Brookfield White Pine Hydro LLC; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments, 7995 [2020-02823]
Download as PDF
Federal Register / Vol. 85, No. 29 / Wednesday, February 12, 2020 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2322–069]
Brookfield White Pine Hydro LLC;
Notice of Application Tendered for
Filing With the Commission and
Establishing Procedural Schedule for
Licensing and Deadline for
Submission of Final Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 2322–069.
c. Date Filed: January 31, 2020.
d. Applicant: Brookfield White Pine
Hydro LLC (Brookfield).
e. Name of Project: Shawmut
Hydroelectric Project.
f. Location: The existing project is
located on the Kennebec River in
Kennebec and Somerset Counties,
Maine. The project does not affect
federal lands.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Frank Dunlap,
150 Main Street, Lewiston, Maine
04240; (207) 755–5603.
i. FERC Contact: Matt Cutlip, (503)
552–2762 or matt.cutlip@ferc.gov.
j. This application is not ready for
environmental analysis at this time.
k. Project Description: The project
consists of the following constructed
facilities: (1) A 24-foot-high, 1,480-footlong concrete gravity dam consisting of:
(i) A 380-foot-long overflow section
with hinged flashboards, (ii) a 730-footlong overflow section with an inflatable
bladder, (iii) 25-foot-wide sluice section;
(iv) a non-overflow section; and (v) a
headworks containing 11 headgates that
regulate flow into a forebay; (2) a 1,310acre impoundment extending about 12
miles upstream; (3) two powerhouses
adjacent to the forebay, separated by a
10-foot-high by 7-foot-wide Tainter gate
and a 6-foot-high by 6-foot-wide deep
gate; (4) eight turbine-generating units;
(5) a 300-foot-long tailrace; (6) 250-footlong generator leads connecting the
powerhouses with a substation; and (7)
appurtenant facilities.
Brookfield operates the project in a
run-of-river mode and implements
specific operating procedure to facilitate
upstream and downstream fish passage
at the project. Upstream passage for
American eel is provided by a dedicated
eel passage facility located adjacent to
one of the powerhouses. There are no
constructed upstream anadromous
fishways at the project. Currently
anadromous fish are captured and
transported upstream of the Shawmut
Project via a fish lift and transport
system at the Lockwood Dam
Hydroelectric Project No. 2574, located
about 6 miles downstream. Downstream
fish passage for American eel and
anadromous fish at the Shawmut Project
is provided via a combination of routing
flows through the project’s spillways,
turbines, and other flow regulating
equipment (e.g., Tainter gate between
the powerhouses).
l. Locations of the Application: A
copy of the application is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY).
m. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Procedural Schedule: The
application will be processed according
to the following preliminary Hydro
Licensing Schedule. Revisions to the
schedule may be made as appropriate.
Milestone
Target date
Notice of Acceptance/Notice of Ready for Environmental Analysis ..........................................................................................
Filing of recommendations, preliminary terms and conditions, and fishway prescriptions .......................................................
Commission issues Draft Environmental Assessment (EA) ......................................................................................................
Comments on Draft EA ..............................................................................................................................................................
Modified terms and conditions ...................................................................................................................................................
Commission issues Final EA .....................................................................................................................................................
o. Final amendments to the
application must be filed with the
Commission no later than thirty (30)
days from the issuance date of the
notice of ready for environmental
analysis.
DEPARTMENT OF ENERGY
Dated: February 5, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
Briar Hydro Associates, LLC; Notice of
Intent To File License Application,
Filing of Pre-Application Document,
and Approving Use of the Traditional
Licensing Process
[FR Doc. 2020–02823 Filed 2–11–20; 8:45 am]
lotter on DSKBCFDHB2PROD with NOTICES
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
[Project No. 3342–023]
a. Type of Filing: Notice of Intent to
File License Application and Request to
Use the Traditional Licensing Process.
b. Project No.: 3342–023.
c. Date Filed: November 29, 2019.
d. Submitted By: Briar Hydro
Associates, LLC (Briar Hydro).
e. Name of Project: Penacook Lower
Falls Hydroelectric Project.
VerDate Sep<11>2014
17:03 Feb 11, 2020
Jkt 250001
PO 00000
Frm 00079
Fmt 4703
7995
Sfmt 4703
March 2020.
May 2020.
November 2020.
December 2020.
February 2021.
May 2021.
f. Location: On the Contoocook River,
in Merrimack County, New Hampshire.
No federal lands are occupied by the
project works or located within the
project boundary.
g. Filed Pursuant to: 18 CFR 5.3 and
5.5 of the Commission’s regulations.
h. Potential Applicant Contact:
Andrew J. Locke, Essex Hydro
Associates, LLC, 55 Union Street,
Boston, MA 02108; (617) 357–0032;
email—alocke@essexhydro.com.
i. FERC Contact: Jeanne Edwards at
(202) 502–6181; or email at
jeanne.edwards@ferc.gov.
j. Briar Hydro filed its request to use
the Traditional Licensing Process on
November 29, 2019. Briar Hydro
provided public notice of its request on
December 12, 2019. In a letter dated
February 6, 2020, the Director of the
Division of Hydropower Licensing
E:\FR\FM\12FEN1.SGM
12FEN1
Agencies
[Federal Register Volume 85, Number 29 (Wednesday, February 12, 2020)]
[Notices]
[Page 7995]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-02823]
[[Page 7995]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2322-069]
Brookfield White Pine Hydro LLC; Notice of Application Tendered
for Filing With the Commission and Establishing Procedural Schedule for
Licensing and Deadline for Submission of Final Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 2322-069.
c. Date Filed: January 31, 2020.
d. Applicant: Brookfield White Pine Hydro LLC (Brookfield).
e. Name of Project: Shawmut Hydroelectric Project.
f. Location: The existing project is located on the Kennebec River
in Kennebec and Somerset Counties, Maine. The project does not affect
federal lands.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact: Frank Dunlap, 150 Main Street, Lewiston,
Maine 04240; (207) 755-5603.
i. FERC Contact: Matt Cutlip, (503) 552-2762 or
[email protected].
j. This application is not ready for environmental analysis at this
time.
k. Project Description: The project consists of the following
constructed facilities: (1) A 24-foot-high, 1,480-foot-long concrete
gravity dam consisting of: (i) A 380-foot-long overflow section with
hinged flashboards, (ii) a 730-foot-long overflow section with an
inflatable bladder, (iii) 25-foot-wide sluice section; (iv) a non-
overflow section; and (v) a headworks containing 11 headgates that
regulate flow into a forebay; (2) a 1,310-acre impoundment extending
about 12 miles upstream; (3) two powerhouses adjacent to the forebay,
separated by a 10-foot-high by 7-foot-wide Tainter gate and a 6-foot-
high by 6-foot-wide deep gate; (4) eight turbine-generating units; (5)
a 300-foot-long tailrace; (6) 250-foot-long generator leads connecting
the powerhouses with a substation; and (7) appurtenant facilities.
Brookfield operates the project in a run-of-river mode and
implements specific operating procedure to facilitate upstream and
downstream fish passage at the project. Upstream passage for American
eel is provided by a dedicated eel passage facility located adjacent to
one of the powerhouses. There are no constructed upstream anadromous
fishways at the project. Currently anadromous fish are captured and
transported upstream of the Shawmut Project via a fish lift and
transport system at the Lockwood Dam Hydroelectric Project No. 2574,
located about 6 miles downstream. Downstream fish passage for American
eel and anadromous fish at the Shawmut Project is provided via a
combination of routing flows through the project's spillways, turbines,
and other flow regulating equipment (e.g., Tainter gate between the
powerhouses).
l. Locations of the Application: A copy of the application is
available for review at the Commission in the Public Reference Room or
may be viewed on the Commission's website at https://www.ferc.gov using
the ``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For
assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY).
m. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. Procedural Schedule: The application will be processed according
to the following preliminary Hydro Licensing Schedule. Revisions to the
schedule may be made as appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Notice of Acceptance/Notice of Ready March 2020.
for Environmental Analysis.
Filing of recommendations, preliminary May 2020.
terms and conditions, and fishway
prescriptions.
Commission issues Draft Environmental November 2020.
Assessment (EA).
Comments on Draft EA.................. December 2020.
Modified terms and conditions......... February 2021.
Commission issues Final EA............ May 2021.
------------------------------------------------------------------------
o. Final amendments to the application must be filed with the
Commission no later than thirty (30) days from the issuance date of the
notice of ready for environmental analysis.
Dated: February 5, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020-02823 Filed 2-11-20; 8:45 am]