Download as PDF khammond on DSKJM1Z7X2PROD with NOTICES Federal Register / Vol. 85, No. 41 / Monday, March 2, 2020 / Notices d. Applicant: Great Falls Hydroelectric Company and the City of Paterson, New Jersey, as co-licensees. e. Name of Project: Great Falls Hydroelectric Project (Great Falls Project or project). f. Location: On the Passaic River, near the City of Paterson, Passaic County, New Jersey. The project does not occupy federal land. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Mr. Robert Gates, Senior Vice President of Operations, Eagle Creek Renewable Energy, 65 Madison Avenue, Suite 500, Morristown, NJ 07960; (973) 998–8400; email—bob.gates@eaglecreekre.com and/or Ben-David Seligman, 2nd Assistant Corp. Counsel, City of Paterson, 155 Market Street, Paterson, NJ; (973) 321–1366; email—bseligman@ patersonnj.gov. i. FERC Contact: Christopher Millard at (202) 502–8256; or email at christopher.millard@ferc.gov. j. Deadline for filing motions to intervene and protests: 60 days from the issuance date of this notice. The Commission strongly encourages electronic filing. Please file motions to intervene and protests using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–2814–025. The Commission’s Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. This application has been accepted for filing but is not ready for environmental analysis at this time. l. The existing project works consist of: (1) The Society for the Establishment of Useful Manufactures (S.U.M.) dam, an overflow granite stone gravity structure about 315 feet long, with a maximum height of 15 feet and having a crest elevation of 114.6 feet mean sea level (msl); (2) a reservoir with a surface area of 202 acres and a storage capacity of 1,415 acre-feet at elevation 114.6 feet VerDate Sep<11>2014 18:10 Feb 28, 2020 Jkt 250001 msl; (3) a forebay inlet structure; (4) a headgate control structure containing three trashracks and three steel gates; (5) three penstocks, each 8.5 feet in diameter and approximately 55 feet long; (6) a powerhouse containing three turbine-generator units with a total rated capacity of 10.95 megawatts; (7) a 37foot-long, 4.16-kilovolt (kV) underground transmission line connecting the powerhouse to a 4.16/ 26.4-kV step-up transformer which in turn is connected to a 26.4-kV transmission grid via an approximately 30-foot-long 26.4-kV underground transmission line; (8) and appurtenant facilities. The Great Falls Project is operated in a run-of-river mode. For the period 2010 through 2018, the average annual generation at the Great Falls Project was 17,484 megawatt-hours. m. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s website at https://www.ferc.gov using the eLibrary link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the addresses in item h above. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Anyone may submit a protest or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, and .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any protests or motions to intervene must be received on or before the specified comment date for the particular application. All filings must: (1) Bear in all capital letters the title PROTEST or MOTION TO INTERVENE; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 12283 be served upon each representative of the applicant specified in the particular application. o. Procedural schedule and final amendments: The application will be processed according to the following preliminary schedule. Revisions to the schedule will be made as appropriate. Filing of motions to intervene and protests: April 2020. Issue notice of ready for environmental analysis: May 2020. Deadline for filing of recommendations, terms and conditions, and prescriptions:July 2020. Reply comments due: September 2020. Commission issues EA: November 2020. Comments on EA: December 2020. p. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis. Dated: February 25, 2020. Kimberly D. Bose, Secretary. [FR Doc. 2020–04218 Filed 2–28–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER17–2059–004; ER10–3097–009. Applicants: Puget Sound Energy, Inc., Bruce Power Inc. Description: Second Supplement to July 1, 2019 Updated Market Power Analysis in the Northwest Region for Puget Sound Energy, Inc., et al. Filed Date: 2/24/20. Accession Number: 20200224–5156. Comments Due: 5 p.m. ET 3/16/20. Docket Numbers: ER19–1958–002. Applicants: PJM Interconnection, L.L.C. Description: Compliance filing: Compliance filing per Commission’s 12/ 19/19 order re: Order No. 845 in ER19– 1958 to be effective 12/31/9998. Filed Date: 2/21/20. Accession Number: 20200221–5143. Comments Due: 5 p.m. ET 3/13/20. Docket Numbers: ER20–495–001. Applicants: Midcontinent Independent System Operator, Inc. Description: Tariff Amendment: 2020–02–24_SA 3380 Deficiency E:\FR\FM\02MRN1.SGM 02MRN1 khammond on DSKJM1Z7X2PROD with NOTICES 12284 Federal Register / Vol. 85, No. 41 / Monday, March 2, 2020 / Notices Response for J639 GIA to be effective 11/15/2019. Filed Date: 2/24/20. Accession Number: 20200224–5096. Comments Due: 5 p.m. ET 3/16/20. Docket Numbers: ER20–612–001. Applicants: Midcontinent Independent System Operator, Inc. Description: Tariff Amendment: 2020–02–24_SA 3392 Deficiency Response for J944 GIA to be effective 12/3/2019. Filed Date: 2/24/20. Accession Number: 20200224–5098. Comments Due: 5 p.m. ET 3/16/20. Docket Numbers: ER20–886–000. Applicants: Orsted US Trading LLC. Description: Errata to January 28, 2020 Orsted US Trading LLC tariff filing. Filed Date: 2/21/20. Accession Number: 20200221–5071. Comments Due: 5 p.m. ET 3/13/20. Docket Numbers: ER20–1068–000. Applicants: The Dayton Power and Light Company. Description: Application to Establish Incentive Rate Treatment for Qualifying for Transmission Projects, et al. of The Dayton Power and Light Company. Filed Date: 2/25/20. Accession Number: 20200225–5081. Comments Due: 5 p.m. ET 3/17/20. Docket Numbers: ER20–1069–000. Applicants: Duke Energy Carolinas, LLC. Description: § 205(d) Rate Filing: Revised DEC–CEPCI NITSA (SA No. 447) to be effective 2/1/2020. Filed Date: 2/25/20. Accession Number: 20200225–5090. Comments Due: 5 p.m. ET 3/17/20. Docket Numbers: ER20–1070–000. Applicants: Rodan Energy Solutions (USA) Inc. Description: Baseline eTariff Filing: RODAN ENERGY SOLUTIONS (USA) INC INITIAL MBR Tariff to be effective 4/1/2020. Filed Date: 2/25/20. Accession Number: 20200225–5095. Comments Due: 5 p.m. ET 3/17/20. Docket Numbers: ER20–1071–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: Revisions to Attachment AN to be effective 4/26/2020. Filed Date: 2/25/20. Accession Number: 20200225–5122. Comments Due: 5 p.m. ET 3/17/20. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 VerDate Sep<11>2014 18:10 Feb 28, 2020 Jkt 250001 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: February 25, 2020. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2020–04231 Filed 2–28–20; 8:45 am] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Docket Numbers: RP20–543–000. Applicants: Transcontinental Gas Pipe Line Company, LLC. Description: § 4(d) Rate Filing: Rate Schedules LSS and SS–2 Tracker Filing effective February 1, 2020 to be effective 2/1/2020. Filed Date: 2/24/20. Accession Number: 20200224–5112. Comments Due: 5 p.m. ET 3/9/20. Docket Numbers: RP20–544–000. Applicants: Equitrans, L.P. Description: § 4(d) Rate Filing: DEPARTMENT OF ENERGY Negotiated Rate Agreement—Arsenal Amendment to be effective 3/1/2020. Federal Energy Regulatory Filed Date: 2/25/20. Commission Accession Number: 20200225–5002. Comments Due: 5 p.m. ET 3/9/20. [Project No. 2413–124; Georgia] Docket Numbers: RP20–545–000. Georgia Power Company; Notice of Applicants: Lucid Energy Delaware, Teleconference for Tribal Consultation LLC, Devon Gas Services, L.P. Meeting Description: Joint Petition for Limited Waivers, et al. of Lucid Energy On December 3, 2019, Mr. Turner W. Delaware, LLC, et al. under RP20–545. Hunt, Archaeological Technician of the Filed Date: 2/24/20. Muscogee (Creek) Nation sent an email Accession Number: 20200224–5154. requesting consultation regarding the Comments Due: 5 p.m. ET 3/2/20. relicensing of the Wallace Hydroelectric Project. Commission Staff will hold a The filings are accessible in the teleconference with representatives of Commission’s eLibrary system by the Muscogee (Creek) Nation to learn clicking on the links or querying the more about the tribe’s concerns. The docket number. teleconference will take place at 2:00 Any person desiring to intervene or p.m. Eastern Standard Time on protest in any of the above proceedings Thursday, March 12, 2020. must file in accordance with Rules 211 and 214 of the Commission’s This teleconference is limited to Regulations (18 CFR 385.211 and members of the invited tribe and Commission staff. Interested parties may 385.214) on or before 5:00 p.m. Eastern time on the specified date(s). Protests attend the teleconference as observers only. A summary of the meeting will be may be considered, but intervention is necessary to become a party to the prepared and posted in the aboveproceeding. referenced docket on the Commission’s eFiling is encouraged. More detailed eLibrary system. information relating to filing To receive specific instructions on requirements, interventions, protests, how to participate, please contact service, and qualifying facilities filings Dustin Wilson at dustin.wilson@ can be found at: https://www.ferc.gov/ ferc.gov, or (202) 502–6528 by March 10, docs-filing/efiling/filing-req.pdf. For 2020. other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: February 25, 2020. BILLING CODE 6717–01–P [FR Doc. 2020–04217 Filed 2–28–20; 8:45 am] Dated: February 25, 2020. Nathaniel J. Davis, Sr., Deputy Secretary. BILLING CODE 6717–01–P [FR Doc. 2020–04232 Filed 2–28–20; 8:45 am] Kimberly D. Bose, Secretary. PO 00000 BILLING CODE 6717–01–P Frm 00035 Fmt 4703 Sfmt 4703 E:\FR\FM\02MRN1.SGM 02MRN1

Agencies

[Federal Register Volume 85, Number 41 (Monday, March 2, 2020)]
[Notices]
[Pages 12283-12284]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-04231]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER17-2059-004; ER10-3097-009.
    Applicants: Puget Sound Energy, Inc., Bruce Power Inc.
    Description: Second Supplement to July 1, 2019 Updated Market Power 
Analysis in the Northwest Region for Puget Sound Energy, Inc., et al.
    Filed Date: 2/24/20.
    Accession Number: 20200224-5156.
    Comments Due: 5 p.m. ET 3/16/20.

    Docket Numbers: ER19-1958-002.
    Applicants: PJM Interconnection, L.L.C.
    Description: Compliance filing: Compliance filing per Commission's 
12/19/19 order re: Order No. 845 in ER19-1958 to be effective 12/31/
9998.
    Filed Date: 2/21/20.
    Accession Number: 20200221-5143.
    Comments Due: 5 p.m. ET 3/13/20.

    Docket Numbers: ER20-495-001.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Tariff Amendment: 2020-02-24_SA 3380 Deficiency

[[Page 12284]]

Response for J639 GIA to be effective 11/15/2019.
    Filed Date: 2/24/20.
    Accession Number: 20200224-5096.
    Comments Due: 5 p.m. ET 3/16/20.

    Docket Numbers: ER20-612-001.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Tariff Amendment: 2020-02-24_SA 3392 Deficiency 
Response for J944 GIA to be effective 12/3/2019.
    Filed Date: 2/24/20.
    Accession Number: 20200224-5098.
    Comments Due: 5 p.m. ET 3/16/20.

    Docket Numbers: ER20-886-000.
    Applicants: Orsted US Trading LLC.
    Description: Errata to January 28, 2020 Orsted US Trading LLC 
tariff filing.
    Filed Date: 2/21/20.
    Accession Number: 20200221-5071.
    Comments Due: 5 p.m. ET 3/13/20.

    Docket Numbers: ER20-1068-000.
    Applicants: The Dayton Power and Light Company.
    Description: Application to Establish Incentive Rate Treatment for 
Qualifying for Transmission Projects, et al. of The Dayton Power and 
Light Company.
    Filed Date: 2/25/20.
    Accession Number: 20200225-5081.
    Comments Due: 5 p.m. ET 3/17/20.

    Docket Numbers: ER20-1069-000.
    Applicants: Duke Energy Carolinas, LLC.
    Description: Sec.  205(d) Rate Filing: Revised DEC-CEPCI NITSA (SA 
No. 447) to be effective 2/1/2020.
    Filed Date: 2/25/20.
    Accession Number: 20200225-5090.
    Comments Due: 5 p.m. ET 3/17/20.

    Docket Numbers: ER20-1070-000.
    Applicants: Rodan Energy Solutions (USA) Inc.
    Description: Baseline eTariff Filing: RODAN ENERGY SOLUTIONS (USA) 
INC INITIAL MBR Tariff to be effective 4/1/2020.
    Filed Date: 2/25/20.
    Accession Number: 20200225-5095.
    Comments Due: 5 p.m. ET 3/17/20.

    Docket Numbers: ER20-1071-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Sec.  205(d) Rate Filing: Revisions to Attachment AN 
to be effective 4/26/2020.
    Filed Date: 2/25/20.
    Accession Number: 20200225-5122.
    Comments Due: 5 p.m. ET 3/17/20.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: February 25, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020-04231 Filed 2-28-20; 8:45 am]
 BILLING CODE 6717-01-P