Exelon Generation Company, LLC and PSEG Nuclear, LLC Peach Bottom Atomic Power Station, Units 2 and 3, 14247-14248 [2020-04941]

Download as PDF Federal Register / Vol. 85, No. 48 / Wednesday, March 11, 2020 / Notices JUDICIAL CONFERENCE OF THE UNITED STATES Committee on Rules of Practice and Procedure; Meeting of the Judicial Conference Judicial Conference of the United States, Committee on Rules of Practice and Procedure. ACTION: Notice of open meeting. AGENCY: The Committee on Rules of Practice and Procedure will hold a meeting on June 23, 2020. The meeting will be open to public observation but not participation. An agenda and supporting materials will be posted at least 7 days in advance of the meeting at: https://www.uscourts.gov/rulespolicies/records-and-archives-rulescommittees/agenda-books. DATES: June 23, 2020. Time: 9 a.m.–5 p.m. ADDRESSES: Administrative Office of the U.S. Courts, One Columbus Circle NE, Washington, DC 20544. FOR FURTHER INFORMATION CONTACT: Rebecca A. Womeldorf, Secretary, Committee on Rules of Practice and Procedure of the Judicial Conference of the United States, Thurgood Marshall Federal Judiciary Building, One Columbus Circle NE, Suite 7–300, Washington, DC 20544, Telephone (202) 502–1820. SUMMARY: Authority: 28 U.S.C. 2073. [FR Doc. 2020–04894 Filed 3–10–20; 8:45 am] BILLING CODE 2210–55–P DEPARTMENT OF JUSTICE Antitrust Division lotter on DSKBCFDHB2PROD with NOTICES Notice Pursuant to the National Cooperative Research and Production Act of 1993—3D PDF Consortium, Inc. Notice is hereby given that, on February 21, 2020, pursuant to Section 6(a) of the National Cooperative Research and Production Act of 1993, 15 U.S.C. 4301 et seq. (‘‘the Act’’), 3D PDF Consortium, Inc. (‘‘3D PDF’’) has filed written notifications simultaneously with the Attorney General and the Federal Trade Commission disclosing changes in its membership. The notifications were filed for the purpose of extending the Act’s provisions limiting the recovery of antitrust plaintiffs to actual damages 16:37 Mar 10, 2020 Jkt 250001 Suzanne Morris, Chief, Premerger and Division Statistics Unit, Antitrust Division. [FR Doc. 2020–04917 Filed 3–10–20; 8:45 am] BILLING CODE 4410–11–P DEPARTMENT OF JUSTICE Notice is hereby given that, on February 21, 2020 pursuant to Section 6(a) of the National Cooperative Research and Production Act of 1993, 15 U.S.C. 4301 et seq. (‘‘the Act’’), Open RF Association, Inc. filed written notifications simultaneously with the Attorney General and the Federal Trade Commission disclosing (1) the identities of the parties to Open RF Association, Inc. and (2) the nature and objectives of Open RF Association, Inc. The notifications were filed for the purpose of invoking the Act’s provisions limiting the recovery of antitrust plaintiffs to actual damages under specified circumstances. Pursuant to Section 6(b) of the Act, the identities of the members of Open RF Association, Inc. are the following companies: Broadcom Inc., San Jose, CA; Qorvo, Hillsboro, OR; and Skyworks Solutions, Inc., Irvine CA. The general areas of Open RF Association, Inc.’s general areas of planned activity are to promote the development and adoption of global, PO 00000 Frm 00064 Fmt 4703 Sfmt 4703 open, accessible RFFE (Radio Frequency Front End) interoperability standards and/or specifications for 4/5G Mobile Devices (‘‘Specifications’’), and to undertake such other activities as may from time to time be appropriate to further the purposes and achieve the goals set forth above. Membership in Open RF Association, Inc. remains open and Open RF Association, Inc. intends to file additional written notifications disclosing all changes in membership. Suzanne Morris, Chief, Premerger and Division Statistics. [FR Doc. 2020–04914 Filed 3–10–20; 8:45 am] BILLING CODE 4410–11–P NUCLEAR REGULATORY COMMISSION [Docket Nos. 50–277 and 50–278; NRC– 2020–0061] Exelon Generation Company, LLC and PSEG Nuclear, LLC Peach Bottom Atomic Power Station, Units 2 and 3 Nuclear Regulatory Commission. ACTION: Subsequent renewed licenses and record of decision; issuance. AGENCY: The U.S. Nuclear Regulatory Commission (NRC) has issued Subsequent Renewed Facility Operating Licenses Nos. DPR–44 and DPR–56 to Exelon Generation Company, LLC and PSEG Nuclear, LLC (Exelon, PSEG, or the licensees), for Peach Bottom Atomic Power Station, Units 2 and 3, respectively. In addition, the NRC has prepared a record of decision (ROD) that supports the NRC’s decision to issue Subsequent Renewed Facility Operating License Nos. DPR–44 and DPR–56. DATES: The Subsequent Renewed Facility Operating Licenses Nos. DPR– 44 and DPR–56 were issued on March 5, 2020. ADDRESSES: Please refer to Docket ID NRC–2020–0061 when contacting the NRC about the availability of information regarding this document. You may obtain publicly-available information related to this document using any of the following methods: • Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC–2020–0061. Address questions about NRC docket IDs in Regulations.gov to Jennifer Borges; telephone: 301–287–9127; email: Jennifer.Borges@nrc.gov. For technical questions, contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document. SUMMARY: Antitrust Division Notice Pursuant to the National Cooperative Research and Production Act of 1993—Open RF Association, Inc. Dated: March 5, 2020. Rebecca A. Womeldorf, Secretary, Committee on Rules of Practice and Procedure, Judicial Conference of the United States. VerDate Sep<11>2014 under specified circumstances. Specifically, Linda Shave (individual member), Endwell, NY; Patricia C. Franks (individual member), North Ward, AUSTRALIA; and NetApp Inc., Waltham, MA, have been added as parties to this venture. No other changes have been made in either the membership or planned activity of the group research project. Membership in this group research project remains open and 3D PDF intends to file additional written notifications disclosing all changes in membership. On March 27, 2012, 3D PDF filed its original notification pursuant to Section 6(a) of the Act. The Department of Justice published a notice in the Federal Register pursuant to Section 6(b) of the Act on April 20, 2012 (77 FR 23754). The last notification was filed with the Department on September 6, 2019. A notice was published in the Federal Register pursuant to Section 6(b) of the Act on October 17, 2019 (84 FR 55586). 14247 E:\FR\FM\11MRN1.SGM 11MRN1 lotter on DSKBCFDHB2PROD with NOTICES 14248 Federal Register / Vol. 85, No. 48 / Wednesday, March 11, 2020 / Notices • NRC’s Agencywide Documents Access and Management System (ADAMS): You may access publiclyavailable documents online in the ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/ adams.html. To begin the search, select ‘‘Begin Web-based ADAMS Search.’’ For problems with ADAMS, please contact the NRC’s Public Document Room (PDR) reference staff at 1–800–397–4209, 301– 415–4737, or by email to pdr.resource@ nrc.gov. The ADAMS accession number for each document referenced (if it is available in ADAMS) is provided the first time that it is mentioned in this document. • NRC’s PDR: You may examine and purchase copies of public documents at the NRC’s PDR, Room O1–F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. FOR FURTHER INFORMATION CONTACT: Bennett Brady, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555– 0001; telephone: 301–415–2981, email: Bennett.Brady@nrc.gov. SUPPLEMENTARY INFORMATION: Notice is hereby given that the NRC has issued Subsequent Renewed Facility Operating Licenses Nos. DPR–44 and DPR–56 to Exelon Generation Company, LLC and PSEG Nuclear, LLC (Exelon, PSEG, or the licensees), for Peach Bottom Atomic Power Station, Units 2 and 3, respectively. Exelon is the operator of the facility. Subsequent Renewed Facility Operating Licenses Nos. DPR– 44 and DPR–56 authorize operation of Unit 2 and Unit 3, respectively, by Exelon at reactor core power levels not in excess of 4,016 megawatts thermal for each unit, in accordance with the provisions of the Peach Bottom, Units 2 and 3 renewed licenses and technical specifications. Notice is also given that the ROD that supports the NRC’s decision to issue Subsequent Renewed Facility Operating Licenses Nos. DPR– 44 and DPR–56 is available in ADAMS under Accession No. ML20024G429. As discussed in the ROD and the final supplemental environmental impact statement (FSEIS) for Peach Bottom, Units 2 and 3, Supplement 10, Second Renewal, to NUREG–1437, ‘‘Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Regarding Subseqent License Renewal for Peach Bottom Atomic Power Station, Unit 2 and Unit 3, Final Report,’’ dated January 2020 (ADAMS Accession No. ML20023A937), the NRC staff considered a range of reasonable alternatives that included a new nuclear power alternative, a supercritical pulverized coal alternative, a natural gas VerDate Sep<11>2014 16:37 Mar 10, 2020 Jkt 250001 combined-cycle alternative, and a combination alternative of natural gas combined-cycle, wind, solar, and purchased power. The FSEIS documents the environmental review, including the determination that the adverse environmental impacts of subsequent license renewal for Peach Bottom Units 2 and 3 are not so great that preserving the option of subsequent license renewal for energy planning decisionmakers would be unreasonable. In addition to the NRC staff’s independent environmental review, the FSEIS conclusion is based on (1) the analysis and findings in the Generic Environmental Impact Statement for License Renewal of Nuclear Plants, (2) information provided in the environmental report submitted by Exelon, and (3) consultation with Federal, State, local, and Tribal agencies. Peach Bottom Units 2 and 3 are single-cycle, forced-circulation boiling water reactors located in Peach Bottom Township, near Delta, York County, Pennsylvania. The application for the subsquent renewed licenses, ‘‘Subsequent License Renewal Application, Peach Bottom Atomic Power Station Units 2 and 3,’’ dated July 10, 2018 (ADAMS Package Accession No. ML18193A689), as supplemented by letters dated through October 9, 2019, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the NRC’s regulations. As required by the Act and NRC regulations in chapter 1 of title 10 of the Code of Federal Regulations (10 CFR), the NRC has made appropriate findings, which are set forth in the licenses. A public notice of the proposed issuance of the renewed licenses and an opportunity for a hearing was published in the Federal Register on September 6, 2018 (83 FR 45285). An NRC Atomic Safety and Licensing Board denied an intervention petition and terminated the adjudicatory proceeding. An appeal and motions related to a request to file a new contention are pending before the Commission. Because the termination of the proceeding has not been stayed pending Commission review, and the NRC staff has determined that issuance of the subsequent renewed licenses prior to Commission action on the pending appeal and motions would not foreclose or prejudice any Commission action, issuance of the subsequent renewed licenses is permissible. For further details with respect to this action, see: (1) Exelon Generation Company’s subsequent license renewal application for Peach Bottom Units 2 and 3, dated July 10, 2018 (ADAMS PO 00000 Frm 00065 Fmt 4703 Sfmt 4703 Package Accession No. ML18193A689), as supplemented by letters dated through October 9, 2019; (2) the NRC’s safety evaluation report, dated Februrary 2020 (ADAMS Package Accession No. ML20044D902); (3) the NRC’s final environmental impact statement (NUREG–1437, Supplement 10, Second Renewal) for Peach Bottom Units 2 and 3, dated January 2020 (ADAMS Accession No. ML20023A937); and (4) the NRC’s ROD (ADAMS Accession No. ML20024G429). Dated at Rockville, Maryland, this 6th day of March, 2020. For the Nuclear Regulatory Commission. Anna H. Bradford, Director, Division of New and Renewed Licenses, Office of Nuclear Reactor Regulation. [FR Doc. 2020–04941 Filed 3–10–20; 8:45 am] BILLING CODE 7590–01–P NUCLEAR REGULATORY COMMISSION [NRC–2020–0001] Sunshine Act Meetings Weeks of March 9, 16, 23, 30, April 6, 13, 2020. TIME AND DATE: Commissioners’ Conference Room, 11555 Rockville Pike, Rockville, Maryland. PLACE: STATUS: Public. Week of March 9, 2020 There are no meetings scheduled for the week of March 9, 2020. Week of March 16, 2020—Tentative There are no meetings scheduled for the week of March 16, 2020. Week of March 23, 2020—Tentative There are no meetings scheduled for the week of March 23, 2020. Week of March 30, 2020—Tentative Tuesday, March 31, 2020 10 a.m. Meeting with the Advisory Committee on the Medical Uses of Isotopes (Public Meeting) (Contact: Kellee Jamerson: 301–415–7408) This meeting will be webcast live at the Web address—https://www.nrc.gov/. Thursday, April 2, 2020 10 a.m. Strategic Programmatic Overview of the Operating Reactors and New Reactors Business Lines (Public Meeting) (Contact: Luis Betancourt: 301–415–6146) This meeting will be webcast live at the Web address—https://www.nrc.gov/. E:\FR\FM\11MRN1.SGM 11MRN1

Agencies

[Federal Register Volume 85, Number 48 (Wednesday, March 11, 2020)]
[Notices]
[Pages 14247-14248]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-04941]


=======================================================================
-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket Nos. 50-277 and 50-278; NRC-2020-0061]


Exelon Generation Company, LLC and PSEG Nuclear, LLC Peach Bottom 
Atomic Power Station, Units 2 and 3

AGENCY: Nuclear Regulatory Commission.

ACTION: Subsequent renewed licenses and record of decision; issuance.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) has issued 
Subsequent Renewed Facility Operating Licenses Nos. DPR-44 and DPR-56 
to Exelon Generation Company, LLC and PSEG Nuclear, LLC (Exelon, PSEG, 
or the licensees), for Peach Bottom Atomic Power Station, Units 2 and 
3, respectively. In addition, the NRC has prepared a record of decision 
(ROD) that supports the NRC's decision to issue Subsequent Renewed 
Facility Operating License Nos. DPR-44 and DPR-56.

DATES: The Subsequent Renewed Facility Operating Licenses Nos. DPR-44 
and DPR-56 were issued on March 5, 2020.

ADDRESSES: Please refer to Docket ID NRC-2020-0061 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document 
using any of the following methods:
     Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2020-0061. Address 
questions about NRC docket IDs in Regulations.gov to Jennifer Borges; 
telephone: 301-287-9127; email: [email protected]. For technical 
questions, contact the individual listed in the FOR FURTHER INFORMATION 
CONTACT section of this document.

[[Page 14248]]

     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may access publicly-available documents online in the 
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS 
Search.'' For problems with ADAMS, please contact the NRC's Public 
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or 
by email to [email protected]. The ADAMS accession number for each 
document referenced (if it is available in ADAMS) is provided the first 
time that it is mentioned in this document.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

FOR FURTHER INFORMATION CONTACT: Bennett Brady, Office of Nuclear 
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 
20555-0001; telephone: 301-415-2981, email: [email protected].

SUPPLEMENTARY INFORMATION: Notice is hereby given that the NRC has 
issued Subsequent Renewed Facility Operating Licenses Nos. DPR-44 and 
DPR-56 to Exelon Generation Company, LLC and PSEG Nuclear, LLC (Exelon, 
PSEG, or the licensees), for Peach Bottom Atomic Power Station, Units 2 
and 3, respectively. Exelon is the operator of the facility. Subsequent 
Renewed Facility Operating Licenses Nos. DPR-44 and DPR-56 authorize 
operation of Unit 2 and Unit 3, respectively, by Exelon at reactor core 
power levels not in excess of 4,016 megawatts thermal for each unit, in 
accordance with the provisions of the Peach Bottom, Units 2 and 3 
renewed licenses and technical specifications. Notice is also given 
that the ROD that supports the NRC's decision to issue Subsequent 
Renewed Facility Operating Licenses Nos. DPR-44 and DPR-56 is available 
in ADAMS under Accession No. ML20024G429.
    As discussed in the ROD and the final supplemental environmental 
impact statement (FSEIS) for Peach Bottom, Units 2 and 3, Supplement 
10, Second Renewal, to NUREG-1437, ``Generic Environmental Impact 
Statement for License Renewal of Nuclear Plants, Regarding Subseqent 
License Renewal for Peach Bottom Atomic Power Station, Unit 2 and Unit 
3, Final Report,'' dated January 2020 (ADAMS Accession No. 
ML20023A937), the NRC staff considered a range of reasonable 
alternatives that included a new nuclear power alternative, a 
supercritical pulverized coal alternative, a natural gas combined-cycle 
alternative, and a combination alternative of natural gas combined-
cycle, wind, solar, and purchased power. The FSEIS documents the 
environmental review, including the determination that the adverse 
environmental impacts of subsequent license renewal for Peach Bottom 
Units 2 and 3 are not so great that preserving the option of subsequent 
license renewal for energy planning decisionmakers would be 
unreasonable. In addition to the NRC staff's independent environmental 
review, the FSEIS conclusion is based on (1) the analysis and findings 
in the Generic Environmental Impact Statement for License Renewal of 
Nuclear Plants, (2) information provided in the environmental report 
submitted by Exelon, and (3) consultation with Federal, State, local, 
and Tribal agencies.
    Peach Bottom Units 2 and 3 are single-cycle, forced-circulation 
boiling water reactors located in Peach Bottom Township, near Delta, 
York County, Pennsylvania. The application for the subsquent renewed 
licenses, ``Subsequent License Renewal Application, Peach Bottom Atomic 
Power Station Units 2 and 3,'' dated July 10, 2018 (ADAMS Package 
Accession No. ML18193A689), as supplemented by letters dated through 
October 9, 2019, complies with the standards and requirements of the 
Atomic Energy Act of 1954, as amended (the Act), and the NRC's 
regulations. As required by the Act and NRC regulations in chapter 1 of 
title 10 of the Code of Federal Regulations (10 CFR), the NRC has made 
appropriate findings, which are set forth in the licenses.
    A public notice of the proposed issuance of the renewed licenses 
and an opportunity for a hearing was published in the Federal Register 
on September 6, 2018 (83 FR 45285). An NRC Atomic Safety and Licensing 
Board denied an intervention petition and terminated the adjudicatory 
proceeding. An appeal and motions related to a request to file a new 
contention are pending before the Commission. Because the termination 
of the proceeding has not been stayed pending Commission review, and 
the NRC staff has determined that issuance of the subsequent renewed 
licenses prior to Commission action on the pending appeal and motions 
would not foreclose or prejudice any Commission action, issuance of the 
subsequent renewed licenses is permissible.
    For further details with respect to this action, see: (1) Exelon 
Generation Company's subsequent license renewal application for Peach 
Bottom Units 2 and 3, dated July 10, 2018 (ADAMS Package Accession No. 
ML18193A689), as supplemented by letters dated through October 9, 2019; 
(2) the NRC's safety evaluation report, dated Februrary 2020 (ADAMS 
Package Accession No. ML20044D902); (3) the NRC's final environmental 
impact statement (NUREG-1437, Supplement 10, Second Renewal) for Peach 
Bottom Units 2 and 3, dated January 2020 (ADAMS Accession No. 
ML20023A937); and (4) the NRC's ROD (ADAMS Accession No. ML20024G429).

    Dated at Rockville, Maryland, this 6th day of March, 2020.

    For the Nuclear Regulatory Commission.
Anna H. Bradford, Director,
Division of New and Renewed Licenses, Office of Nuclear Reactor 
Regulation.
[FR Doc. 2020-04941 Filed 3-10-20; 8:45 am]
BILLING CODE 7590-01-P