North Baja Pipeline, LLC; Notice of Schedule for Environmental Review of the North Baja Xpress Project, 11066 [2020-03791]
Download as PDF
11066
Federal Register / Vol. 85, No. 38 / Wednesday, February 26, 2020 / Notices
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is March 5,
2020.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: February 14, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–03793 Filed 2–25–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
khammond on DSKJM1Z7X2PROD with NOTICES
[Docket No. CP20–27–000]
North Baja Pipeline, LLC; Notice of
Schedule for Environmental Review of
the North Baja Xpress Project
On December 16, 2019, North Baja
Pipeline, LLC (North Baja) filed an
application in Docket No. CP20–27–000
requesting a Certificate of Public
Convenience and Necessity pursuant to
Section 7(c) of the Natural Gas Act to
VerDate Sep<11>2014
17:22 Feb 25, 2020
Jkt 250001
construct and operate certain natural gas
pipeline facilities. The proposed project
is known as the North Baja Xpress
Project (Project), and includes North
Baja’s installation of additional
compression facilities and other
modifications on its system to create
495 million cubic feet per day of
incremental firm delivery to the U.S./
Mexico border.
On December 31, 2019, the Federal
Energy Regulatory Commission
(Commission or FERC) issued its Notice
of Application for the Project. Among
other things, that notice alerted agencies
issuing federal authorizations of the
requirement to complete all necessary
reviews and to reach a final decision on
a request for a federal authorization
within 90 days of the date of issuance
of the Commission staff’s Environmental
Assessment (EA) for the Project. This
instant notice identifies the FERC staff’s
planned schedule for the completion of
the EA for the Project.
Schedule for Environmental Review
Issuance of EA—July 17, 2020
90-day Federal Authorization Decision
Deadline—October 15, 2020
If a schedule change becomes
necessary, additional notice will be
provided so that the relevant agencies
are kept informed of the Project’s
progress.
Project Description
North Baja would construct one new
31,900 ISO horsepower compressor unit
and restage two existing 7,700
horsepower compressor units at its
existing Ehrenberg Compressor Station
in La Paz County, Arizona, as well as
install additional flow measurement
facilities and piping modifications at its
existing El Paso and Ogilby Meter
Stations in La Paz County, Arizona and
Imperial County, California,
respectively.
Background
On January 31, 2020, the Commission
issued a Notice of Intent to Prepare an
Environmental Assessment for the
Proposed North Baja Xpress Project and
Request for Comments on
Environmental Issues (NOI). The NOI
was sent to affected landowners; federal,
state, and local government agencies;
elected officials; environmental and
public interest groups; Native American
tribes; other interested parties; and local
libraries and newspapers. All
substantive comments will be addressed
in the EA.
Additional Information
In order to receive notification of the
issuance of the EA and to keep track of
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC
website (www.ferc.gov). Using the
eLibrary link, select General Search
from the eLibrary menu, enter the
selected date range and Docket Number
excluding the last three digits (i.e.,
CP20–27), and follow the instructions.
For assistance with access to eLibrary,
the helpline can be reached at (866)
208–3676, TTY (202) 502–8659, or at
FERCOnlineSupport@ferc.gov. The
eLibrary link on the FERC website also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and rule
makings.
Dated: February 14, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–03791 Filed 2–25–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC20–37–000.
Applicants: Nevada Power Company,
Sierra Pacific Power Company.
Description: Joint Application for
Authorization Under Section 203 of the
Federal Power Act, et al. of Nevada
Power Company, et al.
Filed Date: 2/13/20.
Accession Number: 20200213–5200.
Comments Due: 5 p.m. ET 3/5/20.
Docket Numbers: EC20–38–000.
Applicants: Astoria Energy LLC,
Astoria Energy II LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act, et al. of Astoria
Energy LLC, et al.
Filed Date: 2/14/20.
Accession Number: 20200214–5141.
Comments Due: 5 p.m. ET 3/6/20.
Take notice that the Commission
received the following electric rate
filings:
E:\FR\FM\26FEN1.SGM
26FEN1
Agencies
[Federal Register Volume 85, Number 38 (Wednesday, February 26, 2020)]
[Notices]
[Page 11066]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-03791]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP20-27-000]
North Baja Pipeline, LLC; Notice of Schedule for Environmental
Review of the North Baja Xpress Project
On December 16, 2019, North Baja Pipeline, LLC (North Baja) filed
an application in Docket No. CP20-27-000 requesting a Certificate of
Public Convenience and Necessity pursuant to Section 7(c) of the
Natural Gas Act to construct and operate certain natural gas pipeline
facilities. The proposed project is known as the North Baja Xpress
Project (Project), and includes North Baja's installation of additional
compression facilities and other modifications on its system to create
495 million cubic feet per day of incremental firm delivery to the
U.S./Mexico border.
On December 31, 2019, the Federal Energy Regulatory Commission
(Commission or FERC) issued its Notice of Application for the Project.
Among other things, that notice alerted agencies issuing federal
authorizations of the requirement to complete all necessary reviews and
to reach a final decision on a request for a federal authorization
within 90 days of the date of issuance of the Commission staff's
Environmental Assessment (EA) for the Project. This instant notice
identifies the FERC staff's planned schedule for the completion of the
EA for the Project.
Schedule for Environmental Review
Issuance of EA--July 17, 2020
90-day Federal Authorization Decision Deadline--October 15, 2020
If a schedule change becomes necessary, additional notice will be
provided so that the relevant agencies are kept informed of the
Project's progress.
Project Description
North Baja would construct one new 31,900 ISO horsepower compressor
unit and restage two existing 7,700 horsepower compressor units at its
existing Ehrenberg Compressor Station in La Paz County, Arizona, as
well as install additional flow measurement facilities and piping
modifications at its existing El Paso and Ogilby Meter Stations in La
Paz County, Arizona and Imperial County, California, respectively.
Background
On January 31, 2020, the Commission issued a Notice of Intent to
Prepare an Environmental Assessment for the Proposed North Baja Xpress
Project and Request for Comments on Environmental Issues (NOI). The NOI
was sent to affected landowners; federal, state, and local government
agencies; elected officials; environmental and public interest groups;
Native American tribes; other interested parties; and local libraries
and newspapers. All substantive comments will be addressed in the EA.
Additional Information
In order to receive notification of the issuance of the EA and to
keep track of all formal issuances and submittals in specific dockets,
the Commission offers a free service called eSubscription. This can
reduce the amount of time you spend researching proceedings by
automatically providing you with notification of these filings,
document summaries, and direct links to the documents. Go to
www.ferc.gov/docs-filing/esubscription.asp.
Additional information about the Project is available from the
Commission's Office of External Affairs at (866) 208-FERC or on the
FERC website (www.ferc.gov). Using the eLibrary link, select General
Search from the eLibrary menu, enter the selected date range and Docket
Number excluding the last three digits (i.e., CP20-27), and follow the
instructions. For assistance with access to eLibrary, the helpline can
be reached at (866) 208-3676, TTY (202) 502-8659, or at
[email protected]. The eLibrary link on the FERC website also
provides access to the texts of formal documents issued by the
Commission, such as orders, notices, and rule makings.
Dated: February 14, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-03791 Filed 2-25-20; 8:45 am]
BILLING CODE 6717-01-P