Commission Information Collection Activities (FERC-725G); Comment Request; Extension, 14190-14191 [2020-04953]

Download as PDF 14190 Federal Register / Vol. 85, No. 48 / Wednesday, March 11, 2020 / Notices Germantown Rd., Germantown, MD 20874–1290. Phone: (301) 903–1788. Please include ‘‘Question on the RFI’’ in the subject line. SUPPLEMENTARY INFORMATION: On February 24, 2020, the U.S. Department of Energy (DOE) published a request for information (RFI) in the Federal Register (85 FR 10424). DOE issued this RFI to invite public input on key challenges in reconstituting uranium mining and conversion capabilities in the United States. This invitation is in recognition of the importance of nuclear fuel supply chain capabilities in the United States. The Joint Explanatory Statement of the Energy and Water Development Committees on H.R. 1865, the Fiscal Year 2020 Energy and Water Appropriations Act, requests the Department to contract not later than 60 days after enactment of the Act with a Federally-Funded Research and Development Center (FFRDC) or other independent organization to work with industry to identify key challenges in reconstituting mining and conversion capabilities in the United States. The responses received from this RFI will be provided to the FFRDC or the independent organization. The RFI established a March 16, 2020, deadline for the submission of written comments. DOE has received requests from the public for extension of the public comment period. In response to those requests, DOE is extending the comment period to March 30, 2020 to provide the public additional time for comment. Signed in Washington, DC, on March 5, 2020. Andrew Griffith, Deputy Assistant Secretary for Nuclear Fuel Cycle and Supply Chain, Office of Nuclear Energy, Department of Energy. [FR Doc. 2020–04964 Filed 3–10–20; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RD20–1–000] Commission Information Collection Activities (FERC–725G); Comment Request; Extension Federal Energy Regulatory Commission. ACTION: Notice of information collection and request for comments. lotter on DSKBCFDHB2PROD with NOTICES AGENCY: In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission (Commission or FERC) is soliciting SUMMARY: VerDate Sep<11>2014 16:37 Mar 10, 2020 Jkt 250001 public comment on the currently approved information collection FERC– 725G (Mandatory Reliability Standards for the Bulk-Power System: PRC Standards: Regional Reliability Standard PRC–006–NPCC–2 Automatic Underfrequency Load-Shedding (UFLS)) and submitting the information collection to the Office of Management and Budget (OMB) for review. Any interested person may file comments directly with OMB and should address a copy of those comments to the Commission as explained below. DATES: Comments on the collection of information are due May 11, 2020. ADDRESSES: Comments filed with OMB, identified by OMB Control No. 1902– 0252, should be sent via email to the Office of Information and Regulatory Affairs: oira_submission@omb.gov. Attention: Federal Energy Regulatory Commission Desk Officer. A copy of the comments should also be sent to the Commission, in Docket No. RD20–1–000, by either of the following methods: • eFiling at Commission’s Website: https://www.ferc.gov/docs-filing/ efiling.asp • Mail/Hand Delivery/Courier: Federal Energy Regulatory Commission, Secretary of the Commission, 888 First Street NE, Washington, DC 20426. Instructions: All submissions must be formatted and filed in accordance with submission guidelines at: https:// www.ferc.gov/help/submissionguide.asp. For user assistance, contact FERC Online Support by email at ferconlinesupport@ferc.gov, or by phone at: (866) 208–3676 (toll-free), or (202) 502–8659 for TTY. Docket: Users interested in receiving automatic notification of activity in this docket or in viewing/downloading comments and issuances in this docket may do so at https://www.ferc.gov/docsfiling/docs-filing.asp. FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at DataClearance@FERC.gov, telephone at (202) 502–8663, and fax at (202) 273– 0873. SUPPLEMENTARY INFORMATION: Title: FERC–725G (Mandatory Reliability Standards for the Bulk-Power System: Regional Reliability Standard PRC–006–NPCC–2, Automatic Underfrequency Load-Shedding (UFLS). OMB Control No.: 1902–0252. Type of Request: Revisions to the information collection, as discussed in Docket No. RD20–1–000. Abstract: The proposed regional Reliability Standard applies to generator owners, planning coordinators, distribution providers, and transmission PO 00000 Frm 00007 Fmt 4703 Sfmt 4703 owners in the Northeast Power Coordinating Council Region and is designed to ensure the development of an effective automatic underfrequency load shedding (UFLS) program to preserve the security and integrity of the Bulk-Power System during declining system frequency events in coordination with the NERC continent-wide UFLS Reliability Standard PRC–006–1. The Commission also proposes to approve the related violation risk factors, violation severity levels, implementation plan, and effective date proposed by NERC. On August 8, 2005, Congress enacted into law the Electricity Modernization Act of 2005, which is Title XII, Subtitle A, of the Energy Policy Act of 2005 (EPAct 2005).1 EPAct 2005 added a new section 215 to the FPA, which required a Commission-certified Electric Reliability Organization (ERO) to develop mandatory and enforceable Reliability Standards, which are subject to Commission review and approval. Once approved, the Reliability Standards may be enforced by the ERO subject to Commission oversight, or the Commission can independently enforce Reliability Standards.2 On February 3, 2006, the Commission issued Order No. 672, implementing section 215 of the FPA.3 Pursuant to Order No. 672, the Commission certified one organization, North American Electric Reliability Corporation (NERC), as the ERO.4 The Reliability Standards developed by the ERO and approved by the Commission apply to users, owners and operators of the Bulk-Power System as set forth in each Reliability Standard. On December 23, 2019, the North American Electric Reliability Corporation (NERC) and Northeast Power Coordinating Council, Inc. (NPCC) filed a joint petition seeking approval of proposed regional Reliability Standard PRC–006–NPCC–2 (NPCC Automatic Underfrequency Load Shedding). NERC and NPCC state that regional Reliability Standard PRC–006– NPCC–2 establishes consistent and coordinated requirements for the design, 1 Energy Policy Act of 2005, Public Law No. 109– 58, Title XII, Subtitle A, 119 Stat. 594, 941 (codified at 16 U.S.C. 824o). 2 16 U.S.C. 824o(e)(3). 3 Rules Concerning Certification of the Electric Reliability Organization; and Procedures for the Establishment, Approval, and Enforcement of Electric Reliability Standards, Order No. 672, FERC Stats. & Regs. ¶ 31,204, order on reh’g, Order No. 672–A, FERC Stats. & Regs. ¶ 31,212 (2006). 4 North American Electric Reliability Corp., 116 FERC ¶ 61,062, order on reh’g and compliance, 117 FERC ¶ 61,126 (2006), order on compliance, 118 FERC ¶ 61,190, order on reh’g, 119 FERC ¶ 61,046 (2007), aff’d sub nom. Alcoa Inc. v. FERC, 564 F.3d 1342 (D.C. Cir. 2009). E:\FR\FM\11MRN1.SGM 11MRN1 Federal Register / Vol. 85, No. 48 / Wednesday, March 11, 2020 / Notices implementation, and analysis of automatic underfrequency load shedding (UFLS) programs among all NPCC applicable entities. These requirements are more stringent and specific than the NERC continent-wide UFLS Reliability Standard, PRC–006–3, and were established such that the declining frequency is arrested and recovered in accordance with NPCC performance requirements. NPCC revised currently effective Regional Reliability Standard PRC–006–NPCC–1 to remove redundancies with the Reliability Standard PRC–006–3, clarify obligations for registered entities, improve communication of island boundaries to affected registered entities, and provide entities with the flexibility to calculate net load shed for UFLS in certain situations. On February 19, 2020, the Commission issued a Delegated Letter Order, Docket No. RD20–1–000, approving proposed Reliability Standard PRC–006–NPCC–2, the associated VRFs and VSLs, the Effective Date, and the retirement of the currently effective Regional Reliability Standard PRC–006–NPCC–1. The effective date for Reliability Standard PRC–006– NPCC–2 is as of the date of this order, January 18, 2020. Type of Respondents: Generator owners, planning coordinators, distribution providers, and transmission owners in the Northeast Power Coordinating Council (NPCC) Region. Estimate of Annual Burden: 5 Our estimates are based on the NERC Compliance Registry Summary of Entities as of January 31, 2019. According to the NERC compliance 14191 registry, and Functions as of, which indicates there are registered as GO, PC, DP and TO entities. The individual burden estimates are based on the time needed to gather data, run studies, and analyze study results to design or update the underfrequency load shedding programs. Additionally, documentation and the review of underfrequency load shedding program results by supervisors and management is included in the administrative estimations. These are consistent with estimates for similar tasks in other Commission approved standards. Estimates for the additional burden and cost imposed by the order in Docket No. RD20–1–000 follow: Commission estimates the annual burden and cost 6 as follows. Burden and cost for the information collection as follows: RD20–1–000—MANDATORY RELIABILITY STANDARDS FOR THE BULK-POWER SYSTEM: REGIONAL RELIABILITY STANDARD PRC–006–NPCC–2 AUTOMATIC UNDERFREQUENCY LOAD SHEDDING [UFLS] Reliability standard & requirement Average annual number 1 of respondents Average annual number of responses per respondent Average annual total number of responses Average burden hrs. & cost ($) per response Total annual burden hours & cost ($) (rounded) Cost per respondent ($) (1) (2) (1) * (2) = (3) (4) (3) * (4) = (5) (5) ÷ (1) ........... ........... ........... ........... 3,000 hrs.; $10,000 ... 48 hrs.; $160 ............. 1,224 hrs.; $4,080 ..... 936 hrs.; $3,120 ........ $80 $80 $80 .................... ............................... 5,208 hrs.; $17,360 ... .................... GO .................................... PC ..................................... DP ..................................... TO ..................................... 125 2 51 39 1 1 1 1 125 2 51 39 Total .......................... ............................ .......................... .......................... lotter on DSKBCFDHB2PROD with NOTICES Comments: Comments are invited on: (1) Whether the collection of information is necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency’s estimate of the burden and cost of the collection of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information collection; and (4) ways to minimize the burden of the collection of information on those who are to respond, including the use of automated collection techniques or other forms of information technology. 24 24 24 24 hrs.; hrs.; hrs.; hrs.; $80 $80 $80 $80 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 BILLING CODE 6717–01–P Take notice that the Commission received the following electric rate filings: Docket Numbers: ER20–1113–001. Applicants: Southwest Power Pool, Inc. Description: Tariff Amendment: 3616 Iron Star Wind Project/ITC E&P Ag Cancel-Amended Filing to be effective 2/8/2020. Filed Date: 3/5/20. Accession Number: 20200305–5060. Comments Due: 5 p.m. ET 3/26/20. Docket Numbers: ER20–1164–000. Applicants: Midcontinent Independent System Operator, Inc. 5 Burden is defined as the total time, effort, or financial resources expended by persons to generate, maintain, retain, or disclose or provide information to or for a federal agency. See 5 CFR 1320 for additional information on the definition of information collection burden. 6 The Commission staff estimates that industry is similarly situated in terms of hourly cost (for wages Dated: March 5, 2020. Kimberly D. Bose, Secretary. [FR Doc. 2020–04953 Filed 3–10–20; 8:45 am] VerDate Sep<11>2014 16:37 Mar 10, 2020 Jkt 250001 PO 00000 Frm 00008 Fmt 4703 Sfmt 4703 Description: § 205(d) Rate Filing: 2020–03–04_SA 3438 Entergy ArkansasLong Lake Solar GIA (J834) to be effective 2/21/2020. Filed Date: 3/4/20. Accession Number: 20200304–5295. Comments Due: 5 p.m. ET 3/25/20. Docket Numbers: ER20–1167–000. Applicants: Midcontinent Independent System Operator, Inc., Republic Transmission, LLC. Description: § 205(d) Rate Filing: 2020–03–04_Republic Transmission Integration Filing to be effective 12/31/ 9998. Filed Date: 3/4/20. Accession Number: 20200304–5247. Comments Due: 5 p.m. ET 3/25/20. Docket Numbers: ER20–1168–000. Applicants: DTE Big Turtle Wind Farm I, LLC. Description: § 205(d) Rate Filing: DTE Big Turtle Wind Farm I, LLC Notice of Succession to be effective 1/15/2020. plus benefits). Based on the Commission’s FY (Fiscal Year) 2019 average cost (for wages plus benefits), $80.00/hour is used. E:\FR\FM\11MRN1.SGM 11MRN1

Agencies

[Federal Register Volume 85, Number 48 (Wednesday, March 11, 2020)]
[Notices]
[Pages 14190-14191]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-04953]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. RD20-1-000]


Commission Information Collection Activities (FERC-725G); Comment 
Request; Extension

AGENCY: Federal Energy Regulatory Commission.

ACTION: Notice of information collection and request for comments.

-----------------------------------------------------------------------

SUMMARY: In compliance with the requirements of the Paperwork Reduction 
Act of 1995, the Federal Energy Regulatory Commission (Commission or 
FERC) is soliciting public comment on the currently approved 
information collection FERC-725G (Mandatory Reliability Standards for 
the Bulk-Power System: PRC Standards: Regional Reliability Standard 
PRC-006-NPCC-2 Automatic Underfrequency Load-Shedding (UFLS)) and 
submitting the information collection to the Office of Management and 
Budget (OMB) for review. Any interested person may file comments 
directly with OMB and should address a copy of those comments to the 
Commission as explained below.

DATES: Comments on the collection of information are due May 11, 2020.

ADDRESSES: Comments filed with OMB, identified by OMB Control No. 1902-
0252, should be sent via email to the Office of Information and 
Regulatory Affairs: [email protected]. Attention: Federal Energy 
Regulatory Commission Desk Officer.
    A copy of the comments should also be sent to the Commission, in 
Docket No. RD20-1-000, by either of the following methods:
     eFiling at Commission's Website: https://www.ferc.gov/docs-filing/efiling.asp
     Mail/Hand Delivery/Courier: Federal Energy Regulatory 
Commission, Secretary of the Commission, 888 First Street NE, 
Washington, DC 20426.
    Instructions: All submissions must be formatted and filed in 
accordance with submission guidelines at: https://www.ferc.gov/help/submission-guide.asp. For user assistance, contact FERC Online Support 
by email at [email protected], or by phone at: (866) 208-3676 
(toll-free), or (202) 502-8659 for TTY.
    Docket: Users interested in receiving automatic notification of 
activity in this docket or in viewing/downloading comments and 
issuances in this docket may do so at https://www.ferc.gov/docs-filing/docs-filing.asp.

FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at 
[email protected], telephone at (202) 502-8663, and fax at (202) 
273-0873.

SUPPLEMENTARY INFORMATION:
    Title: FERC-725G (Mandatory Reliability Standards for the Bulk-
Power System: Regional Reliability Standard PRC-006-NPCC-2, Automatic 
Underfrequency Load-Shedding (UFLS).
    OMB Control No.: 1902-0252.
    Type of Request: Revisions to the information collection, as 
discussed in Docket No. RD20-1-000.
    Abstract: The proposed regional Reliability Standard applies to 
generator owners, planning coordinators, distribution providers, and 
transmission owners in the Northeast Power Coordinating Council Region 
and is designed to ensure the development of an effective automatic 
underfrequency load shedding (UFLS) program to preserve the security 
and integrity of the Bulk-Power System during declining system 
frequency events in coordination with the NERC continent-wide UFLS 
Reliability Standard PRC-006-1. The Commission also proposes to approve 
the related violation risk factors, violation severity levels, 
implementation plan, and effective date proposed by NERC.
    On August 8, 2005, Congress enacted into law the Electricity 
Modernization Act of 2005, which is Title XII, Subtitle A, of the 
Energy Policy Act of 2005 (EPAct 2005).\1\ EPAct 2005 added a new 
section 215 to the FPA, which required a Commission-certified Electric 
Reliability Organization (ERO) to develop mandatory and enforceable 
Reliability Standards, which are subject to Commission review and 
approval. Once approved, the Reliability Standards may be enforced by 
the ERO subject to Commission oversight, or the Commission can 
independently enforce Reliability Standards.\2\
---------------------------------------------------------------------------

    \1\ Energy Policy Act of 2005, Public Law No. 109-58, Title XII, 
Subtitle A, 119 Stat. 594, 941 (codified at 16 U.S.C. 824o).
    \2\ 16 U.S.C. 824o(e)(3).
---------------------------------------------------------------------------

    On February 3, 2006, the Commission issued Order No. 672, 
implementing section 215 of the FPA.\3\ Pursuant to Order No. 672, the 
Commission certified one organization, North American Electric 
Reliability Corporation (NERC), as the ERO.\4\ The Reliability 
Standards developed by the ERO and approved by the Commission apply to 
users, owners and operators of the Bulk-Power System as set forth in 
each Reliability Standard.
---------------------------------------------------------------------------

    \3\ Rules Concerning Certification of the Electric Reliability 
Organization; and Procedures for the Establishment, Approval, and 
Enforcement of Electric Reliability Standards, Order No. 672, FERC 
Stats. & Regs. ] 31,204, order on reh'g, Order No. 672-A, FERC 
Stats. & Regs. ] 31,212 (2006).
    \4\ North American Electric Reliability Corp., 116 FERC ] 
61,062, order on reh'g and compliance, 117 FERC ] 61,126 (2006), 
order on compliance, 118 FERC ] 61,190, order on reh'g, 119 FERC ] 
61,046 (2007), aff'd sub nom. Alcoa Inc. v. FERC, 564 F.3d 1342 
(D.C. Cir. 2009).
---------------------------------------------------------------------------

    On December 23, 2019, the North American Electric Reliability 
Corporation (NERC) and Northeast Power Coordinating Council, Inc. 
(NPCC) filed a joint petition seeking approval of proposed regional 
Reliability Standard PRC-006-NPCC-2 (NPCC Automatic Underfrequency Load 
Shedding). NERC and NPCC state that regional Reliability Standard PRC-
006-NPCC-2 establishes consistent and coordinated requirements for the 
design,

[[Page 14191]]

implementation, and analysis of automatic underfrequency load shedding 
(UFLS) programs among all NPCC applicable entities. These requirements 
are more stringent and specific than the NERC continent-wide UFLS 
Reliability Standard, PRC-006-3, and were established such that the 
declining frequency is arrested and recovered in accordance with NPCC 
performance requirements. NPCC revised currently effective Regional 
Reliability Standard PRC-006-NPCC-1 to remove redundancies with the 
Reliability Standard PRC-006-3, clarify obligations for registered 
entities, improve communication of island boundaries to affected 
registered entities, and provide entities with the flexibility to 
calculate net load shed for UFLS in certain situations.
    On February 19, 2020, the Commission issued a Delegated Letter 
Order, Docket No. RD20-1-000, approving proposed Reliability Standard 
PRC-006-NPCC-2, the associated VRFs and VSLs, the Effective Date, and 
the retirement of the currently effective Regional Reliability Standard 
PRC-006-NPCC-1. The effective date for Reliability Standard PRC-006-
NPCC-2 is as of the date of this order, January 18, 2020.
    Type of Respondents: Generator owners, planning coordinators, 
distribution providers, and transmission owners in the Northeast Power 
Coordinating Council (NPCC) Region.
    Estimate of Annual Burden: \5\ Our estimates are based on the NERC 
Compliance Registry Summary of Entities as of January 31, 2019. 
According to the NERC compliance registry, and Functions as of, which 
indicates there are registered as GO, PC, DP and TO entities.
---------------------------------------------------------------------------

    \5\ Burden is defined as the total time, effort, or financial 
resources expended by persons to generate, maintain, retain, or 
disclose or provide information to or for a federal agency. See 5 
CFR 1320 for additional information on the definition of information 
collection burden.
---------------------------------------------------------------------------

    The individual burden estimates are based on the time needed to 
gather data, run studies, and analyze study results to design or update 
the underfrequency load shedding programs. Additionally, documentation 
and the review of underfrequency load shedding program results by 
supervisors and management is included in the administrative 
estimations. These are consistent with estimates for similar tasks in 
other Commission approved standards.
    Estimates for the additional burden and cost imposed by the order 
in Docket No. RD20-1-000 follow:
    Commission estimates the annual burden and cost \6\ as follows. 
Burden and cost for the information collection as follows:
---------------------------------------------------------------------------

    \6\ The Commission staff estimates that industry is similarly 
situated in terms of hourly cost (for wages plus benefits). Based on 
the Commission's FY (Fiscal Year) 2019 average cost (for wages plus 
benefits), $80.00/hour is used.

    RD20-1-000--Mandatory Reliability Standards for the Bulk-Power System: Regional Reliability Standard PRC-006-NPCC-2 Automatic Underfrequency Load
                                                                        Shedding
                                                                         [UFLS]
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                   Average annual
    Reliability standard &       Average annual      number of      Average annual    Average burden hrs. &     Total annual burden hours &    Cost per
          requirement             number \1\ of    responses per   total number of    cost ($) per response         cost ($) (rounded)        respondent
                                   respondents       respondent       responses                                                                  ($)
                                             (1)              (2)  (1) * (2) = (3)  (4)......................  (3) * (4) = (5).............    (5) / (1)
--------------------------------------------------------------------------------------------------------------------------------------------------------
GO............................               125                1              125  24 hrs.; $80.............  3,000 hrs.; $10,000.........          $80
PC............................                 2                1                2  24 hrs.; $80.............  48 hrs.; $160...............          $80
DP............................                51                1               51  24 hrs.; $80.............  1,224 hrs.; $4,080..........          $80
TO............................                39                1               39  24 hrs.; $80.............  936 hrs.; $3,120............  ...........
                               ----------------------------------------------------                           ------------------------------------------
    Total.....................  ................  ...............  ...............  .........................  5,208 hrs.; $17,360.........  ...........
--------------------------------------------------------------------------------------------------------------------------------------------------------

    Comments: Comments are invited on: (1) Whether the collection of 
information is necessary for the proper performance of the functions of 
the Commission, including whether the information will have practical 
utility; (2) the accuracy of the agency's estimate of the burden and 
cost of the collection of information, including the validity of the 
methodology and assumptions used; (3) ways to enhance the quality, 
utility and clarity of the information collection; and (4) ways to 
minimize the burden of the collection of information on those who are 
to respond, including the use of automated collection techniques or 
other forms of information technology.

    Dated: March 5, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-04953 Filed 3-10-20; 8:45 am]