Federal Register / Vol. 85, No. 41 / Monday, March 2, 2020 / Notices
d. Applicant: Great Falls
Hydroelectric Company and the City of
Paterson, New Jersey, as co-licensees.
e. Name of Project: Great Falls
Hydroelectric Project (Great Falls
Project or project).
f. Location: On the Passaic River, near
the City of Paterson, Passaic County,
New Jersey. The project does not occupy
federal land.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mr. Robert
Gates, Senior Vice President of
Operations, Eagle Creek Renewable
Energy, 65 Madison Avenue, Suite 500,
Morristown, NJ 07960; (973) 998–8400;
email—bob.gates@eaglecreekre.com
and/or Ben-David Seligman, 2nd
Assistant Corp. Counsel, City of
Paterson, 155 Market Street, Paterson,
NJ; (973) 321–1366; email—bseligman@
patersonnj.gov.
i. FERC Contact: Christopher Millard
at (202) 502–8256; or email at
christopher.millard@ferc.gov.
j. Deadline for filing motions to
intervene and protests: 60 days from the
issuance date of this notice.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and protests using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. The first
page of any filing should include docket
number P–2814–025.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted
for filing but is not ready for
environmental analysis at this time.
l. The existing project works consist
of: (1) The Society for the Establishment
of Useful Manufactures (S.U.M.) dam,
an overflow granite stone gravity
structure about 315 feet long, with a
maximum height of 15 feet and having
a crest elevation of 114.6 feet mean sea
level (msl); (2) a reservoir with a surface
area of 202 acres and a storage capacity
of 1,415 acre-feet at elevation 114.6 feet
VerDate Sep<11>2014
18:10 Feb 28, 2020
Jkt 250001
msl; (3) a forebay inlet structure; (4) a
headgate control structure containing
three trashracks and three steel gates; (5)
three penstocks, each 8.5 feet in
diameter and approximately 55 feet
long; (6) a powerhouse containing three
turbine-generator units with a total rated
capacity of 10.95 megawatts; (7) a 37foot-long, 4.16-kilovolt (kV)
underground transmission line
connecting the powerhouse to a 4.16/
26.4-kV step-up transformer which in
turn is connected to a 26.4-kV
transmission grid via an approximately
30-foot-long 26.4-kV underground
transmission line; (8) and appurtenant
facilities.
The Great Falls Project is operated in
a run-of-river mode. For the period 2010
through 2018, the average annual
generation at the Great Falls Project was
17,484 megawatt-hours.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s website at
https://www.ferc.gov using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
For assistance, contact FERC Online
Support. A copy is also available for
inspection and reproduction at the
addresses in item h above.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Anyone may submit a protest or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210, .211,
and .214. In determining the appropriate
action to take, the Commission will
consider all protests or other comments
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any protests or
motions to intervene must be received
on or before the specified comment date
for the particular application.
All filings must: (1) Bear in all capital
letters the title PROTEST or MOTION
TO INTERVENE; (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. Agencies
may obtain copies of the application
directly from the applicant. A copy of
any protest or motion to intervene must
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
12283
be served upon each representative of
the applicant specified in the particular
application.
o. Procedural schedule and final
amendments: The application will be
processed according to the following
preliminary schedule. Revisions to the
schedule will be made as appropriate.
Filing of motions to intervene and
protests: April 2020.
Issue notice of ready for
environmental analysis: May 2020.
Deadline for filing of
recommendations, terms and
conditions, and prescriptions:July 2020.
Reply comments due: September
2020.
Commission issues EA: November
2020.
Comments on EA: December 2020.
p. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Dated: February 25, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–04218 Filed 2–28–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER17–2059–004;
ER10–3097–009.
Applicants: Puget Sound Energy, Inc.,
Bruce Power Inc.
Description: Second Supplement to
July 1, 2019 Updated Market Power
Analysis in the Northwest Region for
Puget Sound Energy, Inc., et al.
Filed Date: 2/24/20.
Accession Number: 20200224–5156.
Comments Due: 5 p.m. ET 3/16/20.
Docket Numbers: ER19–1958–002.
Applicants: PJM Interconnection,
L.L.C.
Description: Compliance filing:
Compliance filing per Commission’s 12/
19/19 order re: Order No. 845 in ER19–
1958 to be effective 12/31/9998.
Filed Date: 2/21/20.
Accession Number: 20200221–5143.
Comments Due: 5 p.m. ET 3/13/20.
Docket Numbers: ER20–495–001.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Tariff Amendment:
2020–02–24_SA 3380 Deficiency
E:\FR\FM\02MRN1.SGM
02MRN1
khammond on DSKJM1Z7X2PROD with NOTICES
12284
Federal Register / Vol. 85, No. 41 / Monday, March 2, 2020 / Notices
Response for J639 GIA to be effective
11/15/2019.
Filed Date: 2/24/20.
Accession Number: 20200224–5096.
Comments Due: 5 p.m. ET 3/16/20.
Docket Numbers: ER20–612–001.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Tariff Amendment:
2020–02–24_SA 3392 Deficiency
Response for J944 GIA to be effective
12/3/2019.
Filed Date: 2/24/20.
Accession Number: 20200224–5098.
Comments Due: 5 p.m. ET 3/16/20.
Docket Numbers: ER20–886–000.
Applicants: Orsted US Trading LLC.
Description: Errata to January 28, 2020
Orsted US Trading LLC tariff filing.
Filed Date: 2/21/20.
Accession Number: 20200221–5071.
Comments Due: 5 p.m. ET 3/13/20.
Docket Numbers: ER20–1068–000.
Applicants: The Dayton Power and
Light Company.
Description: Application to Establish
Incentive Rate Treatment for Qualifying
for Transmission Projects, et al. of The
Dayton Power and Light Company.
Filed Date: 2/25/20.
Accession Number: 20200225–5081.
Comments Due: 5 p.m. ET 3/17/20.
Docket Numbers: ER20–1069–000.
Applicants: Duke Energy Carolinas,
LLC.
Description: § 205(d) Rate Filing:
Revised DEC–CEPCI NITSA (SA No.
447) to be effective 2/1/2020.
Filed Date: 2/25/20.
Accession Number: 20200225–5090.
Comments Due: 5 p.m. ET 3/17/20.
Docket Numbers: ER20–1070–000.
Applicants: Rodan Energy Solutions
(USA) Inc.
Description: Baseline eTariff Filing:
RODAN ENERGY SOLUTIONS (USA)
INC INITIAL MBR Tariff to be effective
4/1/2020.
Filed Date: 2/25/20.
Accession Number: 20200225–5095.
Comments Due: 5 p.m. ET 3/17/20.
Docket Numbers: ER20–1071–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
Revisions to Attachment AN to be
effective 4/26/2020.
Filed Date: 2/25/20.
Accession Number: 20200225–5122.
Comments Due: 5 p.m. ET 3/17/20.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
VerDate Sep<11>2014
18:10 Feb 28, 2020
Jkt 250001
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: February 25, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–04231 Filed 2–28–20; 8:45 am]
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Numbers: RP20–543–000.
Applicants: Transcontinental Gas
Pipe Line Company, LLC.
Description: § 4(d) Rate Filing: Rate
Schedules LSS and SS–2 Tracker Filing
effective February 1, 2020 to be effective
2/1/2020.
Filed Date: 2/24/20.
Accession Number: 20200224–5112.
Comments Due: 5 p.m. ET 3/9/20.
Docket Numbers: RP20–544–000.
Applicants: Equitrans, L.P.
Description: § 4(d) Rate Filing:
DEPARTMENT OF ENERGY
Negotiated Rate Agreement—Arsenal
Amendment to be effective 3/1/2020.
Federal Energy Regulatory
Filed Date: 2/25/20.
Commission
Accession Number: 20200225–5002.
Comments Due: 5 p.m. ET 3/9/20.
[Project No. 2413–124; Georgia]
Docket Numbers: RP20–545–000.
Georgia Power Company; Notice of
Applicants: Lucid Energy Delaware,
Teleconference for Tribal Consultation LLC, Devon Gas Services, L.P.
Meeting
Description: Joint Petition for Limited
Waivers, et al. of Lucid Energy
On December 3, 2019, Mr. Turner W.
Delaware, LLC, et al. under RP20–545.
Hunt, Archaeological Technician of the
Filed Date: 2/24/20.
Muscogee (Creek) Nation sent an email
Accession Number: 20200224–5154.
requesting consultation regarding the
Comments Due: 5 p.m. ET 3/2/20.
relicensing of the Wallace Hydroelectric
Project. Commission Staff will hold a
The filings are accessible in the
teleconference with representatives of
Commission’s eLibrary system by
the Muscogee (Creek) Nation to learn
clicking on the links or querying the
more about the tribe’s concerns. The
docket number.
teleconference will take place at 2:00
Any person desiring to intervene or
p.m. Eastern Standard Time on
protest in any of the above proceedings
Thursday, March 12, 2020.
must file in accordance with Rules 211
and 214 of the Commission’s
This teleconference is limited to
Regulations (18 CFR 385.211 and
members of the invited tribe and
Commission staff. Interested parties may 385.214) on or before 5:00 p.m. Eastern
time on the specified date(s). Protests
attend the teleconference as observers
only. A summary of the meeting will be may be considered, but intervention is
necessary to become a party to the
prepared and posted in the aboveproceeding.
referenced docket on the Commission’s
eFiling is encouraged. More detailed
eLibrary system.
information relating to filing
To receive specific instructions on
requirements, interventions, protests,
how to participate, please contact
service, and qualifying facilities filings
Dustin Wilson at dustin.wilson@
can be found at: https://www.ferc.gov/
ferc.gov, or (202) 502–6528 by March 10, docs-filing/efiling/filing-req.pdf. For
2020.
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: February 25, 2020.
BILLING CODE 6717–01–P
[FR Doc. 2020–04217 Filed 2–28–20; 8:45 am]
Dated: February 25, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
BILLING CODE 6717–01–P
[FR Doc. 2020–04232 Filed 2–28–20; 8:45 am]
Kimberly D. Bose,
Secretary.
PO 00000
BILLING CODE 6717–01–P
Frm 00035
Fmt 4703
Sfmt 4703
E:\FR\FM\02MRN1.SGM
02MRN1
Agencies
[Federal Register Volume 85, Number 41 (Monday, March 2, 2020)]
[Notices]
[Pages 12283-12284]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-04231]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER17-2059-004; ER10-3097-009.
Applicants: Puget Sound Energy, Inc., Bruce Power Inc.
Description: Second Supplement to July 1, 2019 Updated Market Power
Analysis in the Northwest Region for Puget Sound Energy, Inc., et al.
Filed Date: 2/24/20.
Accession Number: 20200224-5156.
Comments Due: 5 p.m. ET 3/16/20.
Docket Numbers: ER19-1958-002.
Applicants: PJM Interconnection, L.L.C.
Description: Compliance filing: Compliance filing per Commission's
12/19/19 order re: Order No. 845 in ER19-1958 to be effective 12/31/
9998.
Filed Date: 2/21/20.
Accession Number: 20200221-5143.
Comments Due: 5 p.m. ET 3/13/20.
Docket Numbers: ER20-495-001.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Tariff Amendment: 2020-02-24_SA 3380 Deficiency
[[Page 12284]]
Response for J639 GIA to be effective 11/15/2019.
Filed Date: 2/24/20.
Accession Number: 20200224-5096.
Comments Due: 5 p.m. ET 3/16/20.
Docket Numbers: ER20-612-001.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Tariff Amendment: 2020-02-24_SA 3392 Deficiency
Response for J944 GIA to be effective 12/3/2019.
Filed Date: 2/24/20.
Accession Number: 20200224-5098.
Comments Due: 5 p.m. ET 3/16/20.
Docket Numbers: ER20-886-000.
Applicants: Orsted US Trading LLC.
Description: Errata to January 28, 2020 Orsted US Trading LLC
tariff filing.
Filed Date: 2/21/20.
Accession Number: 20200221-5071.
Comments Due: 5 p.m. ET 3/13/20.
Docket Numbers: ER20-1068-000.
Applicants: The Dayton Power and Light Company.
Description: Application to Establish Incentive Rate Treatment for
Qualifying for Transmission Projects, et al. of The Dayton Power and
Light Company.
Filed Date: 2/25/20.
Accession Number: 20200225-5081.
Comments Due: 5 p.m. ET 3/17/20.
Docket Numbers: ER20-1069-000.
Applicants: Duke Energy Carolinas, LLC.
Description: Sec. 205(d) Rate Filing: Revised DEC-CEPCI NITSA (SA
No. 447) to be effective 2/1/2020.
Filed Date: 2/25/20.
Accession Number: 20200225-5090.
Comments Due: 5 p.m. ET 3/17/20.
Docket Numbers: ER20-1070-000.
Applicants: Rodan Energy Solutions (USA) Inc.
Description: Baseline eTariff Filing: RODAN ENERGY SOLUTIONS (USA)
INC INITIAL MBR Tariff to be effective 4/1/2020.
Filed Date: 2/25/20.
Accession Number: 20200225-5095.
Comments Due: 5 p.m. ET 3/17/20.
Docket Numbers: ER20-1071-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: Revisions to Attachment AN
to be effective 4/26/2020.
Filed Date: 2/25/20.
Accession Number: 20200225-5122.
Comments Due: 5 p.m. ET 3/17/20.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: February 25, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020-04231 Filed 2-28-20; 8:45 am]
BILLING CODE 6717-01-P