South Sutter Water District; Notice of Application for Surrender of Conduit Exemption, Soliciting Comments, Motions To Intervene, and Protests, 14192-14193 [2020-04899]

Download as PDF lotter on DSKBCFDHB2PROD with NOTICES 14192 Federal Register / Vol. 85, No. 48 / Wednesday, March 11, 2020 / Notices Filed Date: 3/5/20. Accession Number: 20200305–5056. Comments Due: 5 p.m. ET 3/26/20. Docket Numbers: ER20–1169–000. Applicants: The Dayton Power and Light Company, East Kentucky Power Cooperative, Inc., PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: The Dayton Power and Light Company submits IA SA No. 3137 to be effective 5/5/2020. Filed Date: 3/5/20. Accession Number: 20200305–5070. Comments Due: 5 p.m. ET 3/26/20. Docket Numbers: ER20–1170–000. Applicants: Electric Energy, Inc. Description: Tariff Cancellation: Cancellation Open Access Transmission Tariff to be effective 3/5/2020. Filed Date: 3/5/20. Accession Number: 20200305–5072. Comments Due: 5 p.m. ET 3/26/20. Docket Numbers: ER20–1171–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: First Revised ISA, SA No. 5231; Queue No. AC1–048/AC2–053/AE1–006 to be effective 2/4/2020. Filed Date: 3/5/20. Accession Number: 20200305–5078. Comments Due: 5 p.m. ET 3/26/20. Docket Numbers: ER20–1172–000. Applicants: Emera Maine. Description: Tariff Cancellation: Notice of Termination of Expired TSA— ReEnergy Ashland, LLC to be effective 2/28/2020. Filed Date: 3/5/20. Accession Number: 20200305–5079. Comments Due: 5 p.m. ET 3/26/20. Docket Numbers: ER20–1173–000. Applicants: Emera Maine. Description: Tariff Cancellation: Notice of Termination of Expired Interconnect Agreement—ReEnergy Ashland, LP to be effective 2/28/2020. Filed Date: 3/5/20. Accession Number: 20200305–5081. Comments Due: 5 p.m. ET 3/26/20. Docket Numbers: ER20–1174–000. Applicants: Midcontinent Independent System Operator, Inc., Otter Tail Power Company. Description: § 205(d) Rate Filing: 2020–03–05_SA 3440 OTP-Dakota Range III FSA (J488) BSP Switch Replacement to be effective 3/6/2020. Filed Date: 3/5/20. Accession Number: 20200305–5083. Comments Due: 5 p.m. ET 3/26/20. Docket Numbers: ER20–1175–000. Applicants: Midcontinent Independent System Operator, Inc., Otter Tail Power Company. Description: § 205(d) Rate Filing: 2020–03–05_SA 3441 OTP-Tatanka VerDate Sep<11>2014 16:37 Mar 10, 2020 Jkt 250001 Ridge Wind FSA (J493) BSP Switch Replacement to be effective 3/6/2020. Filed Date: 3/5/20. Accession Number: 20200305–5089. Comments Due: 5 p.m. ET 3/26/20. DEPARTMENT OF ENERGY Docket Numbers: ER20–1176–000. Applicants: Midcontinent Independent System Operator, Inc., Otter Tail Power Company. Description: § 205(d) Rate Filing: 2020–03–05_SA 3342 OTP-Deuel Harvest Wind FSA (J526) BSP Switch Replacement to be effective 3/6/2020. Filed Date: 3/5/20. Accession Number: 20200305–5091. Comments Due: 5 p.m. ET 3/26/20. South Sutter Water District; Notice of Application for Surrender of Conduit Exemption, Soliciting Comments, Motions To Intervene, and Protests Docket Numbers: ER20–1177–000. Applicants: Southern California Edison Company. Description: § 205(d) Rate Filing: Amended GIA and DSA San Gorgonio Westwinds II, San Jacinto Power SA No. 863–864 to be effective 5/5/2020. Filed Date: 3/5/20. Accession Number: 20200305–5112. Comments Due: 5 p.m. ET 3/26/20. Docket Numbers: ER20–1178–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original ISA, SA No. 5596; Queue No. AD1–020 to be effective 2/4/2020. Filed Date: 3/5/20. Accession Number: 20200305–5117. Comments Due: 5 p.m. ET 3/26/20. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: March 5, 2020. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2020–04961 Filed 3–10–20; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00009 Fmt 4703 Sfmt 4703 Federal Energy Regulatory Commission [Project No. 7580–003] Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Proceeding: Application for surrender of conduit exemption from licensing. b. Project No.: 7580–003. c. Date Filed: December 31, 2019. d. Exemptee: South Sutter Water District (SSWD). e. Name of Project: Vanjop No. 1 Hydroelectric Project. f. Location: The project is located on SSWD’s Conveyance Canal which is part of SSWD’s water delivery system near Sheridan in Placer County, California. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Licensee Contact: Brad Arnold, General Manager, South Suter Water District, 2464 Pacific Avenue, Trowbridge, CA 95659, (530) 656–2242 sswd@hughes.net. i. FERC Contact: Kim Nguyen, (202) 502–6105, Kim.Nguyen@ferc.gov. j. Deadline for filing comments, interventions, and protests is April 3, 2020. The Commission strongly encourages electronic filing. Please file motions to intervene, protests and comments using the Commission’s eFiling system at https://www.ferc.gov/ docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–7580–003. k. Description of Project Facilities: The project consists of a radial gate, a bypass gate, an intake structure, a catch basin, a discharge structure, three turbine-generator units with total generating capacity of 415 kilowatts, and a short transmission line. E:\FR\FM\11MRN1.SGM 11MRN1 lotter on DSKBCFDHB2PROD with NOTICES Federal Register / Vol. 85, No. 48 / Wednesday, March 11, 2020 / Notices l. Description of Request: The licensee is proposing to surrender its exemption. The project operated until 2018 when significant repairs necessitated an extended outage until now. SSWD evaluated repair along with future operations and maintenance costs for the project, and concluded that the project is no longer economical, especially since the power purchase contract with Pacific Gas and Electric expired on October 14, 2019. The facilities would remain in place, except for the turbine-generator units which would be removed. m. This filing may be viewed on the Commission’s website at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction in the Commission’s Public Reference Room located at 888 First Street NE, Room 2A, Washington, DC 20426, or by calling (202) 502–8371. n. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. o. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .212 and .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. p. Filing and Service of Responsive Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All VerDate Sep<11>2014 16:37 Mar 10, 2020 Jkt 250001 comments, motions to intervene, or protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments, motions to intervene, or protests should relate to the surrender application that is the subject of this notice. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. q. Agency Comments—Federal, state, and local agencies are invited to file comments on the described proceeding. If any agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. Dated: March 4, 2020. Kimberly D. Bose, Secretary. [FR Doc. 2020–04899 Filed 3–10–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL20–27–000] Liberty Power Holdings LLC v. Eversource Energy Service Company and ISO New England, Inc.; Notice of Complaint Take notice that on February 28, 2020, pursuant to section 206 of the Federal Power Act (FPA), 16 U.S.C. 824e, and Rule 206 of the Federal Energy Regulatory Commission’s (Commission) Rules of Practice and Procedure, 18 CFR 385.206, Liberty Power Holdings LLC (Liberty or Complainant) filed a formal complaint against Eversource Energy Service Company (Eversource) and ISO New England, Inc. (ISO–NE or collectively Respondents), seeking compensation for improperly calculated and billed charges relating to load that was not the responsibility of Liberty during November of 2018 in violation of PO 00000 Frm 00010 Fmt 4703 Sfmt 4703 14193 the FPA and the ISO–NE Tariff, all as more fully explained in the complaint. The Complainant certifies that copies of the complaint were served on the contacts listed for Respondents in the Commission’s list of Corporate Officials. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. The Respondents’ answer and all interventions, or protests must be filed on or before the comment date. The Respondents’ answer, motions to intervene, and protests must be served on the Complainant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on March 19, 2020. Dated: March 4, 2020. Kimberly D. Bose, Secretary. [FR Doc. 2020–04900 Filed 3–10–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL20–29–000] LS Power Grid California, LLC; Notice of Petition for Declaratory Order Take notice that on March 4, 2020, pursuant to Rule 207 of the Federal E:\FR\FM\11MRN1.SGM 11MRN1

Agencies

[Federal Register Volume 85, Number 48 (Wednesday, March 11, 2020)]
[Notices]
[Pages 14192-14193]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-04899]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 7580-003]


South Sutter Water District; Notice of Application for Surrender 
of Conduit Exemption, Soliciting Comments, Motions To Intervene, and 
Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Proceeding: Application for surrender of conduit 
exemption from licensing.
    b. Project No.: 7580-003.
    c. Date Filed: December 31, 2019.
    d. Exemptee: South Sutter Water District (SSWD).
    e. Name of Project: Vanjop No. 1 Hydroelectric Project.
    f. Location: The project is located on SSWD's Conveyance Canal 
which is part of SSWD's water delivery system near Sheridan in Placer 
County, California.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Licensee Contact: Brad Arnold, General Manager, South Suter 
Water District, 2464 Pacific Avenue, Trowbridge, CA 95659, (530) 656-
2242 [email protected].
    i. FERC Contact: Kim Nguyen, (202) 502-6105, [email protected].
    j. Deadline for filing comments, interventions, and protests is 
April 3, 2020. The Commission strongly encourages electronic filing. 
Please file motions to intervene, protests and comments using the 
Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
https://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426. The first page of any filing should include 
docket number P-7580-003.
    k. Description of Project Facilities: The project consists of a 
radial gate, a bypass gate, an intake structure, a catch basin, a 
discharge structure, three turbine-generator units with total 
generating capacity of 415 kilowatts, and a short transmission line.

[[Page 14193]]

    l. Description of Request: The licensee is proposing to surrender 
its exemption. The project operated until 2018 when significant repairs 
necessitated an extended outage until now. SSWD evaluated repair along 
with future operations and maintenance costs for the project, and 
concluded that the project is no longer economical, especially since 
the power purchase contract with Pacific Gas and Electric expired on 
October 14, 2019. The facilities would remain in place, except for the 
turbine-generator units which would be removed.
    m. This filing may be viewed on the Commission's website at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number 
excluding the last three digits in the docket number field to access 
the document. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and 
issuances related to this or other pending projects. For assistance, 
call 1-866-208-3676 or email [email protected], for TTY, call 
(202) 502-8659. A copy is also available for inspection and 
reproduction in the Commission's Public Reference Room located at 888 
First Street NE, Room 2A, Washington, DC 20426, or by calling (202) 
502-8371.
    n. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    o. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.212 and .214. In determining the appropriate action to take, the 
Commission will consider all protests or other comments filed, but only 
those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any comments, 
protests, or motions to intervene must be received on or before the 
specified comment date for the particular application.
    p. Filing and Service of Responsive Documents: Any filing must (1) 
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or 
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person protesting or intervening; and (4) otherwise 
comply with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests must set forth their 
evidentiary basis and otherwise comply with the requirements of 18 CFR 
4.34(b). All comments, motions to intervene, or protests should relate 
to the surrender application that is the subject of this notice. 
Agencies may obtain copies of the application directly from the 
applicant. A copy of any protest or motion to intervene must be served 
upon each representative of the applicant specified in the particular 
application. If an intervener files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency. A copy of all other 
filings in reference to this application must be accompanied by proof 
of service on all persons listed in the service list prepared by the 
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 
385.2010.
    q. Agency Comments--Federal, state, and local agencies are invited 
to file comments on the described proceeding. If any agency does not 
file comments within the time specified for filing comments, it will be 
presumed to have no comments.

    Dated: March 4, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-04899 Filed 3-10-20; 8:45 am]
 BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.