Environmental Impact Statements; Notice of Availability, 10164 [2020-03495]
Download as PDF
10164
Federal Register / Vol. 85, No. 35 / Friday, February 21, 2020 / Notices
mid or low capacity conditions. Thus,
overall, the refrigerant exiting the
crankcase is optimized across the range
of operating conditions, improving
system efficiency and therefore lowering
indirect CO2 emissions due to use of the
air conditioning system.
Hyundai and Kia are applying for
credits for the 2021 and later model
years for vehicles sold in the U.S. and
equipped with the Hanon A/C
compressor with variable orifice valve
technology. The credits requested range
from 1.5 g/mi to 1.8 g/mi, depending on
the specifics of the A/C system. EPA
considers this compressor technology to
be a technology that, if approved, will
be subject to the maximum limits for an
A/C system of 5.0 g/mi for passenger
automobiles and 7.2 g/mi for light
trucks specified in the regulations.8
Details of the testing and analysis can be
found in the manufacturer’s
applications.
khammond on DSKJM1Z7X2PROD with NOTICES
III. EPA Decision Process
EPA has reviewed the applications for
completeness and is now making the
applications available for public review
and comment as required by the
regulations. The off-cycle credit
applications submitted by the
manufacturers (with confidential
business information redacted) have
been placed in the public docket (see
ADDRESSES section above) and on EPA’s
website at https://www.epa.gov/vehicleand-engine-certification/complianceinformation-light-duty-greenhouse-gasghg-standards.
EPA is providing a 30-day comment
period on the applications for off-cycle
credits described in this document, as
specified by the regulations. The
manufacturers may submit a written
rebuttal of comments for EPA’s
consideration, or may revise an
application in response to comments.
After reviewing any public comments
and any rebuttal of comments submitted
by manufacturers, EPA will make a final
decision regarding the credit requests.
EPA will make its decision available to
the public by placing a decision
document (or multiple decision
documents) in the docket and on EPA’s
website at the same manufacturerspecific pages shown above. While the
broad methodologies used by these
manufacturers could potentially be used
for other vehicles and by other
manufacturers, the vehicle specific data
needed to demonstrate the off-cycle
emissions reductions would likely be
different. In such cases, a new
application would be required,
8 See
40 CFR 86.1868–12(b).
VerDate Sep<11>2014
17:22 Feb 20, 2020
Jkt 250001
including an opportunity for public
comment.
Dated: February 11, 2020.
Byron J. Bunker,
Director, Compliance Division, Office of
Transportation and Air Quality, Office of Air
and Radiation.
[FR Doc. 2020–03510 Filed 2–20–20; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–9049–5]
Environmental Impact Statements;
Notice of Availability
Weekly receipt of Environmental
Impact Statements filed February 10,
2020 10 a.m. EST through February 17,
2020 10 a.m. EST pursuant to 40 CFR
1506.9.
Responsible Agency: Office of Federal
Activities, General Information 202–
564–5632 or https://www.epa.gov/nepa/.
Section 309(a) of the Clean Air Act
requires that EPA make public its
comments on EISs issued by other
Federal agencies. EPA’s comment letters
on EISs are available at: https://
cdxnodengn.epa.gov/cdx-enepa-public/
action/eis/search.
EIS No. 20200039, Final, DOE, OR,
ADOPTION—Jordan Cove Energy
Project, Contact: Brian Lavoie 202–
586–2459.
The Department of Energy (DOE) has
adopted the Federal Energy Regulatory
Commission’s Final EIS No. 20190276,
filed 11/15/2019 with the EPA. DOE
was a cooperating agency on this
project. Therefore, recirculation of the
document is not necessary under
Section 1506.3(c) of the CEQ
regulations.
EIS No. 20200040, Final Supplement,
DOE, LA, ADOPTION—Magnolia
LNG Production Capacity
Amendment, Contact: Brian Lavoie
202–586–2459.
The Department of Energy (DOE) has
adopted the Federal Energy Regulatory
Commission’s Final EIS No. 20200018,
filed 1/24/2020 with the EPA. DOE was
a cooperating agency on this project.
Therefore, recirculation of the document
is not necessary under Section 1506.3(c)
of the CEQ regulations.
EIS No. 20200041, Final, FERC, NC,
Southgate Project, Review Period
Ends: 03/23/2020, Contact: Office of
External Affairs 866–208–3372.
EIS No. 20200042, Draft Supplement,
BLM, ID, Idaho Greater Sage-Grouse
2020 Draft Supplemental EIS,
Comment Period Ends: 04/06/2020,
Contact: Jon Beck 208–373–3841.
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
EIS No. 20200043, Final, USACE, NY,
Fire Island Inlet to Montauk Point
Reformulation Study, Review
Period Ends: 03/23/2020, Contact:
Robert J Smith 917–790–8729.
EIS No. 20200044, Final, BLM, WY,
Moneta Divide Natural Gas and Oil
Development Project, Review
Period Ends: 03/23/2020, Contact:
Holly Elliot 307–347–5100.
EIS No. 20200045, Draft Supplement,
BLM, CO, Colorado Greater SageGrouse 2020 Draft Supplemental
EIS, Comment Period Ends: 04/06/
2020, Contact: Jon Beck 208–373–
3841.
EIS No. 20200046, Draft Supplement,
BLM, NV, Nevada/California
Greater Sage-Grouse 2020 Draft
Supplemental EIS, Comment Period
Ends: 04/06/2020, Contact: Jon Beck
208–373–3841.
EIS No. 20200047, Draft Supplement,
BLM, OR, Oregon Greater SageGrouse 2020 Draft Supplemental
EIS, Comment Period Ends: 04/06/
2020, Contact: Jon Beck 208–373–
3841.
EIS No. 20200048, Draft Supplement,
BLM, UT, Utah Greater Sage-Grouse
2020 Draft Supplemental EIS,
Comment Period Ends: 04/06/2020,
Contact: Jon Beck 208–373–3841.
EIS No. 20200049, Draft Supplement,
BLM, WY, Wyoming Greater SageGrouse 2020 Draft Supplemental
EIS, Comment Period Ends: 04/06/
2020, Contact: Jon Beck 208–373–
3841.
Dated: February 18, 2020.
Cindy S. Barger,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 2020–03495 Filed 2–20–20; 8:45 am]
BILLING CODE 6560–50–P
FEDERAL DEPOSIT INSURANCE
CORPORATION
Update to Notice of Financial
Institutions for Which the Federal
Deposit Insurance Corporation Has
Been Appointed Either Receiver,
Liquidator, or Manager
Federal Deposit Insurance
Corporation.
ACTION: Update listing of financial
institutions in liquidation.
AGENCY:
Notice is hereby given that
the Federal Deposit Insurance
Corporation (Corporation) has been
appointed the sole receiver for the
following financial institution effective
as of the Date Closed as indicated in the
listing.
SUPPLEMENTARY INFORMATION:
SUMMARY:
E:\FR\FM\21FEN1.SGM
21FEN1
Agencies
[Federal Register Volume 85, Number 35 (Friday, February 21, 2020)]
[Notices]
[Page 10164]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-03495]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-9049-5]
Environmental Impact Statements; Notice of Availability
Weekly receipt of Environmental Impact Statements filed February
10, 2020 10 a.m. EST through February 17, 2020 10 a.m. EST pursuant to
40 CFR 1506.9.
Responsible Agency: Office of Federal Activities, General
Information 202-564-5632 or https://www.epa.gov/nepa/.
Section 309(a) of the Clean Air Act requires that EPA make public
its comments on EISs issued by other Federal agencies. EPA's comment
letters on EISs are available at: https://cdxnodengn.epa.gov/cdx-enepa-public/action/eis/search.
EIS No. 20200039, Final, DOE, OR, ADOPTION--Jordan Cove Energy Project,
Contact: Brian Lavoie 202-586-2459.
The Department of Energy (DOE) has adopted the Federal Energy
Regulatory Commission's Final EIS No. 20190276, filed 11/15/2019 with
the EPA. DOE was a cooperating agency on this project. Therefore,
recirculation of the document is not necessary under Section 1506.3(c)
of the CEQ regulations.
EIS No. 20200040, Final Supplement, DOE, LA, ADOPTION--Magnolia LNG
Production Capacity Amendment, Contact: Brian Lavoie 202-586-2459.
The Department of Energy (DOE) has adopted the Federal Energy
Regulatory Commission's Final EIS No. 20200018, filed 1/24/2020 with
the EPA. DOE was a cooperating agency on this project. Therefore,
recirculation of the document is not necessary under Section 1506.3(c)
of the CEQ regulations.
EIS No. 20200041, Final, FERC, NC, Southgate Project, Review Period
Ends: 03/23/2020, Contact: Office of External Affairs 866-208-3372.
EIS No. 20200042, Draft Supplement, BLM, ID, Idaho Greater Sage-Grouse
2020 Draft Supplemental EIS, Comment Period Ends: 04/06/2020, Contact:
Jon Beck 208-373-3841.
EIS No. 20200043, Final, USACE, NY, Fire Island Inlet to Montauk Point
Reformulation Study, Review Period Ends: 03/23/2020, Contact: Robert J
Smith 917-790-8729.
EIS No. 20200044, Final, BLM, WY, Moneta Divide Natural Gas and Oil
Development Project, Review Period Ends: 03/23/2020, Contact: Holly
Elliot 307-347-5100.
EIS No. 20200045, Draft Supplement, BLM, CO, Colorado Greater Sage-
Grouse 2020 Draft Supplemental EIS, Comment Period Ends: 04/06/2020,
Contact: Jon Beck 208-373-3841.
EIS No. 20200046, Draft Supplement, BLM, NV, Nevada/California Greater
Sage-Grouse 2020 Draft Supplemental EIS, Comment Period Ends: 04/06/
2020, Contact: Jon Beck 208-373-3841.
EIS No. 20200047, Draft Supplement, BLM, OR, Oregon Greater Sage-Grouse
2020 Draft Supplemental EIS, Comment Period Ends: 04/06/2020, Contact:
Jon Beck 208-373-3841.
EIS No. 20200048, Draft Supplement, BLM, UT, Utah Greater Sage-Grouse
2020 Draft Supplemental EIS, Comment Period Ends: 04/06/2020, Contact:
Jon Beck 208-373-3841.
EIS No. 20200049, Draft Supplement, BLM, WY, Wyoming Greater Sage-
Grouse 2020 Draft Supplemental EIS, Comment Period Ends: 04/06/2020,
Contact: Jon Beck 208-373-3841.
Dated: February 18, 2020.
Cindy S. Barger,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 2020-03495 Filed 2-20-20; 8:45 am]
BILLING CODE 6560-50-P