4/10/2020, [Insert Federal Register citation]. * * * 252:100–8–33 .................... * * Exemptions ....................... * 9/15/2017 * 4/10/2020, [Insert Federal Register citation]. * * * 252:100–8–35 .................... * * Air quality impact evaluation. * 9/15/2018 * 4/10/2020, [Insert Federal Register citation]. * * * 252:100–8–36.1 ................. * * Public participation ........... * 6/15/2006 * 4/10/2020, [Insert Federal Register citation]. * * VerDate Sep<11>2014 16:16 Apr 09, 2020 Jkt 250001 PO 00000 Frm 00033 Fmt 4700 Sfmt 4700 E:\FR\FM\10APR1.SGM 10APR1 20184 Federal Register / Vol. 85, No. 70 / Friday, April 10, 2020 / Rules and Regulations EPA APPROVED OKLAHOMA REGULATIONS—Continued State citation State effective date Title/subject * * * EPA approval date * Explanation * * * * * * * Part 9. Major Sources Affecting Nonattainment Areas * 252:100–8–51.1 ................. * * * Emission reductions and offsets. * * 9/15/2017 * * 4/10/2020, [Insert Federal Register citation]. * * Appendices for OAC 252: Chapter 100 * 252:100, Appendix Q ........ * * * * * Incorporation by reference * * * * 9/15/2018 * * * 4/10/2020, [Insert Federal Register citation]. * (e) * * * * SIP only includes specified portions of 40 CFR parts 50, 51, and 98, as referenced in 252:100, Appendix Q. * * * * EPA-APPROVED NONREGULATORY PROVISIONS AND QUASI-REGULATORY MEASURES IN THE OKLAHOMA SIP Applicable geographic or nonattainment area Name of SIP provision * * Letter to Ms. Anne Idsal, Regional Administrator, EPA Region 6, dated May 16, 2018 regarding ‘‘Clarification of PSD Public Participation Procedures under 2017 Revisions to the Oklahoma State Implementation Plan’’. * * * * * Statewide ...................................... * * * State submittal date * 05/16/2018 * EPA approval date Explanation * * 4/10/2020, [Insert Federal Register citation]. * * * * * EPA APPROVED STATUTES IN THE OKLAHOMA SIP Title/subject 25 O.S. 304(2) ...... Oklahoma Open Meetings Act .... 8/27/2010 27A O.S. 2–5– 112(E). Oklahoma Clean Air Act; Implementation of Comprehensive Permitting Program. Uniform Environmental Permitting Act; Definitions. 6/3/2004 27A O.S. 2–14–103 27A O.S. 2–14–301 27A O.S. 2–14–302 lotter on DSKBCFDHB2PROD with RULES State effective date State citation 27A O.S. 2–14–303 27A O.S. 2–14–304 VerDate Sep<11>2014 Uniform Environmental Permitting Act; Notice. Uniform Environmental Permitting Act; Preparation of Draft Denial or Permit. Uniform Environmental Permitting Act; Formal Public Meeting. Uniform Environmental Permitting Act; Draft Permits or Denials for Tier Applications. 17:35 Apr 09, 2020 Jkt 250001 PO 00000 Frm 00034 EPA approval date Explanation 4/10/2020, [Insert Federal Register citation]. 4/10/2020, [Insert Federal Register citation]. SIP only includes the definition of ‘‘Meeting’’. SIP only includes the provisions for notification to an affected state. SIP only includes definitions of ‘‘Process Meeting’’ and ‘‘Response to Comments’’. 11/1/2015 4/10/2020, [Insert Federal Register citation]. 7/1/1996 4/10/2020, [Insert Federal Register citation]. 4/10/2020, [Insert Federal Register citation]. 7/1/1996 7/1/1996 5/9/2002 Fmt 4700 4/10/2020, [Insert Federal Register citation]. 4/10/2020, [Insert Federal Register citation]. Sfmt 4700 E:\FR\FM\10APR1.SGM 10APR1 20185 Federal Register / Vol. 85, No. 70 / Friday, April 10, 2020 / Rules and Regulations EPA APPROVED STATUTES IN THE OKLAHOMA SIP—Continued Title/subject 51 O.S. 24A.3 ....... Oklahoma Open Records Act; Definitions. Administrative Procedures Act; Promulgation of certain rules— Public inspection of rules, orders, decision and opinions— Rulemaking record—Prohibited actions—Violations. Administrative Procedures Act; Adoption, amendment or revocation of rule. 75 O.S. 302(B) ...... 75 O.S. 303 ........... * * * * * * 3. In § 52.1922 revise paragraph (b) and remove paragraph (c). The revision reads as follows: ■ § 52.1922 Approval status. * * * * * (b) The EPA is disapproving the following severable portions of the February 6, 2012, Oklahoma SIP submittal: (1) Revisions establishing Minor New Source Review Greenhouse Gas (GHG) permitting requirements at OAC 252:100–7–2.1 as submitted on February 6, 2012. (2) [Reserved]. * * * * * [FR Doc. 2020–06160 Filed 4–9–20; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 180 [EPA–HQ–OPP–2019–0266; FRL–10005–93] Autographa Californica Multiple Nucleopolyhedrovirus Strain R3; Exemption From the Requirement of a Tolerance Environmental Protection Agency (EPA). ACTION: Final rule. AGENCY: This regulation establishes an exemption from the requirement of a tolerance for residues of Autographa californica multiple nucleopolyhedrovirus strain R3 in or on all food commodities when used in accordance with label directions and good agricultural practices. AgBiTech Pty Ltd. submitted a petition to EPA under the Federal Food, Drug, and Cosmetic Act (FFDCA), requesting an exemption from the requirement of a tolerance. This regulation eliminates the SUMMARY: VerDate Sep<11>2014 16:16 Apr 09, 2020 11/1/2014 11/1/1998 11/1/2013 * * lotter on DSKBCFDHB2PROD with RULES State effective date State citation Jkt 250001 EPA approval date Explanation 4/10/2020, [Insert Federal Register citation]. 4/10/2020, [Insert Federal Register citation]. SIP only includes the definition of ‘‘Record’’. SIP only includes the requirement to maintain, and the description of the contents of the rulemaking record. 4/10/2020, [Insert Federal Register citation]. SIP only includes the process for adoption, amendment or revocation of a rule. * * need to establish a maximum permissible level for residues of Autographa californica multiple nucleopolyhedrovirus strain R3 in or on all food commodities under FFDCA. DATES: This regulation is effective April 10, 2020. Objections and requests for hearings must be received on or before June 9, 2020 and must be filed in accordance with the instructions provided in 40 CFR part 178 (see also Unit I.C. of the SUPPLEMENTARY INFORMATION). ADDRESSES: The docket for this action, identified by docket identification (ID) number EPA–HQ–OPP–2019–0266, is available at https://www.regulations.gov or at the Office of Pesticide Programs Regulatory Public Docket (OPP Docket) in the Environmental Protection Agency Docket Center (EPA/DC), West William Jefferson Clinton Bldg., Rm. 3334, 1301 Constitution Ave. NW, Washington, DC 20460–0001. The Public Reading Room is open from 8:30 a.m. to 4:30 p.m., Monday through Friday, excluding legal holidays. The telephone number for the Public Reading Room is (202) 566–1744, and the telephone number for the OPP Docket is (703) 305–5805. Please review the visitor instructions and additional information about the docket available at https://www.epa.gov/dockets. FOR FURTHER INFORMATION CONTACT: Robert McNally, Biopesticides and Pollution Prevention Division (7511P), Office of Pesticide Programs, Environmental Protection Agency, 1200 Pennsylvania Ave. NW, Washington, DC 20460–0001; main telephone number: (703) 305–7090; email address: BPPDFRNotices@epa.gov. SUPPLEMENTARY INFORMATION: I. General Information A. Does this action apply to me? You may be potentially affected by this action if you are an agricultural producer, food manufacturer, or PO 00000 Frm 00035 Fmt 4700 Sfmt 4700 * * pesticide manufacturer. The following list of North American Industrial Classification System (NAICS) codes is not intended to be exhaustive, but rather provides a guide to help readers determine whether this document applies to them. Potentially affected entities may include: • Crop production (NAICS code 111). • Animal production (NAICS code 112). • Food manufacturing (NAICS code 311). • Pesticide manufacturing (NAICS code 32532). B. How can I get electronic access to other related information? You may access a frequently updated electronic version of 40 CFR part 180 through the Government Publishing Office’s e-CFR site at https:// www.ecfr.gov/cgi-bin/textidx?&c=ecfr&tpl=/ecfrbrowse/Title40/ 40tab_02.tpl. C. How can I file an objection or hearing request? Under FFDCA section 408(g), 21 U.S.C. 346a(g), any person may file an objection to any aspect of this regulation and may also request a hearing on those objections. You must file your objection or request a hearing on this regulation in accordance with the instructions provided in 40 CFR part 178. To ensure proper receipt by EPA, you must identify docket ID number EPA–HQ– OPP–2019–0266 in the subject line on the first page of your submission. All objections and requests for a hearing must be in writing and must be received by the Hearing Clerk on or before June 9, 2020. Addresses for mail and hand delivery of objections and hearing requests are provided in 40 CFR 178.25(b). In addition to filing an objection or hearing request with the Hearing Clerk as described in 40 CFR part 178, please E:\FR\FM\10APR1.SGM 10APR1

Agencies

[Federal Register Volume 85, Number 70 (Friday, April 10, 2020)]
[Rules and Regulations]
[Pages 20178-20185]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-06160]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 52

[EPA-R06-OAR-2018-0208; FRL-10006-28-Region 6]


Air Plan Approval; Oklahoma; Updates to the General SIP and New 
Source Review Permitting Requirements

AGENCY: Environmental Protection Agency (EPA).

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: Pursuant to the Federal Clean Air Act (CAA or the Act), the 
Environmental Protection Agency (EPA) is approving identified portions 
of revisions to the State Implementation Plan (SIP) for Oklahoma 
submitted by the State of Oklahoma designee by letters dated May 16, 
1994; July 26, 2010; January 8, 2018; May 16, 2018; and December 19, 
2018, and as clarified by letter dated May 16, 2018. This action 
addresses submitted revisions to the Oklahoma SIP pertaining to the 
incorporation by reference of federal requirements, updates to the 
general SIP provisions, and updates to the New Source Review (NSR) 
permit programs to address public notice and modeling requirements, 
including certain statutory provisions.

DATES: This rule is effective on May 11, 2020.

ADDRESSES: The EPA has established a docket for this action under 
Docket ID No. EPA-R06-OAR-2018-0208. All documents in the docket are 
listed on the https://www.regulations.gov website. Although listed in 
the index, some information is not publicly available, e.g., 
Confidential Business Information or other information whose disclosure 
is restricted by statute. Certain other material, such as copyrighted 
material, is not placed on the internet and will be publicly available 
only in hard copy form. Publicly available docket materials are 
available either electronically through https://www.regulations.gov or 
in hard copy at the EPA Region 6 Office, 1201 Elm Street, Suite 500, 
Dallas, Texas 75270.

FOR FURTHER INFORMATION CONTACT: Adina Wiley, EPA Region 6 Office, Air 
Permits Section, 1201 Elm Street, Suite 500, Dallas, TX 75270, 214-665-
2115, [email protected]. To inspect the hard copy materials, please 
schedule an appointment with Ms. Adina Wiley or Mr. Bill Deese at 214-
665-7253.

SUPPLEMENTARY INFORMATION: Throughout this document ``we,'' ``us,'' and 
``our'' means the EPA.

[[Page 20179]]

I. Background

    The background for this action is discussed in detail in our 
December 3, 2019 proposal (84 FR 66103). In that document we proposed 
to approve revisions to the Oklahoma SIP submitted on May 16, 1994; 
July 26, 2010; January 8, 2018; May 16, 2018; and December 19, 2018, 
and as clarified by letter dated May 16, 2018. The revisions include 
the incorporation by reference dates for federal requirements and 
updates to the NSR Prevention of Significant Deterioration (PSD) and 
Nonattainment NSR permitting programs to maintain consistency with 
federal requirements. Our proposal included an analysis of these 
provisions and made a preliminary determination that the revisions were 
developed in accordance with the CAA and EPA's regulations, policy, and 
guidance for SIP development and NSR permitting.
    We received one relevant comment on our proposed approval; the 
comment and our response are presented below.

II. Response to Comments

    Comment: The commenter stated that the EPA needs to be clearer when 
it is approving regulations into the SIP, especially when acting on 
multiple SIP submittals at once. As an example, the commenter noted 
that the EPA appears to be trying to approve the January 8, 2018, and 
December 19, 2018 versions of Oklahoma Administrative Code (OAC) 
252:100, Subchapter 2 and Appendix Q, both of which incorporate by 
reference federal rules as of a date certain. The commenter maintained 
that the EPA cannot approve both versions simultaneously, because the 
SIP can only incorporate by reference one version of the federal rules 
at a time. The commenter asserted that the EPA must find all instances 
of overlapping rules in all the SIP submissions and only approve one. 
Once the EPA decides which of the overlapping rules should be approved 
(i.e., which submission is more recent), the commenter stated that the 
EPA must then disapprove the older versions of the rule as moot. The 
commenter concluded that the EPA approval of multiple overlapping SIPs 
would simply confuse the public.
    Response: We agree with the commenter that action on multiple SIP 
submittals in a single rulemaking can present unique challenges; 
however, we present the following discussion in order to clarify our 
action and ensure the commenter, as well as the public, that we are 
approving only one version of each State regulation addressed by this 
action, as identified in the amendatory language included below. The 
Technical Support Document (TSD) associated with this rulemaking 
identifies each time the State regulatory section has been revised and 
submitted by Oklahoma as a proposed SIP revision. For each submission, 
our TSD provides a line-by-line evaluation of whether the submitted 
revision is approvable under federal requirements. Where a section has 
been revised multiple times, our TSD will show these multiple 
submissions side-by-side with a corresponding evaluation as to the 
approvability of the revisions. The amendatory language included in 
this final rule revises the Oklahoma SIP at 40 CFR 52.1920 based on the 
analysis presented in our TSD and the December 3, 2019 proposal. For 
example, the table at 40 CFR 52.1920(c) titled ``EPA Approved Oklahoma 
Regulations'' identifies each component of the Oklahoma SIP by the 
state citation, name of the section, state effective date, date and 
citation of EPA's final approval, and any comments pertinent to that 
section. Finally, the commenter is incorrect in stating that the EPA 
must disapprove older versions of the submitted rules as moot. As 
demonstrated in the TSD, the sequential Oklahoma regulations build on 
the earlier revisions. To disapprove older submittals as moot would be 
contrary to the State's intended rulemaking. No changes have been made 
as a result of this comment.

III. Final Action

    We are approving the following as revisions to the Oklahoma SIP:
     Removal of Regulation 3.8, adopted on March 30, 1994, 
submitted May 16, 1994;
     New OAC 252:100-8-36.1, Public Participation, adopted on 
April 28, 2006, effective on June 15, 2006, submitted July 16, 2010;
     Submitted on January 8, 2018:
    [cir] Revisions to OAC 252:100-1-3, Definitions, adopted on June 
13, 2017 and effective September 15, 2017;
    [cir] Revisions to OAC 252:100-2-3 and Appendix Q for Incorporation 
by Reference, adopted on June 13, 2017 and effective September 15, 
2017;
    [cir] Revisions to OAC 252:100-8-31, Definitions, adopted on June 
13, 2017 and effective September 15, 2017;
    [cir] Revisions to OAC 252:100-8-33, Exemptions, adopted on June 
13, 2017 and effective September 15, 2017;
    [cir] Revisions to OAC 252:100-8-35, Air quality impact evaluation, 
adopted on June 13, 2017 and effective September 15, 2017; and
    [cir] Revisions to OAC 252:100-8-51.1, Emissions reductions and 
offsets, adopted on June 13, 2017 and effective September 15, 2017.
     Submitted on May 16, 2018:
    [cir] Revisions to OAC 252:4-1-2, Definitions, adopted on June 9, 
2016, effective September 15, 2016;
    [cir] Revisions to OAC 252:4-1-3, Organization, adopted on April 
25, 2013, effective July 1, 2013, and revisions adopted on June 9, 
2016, effective September 15, 2016;
    [cir] Revisions to OAC 252:4-1-5, Availability of a record, adopted 
on May 6, 2005, effective June 15, 2005, and revisions adopted on April 
25, 2013, effective July 1, 2013;
    [cir] Revisions to OAC 252:4-1-6, Administrative fees, adopted on 
May 6, 2005, effective June 15, 2005;
    [cir] Revisions to OAC 252:4-3-1, Meetings, adopted on March 27, 
2007, effective June 15, 2007;
    [cir] Revisions to OAC 252:4-7-5, Fees and fee refunds, adopted on 
June 13, 2017, effective September 15, 2017;
    [cir] Revisions to OAC 252:4-7-13, Notices, adopted on March 25, 
2003, effective June 1, 2003, except for OAC 252:4-7-13(g)(4); and 
revisions adopted June 13, 2017, effective September 15, 2017;
    [cir] Revisions to OAC 252:4-7-15, Permit issuance or denial, 
adopted on May 28, 2002, effective June 1, 2002, and revisions adopted 
April 25, 2013, effective July 1, 2013;
    [cir] Revisions to OAC 252:4-7-18, Pre-issuance permit review and 
correction, adopted April 25, 2013, effective July 1, 2013;
    [cir] New OAC 252:4-7-20, Agency review of final permit decision, 
adopted April 25, 2013, effective July 1, 2013;
    [cir] Revisions to OAC 252:4-7-32, Air quality applications--Tier 
I, adopted March 25, 2003, effective June 1, 2003;
    [cir] Revisions to OAC 252:4-7-33, Air quality applications--Tier 
II, adopted March 25, 2003, effective June 1, 2003, except for OAC 
252:4-7-33(c)(4);
    [cir] Revisions to OAC 252:4-9-32, Individual proceedings filed by 
others, as adopted on May 1, 2009, effective July 1, 2009 and revisions 
adopted April 25, 2013, effective July 1, 2013;
    [cir] Revisions to OAC 252:4-9-51, In general, adopted on March 24, 
2004, effective June 1, 2004;
    [cir] Revisions to OAC 252:4-9-52, Individual proceedings, adopted 
on March 24, 2004, effective June 1, 2004;
    [cir] New OAC 252:4-17, Electronic Reporting, sections OAC 252:4-
17-1--OAC 252:4-17-7, adopted April 27, 2007, effective June 15, 2017;
    [cir] Revisions to OAC 252:4-17-2, Definitions, adopted June 9, 
2016, effective September 15, 2016;
    [cir] Revisions to OAC 252:4-17-4, Electronic signature agreement, 
adopted

[[Page 20180]]

June 9, 2016, effective September 15, 2016;
    [cir] Letter to Ms. Anne Idsal, Regional Administrator, EPA Region 
6, dated May 16, 2018 regarding ``Clarification of PSD Public 
Participation Procedures under 2017 Revisions to the Oklahoma State 
Implementation Plan (SIP)'';
    [cir] Definitions of ``Process Meeting'' and ``Response to 
Comments'' at 27A Oklahoma Statutes (O.S.) 2-14-103 added July 1, 1994, 
and last modified and effective November 1, 2015;
    [cir] The provisions for notification to an affected state at 27A 
O.S. 2-5-112(E) added May 15, 1992, and last modified and effective 
June 3, 2004;
    [cir] 27A O.S. 2-14-301, 2-14-302, and 2-14-303 added and in effect 
July 1, 1996;
    [cir] 27A O.S. 2-14-304 added July 1, 1996, and last modified and 
effective May 9, 2002;
    [cir] Definition of ``Record'' at 51 O.S. 24A.3, added November 1, 
1985, and last modified and effective November 1, 2014;
    [cir] The requirement to maintain, and the description of the 
contents of the rulemaking record at 75 O.S. 302(B) promulgated in 1963 
and last modified and effective November 1, 1998;
    [cir] The process for adoption, amendment or revocation of a rule 
at 75 O.S. 303 promulgated in 1963 and last modified and affective 
November 1, 2013; and
    [cir] Definition of ``Meeting'' at 25 O.S. 304(2) added October 1, 
1977, and last modified and effective in 2010.
     Submitted December 19, 2018:
    [cir] Revisions to OAC 252:100-2-3 and Appendix Q adopted on June 
18, 2018 and effective September 15, 2018; and
    [cir] Revisions to OAC 252:100-8-35, Air quality impact evaluation, 
adopted on June 18, 2018 and effective September 15, 2018.
    The EPA finds that the provisions in OAC 252:4-1-1, 4-1-2, 4-1-3, 
4-1-4, 4-1-5, 4-1-6, 4-1-7, 4-1-8, and 4-1-9, and OAC 252:100-5-1, 5-
1.1 and 5-2.2 are applicable to the entirety of the Oklahoma SIP and 
the amendatory language table at 40 CFR 52.1920(c) is modified to 
reflect this finding. Additionally, the EPA is removing the 
disapprovals listed in 40 CFR 52.1922(b)(2), (b)(3), (b)(4), and (c), 
because the state has submitted appropriate revisions to the SIP to 
correct the disapprovals.

IV. Incorporation by Reference

    In this rule, the EPA is finalizing regulatory text that includes 
incorporation by reference. In accordance with requirements of 1 CFR 
51.5, the EPA is finalizing the incorporation by reference the 
revisions to the Oklahoma regulations as described in the Final Action 
section above. The EPA has made, and will continue to make, these 
materials generally available through www.regulations.gov and at the 
EPA Region 6 Office (please contact the person identified in the FOR 
FURTHER INFORMATION CONTACT section of this preamble for more 
information). Therefore, these materials have been approved by the EPA 
for inclusion in the SIP, have been incorporated by reference by the 
EPA into that plan, are fully federally enforceable under sections 110 
and 113 of the CAA as of the effective date of the final rulemaking of 
EPA's approval, and will be incorporated by reference in the next 
update to the SIP compilation.

V. Statutory and Executive Order Reviews

    Under the Clean Air Act, the Administrator is required to approve a 
SIP submission that complies with the provisions of the Act and 
applicable Federal regulations. 42 U.S.C. 7410(k); 40 CFR 52.02(a). 
Thus, in reviewing SIP submissions, the EPA's role is to approve state 
choices, provided that they meet the criteria of the Clean Air Act. 
Accordingly, this action merely approves state law as meeting Federal 
requirements and does not impose additional requirements beyond those 
imposed by state law. For that reason, this action:
     Is not a ``significant regulatory action'' subject to 
review by the Office of Management and Budget under Executive Orders 
12866 (58 FR 51735, October 4, 1993) and 13563 (76 FR 3821, January 21, 
2011);
     Is not an Executive Order 13771 (82 FR 9339, February 2, 
2017) regulatory action because SIP approvals are exempted under 
Executive Order 12866;
     Does not impose an information collection burden under the 
provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq.);
     Is certified as not having a significant economic impact 
on a substantial number of small entities under the Regulatory 
Flexibility Act (5 U.S.C. 601 et seq.);
     Does not contain any unfunded mandate or significantly or 
uniquely affect small governments, described in the Unfunded Mandates 
Reform Act of 1995 (Pub. L. 104-4);
     Does not have federalism implications as specified in 
Executive Order 13132 (64 FR 43255, August 10, 1999);
     Is not an economically significant regulatory action based 
on health or safety risks subject to Executive Order 13045 (62 FR 
19885, April 23, 1997);
     Is not a significant regulatory action subject to 
Executive Order 13211 (66 FR 28355, May 22, 2001);
     Is not subject to requirements of section 12(d) of the 
National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 
note) because application of those requirements would be inconsistent 
with the CAA; and
     Does not provide the EPA with the discretionary authority 
to address, as appropriate, disproportionate human health or 
environmental effects, using practicable and legally permissible 
methods, under Executive Order 12898 (59 FR 7629, February 16, 1994).
    In addition, the SIP is not approved to apply on any Indian 
reservation land or in any other area where the EPA or an Indian tribe 
has demonstrated that a tribe has jurisdiction. In those areas of 
Indian country, the rule does not have tribal implications and will not 
impose substantial direct costs on tribal governments or preempt tribal 
law as specified by Executive Order 13175 (65 FR 67249, November 9, 
2000).
    The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the 
Small Business Regulatory Enforcement Fairness Act of 1996, generally 
provides that before a rule may take effect, the agency promulgating 
the rule must submit a rule report, which includes a copy of the rule, 
to each House of the Congress and to the Comptroller General of the 
United States. EPA will submit a report containing this action and 
other required information to the U.S. Senate, the U.S. House of 
Representatives, and the Comptroller General of the United States prior 
to publication of the rule in the Federal Register. A major rule cannot 
take effect until 60 days after it is published in the Federal 
Register. This action is not a ``major rule'' as defined by 5 U.S.C. 
804(2).
    Under section 307(b)(1) of the Clean Air Act, petitions for 
judicial review of this action must be filed in the United States Court 
of Appeals for the appropriate circuit by June 9, 2020. Filing a 
petition for reconsideration by the Administrator of this final rule 
does not affect the finality of this action for the purposes of 
judicial review nor does it extend the time within which a petition for 
judicial review may be filed, and shall not postpone the effectiveness 
of such rule or action. This action may not be challenged later in 
proceedings to enforce its requirements. (See CAA section 307(b)(2).)

List of Subjects in 40 CFR Part 52

    Environmental protection, Air pollution control, Carbon monoxide,

[[Page 20181]]

Incorporation by reference, Intergovernmental relations, Lead, Nitrogen 
dioxide, Ozone, Particulate matter, Reporting and recordkeeping 
requirements, Sulfur oxides, Volatile organic compounds.

    Dated: March 19, 2020.
Kenley McQueen,
Regional Administrator, Region 6.

    For the reasons stated in the preamble, the Environmental 
Protection Agency amends 40 CFR part 52 as follows:

PART 52--APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS

0
1. The authority citation for part 52 continues to read as follows:

    Authority:  42 U.S.C. 7401 et seq.

Subpart LL--Oklahoma

0
2. In Sec.  52.1920:
0
a. In paragraph (c), amend the table titled ``EPA Approved Oklahoma 
Regulations'' by:
0
i. Removing the entries for Regulation ``3.8'', ``3.8(a)'', ``3.8(b)'', 
and ``3.8(c)'';
0
ii. Adding entries for ``52:4-7-20'', ``252:4-17-1'', ``252:4-17-2'', 
``252:4-17-3'', ``252:4-17-4'', ``252:4-17-5'', ``252:4-17-6'', 
``252:4-17-7'', ``252:100-8-36.1''; and
0
iii. Revising the entries for ``252:4-1-1''; ``252:4-1-2''; ``252:4-1-
3''; ``252:4-1-4''; ``252:4-1-5''; ``252:4-1-6''; ``252:4-1-7''; 
``252:4-1-8''; ``252:4-1-9''; ``252:4-3-1''; ``252:4-7-5''; ``252:4-7-
13''; ``252-4-7-15''; ``252:4-7-18''; ``252:4-7-32''; ``252:4-7-33''; 
``252:4-9-32''; ``252:4-9-51''; ``252:4-9-52''; ``252:100-1-3''; 
``252:100-2-3''; ``252:100-5-1''; ``252:100-5-1.1''; ``252:100-5-2.2''; 
``252:100-8-31''; ``252:100-8-33''; ``252:100-8-35''; ``252:100-8-
51.1''; and ``252:100, Appendix Q''.
0
b. In paragraph (e),
0
i. Amend the table titled ``EPA-Approved Nonregulatory Provisions and 
Quasi-Regulatory Measures in the Oklahoma SIP'' by adding an entry for: 
``Letter to Ms. Anne Idsal, Regional Administrator, EPA Region 6, dated 
May 16, 2018 regarding ``Clarification of PSD Public Participation 
Procedures under 2017 Revisions to the Oklahoma State Implementation 
Plan''.''
0
ii. Amend the second table titled ``EPA Approved Statutes in the 
Oklahoma SIP'' by adding entries for ``25 O.S. 304(2)'', ``27A O.S. 2-
5-112(E)'', ``2-14-103, O.S. 2-14-301'', ``2-14-302'', ``2-14-303'', 
``2-14-304''; ``51 O.S. 24A.3'', ``75 O.S. 302(B)'', and ``75 O.S. 
303''.
    The additions and revisions read as follows:


Sec.  52.1920   Identification of plan.

* * * * *
    (c) * * *

                                        EPA Approved Oklahoma Regulations
----------------------------------------------------------------------------------------------------------------
                                                             State
          State citation              Title/subject     effective date   EPA approval date       Explanation
----------------------------------------------------------------------------------------------------------------
 
                                                  * * * * * * *
----------------------------------------------------------------------------------------------------------------
                  OKLAHOMA ADMINISTRATIVE CODE, TITLE 252. DEPARTMENT OF ENVIRONMENTAL QUALITY
----------------------------------------------------------------------------------------------------------------
                             Chapter 4 (OAC 252:4). Rules of Practice and Procedure
----------------------------------------------------------------------------------------------------------------
                                        Subchapter 1. General Provisions
----------------------------------------------------------------------------------------------------------------
252:4-1-1........................  Purpose and               6/11/2001  4/10/2020, [Insert
                                    authority.                           Federal Register
                                                                         citation].
252:4-1-2........................  Definitions........       9/15/2016  4/10/2020, [Insert   ...................
                                                                         Federal Register
                                                                         citation].
252:4-1-3........................  Organization.......       9/15/2016  4/10/2020, [Insert   ...................
                                                                         Federal Register
                                                                         citation].
252:4-1-4........................  Office location and       6/11/2001  4/10/2020, [Insert   ...................
                                    hours;                               Federal Register
                                    communications.                      citation].
252:4-1-5........................  Availability of a          7/1/2013  4/10/2020, [Insert   ...................
                                    record.                              Federal Register
                                                                         citation].
252:4-1-6........................  Administrative fees       6/15/2005  4/10/2020, [Insert   ...................
                                                                         Federal Register
                                                                         citation].
252:4-1-7........................  Fee credits for           6/11/2001  4/10/2020, [Insert   ...................
                                    regulatory fees.                     Federal Register
                                                                         citation].
252:4-1-8........................  Board and councils.       6/11/2001  4/10/2020, [Insert   ...................
                                                                         Federal Register
                                                                         citation].
252:4-1-9........................  Severability.......       6/11/2001  4/10/2020, [Insert   ...................
                                                                         Federal Register
                                                                         citation].
----------------------------------------------------------------------------------------------------------------
                                    Subchapter 3. Meetings and Public Forums
----------------------------------------------------------------------------------------------------------------
252:4-3-1........................  Meetings...........       6/15/2007  4/10/2020, [Insert
                                                                         Federal Register
                                                                         citation].
----------------------------------------------------------------------------------------------------------------
 
                                                  * * * * * * *
----------------------------------------------------------------------------------------------------------------
                                   Subchapter 7. Environmental Permit Process
----------------------------------------------------------------------------------------------------------------
                                               Part 1. The Process
----------------------------------------------------------------------------------------------------------------
 

[[Page 20182]]

 
                                                  * * * * * * *
252:4-7-5........................  Fees and fee              9/15/2017  4/10/2020, [Insert   Applicable to minor
                                    refunds.                             Federal Register     NSR permitting
                                                                         citation].           under OAC 252:100-
                                                                                              7 and major NSR
                                                                                              permitting under
                                                                                              OAC 252:100-8.
 
                                                  * * * * * * *
252:4-7-13.......................  Notices............       9/15/2017  4/10/2020, [Insert   The SIP does NOT
                                                                         Federal Register     include (e), (f),
                                                                         citation].           or (g)(4).
                                                                                              Applicable to
                                                                                              minor NSR
                                                                                              permitting under
                                                                                              OAC 252:100-7 and
                                                                                              major NSR
                                                                                              permitting under
                                                                                              OAC 252:100-8.
 
                                                  * * * * * * *
252:4-7-15.......................  Permit issuance or         7/1/2013  4/10/2020, [Insert   Applicable to minor
                                    denial.                              Federal Register     NSR permitting
                                                                         citation].           under OAC 252:100-
                                                                                              7 and major NSR
                                                                                              permitting under
                                                                                              OAC 252:100-8.
 
                                                  * * * * * * *
252:4-7-18.......................  Pre-issuance permit        7/1/2013  4/10/2020, [Insert   Applicable to minor
                                    review and                           Federal Register     NSR permitting
                                    correction.                          citation].           under OAC 252:100-
                                                                                              7 and major NSR
                                                                                              permitting under
                                                                                              OAC 252:100-8.
 
                                                  * * * * * * *
252:4-7-20.......................  Agency review of           7/1/2013  4/10/2020, [Insert   ...................
                                    final permit                         Federal Register
                                    decision.                            citation].
 
                                                  * * * * * * *
----------------------------------------------------------------------------------------------------------------
                                Part 3. Air Quality Division Tiers and Time Lines
----------------------------------------------------------------------------------------------------------------
 
                                                  * * * * * * *
252:4-7-32.......................  Air quality                6/1/2003  4/10/2020, [Insert   Applicable to minor
                                    applications--Tier                   Federal Register     NSR permitting
                                    I.                                   citation].           under OAC 252:100-
                                                                                              7.
                                                                                             The SIP does NOT
                                                                                              include (a), (b),
                                                                                              or (c)(1).
252:4-7-33.......................  Air quality                6/1/2003  4/10/2020, [Insert   The SIP does NOT
                                    applications--Tier                   Federal Register     include (c)(4).
                                    II.                                  citation].
 
                                                  * * * * * * *
----------------------------------------------------------------------------------------------------------------
                                    Subchapter 9. Administrative Proceedings
----------------------------------------------------------------------------------------------------------------
 
                                                  * * * * * * *
----------------------------------------------------------------------------------------------------------------
                                         Part 3. Individual Proceedings
----------------------------------------------------------------------------------------------------------------
 
                                                  * * * * * * *
252:4-9-32.......................  Individual                 7/1/2013  4/10/2020, [Insert
                                    proceedings filed                    Federal Register
                                    by others.                           citation].
 
                                                  * * * * * * *
----------------------------------------------------------------------------------------------------------------
                                  Part 5. Air Quality Advisory Council Hearings
----------------------------------------------------------------------------------------------------------------
252:4-9-51.......................  In general.........        6/1/2004  4/10/2020, [Insert
                                                                         Federal Register
                                                                         citation].
252:4-9-52.......................  Individual                 6/1/2004  4/10/2020, [Insert   ...................
                                    proceedings.                         Federal Register
                                                                         citation].
 
                                                  * * * * * * *
----------------------------------------------------------------------------------------------------------------
                                       Subchapter 17. Electronic Reporting
----------------------------------------------------------------------------------------------------------------
252:4-17-1.......................  Purpose, authority        6/15/2007  4/10/2020, [Insert
                                    and applicability.                   Federal Register
                                                                         citation].

[[Page 20183]]

 
252:4-17-2.......................  Definitions........       9/15/2016  4/10/2020, [Insert
                                                                         Federal Register
                                                                         citation].
252:4-17-3.......................  Use of electronic         6/15/2007  4/10/2020, [Insert
                                    document receiving                   Federal Register
                                    system.                              citation].
252:4-17-4.......................  Electronic                9/15/2016  4/10/2020, [Insert
                                    signature                            Federal Register
                                    agreement.                           citation].
252:4-17-5.......................  Valid electronic          6/15/2007  4/10/2020, [Insert
                                    signature.                           Federal Register
                                                                         citation].
252:4-17-6.......................  Effect of                 6/15/2007  4/10/2020, [Insert
                                    electronic                           Federal Register
                                    signature.                           citation].
252:4-17-7.......................  Enforcement........       6/15/2007  4/10/2020, [Insert   ...................
                                                                         Federal Register
                                                                         citation].
 
                                                  * * * * * * *
----------------------------------------------------------------------------------------------------------------
                                Chapter 100 (OAC 252:100). Air Pollution Control
----------------------------------------------------------------------------------------------------------------
                                        Subchapter 1. General Provisions
----------------------------------------------------------------------------------------------------------------
 
                                                  * * * * * * *
252:100-1-3......................  Definitions........       9/15/2017  4/10/2020, [Insert
                                                                         Federal Register
                                                                         citation].
 
                                                  * * * * * * *
----------------------------------------------------------------------------------------------------------------
                                    Subchapter 2. Incorporation by Reference
----------------------------------------------------------------------------------------------------------------
 
                                                  * * * * * * *
252:100-2-3......................  Incorporation by          9/15/2018  4/10/2020, [Insert
                                    reference.                           Federal Register
                                                                         citation].
 
                                                  * * * * * * *
----------------------------------------------------------------------------------------------------------------
                    Subchapter 5. Registration, Emission Inventory and Annual Operating Fees
----------------------------------------------------------------------------------------------------------------
252:100-5-1......................  Purpose............       6/11/2001  4/10/2020, [Insert
                                                                         Federal Register
                                                                         citation].
252:100-5-1.1....................  Definitions........       6/15/2007  4/10/2020, [Insert
                                                                         Federal Register
                                                                         citation].
 
                                                  * * * * * * *
252:100-5-2.2....................  Annual operating          6/11/2001  4/10/2020, [Insert   ...................
                                    fees.                                Federal Register
                                                                         citation].
 
                                                  * * * * * * *
----------------------------------------------------------------------------------------------------------------
                                    Subchapter 8. Permits for Part 70 Sources
----------------------------------------------------------------------------------------------------------------
 
                                                  * * * * * * *
----------------------------------------------------------------------------------------------------------------
             Part 7. Prevention of Significant Deterioration (PSD) Requirements for Attainment Areas
----------------------------------------------------------------------------------------------------------------
 
                                                  * * * * * * *
252:100-8-31.....................  Definitions........       9/15/2017  4/10/2020, [Insert
                                                                         Federal Register
                                                                         citation].
 
                                                  * * * * * * *
252:100-8-33.....................  Exemptions.........       9/15/2017  4/10/2020, [Insert   ...................
                                                                         Federal Register
                                                                         citation].
 
                                                  * * * * * * *
252:100-8-35.....................  Air quality impact        9/15/2018  4/10/2020, [Insert
                                    evaluation.                          Federal Register
                                                                         citation].
 
                                                  * * * * * * *
252:100-8-36.1...................  Public                    6/15/2006  4/10/2020, [Insert
                                    participation.                       Federal Register
                                                                         citation].
 

[[Page 20184]]

 
                                                  * * * * * * *
----------------------------------------------------------------------------------------------------------------
                               Part 9. Major Sources Affecting Nonattainment Areas
----------------------------------------------------------------------------------------------------------------
 
                                                  * * * * * * *
252:100-8-51.1...................  Emission reductions       9/15/2017  4/10/2020, [Insert
                                    and offsets.                         Federal Register
                                                                         citation].
 
                                                  * * * * * * *
----------------------------------------------------------------------------------------------------------------
                                       Appendices for OAC 252: Chapter 100
----------------------------------------------------------------------------------------------------------------
 
                                                  * * * * * * *
252:100, Appendix Q..............  Incorporation by          9/15/2018  4/10/2020, [Insert   SIP only includes
                                    reference.                           Federal Register     specified portions
                                                                         citation].           of 40 CFR parts
                                                                                              50, 51, and 98, as
                                                                                              referenced in
                                                                                              252:100, Appendix
                                                                                              Q.
 
                                                  * * * * * * *
----------------------------------------------------------------------------------------------------------------

* * * * *
    (e) * * *

             EPA-Approved Nonregulatory Provisions and Quasi-Regulatory Measures in the Oklahoma SIP
----------------------------------------------------------------------------------------------------------------
                                        Applicable
      Name of SIP provision           geographic or          State       EPA  approval date      Explanation
                                    nonattainment area  submittal date
----------------------------------------------------------------------------------------------------------------
 
                                                  * * * * * * *
Letter to Ms. Anne Idsal,          Statewide..........      05/16/2018  4/10/2020, [Insert
 Regional Administrator, EPA                                             Federal Register
 Region 6, dated May 16, 2018                                            citation].
 regarding ``Clarification of PSD
 Public Participation Procedures
 under 2017 Revisions to the
 Oklahoma State Implementation
 Plan''.
 
                                                  * * * * * * *
----------------------------------------------------------------------------------------------------------------

* * * * *

                                    EPA Approved Statutes in the Oklahoma SIP
----------------------------------------------------------------------------------------------------------------
                                                           State
        State citation             Title/subject      effective date    EPA approval date        Explanation
----------------------------------------------------------------------------------------------------------------
25 O.S. 304(2)...............  Oklahoma Open               8/27/2010  4/10/2020, [Insert    SIP only includes
                                Meetings Act.                          Federal Register      the definition of
                                                                       citation].            ``Meeting''.
27A O.S. 2-5-112(E)..........  Oklahoma Clean Air           6/3/2004  4/10/2020, [Insert    SIP only includes
                                Act; Implementation                    Federal Register      the provisions for
                                of Comprehensive                       citation].            notification to an
                                Permitting Program.                                          affected state.
27A O.S. 2-14-103............  Uniform Environmental       11/1/2015  4/10/2020, [Insert    SIP only includes
                                Permitting Act;                        Federal Register      definitions of
                                Definitions.                           citation].            ``Process Meeting''
                                                                                             and ``Response to
                                                                                             Comments''.
27A O.S. 2-14-301............  Uniform Environmental        7/1/1996  4/10/2020, [Insert
                                Permitting Act;                        Federal Register
                                Notice.                                citation].
27A O.S. 2-14-302............  Uniform Environmental        7/1/1996  4/10/2020, [Insert
                                Permitting Act;                        Federal Register
                                Preparation of Draft                   citation].
                                Denial or Permit.
27A O.S. 2-14-303............  Uniform Environmental        7/1/1996  4/10/2020, [Insert
                                Permitting Act;                        Federal Register
                                Formal Public                          citation].
                                Meeting.
27A O.S. 2-14-304............  Uniform Environmental        5/9/2002  4/10/2020, [Insert
                                Permitting Act;                        Federal Register
                                Draft Permits or                       citation].
                                Denials for Tier
                                Applications.

[[Page 20185]]

 
51 O.S. 24A.3................  Oklahoma Open Records       11/1/2014  4/10/2020, [Insert    SIP only includes
                                Act; Definitions.                      Federal Register      the definition of
                                                                       citation].            ``Record''.
75 O.S. 302(B)...............  Administrative              11/1/1998  4/10/2020, [Insert    SIP only includes
                                Procedures Act;                        Federal Register      the requirement to
                                Promulgation of                        citation].            maintain, and the
                                certain rules--                                              description of the
                                Public inspection of                                         contents of the
                                rules, orders,                                               rulemaking record.
                                decision and
                                opinions--Rulemaking
                                record--Prohibited
                                actions--Violations.
75 O.S. 303..................  Administrative              11/1/2013  4/10/2020, [Insert    SIP only includes
                                Procedures Act;                        Federal Register      the process for
                                Adoption, amendment                    citation].            adoption, amendment
                                or revocation of                                             or revocation of a
                                rule.                                                        rule.
 
                                                  * * * * * * *
----------------------------------------------------------------------------------------------------------------

* * * * *

0
3. In Sec.  52.1922 revise paragraph (b) and remove paragraph (c).
    The revision reads as follows:


Sec.  52.1922  Approval status.

* * * * *
    (b) The EPA is disapproving the following severable portions of the 
February 6, 2012, Oklahoma SIP submittal:
    (1) Revisions establishing Minor New Source Review Greenhouse Gas 
(GHG) permitting requirements at OAC 252:100-7-2.1 as submitted on 
February 6, 2012.
    (2) [Reserved].
* * * * *
[FR Doc. 2020-06160 Filed 4-9-20; 8:45 am]
 BILLING CODE 6560-50-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.