Liberty Power Holdings LLC v. Eversource Energy Service Company and ISO New England, Inc.; Notice of Complaint, 14193 [2020-04900]

Download as PDF lotter on DSKBCFDHB2PROD with NOTICES Federal Register / Vol. 85, No. 48 / Wednesday, March 11, 2020 / Notices l. Description of Request: The licensee is proposing to surrender its exemption. The project operated until 2018 when significant repairs necessitated an extended outage until now. SSWD evaluated repair along with future operations and maintenance costs for the project, and concluded that the project is no longer economical, especially since the power purchase contract with Pacific Gas and Electric expired on October 14, 2019. The facilities would remain in place, except for the turbine-generator units which would be removed. m. This filing may be viewed on the Commission’s website at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction in the Commission’s Public Reference Room located at 888 First Street NE, Room 2A, Washington, DC 20426, or by calling (202) 502–8371. n. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. o. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .212 and .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. p. Filing and Service of Responsive Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All VerDate Sep<11>2014 16:37 Mar 10, 2020 Jkt 250001 comments, motions to intervene, or protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments, motions to intervene, or protests should relate to the surrender application that is the subject of this notice. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. q. Agency Comments—Federal, state, and local agencies are invited to file comments on the described proceeding. If any agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. Dated: March 4, 2020. Kimberly D. Bose, Secretary. [FR Doc. 2020–04899 Filed 3–10–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL20–27–000] Liberty Power Holdings LLC v. Eversource Energy Service Company and ISO New England, Inc.; Notice of Complaint Take notice that on February 28, 2020, pursuant to section 206 of the Federal Power Act (FPA), 16 U.S.C. 824e, and Rule 206 of the Federal Energy Regulatory Commission’s (Commission) Rules of Practice and Procedure, 18 CFR 385.206, Liberty Power Holdings LLC (Liberty or Complainant) filed a formal complaint against Eversource Energy Service Company (Eversource) and ISO New England, Inc. (ISO–NE or collectively Respondents), seeking compensation for improperly calculated and billed charges relating to load that was not the responsibility of Liberty during November of 2018 in violation of PO 00000 Frm 00010 Fmt 4703 Sfmt 4703 14193 the FPA and the ISO–NE Tariff, all as more fully explained in the complaint. The Complainant certifies that copies of the complaint were served on the contacts listed for Respondents in the Commission’s list of Corporate Officials. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. The Respondents’ answer and all interventions, or protests must be filed on or before the comment date. The Respondents’ answer, motions to intervene, and protests must be served on the Complainant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on March 19, 2020. Dated: March 4, 2020. Kimberly D. Bose, Secretary. [FR Doc. 2020–04900 Filed 3–10–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL20–29–000] LS Power Grid California, LLC; Notice of Petition for Declaratory Order Take notice that on March 4, 2020, pursuant to Rule 207 of the Federal E:\FR\FM\11MRN1.SGM 11MRN1

Agencies

[Federal Register Volume 85, Number 48 (Wednesday, March 11, 2020)]
[Notices]
[Page 14193]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-04900]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EL20-27-000]


Liberty Power Holdings LLC v. Eversource Energy Service Company 
and ISO New England, Inc.; Notice of Complaint

    Take notice that on February 28, 2020, pursuant to section 206 of 
the Federal Power Act (FPA), 16 U.S.C. 824e, and Rule 206 of the 
Federal Energy Regulatory Commission's (Commission) Rules of Practice 
and Procedure, 18 CFR 385.206, Liberty Power Holdings LLC (Liberty or 
Complainant) filed a formal complaint against Eversource Energy Service 
Company (Eversource) and ISO New England, Inc. (ISO-NE or collectively 
Respondents), seeking compensation for improperly calculated and billed 
charges relating to load that was not the responsibility of Liberty 
during November of 2018 in violation of the FPA and the ISO-NE Tariff, 
all as more fully explained in the complaint.
    The Complainant certifies that copies of the complaint were served 
on the contacts listed for Respondents in the Commission's list of 
Corporate Officials.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. The Respondents' 
answer and all interventions, or protests must be filed on or before 
the comment date. The Respondents' answer, motions to intervene, and 
protests must be served on the Complainant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an 
original and 5 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street NE, Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for electronic review in the 
Commission's Public Reference Room in Washington, DC. There is an 
``eSubscription'' link on the website that enables subscribers to 
receive email notification when a document is added to a subscribed 
docket(s). For assistance with any FERC Online service, please email 
[email protected], or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5:00 p.m. Eastern Time on March 19, 2020.

    Dated: March 4, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-04900 Filed 3-10-20; 8:45 am]
 BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.