In the Matter of Arizona Public Service Company; El Paso Electric Company; Palo Verde Nuclear Generating Station, Units 1, 2, and 3, and Independent Spent Fuel Storage Installation, 13943-13944 [2020-04842]
Download as PDF
Federal Register / Vol. 85, No. 47 / Tuesday, March 10, 2020 / Notices
Agenda
1:30 p.m.–4:00 p.m.
Panel Session: Continued Science
Presentations, Education and
Outreach
4:00 p.m.–5:00 p.m.
Executive Session—Closed Session
5:00 p.m.–7:00 p.m.
Poster Session
7:00 p.m.
Executive Session—Closed Session
April 21, 2020; 8:30 a.m.–7:00 p.m.
May 1, 2020; 8:30 a.m.–4:00 p.m.
8:30 a.m.–11:00 a.m.
Meeting with University
Administrators; Discussion with
Center Directors
11:00 a.m.–3:00 p.m.
Executive Session—Closed Session
3:00 p.m.–4:00 p.m.
Closeout Session with Center
Directors
Reason for Closing: Topics to be
discussed and evaluated during closed
portions of the site review will include
information of a proprietary or
confidential nature, including technical
information and information on
personnel. These matters are exempt
under 5 U.S.C. 552b(c), (4) and (6) of the
Government in the Sunshine Act.
Dated: March 5, 2020.
Crystal Robinson,
Committee Management Officer.
[FR Doc. 2020–04846 Filed 3–9–20; 8:45 am]
BILLING CODE 7555–01–P
NATIONAL SCIENCE FOUNDATION
khammond on DSKJM1Z7X2PROD with NOTICES
Proposal Review Panel for Physics;
Notice of Meeting
In accordance with the Federal
Advisory Committee Act (Pub. L. 92–
463, as amended), the National Science
Foundation (NSF) announces the
following meeting:
Name and Committee Code: Proposal
Review Panel for the Division of Physics
(1208)—PFC CPBF Site Visit.
Date and Time: April 21, 2020; 8:30
a.m.–7:00 p.m., April 22, 2020; 8:30
a.m.–4:00 p.m.
Place: Princeton University, 1 Nassau
Hall, Princeton, NJ 08544.
Type of Meeting: Part-Open.
Contact Person: Jean Cottam-Allen,
Program Director for Physics Frontier
Centers, Division of Physics; National
Science Foundation, 2415 Eisenhower
Avenue, Room 9235, Alexandria, VA
22314; Telephone: (703) 292–8783.
Purpose of Meeting: Site visit to
provide an evaluation of the progress of
the projects at the host site for the
Division of Physics at the National
Science Foundation.
VerDate Sep<11>2014
17:20 Mar 09, 2020
Jkt 250001
8:30 a.m.–12:00 p.m.
Panel Session: Presentations on
Center Overview, Management and
Science
12:00 p.m.–1:30 p.m.
Lunch with Graduate Students and
Postdocs
1:30 p.m.–4:00 p.m.
Panel Session: Continued Science
Presentations, Education and
Outreach
4:00 p.m.–5:00 p.m.
Executive Session—CLOSED
SESSION
5:00 p.m.–7:00 p.m.
Poster Session
7:00 p.m.
Executive Session—CLOSED
SESSION
April 22, 2020; 8:30 a.m.–4:00 p.m.
8:30 a.m.–11:00 a.m.
Meeting with University
Administrators, Discussion with
Center Directors
11:00 a.m.–3:00 p.m.
Executive Session—CLOSED
SESSION
3:00 p.m.–4:00 p.m.
Closeout Session with Center
Directors
Reason for Closing: Topics to be
discussed and evaluated during closed
portions of the site review will include
information of a proprietary or
confidential nature, including technical
information and information on
personnel. These matters are exempt
under 5 U.S.C. 552b(c), (4) and (6) of the
Government in the Sunshine Act.
Dated: March 5, 2020.
Crystal Robinson,
Committee Management Officer.
[FR Doc. 2020–04844 Filed 3–9–20; 8:45 am]
BILLING CODE 7555–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket Nos. STN 50–528, STN 50–529, STN
50–530, and 72–44; NRC–2019–0214]
In the Matter of Arizona Public Service
Company; El Paso Electric Company;
Palo Verde Nuclear Generating Station,
Units 1, 2, and 3, and Independent
Spent Fuel Storage Installation
Nuclear Regulatory
Commission.
ACTION: Indirect transfer of licenses;
order.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) is issuing an Order
SUMMARY:
PO 00000
Frm 00087
Fmt 4703
Sfmt 4703
13943
approving the application filed by El
Paso Electric Company (EPE) on August
13, 2019. The application seeks an NRC
order consenting to the indirect transfer
of EPE’s possession-only non-operating
interests in Renewed Facility Operating
License Nos. NPF–41, NPF–51, and
NPF–74 for the Palo Verde Nuclear
Generating Station (Palo Verde), Units 1,
2, and 3, respectively, and the general
license for the Palo Verde Independent
Spent Fuel Storage Installation (ISFSI)
(together, the Facility). No physical
changes to the Facility or operational
changes were proposed in the
application.
The Order was issued on March
5, 2020, and is effective for one year.
ADDRESSES: Please refer to Docket ID
NRC–2019–0214 when contacting the
NRC about the availability of
information regarding this document.
You may obtain publicly-available
information related to this document
using any of the following methods:
• Federal Rulemaking Website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2019–0214. Address
questions about NRC docket IDs in
Regulations.gov to Jennifer Borges;
telephone: 301–287–9127; email:
Jennifer.Borges@nrc.gov. For technical
questions, contact the individual listed
in the FOR FURTHER INFORMATION
CONTACT section of this document.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publiclyavailable documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘Begin Web-based ADAMS Search.’’ For
problems with ADAMS, please contact
the NRC’s Public Document Room (PDR)
reference staff at 1–800–397–4209, 301–
415–4737, or by email to pdr.resource@
nrc.gov. The license transfer Order and
the NRC safety evaluation supporting
the staff’s findings are available at
ADAMS Package Accession No.
ML20038A226.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT: Siva
P. Lingam, Office of Nuclear Reactor
Regulation, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001; telephone: 301–415–1564, email:
Siva.Lingam@nrc.gov.
SUPPLEMENTARY INFORMATION: The text of
the Order is attached.
DATES:
Dated at Rockville, Maryland, this 5th day
of March, 2020.
E:\FR\FM\10MRN1.SGM
10MRN1
13944
Federal Register / Vol. 85, No. 47 / Tuesday, March 10, 2020 / Notices
For the Nuclear Regulatory Commission.
Siva P. Lingam,
Project Manager, Plant Licensing Branch IV,
Division of Operating Reactor Licensing,
Office of Nuclear Reactor Regulation.
Attachment—Order Approving Indirect
Transfer of Licenses
United States of America
Nuclear Regulatory Commission
In the Matter of: Arizona Public Service
Company, El Paso Electric Company; Palo
Verde Nuclear Generating Station, Units 1, 2,
3, and Independent Spent Fuel Storage
Installation.
Docket Nos. STN 50–528, STN 50–529, STN
50–530, and 72–44. License Nos. NPF–41,
NPF–51, and NPF–74.
Order Approving Indirect Transfer of
Licenses
I
Arizona Public Service Company (APS) is
the licensed operator and a licensed coowner of Renewed Facility Operating License
Nos. NPF–41, NPF–51, and NPF–74 for the
Palo Verde Nuclear Generating Station (Palo
Verde), Units 1, 2, and 3, respectively, and
the general license for the Palo Verde
Independent Spent Fuel Storage Installation
(ISFSI). Palo Verde is located in Maricopa
County, Arizona. The other licensed coowners (tenants-in-common), Salt River
Project Agricultural Improvement and Power
District; Southern California Edison
Company; El Paso Electric Company; Public
Service Company of New Mexico; Southern
California Public Power Authority; and Los
Angeles Department of Water and Power,
hold possession-only rights for these licenses
(i.e., they are not licensed to operate the
facility).
khammond on DSKJM1Z7X2PROD with NOTICES
II
By application dated August 13, 2019
(Agencywide Documents Access and
Management System (ADAMS) Accession
No. ML19225D197), El Paso Electric
Company (EPE) requested, pursuant to Title
10 of the Code of Federal Regulations (10
CFR) Sections 50.80 and 72.50, that the U.S.
Nuclear Regulatory Commission (NRC, the
Commission) consent to the indirect transfer
of EPE’s possession-only non-operating
interests in Renewed Facility Operating
License Nos. NPF–41, NPF–51, and NPF–74
for Palo Verde Units 1, 2, and 3, respectively,
and the general license for the Palo Verde
ISFSI to IIF US Holding 2 LP.
According to the application, EPE
currently owns a 15.8 percent tenant-incommon interest and holds possession-only
rights in the NRC licenses. The proposed
indirect license transfer would result from IIF
US Holding 2 LP indirectly acquiring 100
percent of the shares in EPE. APS would
continue to operate each of the Palo Verde
units and the ISFSI. APS owns a 29.1 percent
tenant-in-common interest and holds both
operating and possession rights in the NRC
licenses. Further, APS operates each of the
Palo Verde units and the ISFSI pursuant to
the operating rights granted to it under the
license of each Palo Verde unit. The
VerDate Sep<11>2014
17:20 Mar 09, 2020
Jkt 250001
remaining tenant-in-common co-owners that
hold possession-only rights in the NRC
licenses are: Salt River Project Agricultural
Improvement and Power District (17.49
percent); Southern California Edison
Company (15.8 percent); Public Service
Company of New Mexico (10.2 percent);
Southern California Public Power Authority
(5.91 percent); and Los Angeles Department
of Water and Power (5.7 percent). The
proposed transaction implicates only an
indirect change in control over EPE’s
possession-only rights in the NRC licenses.
The proposed transaction would not involve
or implicate any change in EPE’s rights and
obligations under any of the NRC licenses,
nor would it implicate APS’s or any
possession-only co-owners’ rights and
obligations under any of the NRC licenses.
No physical changes or operational
changes are being proposed in the
application.
A notice of the application and
opportunity to comment, request a hearing,
and petition for leave to intervene on the
application was published in the Federal
Register on October 28, 2019 (84 FR 57774).
In response, on November 18, 2019, Public
Citizen, Inc. filed a hearing request. The
hearing request is currently pending before
the Commission. The NRC did not receive
any comments on the application.
Under 10 CFR 50.80 and 10 CFR 72.50, no
license for a production or utilization facility
or ISFSI, or any right thereunder, shall be
transferred, either voluntarily or
involuntarily, directly or indirectly, through
transfer of control of the license to any
person, unless the Commission gives its
consent in writing. Upon review of the
information in the application, and other
information before the Commission, the NRC
staff has determined that EPE can indirectly
transfer its 15.8 percent tenant-in-common
interest and possession-only rights in the
NRC licenses to IIF US Holding 2 LP. The
proposed transferee is qualified to be the
indirect holder of the licenses and the
indirect transfer of the licenses is otherwise
consistent with applicable provisions of law,
regulations, and orders issued by the
Commission pursuant thereto, subject to the
condition set forth below.
The findings set forth above are supported
by an NRC staff safety evaluation dated the
same date as this Order, which is available
at ADAMS Accession No. ML20038A235.
III
Accordingly, pursuant to Sections 161b,
161i, and 184 of the Atomic Energy Act of
1954, as amended, 42 U.S.C. 2201(b), 2201(i),
and 2234; and 10 CFR 50.80 and 10 CFR
72.50, it is hereby ordered that the
application regarding the proposed indirect
license transfer is approved for Palo Verde
Units 1, 2, and 3, and the ISFSI, subject to
the following condition.
1. The NRC staff’s approval of this license
transfer is subject to the Commission’s
authority to rescind, modify, or condition the
approved transfer based on the outcome of
any post-effectiveness hearing on the license
transfer application.
It is further ordered that after receipt of all
required regulatory approvals of the
PO 00000
Frm 00088
Fmt 4703
Sfmt 4703
proposed indirect transfer action, the
applicant shall inform the Director of the
Office of Nuclear Reactor Regulation in
writing of such receipt no later than 2
business days prior to the date of the closing
of the indirect transfer. Should the proposed
indirect transfer not be completed within 1
year from the date of this Order, this Order
shall become null and void, provided,
however, upon written application and for
good cause shown, such date may be
extended by order. The condition of this
Order may be amended upon application by
the applicants and approval by the Director
of the Office of Nuclear Reactor Regulation.
This Order is effective upon issuance.
For further details with respect to this
Order, see the application dated August 13,
2019, and the NRC safety evaluation dated
the same date of this Order, which are
available for public inspection at the NRC’s
Public Document Room (PDR), located at One
White Flint North, Public File Area 01 F21,
11555 Rockville Pike (first floor), Rockville,
Maryland. Publicly available documents
created or received at the NRC are accessible
electronically through ADAMS in the NRC
Library at https://www.nrc.gov/reading-rm/
adams.html. Persons who do not have access
to ADAMS or who encounter problems
accessing the documents located in ADAMS,
should contact the NRC PDR reference staff
by telephone at 1–800–397–4209 or 301–
415–4737, or by email to pdr.resource@
nrc.gov.
Dated at Rockville, Maryland this 5th day
of March, 2020.
For the Nuclear Regulatory Commission.
Craig G. Erlanger,
Director, Division of Operating Reactor
Licensing, Office of Nuclear Reactor
Regulation.
[FR Doc. 2020–04842 Filed 3–9–20; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket No. 052–00025; NRC–2008–0252]
Vogtle Electric Generating Plant, Unit 3
Nuclear Regulatory
Commission.
ACTION: License amendment application;
opportunity to comment, request a
hearing, and petition for leave to
intervene.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) is considering
issuance of an amendment and
exemption to Combined License (NPF–
91), issued to Southern Nuclear
Operating Company, Inc. (SNC), and
Georgia Power Company, Oglethorpe
Power Corporation, MEAG Power
SPVM, LLC, MEAG Power SPVJ, LLC,
MEAG Power SPVP, LLC, Authority of
Georgia, and the City of Dalton, Georgia
(collectively, SNC), for construction and
SUMMARY:
E:\FR\FM\10MRN1.SGM
10MRN1
Agencies
[Federal Register Volume 85, Number 47 (Tuesday, March 10, 2020)]
[Notices]
[Pages 13943-13944]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-04842]
=======================================================================
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket Nos. STN 50-528, STN 50-529, STN 50-530, and 72-44; NRC-2019-
0214]
In the Matter of Arizona Public Service Company; El Paso Electric
Company; Palo Verde Nuclear Generating Station, Units 1, 2, and 3, and
Independent Spent Fuel Storage Installation
AGENCY: Nuclear Regulatory Commission.
ACTION: Indirect transfer of licenses; order.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing an
Order approving the application filed by El Paso Electric Company (EPE)
on August 13, 2019. The application seeks an NRC order consenting to
the indirect transfer of EPE's possession-only non-operating interests
in Renewed Facility Operating License Nos. NPF-41, NPF-51, and NPF-74
for the Palo Verde Nuclear Generating Station (Palo Verde), Units 1, 2,
and 3, respectively, and the general license for the Palo Verde
Independent Spent Fuel Storage Installation (ISFSI) (together, the
Facility). No physical changes to the Facility or operational changes
were proposed in the application.
DATES: The Order was issued on March 5, 2020, and is effective for one
year.
ADDRESSES: Please refer to Docket ID NRC-2019-0214 when contacting the
NRC about the availability of information regarding this document. You
may obtain publicly-available information related to this document
using any of the following methods:
Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2019-0214. Address
questions about NRC docket IDs in Regulations.gov to Jennifer Borges;
telephone: 301-287-9127; email: [email protected]. For technical
questions, contact the individual listed in the FOR FURTHER INFORMATION
CONTACT section of this document.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly-available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS
Search.'' For problems with ADAMS, please contact the NRC's Public
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or
by email to [email protected]. The license transfer Order and the
NRC safety evaluation supporting the staff's findings are available at
ADAMS Package Accession No. ML20038A226.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT: Siva P. Lingam, Office of Nuclear
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC
20555-0001; telephone: 301-415-1564, email: [email protected].
SUPPLEMENTARY INFORMATION: The text of the Order is attached.
Dated at Rockville, Maryland, this 5th day of March, 2020.
[[Page 13944]]
For the Nuclear Regulatory Commission.
Siva P. Lingam,
Project Manager, Plant Licensing Branch IV, Division of Operating
Reactor Licensing, Office of Nuclear Reactor Regulation.
Attachment--Order Approving Indirect Transfer of Licenses
United States of America
Nuclear Regulatory Commission
In the Matter of: Arizona Public Service Company, El Paso
Electric Company; Palo Verde Nuclear Generating Station, Units 1, 2,
3, and Independent Spent Fuel Storage Installation.
Docket Nos. STN 50-528, STN 50-529, STN 50-530, and 72-44. License
Nos. NPF-41, NPF-51, and NPF-74.
Order Approving Indirect Transfer of Licenses
I
Arizona Public Service Company (APS) is the licensed operator
and a licensed co-owner of Renewed Facility Operating License Nos.
NPF-41, NPF-51, and NPF-74 for the Palo Verde Nuclear Generating
Station (Palo Verde), Units 1, 2, and 3, respectively, and the
general license for the Palo Verde Independent Spent Fuel Storage
Installation (ISFSI). Palo Verde is located in Maricopa County,
Arizona. The other licensed co-owners (tenants-in-common), Salt
River Project Agricultural Improvement and Power District; Southern
California Edison Company; El Paso Electric Company; Public Service
Company of New Mexico; Southern California Public Power Authority;
and Los Angeles Department of Water and Power, hold possession-only
rights for these licenses (i.e., they are not licensed to operate
the facility).
II
By application dated August 13, 2019 (Agencywide Documents
Access and Management System (ADAMS) Accession No. ML19225D197), El
Paso Electric Company (EPE) requested, pursuant to Title 10 of the
Code of Federal Regulations (10 CFR) Sections 50.80 and 72.50, that
the U.S. Nuclear Regulatory Commission (NRC, the Commission) consent
to the indirect transfer of EPE's possession-only non-operating
interests in Renewed Facility Operating License Nos. NPF-41, NPF-51,
and NPF-74 for Palo Verde Units 1, 2, and 3, respectively, and the
general license for the Palo Verde ISFSI to IIF US Holding 2 LP.
According to the application, EPE currently owns a 15.8 percent
tenant-in-common interest and holds possession-only rights in the
NRC licenses. The proposed indirect license transfer would result
from IIF US Holding 2 LP indirectly acquiring 100 percent of the
shares in EPE. APS would continue to operate each of the Palo Verde
units and the ISFSI. APS owns a 29.1 percent tenant-in-common
interest and holds both operating and possession rights in the NRC
licenses. Further, APS operates each of the Palo Verde units and the
ISFSI pursuant to the operating rights granted to it under the
license of each Palo Verde unit. The remaining tenant-in-common co-
owners that hold possession-only rights in the NRC licenses are:
Salt River Project Agricultural Improvement and Power District
(17.49 percent); Southern California Edison Company (15.8 percent);
Public Service Company of New Mexico (10.2 percent); Southern
California Public Power Authority (5.91 percent); and Los Angeles
Department of Water and Power (5.7 percent). The proposed
transaction implicates only an indirect change in control over EPE's
possession-only rights in the NRC licenses. The proposed transaction
would not involve or implicate any change in EPE's rights and
obligations under any of the NRC licenses, nor would it implicate
APS's or any possession-only co-owners' rights and obligations under
any of the NRC licenses.
No physical changes or operational changes are being proposed in
the application.
A notice of the application and opportunity to comment, request
a hearing, and petition for leave to intervene on the application
was published in the Federal Register on October 28, 2019 (84 FR
57774). In response, on November 18, 2019, Public Citizen, Inc.
filed a hearing request. The hearing request is currently pending
before the Commission. The NRC did not receive any comments on the
application.
Under 10 CFR 50.80 and 10 CFR 72.50, no license for a production
or utilization facility or ISFSI, or any right thereunder, shall be
transferred, either voluntarily or involuntarily, directly or
indirectly, through transfer of control of the license to any
person, unless the Commission gives its consent in writing. Upon
review of the information in the application, and other information
before the Commission, the NRC staff has determined that EPE can
indirectly transfer its 15.8 percent tenant-in-common interest and
possession-only rights in the NRC licenses to IIF US Holding 2 LP.
The proposed transferee is qualified to be the indirect holder of
the licenses and the indirect transfer of the licenses is otherwise
consistent with applicable provisions of law, regulations, and
orders issued by the Commission pursuant thereto, subject to the
condition set forth below.
The findings set forth above are supported by an NRC staff
safety evaluation dated the same date as this Order, which is
available at ADAMS Accession No. ML20038A235.
III
Accordingly, pursuant to Sections 161b, 161i, and 184 of the
Atomic Energy Act of 1954, as amended, 42 U.S.C. 2201(b), 2201(i),
and 2234; and 10 CFR 50.80 and 10 CFR 72.50, it is hereby ordered
that the application regarding the proposed indirect license
transfer is approved for Palo Verde Units 1, 2, and 3, and the
ISFSI, subject to the following condition.
1. The NRC staff's approval of this license transfer is subject
to the Commission's authority to rescind, modify, or condition the
approved transfer based on the outcome of any post-effectiveness
hearing on the license transfer application.
It is further ordered that after receipt of all required
regulatory approvals of the proposed indirect transfer action, the
applicant shall inform the Director of the Office of Nuclear Reactor
Regulation in writing of such receipt no later than 2 business days
prior to the date of the closing of the indirect transfer. Should
the proposed indirect transfer not be completed within 1 year from
the date of this Order, this Order shall become null and void,
provided, however, upon written application and for good cause
shown, such date may be extended by order. The condition of this
Order may be amended upon application by the applicants and approval
by the Director of the Office of Nuclear Reactor Regulation.
This Order is effective upon issuance.
For further details with respect to this Order, see the
application dated August 13, 2019, and the NRC safety evaluation
dated the same date of this Order, which are available for public
inspection at the NRC's Public Document Room (PDR), located at One
White Flint North, Public File Area 01 F21, 11555 Rockville Pike
(first floor), Rockville, Maryland. Publicly available documents
created or received at the NRC are accessible electronically through
ADAMS in the NRC Library at https://www.nrc.gov/reading-rm/adams.html. Persons who do not have access to ADAMS or who encounter
problems accessing the documents located in ADAMS, should contact
the NRC PDR reference staff by telephone at 1-800-397-4209 or 301-
415-4737, or by email to [email protected].
Dated at Rockville, Maryland this 5th day of March, 2020.
For the Nuclear Regulatory Commission.
Craig G. Erlanger,
Director, Division of Operating Reactor Licensing, Office of Nuclear
Reactor Regulation.
[FR Doc. 2020-04842 Filed 3-9-20; 8:45 am]
BILLING CODE 7590-01-P