Download as PDF 15772 Federal Register / Vol. 85, No. 54 / Thursday, March 19, 2020 / Notices and Conditions/Prescriptions May 12, 2020 Licensee’s Reply to REA Comments June 26, 2020 Commission issues draft EA December 2020 Comments on draft EA January 2020 Commission issues final EA April 2021 Dated: March 13, 2020. Kimberly D. Bose, Secretary. [FR Doc. 2020–05728 Filed 3–18–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RM19–12–000] Revisions to the Filing Process for Commission Forms; Notice of Change In Technical Conference The staff-led technical conference scheduled for March 24 through 26, 2020, in the above-captioned proceeding, will no longer be an inperson technical conference. At this time, the technical conference will still proceed as scheduled, but will be accessible via webcast. A notice with additional information will be issued in this docket to provide an agenda and instructions for those who wish to participate in the technical conference. Dated: March 13, 2020. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2020–05732 Filed 3–18–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP20–78–000] jbell on DSKJLSW7X2PROD with NOTICES Columbia Gas Transmission, LLC; Notice of Request Under Blanket Authorization Take notice that on March 5, 2020, Columbia Gas Transmission, LLC (Columbia), 700 Louisiana Street, Suite 700, Houston, Texas 77002–2700, filed in the above referenced docket, a prior notice request pursuant to sections 157.205 and 157.208 of the Commission’s regulations under the Natural Gas Act (NGA) and Columbia’s blanket certificate issued in Docket No. CP83–76–000. Columbia request authorization to construct and operate facilities related to its proposed VerDate Sep<11>2014 17:05 Mar 18, 2020 Jkt 250001 greenfield point of receipt meter station at the interconnection of Columbia’s existing Line L2542 and Nexus Gas Transmission’s existing pipeline in Lorain County, Ohio (Quarry Road Meter Station Project). The project will allow Columbia to receive up to 215 million cubic feet per day of receipt capacity for transportation on its pipeline system. The estimated cost of the project is approximately $14.2 million, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov or toll free at (866) 208–3676, or TTY, contact (202) 502–8659. Any questions regarding this prior notice request should be directed to Sorana Linder, Director, Modernization & Certificates, Columbia Gas Transmission, LLC, 700 Louisiana Street, Suite 700, Houston, Texas 77002–2700, Phone: (832) 320–5209, Email: sorana_linder@tcenergy.com. Any person or the Commission’s staff may, within 60 days after the issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention. Any person filing to intervene, or the Commission’s staff may, pursuant to section 157.205 of the Commission’s Regulations under the NGA (18 CFR 157.205) file a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the EA for this proposal. The filing of the EA in the Commission’s public record for PO 00000 Frm 00015 Fmt 4703 Sfmt 4703 this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s EA. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission’s environmental mailing list and will be notified of any meetings associated with the Commission’s environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. However, the non-party commenters will not receive copies of all documents filed by other parties or issued by the Commission and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests, and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and 3 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. Dated: March 13, 2020. Kimberly D. Bose, Secretary. [FR Doc. 2020–05734 Filed 3–18–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG20–95–000. Applicants: Las Majadas Wind Farm, LLC. Description: Notice of SelfCertification of Exempt Wholesale Generator Status of Las Majadas Wind Farm, LLC. Filed Date: 3/5/20. Accession Number: 20200305–5198. Comments Due: 5 p.m. ET 3/26/20. Docket Numbers: EG20–96–000. Applicants: Milligan 1 Wind LLC. Description: Notice of SelfCertification of Exempt Wholesale E:\FR\FM\19MRN1.SGM 19MRN1 jbell on DSKJLSW7X2PROD with NOTICES Federal Register / Vol. 85, No. 54 / Thursday, March 19, 2020 / Notices Generator Status of Milligan 1 Wind LLC. Filed Date: 3/5/20. Accession Number: 20200305–5199. Comments Due: 5 p.m. ET 3/26/20. Docket Numbers: EG20–97–000. Applicants: King Plains Wind Project, LLC. Description: Notice of SelfCertification of Exempt Wholesale Generator Status of King Plains Wind Project, LLC. Filed Date: 3/10/20. Accession Number: 20200310–5206. Comments Due: 5 p.m. ET 3/31/20. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER17–996–001; EL16–92–002. Applicants: New York Independent System Operator, Inc. Description: Notice of Compliance Plan and Request for Conditional Waiver of the New York Independent System Operator, Inc. Filed Date: 3/11/20. Accession Number: 20200311–5283. Comments Due: 5 p.m. ET 4/1/20. Docket Numbers: ER18–1646–000; ER18–1646–001; EL18–96–000. Applicants: Electric Energy, Inc. Description: Response to November 20, 2020 Deficiency Letter of Electric Energy, Inc. Filed Date: 3/12/20. Accession Number: 20200312–5195. Comments Due: 5 p.m. ET 4/2/20. Docket Numbers: ER20–924–001. Applicants: PacifiCorp. Description: Tariff Amendment: OATT Queue Reform—Deficiency dated 3/6/2020 to be effective 4/1/2020. Filed Date: 3/13/20. Accession Number: 20200313–5149. Comments Due: 5 p.m. ET 4/3/20. Docket Numbers: ER20–1258–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Revisions to Sch. 12-Appx A: February 2020 RTEP, 30-day Comments due to be effective 6/10/2020. Filed Date: 3/12/20. Accession Number: 20200312–5168. Comments Due: 5 p.m. ET 4/2/20. Docket Numbers: ER20–1259–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2020–03–13_SA 3239 MEC-Wisconsin Power and Light 1st Rev GIA (J534) to be effective 2/28/2020. Filed Date: 3/13/20. Accession Number: 20200313–5020. Comments Due: 5 p.m. ET 4/3/20. Docket Numbers: ER20–1260–000. VerDate Sep<11>2014 17:05 Mar 18, 2020 Jkt 250001 Applicants: Midcontinent Independent System Operator, Inc., Otter Tail Power Company. Description: § 205(d) Rate Filing: 2020–03–13_SA 3459 OTP-Dakota Range III FSA (J488) BSP 2nd Transformer to be effective 3/14/2020. Filed Date: 3/13/20. Accession Number: 20200313–5064. Comments Due: 5 p.m. ET 4/3/20. Docket Numbers: ER20–1261–000. Applicants: Midcontinent Independent System Operator, Inc., Otter Tail Power Company. Description: § 205(d) Rate Filing: 2020–03–13_SA 3460 OTP-Tatanka Ridge Wind FSA (J493) BSP 2nd Transformer to be effective 3/14/2020. Filed Date: 3/13/20. Accession Number: 20200313–5072. Comments Due: 5 p.m. ET 4/3/20. Docket Numbers: ER20–1262–000. Applicants: Midcontinent Independent System Operator, Inc., Otter Tail Power Company. Description: § 205(d) Rate Filing: 2020–03–13_SA 3461 OTP-Deuel Harvest Wind Energy FSA (J526) BSP 2nd Transformer to be effective 3/14/2020. Filed Date: 3/13/20. Accession Number: 20200313–5119. Comments Due: 5 p.m. ET 4/3/20. Docket Numbers: ER20–1263–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: Tariff Revisions to Clarify Process for Execution of Real-Time Balancing Market to be effective 5/13/2020. Filed Date: 3/13/20. Accession Number: 20200313–5086. Comments Due: 5 p.m. ET 4/3/20. Docket Numbers: ER20–1264–000. Applicants: Midcontinent Independent System Operator, Inc., MidAmerican Energy Company. Description: § 205(d) Rate Filing: 2020–03–13_SA 2193 MidAmericanCIPCO 2nd Rev GFA 472 to be effective 3/14/2020. Filed Date: 3/13/20. Accession Number: 20200313–5100. Comments Due: 5 p.m. ET 4/3/20. Docket Numbers: ER20–1265–000. Applicants: UNS Electric, Inc. Description: Compliance filing: Order No. 864 Compliance Filing to be effective 6/1/2020. Filed Date: 3/13/20. Accession Number: 20200313–5104. Comments Due: 5 p.m. ET 4/3/20. Docket Numbers: ER20–1267–000. Applicants: Northern Indiana Public Service Company. Description: § 205(d) Rate Filing: Filing of a CIAC Agreement to be effective 3/1/2020. PO 00000 Frm 00016 Fmt 4703 Sfmt 9990 15773 Filed Date: 3/13/20. Accession Number: 20200313–5120. Comments Due: 5 p.m. ET 4/3/20. Docket Numbers: ER20–1281–000. Applicants: California Independent System Operator Corp. Description: Compliance filing: 2020–03–13 Reconcile Overlapping Approved Tariff Records to be effective 12/31/2019. Filed Date: 3/13/20. Accession Number: 20200313–5156. Comments Due: 5 p.m. ET 4/3/20. Take notice that the Commission received the following electric securities filings: Docket Numbers: ES20–15–000. Applicants: Cross-Sound Cable Company, LLC. Description: Amendment to February 12, 2020 Application Under Section 204 of the Federal Power Act for Authorization to Incur Obligations and Liabilities, et al. of Cross-Sound Cable Company, LLC. Filed Date: 3/9/20. Accession Number: 20200309–5258. Comments Due: 5 p.m. ET 3/19/20. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: March 13, 2020. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2020–05731 Filed 3–18–20; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\19MRN1.SGM 19MRN1

Agencies

[Federal Register Volume 85, Number 54 (Thursday, March 19, 2020)]
[Notices]
[Pages 15772-15773]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-05731]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following exempt 
wholesale generator filings:

    Docket Numbers: EG20-95-000.
    Applicants: Las Majadas Wind Farm, LLC.
    Description: Notice of Self-Certification of Exempt Wholesale 
Generator Status of Las Majadas Wind Farm, LLC.
    Filed Date: 3/5/20.
    Accession Number: 20200305-5198.
    Comments Due: 5 p.m. ET 3/26/20.

    Docket Numbers: EG20-96-000.
    Applicants: Milligan 1 Wind LLC.
    Description: Notice of Self-Certification of Exempt Wholesale

[[Page 15773]]

Generator Status of Milligan 1 Wind LLC.
    Filed Date: 3/5/20.
    Accession Number: 20200305-5199.
    Comments Due: 5 p.m. ET 3/26/20.

    Docket Numbers: EG20-97-000.
    Applicants: King Plains Wind Project, LLC.
    Description: Notice of Self-Certification of Exempt Wholesale 
Generator Status of King Plains Wind Project, LLC.
    Filed Date: 3/10/20.
    Accession Number: 20200310-5206.
    Comments Due: 5 p.m. ET 3/31/20.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER17-996-001; EL16-92-002.
    Applicants: New York Independent System Operator, Inc.
    Description: Notice of Compliance Plan and Request for Conditional 
Waiver of the New York Independent System Operator, Inc.
    Filed Date: 3/11/20.
    Accession Number: 20200311-5283.
    Comments Due: 5 p.m. ET 4/1/20.

    Docket Numbers: ER18-1646-000; ER18-1646-001; EL18-96-000.
    Applicants: Electric Energy, Inc.
    Description: Response to November 20, 2020 Deficiency Letter of 
Electric Energy, Inc.
    Filed Date: 3/12/20.
    Accession Number: 20200312-5195.
    Comments Due: 5 p.m. ET 4/2/20.

    Docket Numbers: ER20-924-001.
    Applicants: PacifiCorp.
    Description: Tariff Amendment: OATT Queue Reform--Deficiency dated 
3/6/2020 to be effective 4/1/2020.
    Filed Date: 3/13/20.
    Accession Number: 20200313-5149.
    Comments Due: 5 p.m. ET 4/3/20.

    Docket Numbers: ER20-1258-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Revisions to Sch. 12-Appx A: 
February 2020 RTEP, 30-day Comments due to be effective 6/10/2020.
    Filed Date: 3/12/20.
    Accession Number: 20200312-5168.
    Comments Due: 5 p.m. ET 4/2/20.

    Docket Numbers: ER20-1259-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: 2020-03-13_SA 3239 MEC-
Wisconsin Power and Light 1st Rev GIA (J534) to be effective 2/28/2020.
    Filed Date: 3/13/20.
    Accession Number: 20200313-5020.
    Comments Due: 5 p.m. ET 4/3/20.

    Docket Numbers: ER20-1260-000.
    Applicants: Midcontinent Independent System Operator, Inc., Otter 
Tail Power Company.
    Description: Sec.  205(d) Rate Filing: 2020-03-13_SA 3459 OTP-
Dakota Range III FSA (J488) BSP 2nd Transformer to be effective 3/14/
2020.
    Filed Date: 3/13/20.
    Accession Number: 20200313-5064.
    Comments Due: 5 p.m. ET 4/3/20.

    Docket Numbers: ER20-1261-000.
    Applicants: Midcontinent Independent System Operator, Inc., Otter 
Tail Power Company.
    Description: Sec.  205(d) Rate Filing: 2020-03-13_SA 3460 OTP-
Tatanka Ridge Wind FSA (J493) BSP 2nd Transformer to be effective 3/14/
2020.
    Filed Date: 3/13/20.
    Accession Number: 20200313-5072.
    Comments Due: 5 p.m. ET 4/3/20.

    Docket Numbers: ER20-1262-000.
    Applicants: Midcontinent Independent System Operator, Inc., Otter 
Tail Power Company.
    Description: Sec.  205(d) Rate Filing: 2020-03-13_SA 3461 OTP-Deuel 
Harvest Wind Energy FSA (J526) BSP 2nd Transformer to be effective 3/
14/2020.
    Filed Date: 3/13/20.
    Accession Number: 20200313-5119.
    Comments Due: 5 p.m. ET 4/3/20.

    Docket Numbers: ER20-1263-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Sec.  205(d) Rate Filing: Tariff Revisions to Clarify 
Process for Execution of Real-Time Balancing Market to be effective 5/
13/2020.
    Filed Date: 3/13/20.
    Accession Number: 20200313-5086.
    Comments Due: 5 p.m. ET 4/3/20.

    Docket Numbers: ER20-1264-000.
    Applicants: Midcontinent Independent System Operator, Inc., 
MidAmerican Energy Company.
    Description: Sec.  205(d) Rate Filing: 2020-03-13_SA 2193 
MidAmerican-CIPCO 2nd Rev GFA 472 to be effective 3/14/2020.
    Filed Date: 3/13/20.
    Accession Number: 20200313-5100.
    Comments Due: 5 p.m. ET 4/3/20.

    Docket Numbers: ER20-1265-000.
    Applicants: UNS Electric, Inc.
    Description: Compliance filing: Order No. 864 Compliance Filing to 
be effective 6/1/2020.
    Filed Date: 3/13/20.
    Accession Number: 20200313-5104.
    Comments Due: 5 p.m. ET 4/3/20.

    Docket Numbers: ER20-1267-000.
    Applicants: Northern Indiana Public Service Company.
    Description: Sec.  205(d) Rate Filing: Filing of a CIAC Agreement 
to be effective 3/1/2020.
    Filed Date: 3/13/20.
    Accession Number: 20200313-5120.
    Comments Due: 5 p.m. ET 4/3/20.

    Docket Numbers: ER20-1281-000.
    Applicants: California Independent System Operator Corp.
    Description: Compliance filing: 2020-03-13 Reconcile Overlapping 
Approved Tariff Records to be effective 12/31/2019.
    Filed Date: 3/13/20.
    Accession Number: 20200313-5156.
    Comments Due: 5 p.m. ET 4/3/20.

    Take notice that the Commission received the following electric 
securities filings:

    Docket Numbers: ES20-15-000.

    Applicants: Cross-Sound Cable Company, LLC.
    Description: Amendment to February 12, 2020 Application Under 
Section 204 of the Federal Power Act for Authorization to Incur 
Obligations and Liabilities, et al. of Cross-Sound Cable Company, LLC.
    Filed Date: 3/9/20.
    Accession Number: 20200309-5258.
    Comments Due: 5 p.m. ET 3/19/20.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: March 13, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020-05731 Filed 3-18-20; 8:45 am]