Download as PDF Federal Register / Vol. 85, No. 29 / Wednesday, February 12, 2020 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2322–069] Brookfield White Pine Hydro LLC; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: New Major License. b. Project No.: 2322–069. c. Date Filed: January 31, 2020. d. Applicant: Brookfield White Pine Hydro LLC (Brookfield). e. Name of Project: Shawmut Hydroelectric Project. f. Location: The existing project is located on the Kennebec River in Kennebec and Somerset Counties, Maine. The project does not affect federal lands. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)–825(r). h. Applicant Contact: Frank Dunlap, 150 Main Street, Lewiston, Maine 04240; (207) 755–5603. i. FERC Contact: Matt Cutlip, (503) 552–2762 or matt.cutlip@ferc.gov. j. This application is not ready for environmental analysis at this time. k. Project Description: The project consists of the following constructed facilities: (1) A 24-foot-high, 1,480-footlong concrete gravity dam consisting of: (i) A 380-foot-long overflow section with hinged flashboards, (ii) a 730-footlong overflow section with an inflatable bladder, (iii) 25-foot-wide sluice section; (iv) a non-overflow section; and (v) a headworks containing 11 headgates that regulate flow into a forebay; (2) a 1,310acre impoundment extending about 12 miles upstream; (3) two powerhouses adjacent to the forebay, separated by a 10-foot-high by 7-foot-wide Tainter gate and a 6-foot-high by 6-foot-wide deep gate; (4) eight turbine-generating units; (5) a 300-foot-long tailrace; (6) 250-footlong generator leads connecting the powerhouses with a substation; and (7) appurtenant facilities. Brookfield operates the project in a run-of-river mode and implements specific operating procedure to facilitate upstream and downstream fish passage at the project. Upstream passage for American eel is provided by a dedicated eel passage facility located adjacent to one of the powerhouses. There are no constructed upstream anadromous fishways at the project. Currently anadromous fish are captured and transported upstream of the Shawmut Project via a fish lift and transport system at the Lockwood Dam Hydroelectric Project No. 2574, located about 6 miles downstream. Downstream fish passage for American eel and anadromous fish at the Shawmut Project is provided via a combination of routing flows through the project’s spillways, turbines, and other flow regulating equipment (e.g., Tainter gate between the powerhouses). l. Locations of the Application: A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s website at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). m. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Procedural Schedule: The application will be processed according to the following preliminary Hydro Licensing Schedule. Revisions to the schedule may be made as appropriate. Milestone Target date Notice of Acceptance/Notice of Ready for Environmental Analysis .......................................................................................... Filing of recommendations, preliminary terms and conditions, and fishway prescriptions ....................................................... Commission issues Draft Environmental Assessment (EA) ...................................................................................................... Comments on Draft EA .............................................................................................................................................................. Modified terms and conditions ................................................................................................................................................... Commission issues Final EA ..................................................................................................................................................... o. Final amendments to the application must be filed with the Commission no later than thirty (30) days from the issuance date of the notice of ready for environmental analysis. DEPARTMENT OF ENERGY Dated: February 5, 2020. Nathaniel J. Davis, Sr., Deputy Secretary. Briar Hydro Associates, LLC; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process [FR Doc. 2020–02823 Filed 2–11–20; 8:45 am] lotter on DSKBCFDHB2PROD with NOTICES BILLING CODE 6717–01–P Federal Energy Regulatory Commission [Project No. 3342–023] a. Type of Filing: Notice of Intent to File License Application and Request to Use the Traditional Licensing Process. b. Project No.: 3342–023. c. Date Filed: November 29, 2019. d. Submitted By: Briar Hydro Associates, LLC (Briar Hydro). e. Name of Project: Penacook Lower Falls Hydroelectric Project. VerDate Sep<11>2014 17:03 Feb 11, 2020 Jkt 250001 PO 00000 Frm 00079 Fmt 4703 7995 Sfmt 4703 March 2020. May 2020. November 2020. December 2020. February 2021. May 2021. f. Location: On the Contoocook River, in Merrimack County, New Hampshire. No federal lands are occupied by the project works or located within the project boundary. g. Filed Pursuant to: 18 CFR 5.3 and 5.5 of the Commission’s regulations. h. Potential Applicant Contact: Andrew J. Locke, Essex Hydro Associates, LLC, 55 Union Street, Boston, MA 02108; (617) 357–0032; email—alocke@essexhydro.com. i. FERC Contact: Jeanne Edwards at (202) 502–6181; or email at jeanne.edwards@ferc.gov. j. Briar Hydro filed its request to use the Traditional Licensing Process on November 29, 2019. Briar Hydro provided public notice of its request on December 12, 2019. In a letter dated February 6, 2020, the Director of the Division of Hydropower Licensing E:\FR\FM\12FEN1.SGM 12FEN1

Agencies

[Federal Register Volume 85, Number 29 (Wednesday, February 12, 2020)]
[Notices]
[Page 7995]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-02823]



[[Page 7995]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2322-069]


Brookfield White Pine Hydro LLC; Notice of Application Tendered 
for Filing With the Commission and Establishing Procedural Schedule for 
Licensing and Deadline for Submission of Final Amendments

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: New Major License.
    b. Project No.: 2322-069.
    c. Date Filed: January 31, 2020.
    d. Applicant: Brookfield White Pine Hydro LLC (Brookfield).
    e. Name of Project: Shawmut Hydroelectric Project.
    f. Location: The existing project is located on the Kennebec River 
in Kennebec and Somerset Counties, Maine. The project does not affect 
federal lands.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r).
    h. Applicant Contact: Frank Dunlap, 150 Main Street, Lewiston, 
Maine 04240; (207) 755-5603.
    i. FERC Contact: Matt Cutlip, (503) 552-2762 or 
[email protected].
    j. This application is not ready for environmental analysis at this 
time.
    k. Project Description: The project consists of the following 
constructed facilities: (1) A 24-foot-high, 1,480-foot-long concrete 
gravity dam consisting of: (i) A 380-foot-long overflow section with 
hinged flashboards, (ii) a 730-foot-long overflow section with an 
inflatable bladder, (iii) 25-foot-wide sluice section; (iv) a non-
overflow section; and (v) a headworks containing 11 headgates that 
regulate flow into a forebay; (2) a 1,310-acre impoundment extending 
about 12 miles upstream; (3) two powerhouses adjacent to the forebay, 
separated by a 10-foot-high by 7-foot-wide Tainter gate and a 6-foot-
high by 6-foot-wide deep gate; (4) eight turbine-generating units; (5) 
a 300-foot-long tailrace; (6) 250-foot-long generator leads connecting 
the powerhouses with a substation; and (7) appurtenant facilities.
    Brookfield operates the project in a run-of-river mode and 
implements specific operating procedure to facilitate upstream and 
downstream fish passage at the project. Upstream passage for American 
eel is provided by a dedicated eel passage facility located adjacent to 
one of the powerhouses. There are no constructed upstream anadromous 
fishways at the project. Currently anadromous fish are captured and 
transported upstream of the Shawmut Project via a fish lift and 
transport system at the Lockwood Dam Hydroelectric Project No. 2574, 
located about 6 miles downstream. Downstream fish passage for American 
eel and anadromous fish at the Shawmut Project is provided via a 
combination of routing flows through the project's spillways, turbines, 
and other flow regulating equipment (e.g., Tainter gate between the 
powerhouses).
    l. Locations of the Application: A copy of the application is 
available for review at the Commission in the Public Reference Room or 
may be viewed on the Commission's website at https://www.ferc.gov using 
the ``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. For 
assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY).
    m. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. Procedural Schedule: The application will be processed according 
to the following preliminary Hydro Licensing Schedule. Revisions to the 
schedule may be made as appropriate.

------------------------------------------------------------------------
               Milestone                           Target date
------------------------------------------------------------------------
Notice of Acceptance/Notice of Ready    March 2020.
 for Environmental Analysis.
Filing of recommendations, preliminary  May 2020.
 terms and conditions, and fishway
 prescriptions.
Commission issues Draft Environmental   November 2020.
 Assessment (EA).
Comments on Draft EA..................  December 2020.
Modified terms and conditions.........  February 2021.
Commission issues Final EA............  May 2021.
------------------------------------------------------------------------

    o. Final amendments to the application must be filed with the 
Commission no later than thirty (30) days from the issuance date of the 
notice of ready for environmental analysis.

    Dated: February 5, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020-02823 Filed 2-11-20; 8:45 am]
 BILLING CODE 6717-01-P