Description: § 4(d) Rate Filing: NRA
Name Change Cleanup GenOn to Canal
to be effective 3/27/2020.
Filed Date: 2/25/20.
Accession Number: 20200225–5101.
Comments Due: 5 p.m. ET 3/9/20.
Docket Numbers: RP20–548–000.
Applicants: Viking Gas Transmission
Company.
Description: § 4(d) Rate Filing: Annual
LMCRA—Spring 2020 to be effective
4/1/2020.
Filed Date: 2/25/20.
Accession Number: 20200225–5147.
Comments Due: 5 p.m. ET 3/9/20.
Docket Numbers: RP20–516–001.
Applicants: Gulf South Pipeline
Company, LLC.
Description: Tariff Amendment:
Amendment to Docket No. RP20–516–
000 to be effective 4/1/2020.
Filed Date: 2/26/20.
Accession Number: 20200226–5029.
Comments Due: 5 p.m. ET 3/9/20.
Docket Numbers: RP20–549–000.
Applicants: Rover Pipeline LLC.
Description: § 4(d) Rate Filing:
Housekeeping on 2–26–20 to be
effective 3/27/2020.
Filed Date: 2/26/20.
Accession Number: 20200226–5025.
Comments Due: 5 p.m. ET 3/9/20.
Docket Numbers: RP20–550–000.
Applicants: Midcontinent Express
Pipeline LLC.
Description: Compliance filing
Annual Report of Operational Purchases
and Sales 2020.
Filed Date: 2/26/20.
Accession Number: 20200226–5038.
Comments Due: 5 p.m. ET 3/9/20.
Docket Numbers: RP20–551–000.
Applicants: Guardian Pipeline, L.L.C.
Description: § 4(d) Rate Filing: EPCR
Semi-Annual Adjustment—Spring 2020
to be effective 4/1/2020.
Filed Date: 2/26/20.
Accession Number: 20200226–5045.
Comments Due: 5 p.m. ET 3/9/20.
Docket Numbers: RP20–552–000.
Applicants: Texas Eastern
Transmission, LP.
Description: § 4(d) Rate Filing:
Negotiated Rates—EcoEnergy eff
3–1–2020 to be effective 3/1/2020.
Filed Date: 2/26/20.
Accession Number: 20200226–5049.
Comments Due: 5 p.m. ET 3/9/20.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
VerDate Sep<11>2014
16:41 Mar 03, 2020
Jkt 250001
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: February 26, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–04396 Filed 3–3–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–1910–020;
ER10–1911–020.
Applicants: Duquesne Light
Company, Duquesne Power, LLC.
Description: Notice of Change in
Status of the Duquesne MBR Sellers.
Filed Date: 2/25/20.
Accession Number: 20200225–5206.
Comments Due: 5 p.m. ET 3/17/20.
Docket Numbers: ER18–1960–002.
Applicants: Tenaska Pennsylvania
Partners, LLC.
Description: Notification of Change in
Status of Tenaska Pennsylvania
Partners, LLC.
Filed Date: 2/26/20.
Accession Number: 20200226–5212.
Comments Due: 5 p.m. ET 3/18/20.
Docket Numbers: ER18–2513–003.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Report Filing: 2020–02–
21_Errata to Compliance Filing to
Address Self-Fund to be effective N/A.
Filed Date: 2/21/20.
Accession Number: 20200221–5108.
Comments Due: 5 p.m. ET 3/13/20.
Docket Numbers: ER20–609–001.
Applicants: Ohio Power Company,
AEP Ohio Transmission Company, Inc.,
PJM Interconnection, L.L.C.
Description: Compliance filing: Ohio
Power submits Compliance filing in
Docket No. ER20–609 (Buckeye ILDSA)
to be effective 2/14/2020.
Filed Date: 2/26/20.
Accession Number: 20200226–5084.
Comments Due: 5 p.m. ET 3/18/20.
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
Docket Numbers: ER20–1072–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
ALLETE, Inc.
Description: § 205(d) Rate Filing:
2020–02–25_SA 3411 SRC–SWLP
Construction Agreement (Nemadji) to be
effective 2/26/2020.
Filed Date: 2/25/20.
Accession Number: 20200225–5149.
Comments Due: 5 p.m. ET 3/17/20.
Docket Numbers: ER20–1073–000.
Applicants: SR Terrell, LLC.
Description: Baseline eTariff Filing:
MBR Application to be effective
4/25/2020.
Filed Date: 2/25/20.
Accession Number: 20200225–5163.
Comments Due: 5 p.m. ET 3/17/20.
Docket Numbers: ER20–1074–000.
Applicants: Marsh Landing LLC.
Description: Initial rate filing: Filing
of Black Start Agreement to be effective
4/26/2020.
Filed Date: 2/25/20.
Accession Number: 20200225–5166.
Comments Due: 5 p.m. ET 3/17/20.
Docket Numbers: ER20–1075–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2020–02–25 CPM Soft Offer Cap
Initiative to be effective 6/1/2020.
Filed Date: 2/25/20.
Accession Number: 20200225–5168.
Comments Due: 5 p.m. ET 3/17/20.
Docket Numbers: ER20–1076–000.
Applicants: Emera Maine.
Description: Tariff Cancellation:
Notice of Termination of
Interconnection Agreement—ReEnergy
Fort Fairfield LLC to be effective
2/24/2020.
Filed Date: 2/26/20.
Accession Number: 20200226–5040.
Comments Due: 5 p.m. ET 3/18/20.
Docket Numbers: ER20–1077–000.
Applicants: Emera Maine.
Description: Tariff Cancellation:
Notice of Termination of Expired
Service Agreement—ReEnergy Fort
Fairfield LLC to be effective 2/24/2020.
Filed Date: 2/26/20.
Accession Number: 20200226–5042.
Comments Due: 5 p.m. ET 3/18/20.
Docket Numbers: ER20–1078–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Ameren Illinois Company.
Description: § 205(d) Rate Filing:
2020–02–26_Ameren Illinois Company
Att O Materials & Supplies filing to be
effective 6/1/2020.
Filed Date: 2/26/20.
Accession Number: 20200226–5059.
Comments Due: 5 p.m. ET 3/18/20.
Docket Numbers: ER20–1079–000.
E:\FR\FM\04MRN1.SGM
04MRN1
jbell on DSKJLSW7X2PROD with NOTICES
Federal Register / Vol. 85, No. 43 / Wednesday, March 4, 2020 / Notices
Applicants: Midcontinent
Independent System Operator, Inc.,
Ameren Transmission Company of
Illinois.
Description: § 205(d) Rate Filing:
2020–02–26_Ameren Transmission
Company of Illinois Att O Materials &
Supplies to be effective 6/1/2020.
Filed Date: 2/26/20.
Accession Number: 20200226–5061.
Comments Due: 5 p.m. ET 3/18/20.
Docket Numbers: ER20–1080–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Union Electric Company.
Description: § 205(d) Rate Filing:
2020–02–26_Union Electric Company
Att O Materials & Supplies filing to be
effective 6/1/2020.
Filed Date: 2/26/20.
Accession Number: 20200226–5067.
Comments Due: 5 p.m. ET 3/18/20.
Docket Numbers: ER20–1081–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
Attachment V GIA Pro Forma CleanUp
Filing to be effective 1/23/2020.
Filed Date: 2/26/20.
Accession Number: 20200226–5189.
Comments Due: 5 p.m. ET 3/18/20.
Docket Numbers: ER20–1082–000.
Applicants: Oklahoma Gas and
Electric Company.
Description: Order No. 864
Compliance Filing of Oklahoma Gas and
Electric Company.
Filed Date: 2/26/20.
Accession Number: 20200226–5222.
Comments Due: 5 p.m. ET 3/18/20.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: February 26, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–04399 Filed 3–3–20; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
16:41 Mar 03, 2020
Jkt 250001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP19–512–000]
Texas Eastern Transmission, L.P.;
Notice of Revised Schedule for
Environmental Review of the Cameron
Extension Project
This notice identifies the Federal
Energy Regulatory Commission staff’s
revised schedule for the completion of
the environmental assessment (EA) for
Texas Eastern Transmission, L.P.’s
Cameron Extension Project. The first
notice of schedule, issued on November
22, 2019, identified March 9, 2020 as
the EA issuance date. On November 20,
2019, FERC staff requested additional
environmental information to assist in
its EA analysis regarding air modeling
analysis and air quality screening of the
proposed compressor station to
demonstrate that emissions of criteria
pollutants do not result in exceedance
of the National Ambient Air Quality
Standards. On February 20, 2020, Texas
Eastern Transmission, L.P. filed the
requested supplemental information
and Commission staff is currently
reviewing the information for
completeness. Because this information
was not provided in time to meet the
original schedule, Commission staff has
revised the schedule for issuance of the
EA, as described below.
Schedule for Environmental Review
Issuance of the EA April 16, 2020
90-day Federal Authorization Decision
Deadline July 15, 2020
If a schedule change becomes
necessary, an additional notice will be
provided so that the relevant agencies
are kept informed of the project’s
progress.
Additional Information
In order to receive notification of the
issuance of the EA and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC
website (www.ferc.gov). Using the
eLibrary link, select General Search
from the eLibrary menu, enter the
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
12781
selected date range and Docket Number
excluding the last three digits (i.e.,
CP19–512), and follow the instructions.
For assistance with access to eLibrary,
the helpline can be reached at (866)
208–3676, TTY (202) 502–8659, or at
FERCOnlineSupport@ferc.gov. The
eLibrary link on the FERC website also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and rule
makings.
Dated: February 27, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–04445 Filed 3–3–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Numbers: RP20–553–000.
Applicants: Algonquin Gas
Transmission, LLC.
Description: § 4(d) Rate Filing:
Negotiated Rate—Releases to Plymouth
Rock to be effective 3/1/2020.
Filed Date: 2/26/20.
Accession Number: 20200226–5064.
Comments Due: 5 p.m. ET 3/9/20.
Docket Numbers: RP20–554–000.
Applicants: Cimarron River Pipeline,
LLC.
Description: § 4(d) Rate Filing: Fuel
Tracker 2020—Summer Season Rates to
be effective 4/1/2020.
Filed Date: 2/26/20.
Accession Number: 20200226–5068.
Comments Due: 5 p.m. ET 3/9/20.
Docket Numbers: RP20–555–000.
Applicants: Mitsui & Co. Energy
Marketing and Service, MITSUI & CO.
CAMERON LNG SALES LLC.
Description: Joint Petition for Limited
Waivers, et al. of Mitsui & Co. Energy
Marketing and Services (USA) Inc., et al.
under RP20–555.
Filed Date: 2/25/20.
Accession Number: 20200225–5208.
Comments Due: 5 p.m. ET 3/3/20.
Docket Numbers: RP20–556–000.
Applicants: Midwestern Gas
Transmission Company.
Description: § 4(d) Rate Filing: Annual
Fuel Retention Percentage Adjustment—
2020 Rate to be effective 4/1/2020.
Filed Date: 2/26/20.
Accession Number: 20200226–5088.
Comments Due: 5 p.m. ET 3/9/20.
The filings are accessible in the
Commission’s eLibrary system by
E:\FR\FM\04MRN1.SGM
04MRN1
Agencies
[Federal Register Volume 85, Number 43 (Wednesday, March 4, 2020)]
[Notices]
[Pages 12780-12781]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-04399]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-1910-020; ER10-1911-020.
Applicants: Duquesne Light Company, Duquesne Power, LLC.
Description: Notice of Change in Status of the Duquesne MBR
Sellers.
Filed Date: 2/25/20.
Accession Number: 20200225-5206.
Comments Due: 5 p.m. ET 3/17/20.
Docket Numbers: ER18-1960-002.
Applicants: Tenaska Pennsylvania Partners, LLC.
Description: Notification of Change in Status of Tenaska
Pennsylvania Partners, LLC.
Filed Date: 2/26/20.
Accession Number: 20200226-5212.
Comments Due: 5 p.m. ET 3/18/20.
Docket Numbers: ER18-2513-003.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Report Filing: 2020-02-21_Errata to Compliance Filing
to Address Self-Fund to be effective N/A.
Filed Date: 2/21/20.
Accession Number: 20200221-5108.
Comments Due: 5 p.m. ET 3/13/20.
Docket Numbers: ER20-609-001.
Applicants: Ohio Power Company, AEP Ohio Transmission Company,
Inc., PJM Interconnection, L.L.C.
Description: Compliance filing: Ohio Power submits Compliance
filing in Docket No. ER20-609 (Buckeye ILDSA) to be effective 2/14/
2020.
Filed Date: 2/26/20.
Accession Number: 20200226-5084.
Comments Due: 5 p.m. ET 3/18/20.
Docket Numbers: ER20-1072-000.
Applicants: Midcontinent Independent System Operator, Inc., ALLETE,
Inc.
Description: Sec. 205(d) Rate Filing: 2020-02-25_SA 3411 SRC-SWLP
Construction Agreement (Nemadji) to be effective 2/26/2020.
Filed Date: 2/25/20.
Accession Number: 20200225-5149.
Comments Due: 5 p.m. ET 3/17/20.
Docket Numbers: ER20-1073-000.
Applicants: SR Terrell, LLC.
Description: Baseline eTariff Filing: MBR Application to be
effective 4/25/2020.
Filed Date: 2/25/20.
Accession Number: 20200225-5163.
Comments Due: 5 p.m. ET 3/17/20.
Docket Numbers: ER20-1074-000.
Applicants: Marsh Landing LLC.
Description: Initial rate filing: Filing of Black Start Agreement
to be effective 4/26/2020.
Filed Date: 2/25/20.
Accession Number: 20200225-5166.
Comments Due: 5 p.m. ET 3/17/20.
Docket Numbers: ER20-1075-000.
Applicants: California Independent System Operator Corporation.
Description: Sec. 205(d) Rate Filing: 2020-02-25 CPM Soft Offer
Cap Initiative to be effective 6/1/2020.
Filed Date: 2/25/20.
Accession Number: 20200225-5168.
Comments Due: 5 p.m. ET 3/17/20.
Docket Numbers: ER20-1076-000.
Applicants: Emera Maine.
Description: Tariff Cancellation: Notice of Termination of
Interconnection Agreement--ReEnergy Fort Fairfield LLC to be effective
2/24/2020.
Filed Date: 2/26/20.
Accession Number: 20200226-5040.
Comments Due: 5 p.m. ET 3/18/20.
Docket Numbers: ER20-1077-000.
Applicants: Emera Maine.
Description: Tariff Cancellation: Notice of Termination of Expired
Service Agreement--ReEnergy Fort Fairfield LLC to be effective 2/24/
2020.
Filed Date: 2/26/20.
Accession Number: 20200226-5042.
Comments Due: 5 p.m. ET 3/18/20.
Docket Numbers: ER20-1078-000.
Applicants: Midcontinent Independent System Operator, Inc., Ameren
Illinois Company.
Description: Sec. 205(d) Rate Filing: 2020-02-26_Ameren Illinois
Company Att O Materials & Supplies filing to be effective 6/1/2020.
Filed Date: 2/26/20.
Accession Number: 20200226-5059.
Comments Due: 5 p.m. ET 3/18/20.
Docket Numbers: ER20-1079-000.
[[Page 12781]]
Applicants: Midcontinent Independent System Operator, Inc., Ameren
Transmission Company of Illinois.
Description: Sec. 205(d) Rate Filing: 2020-02-26_Ameren
Transmission Company of Illinois Att O Materials & Supplies to be
effective 6/1/2020.
Filed Date: 2/26/20.
Accession Number: 20200226-5061.
Comments Due: 5 p.m. ET 3/18/20.
Docket Numbers: ER20-1080-000.
Applicants: Midcontinent Independent System Operator, Inc., Union
Electric Company.
Description: Sec. 205(d) Rate Filing: 2020-02-26_Union Electric
Company Att O Materials & Supplies filing to be effective 6/1/2020.
Filed Date: 2/26/20.
Accession Number: 20200226-5067.
Comments Due: 5 p.m. ET 3/18/20.
Docket Numbers: ER20-1081-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: Attachment V GIA Pro Forma
CleanUp Filing to be effective 1/23/2020.
Filed Date: 2/26/20.
Accession Number: 20200226-5189.
Comments Due: 5 p.m. ET 3/18/20.
Docket Numbers: ER20-1082-000.
Applicants: Oklahoma Gas and Electric Company.
Description: Order No. 864 Compliance Filing of Oklahoma Gas and
Electric Company.
Filed Date: 2/26/20.
Accession Number: 20200226-5222.
Comments Due: 5 p.m. ET 3/18/20.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: February 26, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020-04399 Filed 3-3-20; 8:45 am]
BILLING CODE 6717-01-P