Columbia Gas Transmission, LLC; Notice of Request Under Blanket Authorization, 15772 [2020-05734]
Download as PDF
15772
Federal Register / Vol. 85, No. 54 / Thursday, March 19, 2020 / Notices
and Conditions/Prescriptions May
12, 2020
Licensee’s Reply to REA Comments
June 26, 2020
Commission issues draft EA December
2020
Comments on draft EA January 2020
Commission issues final EA April
2021
Dated: March 13, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–05728 Filed 3–18–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RM19–12–000]
Revisions to the Filing Process for
Commission Forms; Notice of Change
In Technical Conference
The staff-led technical conference
scheduled for March 24 through 26,
2020, in the above-captioned
proceeding, will no longer be an inperson technical conference. At this
time, the technical conference will still
proceed as scheduled, but will be
accessible via webcast. A notice with
additional information will be issued in
this docket to provide an agenda and
instructions for those who wish to
participate in the technical conference.
Dated: March 13, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–05732 Filed 3–18–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP20–78–000]
jbell on DSKJLSW7X2PROD with NOTICES
Columbia Gas Transmission, LLC;
Notice of Request Under Blanket
Authorization
Take notice that on March 5, 2020,
Columbia Gas Transmission, LLC
(Columbia), 700 Louisiana Street, Suite
700, Houston, Texas 77002–2700, filed
in the above referenced docket, a prior
notice request pursuant to sections
157.205 and 157.208 of the
Commission’s regulations under the
Natural Gas Act (NGA) and Columbia’s
blanket certificate issued in Docket No.
CP83–76–000. Columbia request
authorization to construct and operate
facilities related to its proposed
VerDate Sep<11>2014
17:05 Mar 18, 2020
Jkt 250001
greenfield point of receipt meter station
at the interconnection of Columbia’s
existing Line L2542 and Nexus Gas
Transmission’s existing pipeline in
Lorain County, Ohio (Quarry Road
Meter Station Project). The project will
allow Columbia to receive up to 215
million cubic feet per day of receipt
capacity for transportation on its
pipeline system. The estimated cost of
the project is approximately $14.2
million, all as more fully set forth in the
application which is on file with the
Commission and open to public
inspection. The filing may also be
viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll free at (866) 208–3676, or
TTY, contact (202) 502–8659.
Any questions regarding this prior
notice request should be directed to
Sorana Linder, Director, Modernization
& Certificates, Columbia Gas
Transmission, LLC, 700 Louisiana
Street, Suite 700, Houston, Texas
77002–2700, Phone: (832) 320–5209,
Email: sorana_linder@tcenergy.com.
Any person or the Commission’s staff
may, within 60 days after the issuance
of the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention. Any person filing to
intervene, or the Commission’s staff
may, pursuant to section 157.205 of the
Commission’s Regulations under the
NGA (18 CFR 157.205) file a protest to
the request. If no protest is filed within
the time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request shall be
treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the EA
for this proposal. The filing of the EA
in the Commission’s public record for
PO 00000
Frm 00015
Fmt 4703
Sfmt 4703
this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list and will be
notified of any meetings associated with
the Commission’s environmental review
process. Environmental commenters
will not be required to serve copies of
filed documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 3 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426.
Dated: March 13, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–05734 Filed 3–18–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG20–95–000.
Applicants: Las Majadas Wind Farm,
LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Las Majadas Wind
Farm, LLC.
Filed Date: 3/5/20.
Accession Number: 20200305–5198.
Comments Due: 5 p.m. ET 3/26/20.
Docket Numbers: EG20–96–000.
Applicants: Milligan 1 Wind LLC.
Description: Notice of SelfCertification of Exempt Wholesale
E:\FR\FM\19MRN1.SGM
19MRN1
Agencies
[Federal Register Volume 85, Number 54 (Thursday, March 19, 2020)]
[Notices]
[Page 15772]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-05734]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP20-78-000]
Columbia Gas Transmission, LLC; Notice of Request Under Blanket
Authorization
Take notice that on March 5, 2020, Columbia Gas Transmission, LLC
(Columbia), 700 Louisiana Street, Suite 700, Houston, Texas 77002-2700,
filed in the above referenced docket, a prior notice request pursuant
to sections 157.205 and 157.208 of the Commission's regulations under
the Natural Gas Act (NGA) and Columbia's blanket certificate issued in
Docket No. CP83-76-000. Columbia request authorization to construct and
operate facilities related to its proposed greenfield point of receipt
meter station at the interconnection of Columbia's existing Line L2542
and Nexus Gas Transmission's existing pipeline in Lorain County, Ohio
(Quarry Road Meter Station Project). The project will allow Columbia to
receive up to 215 million cubic feet per day of receipt capacity for
transportation on its pipeline system. The estimated cost of the
project is approximately $14.2 million, all as more fully set forth in
the application which is on file with the Commission and open to public
inspection. The filing may also be viewed on the web at https://www.ferc.gov using the ``eLibrary'' link. Enter the docket number
excluding the last three digits in the docket number field to access
the document. For assistance, please contact FERC Online Support at
[email protected] or toll free at (866) 208-3676, or TTY,
contact (202) 502-8659.
Any questions regarding this prior notice request should be
directed to Sorana Linder, Director, Modernization & Certificates,
Columbia Gas Transmission, LLC, 700 Louisiana Street, Suite 700,
Houston, Texas 77002-2700, Phone: (832) 320-5209, Email:
[email protected].
Any person or the Commission's staff may, within 60 days after the
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention. Any person filing to intervene, or
the Commission's staff may, pursuant to section 157.205 of the
Commission's Regulations under the NGA (18 CFR 157.205) file a protest
to the request. If no protest is filed within the time allowed
therefore, the proposed activity shall be deemed to be authorized
effective the day after the time allowed for protest. If a protest is
filed and not withdrawn within 30 days after the time allowed for
filing a protest, the instant request shall be treated as an
application for authorization pursuant to section 7 of the NGA.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the EA for this proposal. The filing of the EA in the Commission's
public record for this proceeding or the issuance of a Notice of
Schedule for Environmental Review will serve to notify federal and
state agencies of the timing for the completion of all necessary
reviews, and the subsequent need to complete all federal authorizations
within 90 days of the date of issuance of the Commission staff's EA.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commenters will be
placed on the Commission's environmental mailing list and will be
notified of any meetings associated with the Commission's environmental
review process. Environmental commenters will not be required to serve
copies of filed documents on all other parties. However, the non-party
commenters will not receive copies of all documents filed by other
parties or issued by the Commission and will not have the right to seek
court review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests, and interventions in lieu of paper using the ``eFiling'' link
at https://www.ferc.gov. Persons unable to file electronically should
submit an original and 3 copies of the protest or intervention to the
Federal Energy Regulatory Commission, 888 First Street NE, Washington,
DC 20426.
Dated: March 13, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-05734 Filed 3-18-20; 8:45 am]
BILLING CODE 6717-01-P