Combined Notice of Filings #1, 15772-15773 [2020-05731]
Download as PDF
15772
Federal Register / Vol. 85, No. 54 / Thursday, March 19, 2020 / Notices
and Conditions/Prescriptions May
12, 2020
Licensee’s Reply to REA Comments
June 26, 2020
Commission issues draft EA December
2020
Comments on draft EA January 2020
Commission issues final EA April
2021
Dated: March 13, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–05728 Filed 3–18–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RM19–12–000]
Revisions to the Filing Process for
Commission Forms; Notice of Change
In Technical Conference
The staff-led technical conference
scheduled for March 24 through 26,
2020, in the above-captioned
proceeding, will no longer be an inperson technical conference. At this
time, the technical conference will still
proceed as scheduled, but will be
accessible via webcast. A notice with
additional information will be issued in
this docket to provide an agenda and
instructions for those who wish to
participate in the technical conference.
Dated: March 13, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–05732 Filed 3–18–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP20–78–000]
jbell on DSKJLSW7X2PROD with NOTICES
Columbia Gas Transmission, LLC;
Notice of Request Under Blanket
Authorization
Take notice that on March 5, 2020,
Columbia Gas Transmission, LLC
(Columbia), 700 Louisiana Street, Suite
700, Houston, Texas 77002–2700, filed
in the above referenced docket, a prior
notice request pursuant to sections
157.205 and 157.208 of the
Commission’s regulations under the
Natural Gas Act (NGA) and Columbia’s
blanket certificate issued in Docket No.
CP83–76–000. Columbia request
authorization to construct and operate
facilities related to its proposed
VerDate Sep<11>2014
17:05 Mar 18, 2020
Jkt 250001
greenfield point of receipt meter station
at the interconnection of Columbia’s
existing Line L2542 and Nexus Gas
Transmission’s existing pipeline in
Lorain County, Ohio (Quarry Road
Meter Station Project). The project will
allow Columbia to receive up to 215
million cubic feet per day of receipt
capacity for transportation on its
pipeline system. The estimated cost of
the project is approximately $14.2
million, all as more fully set forth in the
application which is on file with the
Commission and open to public
inspection. The filing may also be
viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll free at (866) 208–3676, or
TTY, contact (202) 502–8659.
Any questions regarding this prior
notice request should be directed to
Sorana Linder, Director, Modernization
& Certificates, Columbia Gas
Transmission, LLC, 700 Louisiana
Street, Suite 700, Houston, Texas
77002–2700, Phone: (832) 320–5209,
Email: sorana_linder@tcenergy.com.
Any person or the Commission’s staff
may, within 60 days after the issuance
of the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention. Any person filing to
intervene, or the Commission’s staff
may, pursuant to section 157.205 of the
Commission’s Regulations under the
NGA (18 CFR 157.205) file a protest to
the request. If no protest is filed within
the time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request shall be
treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the EA
for this proposal. The filing of the EA
in the Commission’s public record for
PO 00000
Frm 00015
Fmt 4703
Sfmt 4703
this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list and will be
notified of any meetings associated with
the Commission’s environmental review
process. Environmental commenters
will not be required to serve copies of
filed documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 3 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426.
Dated: March 13, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–05734 Filed 3–18–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG20–95–000.
Applicants: Las Majadas Wind Farm,
LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Las Majadas Wind
Farm, LLC.
Filed Date: 3/5/20.
Accession Number: 20200305–5198.
Comments Due: 5 p.m. ET 3/26/20.
Docket Numbers: EG20–96–000.
Applicants: Milligan 1 Wind LLC.
Description: Notice of SelfCertification of Exempt Wholesale
E:\FR\FM\19MRN1.SGM
19MRN1
jbell on DSKJLSW7X2PROD with NOTICES
Federal Register / Vol. 85, No. 54 / Thursday, March 19, 2020 / Notices
Generator Status of Milligan 1 Wind
LLC.
Filed Date: 3/5/20.
Accession Number: 20200305–5199.
Comments Due: 5 p.m. ET 3/26/20.
Docket Numbers: EG20–97–000.
Applicants: King Plains Wind Project,
LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of King Plains Wind
Project, LLC.
Filed Date: 3/10/20.
Accession Number: 20200310–5206.
Comments Due: 5 p.m. ET 3/31/20.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER17–996–001;
EL16–92–002.
Applicants: New York Independent
System Operator, Inc.
Description: Notice of Compliance
Plan and Request for Conditional
Waiver of the New York Independent
System Operator, Inc.
Filed Date: 3/11/20.
Accession Number: 20200311–5283.
Comments Due: 5 p.m. ET 4/1/20.
Docket Numbers: ER18–1646–000;
ER18–1646–001; EL18–96–000.
Applicants: Electric Energy, Inc.
Description: Response to November
20, 2020 Deficiency Letter of Electric
Energy, Inc.
Filed Date: 3/12/20.
Accession Number: 20200312–5195.
Comments Due: 5 p.m. ET 4/2/20.
Docket Numbers: ER20–924–001.
Applicants: PacifiCorp.
Description: Tariff Amendment:
OATT Queue Reform—Deficiency dated
3/6/2020 to be effective 4/1/2020.
Filed Date: 3/13/20.
Accession Number: 20200313–5149.
Comments Due: 5 p.m. ET 4/3/20.
Docket Numbers: ER20–1258–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Revisions to Sch. 12-Appx A: February
2020 RTEP, 30-day Comments due to be
effective 6/10/2020.
Filed Date: 3/12/20.
Accession Number: 20200312–5168.
Comments Due: 5 p.m. ET 4/2/20.
Docket Numbers: ER20–1259–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2020–03–13_SA 3239 MEC-Wisconsin
Power and Light 1st Rev GIA (J534) to
be effective 2/28/2020.
Filed Date: 3/13/20.
Accession Number: 20200313–5020.
Comments Due: 5 p.m. ET 4/3/20.
Docket Numbers: ER20–1260–000.
VerDate Sep<11>2014
17:05 Mar 18, 2020
Jkt 250001
Applicants: Midcontinent
Independent System Operator, Inc.,
Otter Tail Power Company.
Description: § 205(d) Rate Filing:
2020–03–13_SA 3459 OTP-Dakota
Range III FSA (J488) BSP 2nd
Transformer to be effective 3/14/2020.
Filed Date: 3/13/20.
Accession Number: 20200313–5064.
Comments Due: 5 p.m. ET 4/3/20.
Docket Numbers: ER20–1261–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Otter Tail Power Company.
Description: § 205(d) Rate Filing:
2020–03–13_SA 3460 OTP-Tatanka
Ridge Wind FSA (J493) BSP 2nd
Transformer to be effective 3/14/2020.
Filed Date: 3/13/20.
Accession Number: 20200313–5072.
Comments Due: 5 p.m. ET 4/3/20.
Docket Numbers: ER20–1262–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Otter Tail Power Company.
Description: § 205(d) Rate Filing:
2020–03–13_SA 3461 OTP-Deuel
Harvest Wind Energy FSA (J526) BSP
2nd Transformer to be effective
3/14/2020.
Filed Date: 3/13/20.
Accession Number: 20200313–5119.
Comments Due: 5 p.m. ET 4/3/20.
Docket Numbers: ER20–1263–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
Tariff Revisions to Clarify Process for
Execution of Real-Time Balancing
Market to be effective 5/13/2020.
Filed Date: 3/13/20.
Accession Number: 20200313–5086.
Comments Due: 5 p.m. ET 4/3/20.
Docket Numbers: ER20–1264–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
MidAmerican Energy Company.
Description: § 205(d) Rate Filing:
2020–03–13_SA 2193 MidAmericanCIPCO 2nd Rev GFA 472 to be effective
3/14/2020.
Filed Date: 3/13/20.
Accession Number: 20200313–5100.
Comments Due: 5 p.m. ET 4/3/20.
Docket Numbers: ER20–1265–000.
Applicants: UNS Electric, Inc.
Description: Compliance filing: Order
No. 864 Compliance Filing to be
effective 6/1/2020.
Filed Date: 3/13/20.
Accession Number: 20200313–5104.
Comments Due: 5 p.m. ET 4/3/20.
Docket Numbers: ER20–1267–000.
Applicants: Northern Indiana Public
Service Company.
Description: § 205(d) Rate Filing:
Filing of a CIAC Agreement to be
effective 3/1/2020.
PO 00000
Frm 00016
Fmt 4703
Sfmt 9990
15773
Filed Date: 3/13/20.
Accession Number: 20200313–5120.
Comments Due: 5 p.m. ET 4/3/20.
Docket Numbers: ER20–1281–000.
Applicants: California Independent
System Operator Corp.
Description: Compliance filing:
2020–03–13 Reconcile Overlapping
Approved Tariff Records to be effective
12/31/2019.
Filed Date: 3/13/20.
Accession Number: 20200313–5156.
Comments Due: 5 p.m. ET 4/3/20.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES20–15–000.
Applicants: Cross-Sound Cable
Company, LLC.
Description: Amendment to February
12, 2020 Application Under Section 204
of the Federal Power Act for
Authorization to Incur Obligations and
Liabilities, et al. of Cross-Sound Cable
Company, LLC.
Filed Date: 3/9/20.
Accession Number: 20200309–5258.
Comments Due: 5 p.m. ET 3/19/20.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: March 13, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–05731 Filed 3–18–20; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\19MRN1.SGM
19MRN1
Agencies
[Federal Register Volume 85, Number 54 (Thursday, March 19, 2020)]
[Notices]
[Pages 15772-15773]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-05731]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG20-95-000.
Applicants: Las Majadas Wind Farm, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of Las Majadas Wind Farm, LLC.
Filed Date: 3/5/20.
Accession Number: 20200305-5198.
Comments Due: 5 p.m. ET 3/26/20.
Docket Numbers: EG20-96-000.
Applicants: Milligan 1 Wind LLC.
Description: Notice of Self-Certification of Exempt Wholesale
[[Page 15773]]
Generator Status of Milligan 1 Wind LLC.
Filed Date: 3/5/20.
Accession Number: 20200305-5199.
Comments Due: 5 p.m. ET 3/26/20.
Docket Numbers: EG20-97-000.
Applicants: King Plains Wind Project, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of King Plains Wind Project, LLC.
Filed Date: 3/10/20.
Accession Number: 20200310-5206.
Comments Due: 5 p.m. ET 3/31/20.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER17-996-001; EL16-92-002.
Applicants: New York Independent System Operator, Inc.
Description: Notice of Compliance Plan and Request for Conditional
Waiver of the New York Independent System Operator, Inc.
Filed Date: 3/11/20.
Accession Number: 20200311-5283.
Comments Due: 5 p.m. ET 4/1/20.
Docket Numbers: ER18-1646-000; ER18-1646-001; EL18-96-000.
Applicants: Electric Energy, Inc.
Description: Response to November 20, 2020 Deficiency Letter of
Electric Energy, Inc.
Filed Date: 3/12/20.
Accession Number: 20200312-5195.
Comments Due: 5 p.m. ET 4/2/20.
Docket Numbers: ER20-924-001.
Applicants: PacifiCorp.
Description: Tariff Amendment: OATT Queue Reform--Deficiency dated
3/6/2020 to be effective 4/1/2020.
Filed Date: 3/13/20.
Accession Number: 20200313-5149.
Comments Due: 5 p.m. ET 4/3/20.
Docket Numbers: ER20-1258-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Revisions to Sch. 12-Appx A:
February 2020 RTEP, 30-day Comments due to be effective 6/10/2020.
Filed Date: 3/12/20.
Accession Number: 20200312-5168.
Comments Due: 5 p.m. ET 4/2/20.
Docket Numbers: ER20-1259-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2020-03-13_SA 3239 MEC-
Wisconsin Power and Light 1st Rev GIA (J534) to be effective 2/28/2020.
Filed Date: 3/13/20.
Accession Number: 20200313-5020.
Comments Due: 5 p.m. ET 4/3/20.
Docket Numbers: ER20-1260-000.
Applicants: Midcontinent Independent System Operator, Inc., Otter
Tail Power Company.
Description: Sec. 205(d) Rate Filing: 2020-03-13_SA 3459 OTP-
Dakota Range III FSA (J488) BSP 2nd Transformer to be effective 3/14/
2020.
Filed Date: 3/13/20.
Accession Number: 20200313-5064.
Comments Due: 5 p.m. ET 4/3/20.
Docket Numbers: ER20-1261-000.
Applicants: Midcontinent Independent System Operator, Inc., Otter
Tail Power Company.
Description: Sec. 205(d) Rate Filing: 2020-03-13_SA 3460 OTP-
Tatanka Ridge Wind FSA (J493) BSP 2nd Transformer to be effective 3/14/
2020.
Filed Date: 3/13/20.
Accession Number: 20200313-5072.
Comments Due: 5 p.m. ET 4/3/20.
Docket Numbers: ER20-1262-000.
Applicants: Midcontinent Independent System Operator, Inc., Otter
Tail Power Company.
Description: Sec. 205(d) Rate Filing: 2020-03-13_SA 3461 OTP-Deuel
Harvest Wind Energy FSA (J526) BSP 2nd Transformer to be effective 3/
14/2020.
Filed Date: 3/13/20.
Accession Number: 20200313-5119.
Comments Due: 5 p.m. ET 4/3/20.
Docket Numbers: ER20-1263-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: Tariff Revisions to Clarify
Process for Execution of Real-Time Balancing Market to be effective 5/
13/2020.
Filed Date: 3/13/20.
Accession Number: 20200313-5086.
Comments Due: 5 p.m. ET 4/3/20.
Docket Numbers: ER20-1264-000.
Applicants: Midcontinent Independent System Operator, Inc.,
MidAmerican Energy Company.
Description: Sec. 205(d) Rate Filing: 2020-03-13_SA 2193
MidAmerican-CIPCO 2nd Rev GFA 472 to be effective 3/14/2020.
Filed Date: 3/13/20.
Accession Number: 20200313-5100.
Comments Due: 5 p.m. ET 4/3/20.
Docket Numbers: ER20-1265-000.
Applicants: UNS Electric, Inc.
Description: Compliance filing: Order No. 864 Compliance Filing to
be effective 6/1/2020.
Filed Date: 3/13/20.
Accession Number: 20200313-5104.
Comments Due: 5 p.m. ET 4/3/20.
Docket Numbers: ER20-1267-000.
Applicants: Northern Indiana Public Service Company.
Description: Sec. 205(d) Rate Filing: Filing of a CIAC Agreement
to be effective 3/1/2020.
Filed Date: 3/13/20.
Accession Number: 20200313-5120.
Comments Due: 5 p.m. ET 4/3/20.
Docket Numbers: ER20-1281-000.
Applicants: California Independent System Operator Corp.
Description: Compliance filing: 2020-03-13 Reconcile Overlapping
Approved Tariff Records to be effective 12/31/2019.
Filed Date: 3/13/20.
Accession Number: 20200313-5156.
Comments Due: 5 p.m. ET 4/3/20.
Take notice that the Commission received the following electric
securities filings:
Docket Numbers: ES20-15-000.
Applicants: Cross-Sound Cable Company, LLC.
Description: Amendment to February 12, 2020 Application Under
Section 204 of the Federal Power Act for Authorization to Incur
Obligations and Liabilities, et al. of Cross-Sound Cable Company, LLC.
Filed Date: 3/9/20.
Accession Number: 20200309-5258.
Comments Due: 5 p.m. ET 3/19/20.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: March 13, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020-05731 Filed 3-18-20; 8:45 am]
BILLING CODE 6717-01-P