Data Collection for Analytics and Surveillance and Market-Based Rate Purposes; Notice of Technical Workshop, 11067-11068 [2020-03794]
Download as PDF
khammond on DSKJM1Z7X2PROD with NOTICES
Federal Register / Vol. 85, No. 38 / Wednesday, February 26, 2020 / Notices
Docket Numbers: ER10–1651–004.
Applicants: Golden State Water
Company.
Description: Amendment to June 29,
2019 Updated Market Power Analysis
for the Southwest Region of Golden
State Water Company.
Filed Date: 2/13/20.
Accession Number: 20200213–5192.
Comments Due: 5 p.m. ET 3/5/20.
Docket Numbers: ER19–1507–005.
Applicants: Duke Energy Carolinas,
LLC.
Description: Compliance filing: Joint
OATT Further Compliance Filing for
Order No. 845 to be effective 5/22/2019.
Filed Date: 2/14/20.
Accession Number: 20200214–5064.
Comments Due: 5 p.m. ET 3/6/20.
Docket Numbers: ER20–396–001.
Applicants: Evergy Kansas Central,
Inc.
Description: Tariff Amendment:
Response to Letter Requesting
Additional Information to be effective 6/
28/2018.Filed Date: 2/13/20.
Accession Number: 20200213–5166.
Comments Due: 5 p.m. ET 3/5/20.
Docket Numbers: ER20–1003–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original ISA, SA No. 5564 and Original
ICSA, SA No. 5565; Queue No. AA2–
161 to be effective 1/16/2020.
Filed Date: 2/14/20.
Accession Number: 20200214–5038.
Comments Due: 5 p.m. ET 3/6/20.
Docket Numbers: ER20–1004–000.
Applicants: ORNI 37 LLC.
Description: Request for Limited
Waiver, et al. of ORNI 37 LLC.
Filed Date: 2/13/20.
Accession Number: 20200213–5193.
Comments Due: 5 p.m. ET 3/5/20.
Docket Numbers: ER20–1005–000.
Applicants: Thunder Spirit Wind,
LLC.
Description: Tariff Cancellation:
Cancellation of Market-Based Rate Tariff
to be effective 2/15/2020.
Filed Date: 2/14/20.
Accession Number: 20200214–5073.
Comments Due: 5 p.m. ET 3/6/20.
Docket Numbers: ER20–1006–000.
Applicants: DATC Path 15, LLC.
Description: § 205(d) Rate Filing:
Revised Appendix I 2020 June to be
effective 6/13/2020.
Filed Date: 2/14/20.
Accession Number: 20200214–5077.
Comments Due: 5 p.m. ET 3/6/20.
Docket Numbers: ER20–1007–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2020–02–14_SA 3082 Madison Gas and
VerDate Sep<11>2014
17:22 Feb 25, 2020
Jkt 250001
Electric-SMMPA 1st Rev GIA (J614) to
be effective 1/30/2020.
Filed Date: 2/14/20.
Accession Number: 20200214–5088.
Comments Due: 5 p.m. ET 3/6/20.
Docket Numbers: ER20–1009–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Revisions to the Tariff and OA re
Enhancements to PJM’s FTR Auction
Process to be effective 4/15/2020.
Filed Date: 2/14/20.
Accession Number: 20200214–5104.
Comments Due: 5 p.m. ET 3/6/20.
Docket Numbers: ER20–1010–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original ISA SA No. 5527; Non-Queue
No. NQ165 to be effective 1/15/2020.
Filed Date: 2/14/20.
Accession Number: 20200214–5106.
Comments Due: 5 p.m. ET 3/6/20.
Docket Numbers: ER20–1011–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to ISA, Service Agreement
No. 1131, Non-Queue #NQ122 to be
effective 6/2/2015.
Filed Date: 2/14/20.
Accession Number: 20200214–5108.
Comments Due: 5 p.m. ET 3/6/20.
Docket Numbers: ER20–1012–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing:
Amended GIA Windpower Partners
1993, LLC, Renwind Project SA No. 375
to be effective 2/15/2020.
Filed Date: 2/14/20.
Accession Number: 20200214–5121.
Comments Due: 5 p.m. ET 3/6/20.
Docket Numbers: ER20–1013–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Cancellation:
Notice of Cancellation of ISA, Service
Agreement No. 3645, Queue No. Y1–077
to be effective 12/18/2019.
Filed Date: 2/14/20.
Accession Number: 20200214–5172.
Comments Due: 5 p.m. ET 3/6/20.
Docket Numbers: ER20–1014–000.
Applicants: Cove Mountain Solar,
LLC.
Description: Baseline eTariff Filing:
Application for Market-Based Rate
Authority to be effective 4/9/2020.
Filed Date: 2/14/20.
Accession Number: 20200214–5173.
Comments Due: 5 p.m. ET 3/6/20.
Docket Numbers: ER20–1015–000.
Applicants: Cove Mountain Solar 2,
LLC.
Description: Baseline eTariff Filing:
Application for Market-Based Rate
Authority to be effective 4/9/2020.
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
11067
Filed Date: 2/14/20.
Accession Number: 20200214–5177.
Comments Due: 5 p.m. ET 3/6/20.
Docket Numbers: ER20–1016–000.
Applicants: Cove Mountain Solar,
LLC.
Description: § 205(d) Rate Filing:
Filing of Shared Facilities Common
Ownership Agreement and Request for
Waivers to be effective 4/9/2020.
Filed Date: 2/14/20.
Accession Number: 20200214–5180.
Comments Due: 5 p.m. ET 3/6/20.
Docket Numbers: ER20–1017–000.
Applicants: Cove Mountain Solar 2,
LLC.
Description: Initial rate filing: Filing
of Shared Facilities Common
Ownership Agreement and Request for
Waivers to be effective 4/9/2020.
Filed Date: 2/14/20.
Accession Number: 20200214–5181.
Comments Due: 5 p.m. ET 3/6/20.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: February 14, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–03796 Filed 2–25–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RM16–17–000]
Data Collection for Analytics and
Surveillance and Market-Based Rate
Purposes; Notice of Technical
Workshop
On January 22, 2020, the Federal
Energy Regulatory Commission
(Commission) issued a notice that
Commission staff will hold a technical
workshop on the relational database
E:\FR\FM\26FEN1.SGM
26FEN1
khammond on DSKJM1Z7X2PROD with NOTICES
11068
Federal Register / Vol. 85, No. 38 / Wednesday, February 26, 2020 / Notices
being built in accordance with Order
No. 860 (MBR Database).1 The meeting
will take place on February 27, 2020,
from 9:00 a.m. to 2:30 p.m.2 (EST) in the
Commission Meeting Room, at 888 First
Street NE, Washington, DC 20426. All
interested persons are invited to attend.
For those unable to attend in person,
access to the meeting will be available
via webcast.
Commission staff is hereby
supplementing the January 22, 2020
notice with the agenda for discussion.
During the meeting Commission staff
will provide an overview of the MBR
Database, discuss how the MBR
Database will fit into the market-based
rate program; and answer questions
presented live or via email to
mbrdatabase@ferc.gov.
Please note that matters pending
before the Commission and subject to ex
parte limitations cannot be discussed at
this meeting. An agenda of the meeting
is attached.
Due to the nature of the discussion,
those interested in participating are
encouraged to attend in person. All
interested persons (whether attending in
person or via webcast) are asked to
register at https://www.ferc.gov/whatsnew/registration/02-27-20-form.asp.
There is no registration fee. Anyone
with internet access can listen to the
meeting by navigating to www.ferc.gov’s
Calendar of Events, locating the MBR
Data Technical Workshop, and clicking
on the link to the webcast. The webcast
will allow persons to listen to the
technical conference and email
questions during the meeting to
mbrdatabase@ferc.gov.
Commission conferences are
accessible under section 508 of the
Rehabilitation Act of 1973. For
accessibility accommodations, please
send an email to accessibility@ferc.gov,
call toll free 1–866–208–3372 (voice) or
202–502–8659 (TTY), or send a fax to
202–208–2106 with the required
accommodations.
For more information about the
technical workshop, please contact
Ryan Stertz at 202–502–6473, or send an
email to mbrdatabase@ferc.gov. For
logistics, contact Sarah McKinley at
202–502–8368 or sarah.mckinley@
ferc.gov.
1 Data Collection for Analytics and Surveillance
and Market-Based Rate Purposes, Order No. 860,
168 FERC 61,039 (2019).
2 Please note that the technical workshop was
originally scheduled to end at 12:30 p.m.
VerDate Sep<11>2014
17:22 Feb 25, 2020
Jkt 250001
Dated: February 14, 2020.
Kimberly D. Bose,
Secretary.
Agenda
MBR Database Technical Workshop,
Commission Meeting Room, February
27, 2020
9:00–9:10 a.m. Welcome and
Introductions
9:10–9:35 a.m. Purpose of Database
9:35–10:15 a.m. Overview of MBR
Portal and Features
10:15–11:15 a.m. Data Dictionary
Walk-Through
11:15–11:45 a.m. Making submissions
into the MBR database
11:45–12:00 p.m. Market-Based Rate
Filing Process
12:00–12:30 p.m. Break
12:30–2:30 p.m. Question and Answer
session
[FR Doc. 2020–03794 Filed 2–25–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AD10–12–011]
Increasing Market and Planning
Efficiency and Enhancing Resilience
Through Improved Software; Notice of
Technical Conference: Increasing
Real-Time and Day-Ahead Market
Efficiency and Enhancing Resilience
Through Improved Software
Take notice that Commission staff
will convene a technical conference on
June 23, 24, and 25, 2020 to discuss
opportunities for increasing real-time
and day-ahead market efficiency and
enhancing the resilience of the bulk
power system through improved
software. A detailed agenda with the list
of and times for the selected speakers
will be published on the Commission’s
website 1 after May 22, 2020.
Staff has held similar conferences in
this proceeding in the past years,
focused on enhancing market and
planning efficiency and the resilience of
the bulk power system. As in past
conferences, this conference will bring
together experts from diverse
backgrounds and experiences, including
electric system operators, software
developers, and those from government,
research centers and academia for the
purposes of stimulating discussion,
sharing information, and identifying
fruitful avenues for research concerning
the technical aspects of improved
1 https://www.ferc.gov/industries/electric/indusact/market-planning.asp.
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
software for increasing efficiency and
resilience of the bulk power system.
This conference is intended to build
on those previous discussions. Staff will
be facilitating discussions to explore
research and operational advances with
respect to market modeling that appear
to have significant promise for potential
efficiency or resilience improvements.
Broadly, such topics fall into the
following categories:
(1) Improvements to the
representation of physical constraints
that are either not currently modeled or
currently modeled using mathematical
approximations (e.g., voltage and
reactive power constraints, stability
constraints, fuel delivery constraints,
and constraints related to
contingencies);
(2) Consideration of uncertainty to
better maximize economic efficiency
(expected market surplus) and better
understand events that could impact
resilience of the bulk power system, e.g.,
stochastic modeling, or other improved
modeling approaches to energy and
reserve dispatch and system planning
that efficiently manage uncertainty;
(3) Software related to grid-enhancing
technologies, such as those described in
the notices for Docket No. AD19–19,
Grid-enhancing Technologies, and
Docket No. AD19–15, Managing
Transmission Line Ratings, including
optimal transmission switching,
dynamic line ratings, distributed energy
resources, and software for forecasting
and enhancing visibility into changing
system conditions.
(4) Improvements to the ability to
identify and use flexibility in the
existing systems in ways that improve
bulk power system resilience and
economic efficiency, e.g., transmission
constraint relaxation practices, and
ramp management;
(5) Improvements to the duality
interpretations of the economic dispatch
model, with the goal of enabling the
calculation of prices which represent
better equilibrium and incentives for
efficient entry and exit;
(6) Limitations of current electricity
market software due to its interaction
with hardware, for example, parallel
computing and better cache
management;
(7) Other improvements in algorithms,
model formulations, or hardware that
may allow for increases in market
efficiency and enhanced bulk power
system resilience.
Within these or related topics, we
encourage presentations that discuss
best modeling practices, existing
modeling practices that need
improvement, any advances made, or
related perspectives on increasing
E:\FR\FM\26FEN1.SGM
26FEN1
Agencies
[Federal Register Volume 85, Number 38 (Wednesday, February 26, 2020)]
[Notices]
[Pages 11067-11068]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-03794]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. RM16-17-000]
Data Collection for Analytics and Surveillance and Market-Based
Rate Purposes; Notice of Technical Workshop
On January 22, 2020, the Federal Energy Regulatory Commission
(Commission) issued a notice that Commission staff will hold a
technical workshop on the relational database
[[Page 11068]]
being built in accordance with Order No. 860 (MBR Database).\1\ The
meeting will take place on February 27, 2020, from 9:00 a.m. to 2:30
p.m.\2\ (EST) in the Commission Meeting Room, at 888 First Street NE,
Washington, DC 20426. All interested persons are invited to attend. For
those unable to attend in person, access to the meeting will be
available via webcast.
---------------------------------------------------------------------------
\1\ Data Collection for Analytics and Surveillance and Market-
Based Rate Purposes, Order No. 860, 168 FERC 61,039 (2019).
\2\ Please note that the technical workshop was originally
scheduled to end at 12:30 p.m.
---------------------------------------------------------------------------
Commission staff is hereby supplementing the January 22, 2020
notice with the agenda for discussion. During the meeting Commission
staff will provide an overview of the MBR Database, discuss how the MBR
Database will fit into the market-based rate program; and answer
questions presented live or via email to [email protected].
Please note that matters pending before the Commission and subject
to ex parte limitations cannot be discussed at this meeting. An agenda
of the meeting is attached.
Due to the nature of the discussion, those interested in
participating are encouraged to attend in person. All interested
persons (whether attending in person or via webcast) are asked to
register at https://www.ferc.gov/whats-new/registration/02-27-20-form.asp. There is no registration fee. Anyone with internet access can
listen to the meeting by navigating to www.ferc.gov's Calendar of
Events, locating the MBR Data Technical Workshop, and clicking on the
link to the webcast. The webcast will allow persons to listen to the
technical conference and email questions during the meeting to
[email protected].
Commission conferences are accessible under section 508 of the
Rehabilitation Act of 1973. For accessibility accommodations, please
send an email to [email protected], call toll free 1-866-208-3372
(voice) or 202-502-8659 (TTY), or send a fax to 202-208-2106 with the
required accommodations.
For more information about the technical workshop, please contact
Ryan Stertz at 202-502-6473, or send an email to [email protected].
For logistics, contact Sarah McKinley at 202-502-8368 or
[email protected].
Dated: February 14, 2020.
Kimberly D. Bose,
Secretary.
Agenda
MBR Database Technical Workshop, Commission Meeting Room, February 27,
2020
9:00-9:10 a.m. Welcome and Introductions
9:10-9:35 a.m. Purpose of Database
9:35-10:15 a.m. Overview of MBR Portal and Features
10:15-11:15 a.m. Data Dictionary Walk-Through
11:15-11:45 a.m. Making submissions into the MBR database
11:45-12:00 p.m. Market-Based Rate Filing Process
12:00-12:30 p.m. Break
12:30-2:30 p.m. Question and Answer session
[FR Doc. 2020-03794 Filed 2-25-20; 8:45 am]