Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Plant, Units 3 and 4 Inspections, Tests, Analyses, and Acceptance Criteria, 16388-16389 [2020-06057]
Download as PDF
16388
Federal Register / Vol. 85, No. 56 / Monday, March 23, 2020 / Notices
period was originally scheduled to close
on March 27, 2020.
DATES: The correction is effective March
23, 2020. The due date of comments
requested in the document published on
February 26, 2020 (85 FR 11126) is
extended. Comments should be filed no
later than April 22, 2020. Comments
received after this date will be
considered, if it is practical to do so, but
the Commission is able to ensure
consideration only for comments
received on or before this date.
ADDRESSES: Submit comments directly
to the OMB reviewer at: OMB Office of
Information and Regulatory Affairs
(3150–0104), Attn: Desk Officer for the
Nuclear Regulatory Commission, 725
17th Street NW, Washington, DC 20503;
email: oira_submission@omb.eop.gov.
FOR FURTHER INFORMATION CONTACT:
David Cullison, NRC Clearance Officer,
U.S. Nuclear Regulatory Commission,
Washington, DC 20555–0001; telephone:
301–415–2084; email:
INFOCOLLECTS.Resource@nrc.gov.
SUPPLEMENTARY INFORMATION: In the
Federal Register on February 26, 2020,
in FR Doc. 2020–03826 on page 11127,
in the first column, the response to
question 7 is changed from ‘‘350’’ to
‘‘542 (442 reporting responses plus 100
recordkeepers).’’ In the second column,
the response to question 9 is changed
from ‘‘The total estimated burden for
completing Licensee Event Reports is
28,000 hours (based on 80 hours for
each of 350 reports).’’ to ‘‘The total
estimated burden from completing
Licensee Event Reports is 35,360 hours
(28,288 hours reporting plus 7,072
hours recordkeeping).’’
Dated at Rockville, Maryland, this 18th day
of March 2020.
For the Nuclear Regulatory Commission.
David C. Cullison,
NRC Clearance Officer, Office of the Chief
Information Officer.
[FR Doc. 2020–06064 Filed 3–20–20; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
jbell on DSKJLSW7X2PROD with NOTICES
[Docket Nos. 52–025 and 52–026; NRC–
2008–0252]
Southern Nuclear Operating Company,
Inc., Vogtle Electric Generating Plant,
Units 3 and 4 Inspections, Tests,
Analyses, and Acceptance Criteria
Nuclear Regulatory
Commission.
ACTION: Determination of the successful
completion of inspections, tests, and
analyses.
AGENCY:
VerDate Sep<11>2014
17:26 Mar 20, 2020
Jkt 250001
The U.S. Nuclear Regulatory
Commission (NRC) staff has determined
that specified inspections, tests, and
analyses have been successfully
completed, and that specified
acceptance criteria are met for the
Vogtle Electric Generating Plant (VEGP),
Units 3 and 4.
DATES: Determinations of the successful
completion of inspections, tests, and
analyses for VEGP Units 3 and 4 are
effective on the dates indicated in the
NRC staff’s verification evaluation forms
for the inspections, tests, analyses, and
acceptance criteria (ITAAC).
ADDRESSES: Please refer to Docket ID
NRC–2008–0252 when contacting the
NRC about the availability of
information regarding this document.
You may obtain publicly-available
information related to this document
using any of the following methods:
• Federal Rulemaking website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2008–0252. Address
questions about NRC docket IDs in
Regulations.gov to Jennifer Borges;
telephone: 301–287–9127; email:
Jennifer.Borges@nrc.gov. For technical
questions, contact the individual listed
in the FOR FURTHER INFORMATION
CONTACT section of this document.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publicly
available documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘Begin Web-based ADAMS Search.’’ For
problems with ADAMS, please contact
the NRC’s Public Document Room (PDR)
reference staff at 1–800–397–4209, 301–
415–4737, or by email to pdr.resource@
nrc.gov. The ADAMS accession number
for each document referenced in this
document (if that document is available
in ADAMS) is provided the first time
that a document is referenced.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT:
Cayetano Santos, Office of Nuclear
Reactor Regulation, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001; telephone: 301–415–
7270, email: Cayetano.Santos@nrc.gov.
SUPPLEMENTARY INFORMATION:
SUMMARY:
I. Licensee Notification of Completion
of ITAAC
Southern Nuclear Operating
Company, Inc. (SNC), Georgia Power
Company, Oglethorpe Power
Corporation, MEAG Power SPVM, LLC.,
PO 00000
Frm 00076
Fmt 4703
Sfmt 4703
MEAG Power SPVJ, LLC., MEAG Power
SPVP, LLC., and the City of Dalton,
Georgia, (hereafter called the licensee)
has submitted ITAAC closure
notifications (ICNs) under section
52.99(c)(1) of title 10 of the Code of
Federal Regulations (10 CFR), informing
the NRC that the licensee has
successfully performed the required
inspections, tests, and analyses, and that
the acceptance criteria are met for:
VEGP Unit 3 ITAAC
2.1.02.08d.ii (33), 2.2.03.08c.xii (197),
2.2.03.09a.ii (202), 2.5.02.08b.i (542),
2.5.02.10 (549), 2.5.02.11 (550),
2.5.02.12 (551), 3.2.00.02 (745),
3.3.00.02a.ii.f (769), 3.3.00.04b (782),
and E.3.9.05.01.07 (855).
VEGP Unit 4 ITAAC
2.5.02.10 (549), 2.5.02.12 (551), and
3.3.00.04b (782).
The ITAAC for VEGP Unit 3 are in
Appendix C of the VEGP Unit 3
combined license (ADAMS Accession
No. ML14100A106). The ITAAC for
VEGP Unit 4 are in Appendix C of VEGP
Unit 4 combined license (ADAMS
Accession No. ML14100A135).
II. Licensee ITAAC Post-Closure
Notifications (IPCNs)
Since the last Federal Register notice
of the NRC staff’s determinations of
successful completion of inspections,
tests, and analyses for VEGP Units 3 and
4, the NRC staff has not made additional
determinations of the successful
completion of inspections, tests, and
analyses based on licensee IPCNs
submitted under 10 CFR 52.99(c)(2).
III. NRC Staff Determination of
Completion of ITAAC
The NRC staff has determined that the
specified inspections, tests, and
analyses have been successfully
completed, and that the specified
acceptance criteria are met. The
documentation of the NRC staff’s
determination is in the ITAAC Closure
Verification Evaluation Form (VEF) for
each ITAAC. The VEF is a form that
represents the NRC staff’s structured
process for reviewing ICNs and IPCNs.
Each ICN presents a narrative
description of how the ITAAC was
completed. The NRC’s ICN review
process involves a determination on
whether, among other things: (1) Each
ICN provides sufficient information,
including a summary of the
methodology used to perform the
ITAAC, to demonstrate that the
inspections, tests, and analyses have
been successfully completed; (2) each
ICN provides sufficient information to
demonstrate that the acceptance criteria
E:\FR\FM\23MRN1.SGM
23MRN1
Federal Register / Vol. 85, No. 56 / Monday, March 23, 2020 / Notices
of the ITAAC are met; and (3) any NRC
inspections for the ITAAC have been
completed and any ITAAC findings
associated with that ITAAC have been
closed. The NRC’s review process for
IPCNs is similar to that for ICNs but
focuses on how the licensee addressed
the new, material information giving
rise to the IPCN.
The NRC staff’s determination of the
successful completion of these ITAAC is
based on information available at this
time and is subject to the licensee’s
ability to maintain the condition that
the acceptance criteria are met. If the
NRC staff receives new information that
suggests the NRC staff’s determination
on any of these ITAAC is incorrect, then
the NRC staff will determine whether to
reopen that ITAAC (including
withdrawing the NRC staff’s
determination on that ITAAC). The NRC
staff’s determination will be used to
support a subsequent finding, pursuant
to 10 CFR 52.103(g), at the end of
construction that all acceptance criteria
in the combined license are met. The
ITAAC closure process is not finalized
for these ITAAC until the NRC makes an
affirmative finding under 10 CFR
52.103(g). Any future updates to the
status of these ITAAC will be reflected
on the NRC’s website at https://
www.nrc.gov/reactors/new-reactors/
oversight/itaac.html.
This notice fulfills the NRC staff’s
obligations under 10 CFR 52.99(e)(1) to
publish a notice in the Federal Register
of the NRC staff’s determination of the
successful completion of inspections,
tests, and analyses.
jbell on DSKJLSW7X2PROD with NOTICES
Vogtle Electric Generating Plant Unit 3,
Docket No. 5200025
A complete list of the review status
for VEGP Unit 3 ITAAC, including the
submission date and ADAMS Accession
Number for each ICN received, the
ADAMS Accession Number for each
VEF, and the ADAMS Accession
Numbers for the inspection reports
associated with these specific ITAAC,
can be found on the NRC’s website at
https://www.nrc.gov/reactors/newreactors/new-licensing-files/vog3icnsr.pdf.
Vogtle Electric Generating Plant Unit 4,
Docket No. 5200026
A complete list of the review status
for VEGP Unit 4 ITAAC, including the
submission date and ADAMS accession
number for each ICN and IPCN received,
the ADAMS accession number for each
VEF, and the ADAMS accession
numbers for the inspection reports
associated with these specific ITAAC,
can be found on the NRC’s website at
https://www.nrc.gov/reactors/new-
VerDate Sep<11>2014
17:26 Mar 20, 2020
Jkt 250001
reactors/new-licensing-files/vog4icnsr.pdf.
Dated at Rockville, Maryland, this 17th day
of March 2020.
For the Nuclear Regulatory Commission.
Victor E. Hall,
Chief, Vogtle Project Office, Office of Nuclear
Reactor Regulation.
[FR Doc. 2020–06057 Filed 3–20–20; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
Advisory Committee on the Medical
Uses of Isotopes: Meeting Notice
U.S. Nuclear Regulatory
Commission.
ACTION: Re-notice of meeting.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) will convene a
meeting of the Advisory Committee on
the Medical Uses of Isotopes (ACMUI)
on March 30, 2020. This meeting notice,
published in the Federal Register on
February 19, 2020, is being re-noticed to
inform members of the public that this
meeting will now be conducted on
March 30, 2020 via teleconference.
DATES: March 30, 2020 from 9:30 a.m. to
5:00 p.m. Eastern Standard Time.
FOR FURTHER INFORMATION CONTACT: Ms.
Kellee Jamerson, email:
Kellee.Jamerson@nrc.gov, telephone:
(301) 415–7408.
SUPPLEMENTARY INFORMATION: The
current agenda and any updates are
available at https://www.nrc.gov/readingrm/doc-collections/acmui/meetings/
2020.html or by emailing Ms. Kellee
Jamerson at the contact information
above. The agenda is subject to change.
Purpose: Discuss issues related to 10
CFR part 35 Medical Use of Byproduct
Material.
Public Participation: Any member of
the public who wishes to participate in
the meeting should contact Ms.
Jamerson using the information above.
The meeting will also use the WebEx
application.
SUMMARY:
Conduct of the Meeting
Darlene Metter, M.D. will chair the
meeting. Dr. Metter will conduct the
meeting in a manner that will facilitate
the orderly conduct of business. The
following procedures apply to public
participation in the meeting:
1. Persons who wish to provide a
written statement should submit an
electronic copy to Ms. Jamerson using
the contact information listed above. All
submittals must be received by March
25, 2020, three business days before the
PO 00000
Frm 00077
Fmt 4703
Sfmt 4703
16389
meeting, and must pertain to the topics
on the agenda for the meeting.
2. Questions and comments from
members of the public will be permitted
at designated times during the meeting,
at the discretion of the ACMUI
Chairman.
3. The draft transcript and meeting
summary will be available on the
ACMUI’s website https://www.nrc.gov/
reading-rm/doc-collections/acmui/
meetings/2020.html on or about May 12,
2020.
This meeting will be held in
accordance with the Atomic Energy Act
of 1954, as amended (primarily Section
161a); the Federal Advisory Committee
Act (5 U.S.C. App); and the
Commission’s regulations in Title 10 of
the Code of Federal Regulations, Part 7.
Dated at Rockville, Maryland this 18th day
of March, 2020.
For the U.S. Nuclear Regulatory
Commission.
Russell E. Chazell,
Advisory Committee Management Officer.
[FR Doc. 2020–06073 Filed 3–20–20; 8:45 am]
BILLING CODE 7590–01–P
OFFICE OF PERSONNEL
MANAGEMENT
Submission for Review: 3206–0216, We
Need Important Information About
Your Eligibility for Social Security
Disability Benefits, RI 98–7
Office of Personnel
Management.
ACTION: 60-Day notice and request for
comments.
AGENCY:
The Retirement Services,
Office of Personnel Management (OPM)
offers the general public and other
federal agencies the opportunity to
comment on a revised information
collection request (ICR), We Need
Important Information About Your
Eligibility for Social Security Disability
Benefits, RI 98–7.
DATES: Comments are encouraged and
will be accepted until May 22, 2020.
ADDRESSES: You may submit comments,
identified by docket number and title,
by any of the following methods:
• Federal eRulemaking Portal: https://
www.regulations.gov. Follow the
instructions for submitting comments.
Instructions: All submissions received
must include the agency name, docket
number and title for this Federal
Register document. The general policy
for comments and other submissions
from members of the public is to make
these submissions available for public
viewing on the internet at https://
SUMMARY:
E:\FR\FM\23MRN1.SGM
23MRN1
Agencies
[Federal Register Volume 85, Number 56 (Monday, March 23, 2020)]
[Notices]
[Pages 16388-16389]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-06057]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket Nos. 52-025 and 52-026; NRC-2008-0252]
Southern Nuclear Operating Company, Inc., Vogtle Electric
Generating Plant, Units 3 and 4 Inspections, Tests, Analyses, and
Acceptance Criteria
AGENCY: Nuclear Regulatory Commission.
ACTION: Determination of the successful completion of inspections,
tests, and analyses.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) staff has
determined that specified inspections, tests, and analyses have been
successfully completed, and that specified acceptance criteria are met
for the Vogtle Electric Generating Plant (VEGP), Units 3 and 4.
DATES: Determinations of the successful completion of inspections,
tests, and analyses for VEGP Units 3 and 4 are effective on the dates
indicated in the NRC staff's verification evaluation forms for the
inspections, tests, analyses, and acceptance criteria (ITAAC).
ADDRESSES: Please refer to Docket ID NRC-2008-0252 when contacting the
NRC about the availability of information regarding this document. You
may obtain publicly-available information related to this document
using any of the following methods:
Federal Rulemaking website: Go to https://www.regulations.gov and search for Docket ID NRC-2008-0252. Address
questions about NRC docket IDs in Regulations.gov to Jennifer Borges;
telephone: 301-287-9127; email: [email protected]. For technical
questions, contact the individual listed in the FOR FURTHER INFORMATION
CONTACT section of this document.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS
Search.'' For problems with ADAMS, please contact the NRC's Public
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or
by email to [email protected]. The ADAMS accession number for each
document referenced in this document (if that document is available in
ADAMS) is provided the first time that a document is referenced.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT: Cayetano Santos, Office of Nuclear
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC
20555-0001; telephone: 301-415-7270, email: [email protected].
SUPPLEMENTARY INFORMATION:
I. Licensee Notification of Completion of ITAAC
Southern Nuclear Operating Company, Inc. (SNC), Georgia Power
Company, Oglethorpe Power Corporation, MEAG Power SPVM, LLC., MEAG
Power SPVJ, LLC., MEAG Power SPVP, LLC., and the City of Dalton,
Georgia, (hereafter called the licensee) has submitted ITAAC closure
notifications (ICNs) under section 52.99(c)(1) of title 10 of the Code
of Federal Regulations (10 CFR), informing the NRC that the licensee
has successfully performed the required inspections, tests, and
analyses, and that the acceptance criteria are met for:
VEGP Unit 3 ITAAC
2.1.02.08d.ii (33), 2.2.03.08c.xii (197), 2.2.03.09a.ii (202),
2.5.02.08b.i (542), 2.5.02.10 (549), 2.5.02.11 (550), 2.5.02.12 (551),
3.2.00.02 (745), 3.3.00.02a.ii.f (769), 3.3.00.04b (782), and
E.3.9.05.01.07 (855).
VEGP Unit 4 ITAAC
2.5.02.10 (549), 2.5.02.12 (551), and 3.3.00.04b (782).
The ITAAC for VEGP Unit 3 are in Appendix C of the VEGP Unit 3
combined license (ADAMS Accession No. ML14100A106). The ITAAC for VEGP
Unit 4 are in Appendix C of VEGP Unit 4 combined license (ADAMS
Accession No. ML14100A135).
II. Licensee ITAAC Post-Closure Notifications (IPCNs)
Since the last Federal Register notice of the NRC staff's
determinations of successful completion of inspections, tests, and
analyses for VEGP Units 3 and 4, the NRC staff has not made additional
determinations of the successful completion of inspections, tests, and
analyses based on licensee IPCNs submitted under 10 CFR 52.99(c)(2).
III. NRC Staff Determination of Completion of ITAAC
The NRC staff has determined that the specified inspections, tests,
and analyses have been successfully completed, and that the specified
acceptance criteria are met. The documentation of the NRC staff's
determination is in the ITAAC Closure Verification Evaluation Form
(VEF) for each ITAAC. The VEF is a form that represents the NRC staff's
structured process for reviewing ICNs and IPCNs.
Each ICN presents a narrative description of how the ITAAC was
completed. The NRC's ICN review process involves a determination on
whether, among other things: (1) Each ICN provides sufficient
information, including a summary of the methodology used to perform the
ITAAC, to demonstrate that the inspections, tests, and analyses have
been successfully completed; (2) each ICN provides sufficient
information to demonstrate that the acceptance criteria
[[Page 16389]]
of the ITAAC are met; and (3) any NRC inspections for the ITAAC have
been completed and any ITAAC findings associated with that ITAAC have
been closed. The NRC's review process for IPCNs is similar to that for
ICNs but focuses on how the licensee addressed the new, material
information giving rise to the IPCN.
The NRC staff's determination of the successful completion of these
ITAAC is based on information available at this time and is subject to
the licensee's ability to maintain the condition that the acceptance
criteria are met. If the NRC staff receives new information that
suggests the NRC staff's determination on any of these ITAAC is
incorrect, then the NRC staff will determine whether to reopen that
ITAAC (including withdrawing the NRC staff's determination on that
ITAAC). The NRC staff's determination will be used to support a
subsequent finding, pursuant to 10 CFR 52.103(g), at the end of
construction that all acceptance criteria in the combined license are
met. The ITAAC closure process is not finalized for these ITAAC until
the NRC makes an affirmative finding under 10 CFR 52.103(g). Any future
updates to the status of these ITAAC will be reflected on the NRC's
website at https://www.nrc.gov/reactors/new-reactors/oversight/itaac.html.
This notice fulfills the NRC staff's obligations under 10 CFR
52.99(e)(1) to publish a notice in the Federal Register of the NRC
staff's determination of the successful completion of inspections,
tests, and analyses.
Vogtle Electric Generating Plant Unit 3, Docket No. 5200025
A complete list of the review status for VEGP Unit 3 ITAAC,
including the submission date and ADAMS Accession Number for each ICN
received, the ADAMS Accession Number for each VEF, and the ADAMS
Accession Numbers for the inspection reports associated with these
specific ITAAC, can be found on the NRC's website at https://www.nrc.gov/reactors/new-reactors/new-licensing-files/vog3-icnsr.pdf.
Vogtle Electric Generating Plant Unit 4, Docket No. 5200026
A complete list of the review status for VEGP Unit 4 ITAAC,
including the submission date and ADAMS accession number for each ICN
and IPCN received, the ADAMS accession number for each VEF, and the
ADAMS accession numbers for the inspection reports associated with
these specific ITAAC, can be found on the NRC's website at https://www.nrc.gov/reactors/new-reactors/new-licensing-files/vog4-icnsr.pdf.
Dated at Rockville, Maryland, this 17th day of March 2020.
For the Nuclear Regulatory Commission.
Victor E. Hall,
Chief, Vogtle Project Office, Office of Nuclear Reactor Regulation.
[FR Doc. 2020-06057 Filed 3-20-20; 8:45 am]