Combined Notice of Filings #1, 17571-17572 [2020-06531]
Download as PDF
lotter on DSKBCFDHB2PROD with NOTICES
Federal Register / Vol. 85, No. 61 / Monday, March 30, 2020 / Notices
• 84.2 miles of new 42-inch-diameter
T200 pipeline from the proposed Poker
Lake Meter Station in Eddy County,
New Mexico through Loving, Ward, and
Reeves Counties, Texas and terminating
at the proposed Waha Receiver and
Separation site in Reeves County, Texas;
• 1.4 miles of new 42-inch-diameter
T300 pipeline from the proposed
Double E Waha Receiver and Separation
site in Reeves County, Texas to the final
delivery locations in Pecos County,
Texas; and
• 16.4 miles of new 30-inch-diameter
L100 pipeline from the existing Loving
Processing Plants to the proposed T100
pipeline in Eddy County, New Mexico.
The Commission mailed a copy of the
Notice of Availability to federal, state,
and local government representatives
and agencies; elected officials;
environmental and public interest
groups; Native American tribes;
potentially affected landowners and
other interested individuals and groups;
and newspapers and libraries in the
project area. The EA is only available in
electronic format. It may be viewed and
downloaded from the FERC’s website
(www.ferc.gov), on the Environmental
Documents page (https://www.ferc.gov/
industries/gas/enviro/eis.asp). In
addition, the EA may be accessed by
using the eLibrary link on the FERC’s
website. Click on the eLibrary link
(https://www.ferc.gov/docs-filing/
elibrary.asp), click on General Search,
and enter the docket number in the
Docket Number field, excluding the last
three digits (i.e. CP19–495). Be sure you
have selected an appropriate date range.
For assistance, please contact FERC
Online Support at FercOnlineSupport@
ferc.gov or toll free at (866) 208–3676, or
for TTY, contact (202) 502–8659.
Any person wishing to comment on
the EA may do so. Your comments
should focus on the EA’s disclosure and
discussion of potential environmental
effects, reasonable alternatives, and
measures to avoid or lessen
environmental impacts. The more
specific your comments, the more useful
they will be. To ensure that the
Commission has the opportunity to
consider your comments prior to
making its decision on this project, it is
important that we receive your
comments in Washington, DC on or
before 5:00 p.m. Eastern Time on April
23, 2020.
For your convenience, there are three
methods you can use to file your
comments to the Commission. The
Commission encourages electronic filing
of comments and has staff available to
assist you at (866) 208–3676 or
FercOnlineSupport@ferc.gov. Please
carefully follow these instructions so
VerDate Sep<11>2014
18:05 Mar 27, 2020
Jkt 250001
that your comments are properly
recorded.
(1) You can file your comments
electronically using the eComment
feature on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. This is an easy
method for submitting brief, text-only
comments on a project;
(2) You can also file your comments
electronically using the eFiling feature
on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. With eFiling,
you can provide comments in a variety
of formats by attaching them as a file
with your submission. New eFiling
users must first create an account by
clicking on eRegister. You must select
the type of filing you are making. If you
are filing a comment on a particular
project, please select ‘‘Comment on a
Filing’’; or
(3) You can file a paper copy of your
comments by mailing them to the
following address. Be sure to reference
the project docket number (CP19–495–
000) with your submission: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Room 1A, Washington, DC 20426
Any person seeking to become a party
to the proceeding must file a motion to
intervene pursuant to Rule 214 of the
Commission’s Rules of Practice and
Procedures (18 CFR 385.214). Motions
to intervene are more fully described at
https://www.ferc.gov/resources/guides/
how-to/intervene.asp. Only intervenors
have the right to seek rehearing or
judicial review of the Commission’s
decision. The Commission may grant
affected landowners and others with
environmental concerns intervenor
status upon showing good cause by
stating that they have a clear and direct
interest in this proceeding which no
other party can adequately represent.
Simply filing environmental comments
will not give you intervenor status, but
you do not need intervenor status to
have your comments considered.
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website (www.ferc.gov) using the
eLibrary link. The eLibrary link also
provides access to the texts of all formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
17571
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Dated: March 24, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–06560 Filed 3–27–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG20–107–000.
Applicants: LA3 West Baton Rouge,
LLC.
Description: Self-Certification of EG of
LA3 West Baton Rouge, LLC.
Filed Date: 3/24/20.
Accession Number: 20200324–5015.
Comments Due: 5 p.m. ET 4/14/20.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER18–2280–005.
Applicants: Alliant Energy Corporate
Services, Inc.
Description: Compliance filing: AECS
Schedule 2 Compliance Filing to be
effective 3/1/2019.
Filed Date: 3/24/20.
Accession Number: 20200324–5080.
Comments Due: 5 p.m. ET 4/14/20.
Docket Numbers: ER19–1934–003.
Applicants: Tucson Electric Power
Company.
Description: Compliance filing: Order
No. 845 Compliance Filing to be
effective 5/22/2019.
Filed Date: 3/24/20.
Accession Number: 20200324–5081.
Comments Due: 5 p.m. ET 4/14/20.
Docket Numbers: ER19–1935–002.
Applicants: UNS Electric, Inc.
Description: Compliance filing: Order
No. 845 Compliance Filing to be
effective 5/22/2019.
Filed Date: 3/24/20.
Accession Number: 20200324–5079.
Comments Due: 5 p.m. ET 4/14/20.
Docket Numbers: ER19–1954–001.
Applicants: Southwest Power Pool,
Inc.
Description: Compliance filing: Order
No. 845 Compliance Filing in Response
to Janaury 23 Order to be effective 12/
31/9998.
Filed Date: 3/24/20.
Accession Number: 20200324–5087.
Comments Due: 5 p.m. ET 4/14/20.
E:\FR\FM\30MRN1.SGM
30MRN1
lotter on DSKBCFDHB2PROD with NOTICES
17572
Federal Register / Vol. 85, No. 61 / Monday, March 30, 2020 / Notices
Docket Numbers: ER20–1370–000.
Applicants: Idaho Power Company.
Description: § 205(d) Rate Filing:
Attachment O, Section 8 to be effective
5/22/2020.
Filed Date: 3/23/20.
Accession Number: 20200323–5173.
Comments Due: 5 p.m. ET 4/13/20.
Docket Numbers: ER20–1371–000.
Applicants: Public Service Company
of Colorado.
Description: Compliance filing:
OATT_Att O–PSCo_Table 25_Change
Eff Date to be effective 1/1/2020.
Filed Date: 3/24/20.
Accession Number: 20200324–5050.
Comments Due: 5 p.m. ET 4/14/20.
Docket Numbers: ER20–1372–000.
Applicants: Public Service Company
of Colorado.
Description: Compliance filing: MB—
Prod Depr Rate Rev Eff Date to be
effective 1/1/2020.
Filed Date: 3/24/20.
Accession Number: 20200324–5053.
Comments Due: 5 p.m. ET 4/14/20.
Docket Numbers: ER20–1373–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original ISA, SA No. 5604; Queue No.
AC1–164 to be effective 2/24/2020.
Filed Date: 3/24/20.
Accession Number: 20200324–5062.
Comments Due: 5 p.m. ET 4/14/20.
Docket Numbers: ER20–1374–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2020–03–24_SA 3454 Entergy
Arkansas—Flat Fork Solar GIA (J907) to
be effective 3/10/2020.
Filed Date: 3/24/20.
Accession Number: 20200324–5077.
Comments Due: 5 p.m. ET 4/14/20.
Docket Numbers: ER20–1375–000.
Applicants: Southern California
Edison Company.
Description: Tariff Cancellation:
Notice of Cancellation SEPV Sierra &
Division Solar Projects WDT290a &
WDT290b to be effective 3/6/2020.
Filed Date: 3/24/20.
Accession Number: 20200324–5086.
Comments Due: 5 p.m. ET 4/14/20.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
VerDate Sep<11>2014
18:05 Mar 27, 2020
Jkt 250001
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: March 24, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–06531 Filed 3–27–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Southeastern Power Administration
Proposed Rate Schedules for KerrPhilpott System
Southeastern Power
Administration, DOE.
ACTION: Notice of proposed rates and
opportunities for public review and
comment.
AGENCY:
Southeastern Power
Administration (Southeastern) proposes
to update and extend existing schedules
of rates and charges applicable to the
sale of power from the Kerr-Philpott
System effective October 1, 2020,
through September 30, 2025. Interested
persons may review the rates and
supporting studies and submit written
comments. Southeastern will consider
all comments received in this process.
DATES: Written comments are due on or
before April 29, 2020. In accordance
with 10 CFR 903.23(a), Southeastern has
determined that it is not necessary to
hold public information or public
comment forums for this rate action but
is initiating a 30-day consultation and
comment period to give the public an
opportunity to comment on the
proposed extension. Southeastern will
review and consider all timely
comments at the conclusion of the
consultation and comment period and
make adjustments to the proposal as
appropriate.
SUMMARY:
Written comments should
be submitted to: Administrator,
Southeastern Power Administration, U.
S. Department of Energy, 1166 Athens
Tech Road, Elberton, GA. 30635–6711
or Email: Comments@sepa.doe.gov.
FOR FURTHER INFORMATION CONTACT:
Virgil G. Hobbs III, Assistant
Administrator, Finance and Marketing,
Southeastern Power Administration,
U.S. Department of Energy, 1166 Athens
Tech Road, Elberton, GA 30635–6711,
ADDRESSES:
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
(706) 213–3838; Email: Virgil.Hobbs@
sepa.doe.gov.
The
Federal Energy Regulatory Commission
(FERC), by order issued February 24,
2016, 154 FERC ¶ 62,129, confirmed and
approved Rate Schedules VA–1–C, VA–
2–C, VA–3–C, VA–4–C, DEP–1–C, DEP–
2–C, DEP–3–C, DEP–4–C, AP–1–C, AP–
2–C, AP–3–C, AP–4–C, NC–1–C, and
Replacement-2–B, for the period
October 1, 2015, through September 30,
2020. A repayment study prepared in
February of 2020 showed existing rates
are adequate to recover all costs
required by present repayment criteria.
However, approval of the existing rate
schedules expires September 30, 2020.
The existing rate schedules include an
annual true-up mechanism for the
capacity and energy rates based on the
variance of the actual net revenue
available for repayment from the
planned net revenue available for
repayment. The adjustment is for every
$100,000 under-recovery of the planned
net revenue available for repayment, the
base capacity charge is increased by
$0.02 per kilowatt per month, up to a
maximum of $0.75 per kilowatt per
month, and the base energy charge is
increased by 0.10 mills per kilowatthour, up to a maximum of 3.0 mills per
kilowatt-hour. For every $100,000 overrecovery of the planned net revenue
available for repayment, the base
capacity charge is reduced by $0.02 per
kilowatt per month, up to a maximum
of $0.75 per kilowatt per month, and the
base energy charge is reduced by 0.10
mills per kilowatt-hour, up to a
maximum of 3.0 mills per kilowatthour.
The initial base capacity charge for
the current rate schedules was $4.40 per
kilowatt per month. The initial base
energy charge was 17.80 mills per
kilowatt-hour. As of April 1, 2020, the
base capacity charge has been adjusted
to $3.65 per kilowatt per month and the
base energy charge has been adjusted to
14.80 mills per kilowatt-hour for net
revenue available for repayment. The
existing rates are adequate to meet
repayment criteria. The annual true-ups
incorporated in the rate schedules have
proven to be effective in matching
revenue available for repayment to
planned amounts. Southeastern is
proposing to maintain the initial base
rate of $4.40 per kilowatt per month for
capacity and the initial base energy
charge of 17.80 mills per kilowatt-hour
and the annual true-up mechanism.
SUPPLEMENTARY INFORMATION:
Proposed Unit Rates
The initial base rates for capacity and
energy will be as follows:
E:\FR\FM\30MRN1.SGM
30MRN1
Agencies
[Federal Register Volume 85, Number 61 (Monday, March 30, 2020)]
[Notices]
[Pages 17571-17572]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-06531]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG20-107-000.
Applicants: LA3 West Baton Rouge, LLC.
Description: Self-Certification of EG of LA3 West Baton Rouge, LLC.
Filed Date: 3/24/20.
Accession Number: 20200324-5015.
Comments Due: 5 p.m. ET 4/14/20.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER18-2280-005.
Applicants: Alliant Energy Corporate Services, Inc.
Description: Compliance filing: AECS Schedule 2 Compliance Filing
to be effective 3/1/2019.
Filed Date: 3/24/20.
Accession Number: 20200324-5080.
Comments Due: 5 p.m. ET 4/14/20.
Docket Numbers: ER19-1934-003.
Applicants: Tucson Electric Power Company.
Description: Compliance filing: Order No. 845 Compliance Filing to
be effective 5/22/2019.
Filed Date: 3/24/20.
Accession Number: 20200324-5081.
Comments Due: 5 p.m. ET 4/14/20.
Docket Numbers: ER19-1935-002.
Applicants: UNS Electric, Inc.
Description: Compliance filing: Order No. 845 Compliance Filing to
be effective 5/22/2019.
Filed Date: 3/24/20.
Accession Number: 20200324-5079.
Comments Due: 5 p.m. ET 4/14/20.
Docket Numbers: ER19-1954-001.
Applicants: Southwest Power Pool, Inc.
Description: Compliance filing: Order No. 845 Compliance Filing in
Response to Janaury 23 Order to be effective 12/31/9998.
Filed Date: 3/24/20.
Accession Number: 20200324-5087.
Comments Due: 5 p.m. ET 4/14/20.
[[Page 17572]]
Docket Numbers: ER20-1370-000.
Applicants: Idaho Power Company.
Description: Sec. 205(d) Rate Filing: Attachment O, Section 8 to
be effective 5/22/2020.
Filed Date: 3/23/20.
Accession Number: 20200323-5173.
Comments Due: 5 p.m. ET 4/13/20.
Docket Numbers: ER20-1371-000.
Applicants: Public Service Company of Colorado.
Description: Compliance filing: OATT_Att O-PSCo_Table 25_Change Eff
Date to be effective 1/1/2020.
Filed Date: 3/24/20.
Accession Number: 20200324-5050.
Comments Due: 5 p.m. ET 4/14/20.
Docket Numbers: ER20-1372-000.
Applicants: Public Service Company of Colorado.
Description: Compliance filing: MB--Prod Depr Rate Rev Eff Date to
be effective 1/1/2020.
Filed Date: 3/24/20.
Accession Number: 20200324-5053.
Comments Due: 5 p.m. ET 4/14/20.
Docket Numbers: ER20-1373-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original ISA, SA No. 5604;
Queue No. AC1-164 to be effective 2/24/2020.
Filed Date: 3/24/20.
Accession Number: 20200324-5062.
Comments Due: 5 p.m. ET 4/14/20.
Docket Numbers: ER20-1374-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2020-03-24_SA 3454 Entergy
Arkansas--Flat Fork Solar GIA (J907) to be effective 3/10/2020.
Filed Date: 3/24/20.
Accession Number: 20200324-5077.
Comments Due: 5 p.m. ET 4/14/20.
Docket Numbers: ER20-1375-000.
Applicants: Southern California Edison Company.
Description: Tariff Cancellation: Notice of Cancellation SEPV
Sierra & Division Solar Projects WDT290a & WDT290b to be effective 3/6/
2020.
Filed Date: 3/24/20.
Accession Number: 20200324-5086.
Comments Due: 5 p.m. ET 4/14/20.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: March 24, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020-06531 Filed 3-27-20; 8:45 am]