Nebraska Public Power District; Notice of Availability of Environmental Assessment, 19754-19755 [2020-07376]
Download as PDF
19754
Federal Register / Vol. 85, No. 68 / Wednesday, April 8, 2020 / Notices
Title: FERC–725T, Mandatory
Reliability Standards for the Bulk-Power
System: TRE 1 Reliability Standards.
OMB Control No.: 1902–0273.
Type of Request: Three-year extension
of the FERC–725T information
collection requirements with no changes
to the current reporting requirements.
Abstract: TRE Reliability Standards
apply to entities registered as Generator
Owners (GOs), Generator Operators
(GOPs), and Balancing Authorities (BAs)
within the Texas Reliability Entity
region.
The information collection
requirements entail the setting or
configuration of the Control System
software, identification and recording of
events, data retention, and submitting
frequency measurable events to the
compliance enforcement authority
(Regional Entity or NERC).
Submitting frequency measurable
events. The BA has to identify and post
information regarding Frequency
Measurable Events (FME). Further, the
BA has to calculate and report to the
Compliance Enforcement Authority data
related to Primary Frequency Response
(PFR) performance of each generating
unit/generating facility.
Data retention. The BA, GO, and GOP
shall keep data or evidence to show
compliance, as identified below, unless
directed by its Compliance Enforcement
Authority to retain specific evidence for
a longer period of time as part of an
investigation. Compliance audits are
generally about three years apart.
• The BA shall retain a list of
identified Frequency Measurable Events
and shall retain FME information since
its last compliance audit.
• The BA shall retain all monthly
PFR performance reports since its last
compliance audit.
• The BA shall retain all annual
Interconnection minimum Frequency
Response calculations, and related
methodology and criteria documents,
relating to time periods since its last
compliance audit.
• The BA shall retain all data and
calculations relating to the
Interconnection’s Frequency Response,
and all evidence of actions taken to
increase the Interconnection’s
Frequency Response, since its last
compliance audit.
• Each GOP and GO shall retain
evidence since its last compliance audit.
Type of Respondents: NERC
Registered entities: Balancing
Authorities, Generator Owners,
Generator Operators.
Estimate of Annual Burden : 2 The
Commission estimates the annual public
reporting burden for the information
collection as:
FERC–725T (MANDATORY RELIABILITY STANDARDS FOR THE BULK-POWER SYSTEM: TRE RELIABILITY STANDARDS)
Number of
respondents
Annual
number of
responses per
respondent
Total
number of
responses
Average
burden & cost per
response 3
Total annual burden
hours & total annual
cost
Cost per
respondent
($)
(1)
(2)
(1) * (2) = (3)
(4)
(3) * (4) = (5)
(5) ÷ (1)
Maintenance and Submission of Event Log
Data.
Evidence Retention ......
41
1
1
16 hrs.; $821.44 ..........
16 hrs.; $821.44 ..........
821.44
5 130
1
130
2 hrs.; 102.68 ..............
260 hrs.; 13,348.4 .......
102.68
Total ......................
........................
........................
131
.....................................
276 hrs.; 14,169.84 .....
........................
lotter on DSKBCFDHB2PROD with NOTICES
Comments: Comments are invited on:
(1) Whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collection
of information, including the validity of
the methodology and assumptions used;
(3) ways to enhance the quality, utility
and clarity of the information collection;
and (4) ways to minimize the burden of
the collection of information on those
who are to respond, including the use
of automated collection techniques or
other forms of information technology.
1 Texas
Reliability Entity.
is defined as the total time, effort, or
financial resources expended by persons to
generate, maintain, retain, or disclose or provide
information to or for a Federal agency. For further
explanation of what is included in the information
collection burden, reference 5 Code of Federal
Regulations 1320.3.
2 Burden
VerDate Sep<11>2014
18:37 Apr 07, 2020
Jkt 250001
Dated: April 1, 2020.
Kimberly D. Bose,
Secretary.
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s regulations, 18 CFR part
380 (Order No. 486, 52 FR 47879), the
Office of Energy Projects has reviewed
the application for non-capacity license
amendment for the North Platte/
Keystone Diversion Dam Hydroelectric
Project, located on the North/South
Platte Rivers in Lincoln and Keith
counties, Nebraska, and has prepared an
Environmental Assessment (EA). In the
EA, Commission staff analyzes the
potential environmental effects of the
proposed license amendment and
concludes that issuing an order
approving the proposal, with
appropriate environmental measures,
would not constitute a major federal
action significantly affecting the quality
of the human environment.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
3 The figures for May 2018 posted by the Bureau
of Labor Statistics for the Utilities sector (available
at https://www.bls.gov/oes/current/naics2_22.htm)
and updated March 2019 for benefits information
(at https://www.bls.gov/news.release/ecec.nr0.htm).
The hourly estimates for salary plus benefits are:
—File Clerks (code 43–4071), $34.50.
—Electrical Engineer (code 17–2071), $68.17.
The average hourly burden cost for this collection
is $51.34 [$34.50 + $68.17 = 51.335] and is rounded
to $51.34.
4 BA (balancing authority).
5 BA (balancing authority), GO (generator owner),
and GOP (generator operator).
[FR Doc. 2020–07374 Filed 4–7–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 1835–290]
Nebraska Public Power District; Notice
of Availability of Environmental
Assessment
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
E:\FR\FM\08APN1.SGM
08APN1
Federal Register / Vol. 85, No. 68 / Wednesday, April 8, 2020 / Notices
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘elibrary’’ link.
Enter the docket number excluding the
last three digits in the document field to
access the document. You may also
register online at https://www.ferc.gov/
docs-filing/esubscription.asp to be
notified via email of new filings and
issuances related to this or other
pending projects. At this time, the
Commission has suspended access to
the Commission’s Public Reference
Room, due to the proclamation
declaring a National Emergency
concerning the Novel Coronavirus
Disease (COVID–19), issued by the
President on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3673 or TYY, (202)
502–8659.
For further information, contact Jon
Cofrancesco at (202) 502–8951 or
jon.cofrancesco@ferc.gov.
Dated: April 2, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–07376 Filed 4–7–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
lotter on DSKBCFDHB2PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER11–2154–011.
Applicants: Twin Eagle Resource
Management, LLC.
Description: Notice of Change in
Status of Twin Eagle Resource
Management, LLC.
Filed Date: 3/30/20.
Accession Number: 20200330–5290.
Comments Due: 5 p.m. ET 4/20/20.
Docket Numbers: ER11–2154–012.
Applicants: Twin Eagle Resource
Management, LLC.
Description: Notice of Change in
Status of Twin Eagle Resource
Management, LLC.
Filed Date: 4/2/20.
Accession Number: 20200402–5068.
Comments Due: 5 p.m. ET 4/23/20.
Docket Numbers: ER19–458–001.
Applicants: EDF Trading North
America, LLC, AES Alamitos, LLC, AES
Huntington Beach, LLC, AES Redondo
Beach, LLC.
VerDate Sep<11>2014
18:37 Apr 07, 2020
Jkt 250001
Description: Pre-Arranged/Pre-Agreed
(Stipulation and Offer of Settlement)
Filing of the Settling Parties.
Filed Date: 4/1/20.
Accession Number: 20200401–5434.
Comments Due: 5 p.m. ET 4/22/20.
Docket Numbers: ER19–1216–001.
Applicants: Northwest Ohio Wind,
LLC.
Description: Report Filing: Refund
Report (ER19–1216-) to be effective
N/A.
Filed Date: 4/2/20.
Accession Number: 20200402–5125.
Comments Due: 5 p.m. ET 4/23/20.
Docket Numbers: ER20–783–001.
Applicants: Rosewater Wind Farm
LLC.
Description: Compliance filing:
Amendment to Compliance Filing and
Revised Market-Based Rate Tariff to be
effective 12/16/2019.
Filed Date: 4/2/20.
Accession Number: 20200402–5063.
Comments Due: 5 p.m. ET 4/23/20.
Docket Numbers: ER20–1417–000.
Applicants: Roundhouse Renewable
Energy, LLC.
Description: Amendment to March 27,
2020 Roundhouse Renewable Energy,
LLC tariff filing.
Filed Date: 4/1/20.
Accession Number: 20200401–5418.
Comments Due: 5 p.m. ET 4/22/20.
Docket Numbers: ER20–1474–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2020–04–01_Revisions to Attachment
FF regarding FTP Language to be
effective 6/1/2020.
Filed Date: 4/1/20.
Accession Number: 20200401–5294.
Comments Due: 5 p.m. ET 4/22/20.
Docket Numbers: ER20–1475–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Cancellation:
Notice of Cancellation of Service
Agreement No. 690, No. D07 RE:
Deactivation to be effective 6/1/2020.
Filed Date: 4/1/20.
Accession Number: 20200401–5308.
Comments Due: 5 p.m. ET 4/22/20.
Docket Numbers: ER20–1476–000.
Applicants: Avista Corporation.
Description: § 205(d) Rate Filing:
Avista Corp RS T0447 Communications
Lease Agreement to be effective
6/1/2020.
Filed Date: 4/1/20.
Accession Number: 20200401–5318.
Comments Due: 5 p.m. ET 4/22/20.
Docket Numbers: ER20–1477–000.
Applicants: 3PR Trading, Inc.
Description: Baseline eTariff Filing:
baseline new to be effective 4/2/2020.
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
19755
Filed Date: 4/2/20.
Accession Number: 20200402–5002.
Comments Due: 5 p.m. ET 4/23/20.
Docket Numbers: ER20–1478–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing: 3647
AECC Addendum 2 to Attachment AO
to be effective 4/1/2020.
Filed Date: 4/2/20.
Accession Number: 20200402–5005.
Comments Due: 5 p.m. ET 4/23/20.
Docket Numbers: ER20–1479–000.
Applicants: Public Service Company
of New Mexico.
Description: Formula Rate Postemployment Benefits Other than
Pensions filing of Public Service
Company of New Mexico.
Filed Date: 4/1/20.
Accession Number: 20200401–5419.
Comments Due: 5 p.m. ET 4/22/20.
Docket Numbers: ER20–1480–000.
Applicants: Vermont Electric Power
Company, Inc.
Description: Order No. 864
Compliance Filing of Vermont Electric
Power Company, Inc.
Filed Date: 4/1/20.
Accession Number: 20200401–5430.
Comments Due: 5 p.m. ET 4/22/20.
Docket Numbers: ER20–1481–000.
Applicants: AES Ohio Generation,
LLC.
Description: Tariff Cancellation: AES
Ohio Reactive Power Tariff Cancellation
to be effective 6/1/2020.
Filed Date: 4/2/20.
Accession Number: 20200402–5034.
Comments Due: 5 p.m. ET 4/23/20.
Docket Numbers: ER20–1482–000.
Applicants: Oncor Electric Delivery
Company LLC.
Description: Tariff Cancellation:
Notice of Cancellation to be effective
4/22/2020.
Filed Date: 4/2/20.
Accession Number: 20200402–5037.
Comments Due: 5 p.m. ET 4/23/20.
Docket Numbers: ER20–1483–000.
Applicants: Avista Corporation.
Description: § 205(d) Rate Filing:
Avista Corp RS T1162 Interconnection
and Operating Agreement to be effective
4/3/2020.
Filed Date: 4/2/20.
Accession Number: 20200402–5067.
Comments Due: 5 p.m. ET 4/23/20.
Docket Numbers: ER20–1485–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing:
Amended GIA and Service Agmt
Painted Hills & Cancel SA Nos. 877,
878, 879, 880 to be effective 6/2/2020.
Filed Date: 4/2/20.
Accession Number: 20200402–5070.
E:\FR\FM\08APN1.SGM
08APN1
Agencies
[Federal Register Volume 85, Number 68 (Wednesday, April 8, 2020)]
[Notices]
[Pages 19754-19755]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-07376]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 1835-290]
Nebraska Public Power District; Notice of Availability of
Environmental Assessment
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission's regulations, 18 CFR part
380 (Order No. 486, 52 FR 47879), the Office of Energy Projects has
reviewed the application for non-capacity license amendment for the
North Platte/Keystone Diversion Dam Hydroelectric Project, located on
the North/South Platte Rivers in Lincoln and Keith counties, Nebraska,
and has prepared an Environmental Assessment (EA). In the EA,
Commission staff analyzes the potential environmental effects of the
proposed license amendment and concludes that issuing an order
approving the proposal, with appropriate environmental measures, would
not constitute a major federal action significantly affecting the
quality of the human environment.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all
[[Page 19755]]
interested persons an opportunity to view and/or print the contents of
this document via the internet through the Commission's Home Page
(https://www.ferc.gov) using the ``elibrary'' link. Enter the docket
number excluding the last three digits in the document field to access
the document. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and
issuances related to this or other pending projects. At this time, the
Commission has suspended access to the Commission's Public Reference
Room, due to the proclamation declaring a National Emergency concerning
the Novel Coronavirus Disease (COVID-19), issued by the President on
March 13, 2020. For assistance, contact FERC at
[email protected] or call toll-free, (886) 208-3673 or TYY,
(202) 502-8659.
For further information, contact Jon Cofrancesco at (202) 502-8951
or [email protected].
Dated: April 2, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-07376 Filed 4-7-20; 8:45 am]
BILLING CODE 6717-01-P